Quartz_Creek_AOP_Culvert_Plans_Drawings.pdf
PDF 5 MB Posted
- Attached to
- Idaho Panhandle NF - Quartz Creek AOP Culvert Replacement Federal contract opportunity
- Solicitation number
- AG-02RC-S-16-0100
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Quartz_Creek_AOP_Culvert_334-0.1_FSSS_Specifications.pdf | ||
| Idaho_Panhandle_NF_-_Quartz_Creek_AOP_Culvert_RFP_(AG-02RC-S-16-0100).docx | DOCX document | |
| Quartz_Culvert_Location_Map.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AREA MAP
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE, REGION 1
PRIEST LAKE RANGER DISTRICT
IDAHO PANHANDLE NATIONAL FORESTS
BONNER COUNTY, IDAHO
QUARTZ CREEK
CULVERT REPLACEMENT
NFSR 334 MP 2.25
CONSTRUCTION PLANS FOR:
NORTHERN IDAHO LOCATION MAP
R 4W
R 5W
THIS
PROJECT
T57N
T58N
INDEX TO SHEETS
NO. DESCRIPTION
1 TITLE SHEET
ESTIMATED QUANTITIES &
GENERAL NOTES
ROAD TYPICAL SECTIONS,
POINTS & PROJECT CONTROL
4 ROAD PLAN & PROFILE
5 CULVERT GENERAL LAYOUT
6 EXCAVATION DETAILS
7 FOUNDATION DETAILS
8 PRECAST FOOTING DETAILS
9 STREAM DETAILS
STREAM DEWATERING
REQUIREMENTS
XS1 ROAD CROSS SECTIONS
MATERIAL SOURCES
GOVERNMENT FURNISHED
Waste Site
CONTRACTOR FURNISHED
Crushed Aggregate
Riprap
Coarse Granular Backfill for Geocell
Select Culvert Backfill
DISTRICT RANGER
FOREST ENGINEER
REVIEWED:
DATE
DATE
IDAHO PANHANDLE NATIONAL FORESTS
PRIEST LAKE RANGER DISTRICT
FOREST SUPERVISOR
DATE
IDAHO PANHANDLE NATIONAL FORESTS
RECOMMENDED:
APPROVED:
5711.07
QUARTZ CREEK
CULVERT REPLACEMENT
QUARTZ CREEK NO. 334 - 2.25
ESTIMATED QUANTITIES
K. GAUTHIER
K. GAUTHIER
C. THOMPSON
M. JENSEN
May-16
ITEM NO. ITEM DESCRIPTION
METHOD UNIT
MEASUREMENT
MOBILIZATION15101 Lump SumLSQ 1
PROJECT
TOTAL
CONSTRUCTION SURVEY AND STAKING15220 Lump SumLSQ 1
SOIL EROSION AND POLLUTION CONTROL
15713
Lump SumLSQ 1
DEWATERING15730 Lump SumLSQ 1
GEOCELL ABUTMENT STABILIZATION, 6" DEPTH
27201
Square YardCQ 98
EQUIPMENT RENTAL, HYDRAULIC EXCAVATOR WITH THUMB
62201 HourAQ 8
EQUIPMENT RENTAL, LARGE DUMP TRUCK
62202
HourAQ 8
SEEDING WITH MULCH, DRY METHOD
62503
Lump SumLSQ 1
REMOVAL OF EXISTING CULVERT20301 EachAQ 2
CRUSHED AGGREGATE, SURFACING, COMPACTION METHOD
30801
Cubic YardCQ 55
PRECAST CONCRETE MEMBER, CULVERT FOOTING553A02
Linear FootCQ 142
18' SPAN x 7'-8" RISE STRUCTURAL PLATE ARCH, 60304
Linear FootAQ 70
7GRADE CONTROL STRUCTURES, ROCK WEIR
64801
EachAQ
CONTRACTOR TESTING
15401
Lump SumLSQ 1
Cubic YardCQ 275CRUSHED AGGREGATE, SELECT CULVERT BACKFILL
20806
90PLACED RIPRAP, CLASS 4 (COMMERCIAL SOURCE)
25101
Cubic YardCQ
CQ= Contract Quantity; LSQ= Lump Sum Quantity; AQ= Actual Quantity
(COMMERCIAL SOURCE)
0.111" THICKNESS
(COMMERCIALL SOURCE)
Lump SumLSQ 1STRUCTURAL EXCAVATION
20812
1STREAMBED SIMULATION MATERIAL
64810
Lump SumLSQ
(AVAILABLE ON SITE)
CENTERLINE POINTS
CONTROL POINT TABLE
5711.07
QUARTZ CREEK
CULVERT REPLACEMENT
QUARTZ CREEK NO. 334 - 2.25
ROADWAY TYPICAL SECTIONS
K. GAUTHIER
K. GAUTHIER
C. THOMPSON
M. JENSEN
May-16
5711.07
QUARTZ CREEK
CULVERT REPLACEMENT
QUARTZ CREEK NO. 334 - 2.25
ROAD PLAN & PROFILE
K. GAUTHIER
K. GAUTHIER
C. THOMPSON
M. JENSEN
May-16
Q
U
A
R
T
Z
C
R
E
E
K
LAYOUT POINTS
Q
U
A
R
T
Z
C
R
E
E
K
5711.07
QUARTZ CREEK
CULVERT REPLACEMENT
QUARTZ CREEK NO. 334 - 2.25
CULVERT LAYOUT
K. GAUTHIER
K. GAUTHIER
C. THOMPSON
M. JENSEN
CULVERT REPLACEMENT
QUARTZ CREEK NO. 334 - 2.25
EXCAVATION DETAILS
K. GAUTHIER
K. GAUTHIER
C. THOMPSON
M. JENSEN
ESTIMATED QUANTITIES
CULVERT REPLACEMENT
QUARTZ CREEK NO. 334 - 2.25
FOUNDATION DETAILS
K. GAUTHIER
K. GAUTHIER
C. THOMPSON
M. JENSEN
May-16
STREAM SIDEFILL SIDE
1/4
CULVERT REPLACEMENT
QUARTZ CREEK NO. 334 - 2.25
PRECAST FOOTING DETAILS
K. GAUTHIER
K. GAUTHIER
C. THOMPSON
M. JENSEN
May-16
PLAN SECTION
ELEVATION
BOLTED ALTERNATE
ELEVATION
PLAN SECTION
WELDED ALTERNATE
ELEVATION
POST-INSTALLED ANCHORS ALTERNATE
CULVERT REPLACEMENT
QUARTZ CREEK NO. 334 - 2.25
STREAM DETAILS
K. GAUTHIER
K. GAUTHIER
C. THOMPSON
M. JENSEN
May-16
5711.07
QUARTZ CREEK
CULVERT REPLACEMENT
QUARTZ CREEK NO. 334 - 2.25
STREAM DEWATERING PLAN
K. GAUTHIER
K. GAUTHIER
C. THOMPSON
M. JENSEN
May-16
PUMP
PUMP
PUMP
PUMP
Q
U
A
R
T
Z
C
R
E
E
K