Quartz_Creek_AOP_Culvert_Plans_Drawings.pdf

PDF 5 MB Posted

Attached to
Idaho Panhandle NF - Quartz Creek AOP Culvert Replacement Federal contract opportunity
Solicitation number
AG-02RC-S-16-0100
Issued by
Department of Agriculture Forest Service R1-Northern Region

View the file

Other files for this federal contract opportunity

Other files attached to Idaho Panhandle NF - Quartz Creek AOP Culvert Replacement, newest first.
File Type Posted
Quartz_Creek_AOP_Culvert_334-0.1_FSSS_Specifications.pdf PDF
Idaho_Panhandle_NF_-_Quartz_Creek_AOP_Culvert_RFP_(AG-02RC-S-16-0100).docx DOCX document
Quartz_Culvert_Location_Map.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AREA MAP

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE, REGION 1

PRIEST LAKE RANGER DISTRICT

IDAHO PANHANDLE NATIONAL FORESTS

BONNER COUNTY, IDAHO

QUARTZ CREEK

CULVERT REPLACEMENT

NFSR 334 MP 2.25

CONSTRUCTION PLANS FOR:

NORTHERN IDAHO LOCATION MAP

R 4W

R 5W

THIS

PROJECT

T57N

T58N

INDEX TO SHEETS

NO. DESCRIPTION

1 TITLE SHEET

ESTIMATED QUANTITIES &

GENERAL NOTES

ROAD TYPICAL SECTIONS,

POINTS & PROJECT CONTROL

4 ROAD PLAN & PROFILE

5 CULVERT GENERAL LAYOUT

6 EXCAVATION DETAILS

7 FOUNDATION DETAILS

8 PRECAST FOOTING DETAILS

9 STREAM DETAILS

STREAM DEWATERING

REQUIREMENTS

XS1 ROAD CROSS SECTIONS

MATERIAL SOURCES

GOVERNMENT FURNISHED

Waste Site

CONTRACTOR FURNISHED

Crushed Aggregate

Riprap

Coarse Granular Backfill for Geocell

Select Culvert Backfill

DISTRICT RANGER

FOREST ENGINEER

REVIEWED:

DATE

DATE

IDAHO PANHANDLE NATIONAL FORESTS

PRIEST LAKE RANGER DISTRICT

FOREST SUPERVISOR

DATE

IDAHO PANHANDLE NATIONAL FORESTS

RECOMMENDED:

APPROVED:

5711.07

QUARTZ CREEK

CULVERT REPLACEMENT

QUARTZ CREEK NO. 334 - 2.25

ESTIMATED QUANTITIES

K. GAUTHIER

K. GAUTHIER

C. THOMPSON

M. JENSEN

May-16

ITEM NO. ITEM DESCRIPTION

METHOD UNIT

MEASUREMENT

MOBILIZATION15101 Lump SumLSQ 1

PROJECT

TOTAL

CONSTRUCTION SURVEY AND STAKING15220 Lump SumLSQ 1

SOIL EROSION AND POLLUTION CONTROL

15713

Lump SumLSQ 1

DEWATERING15730 Lump SumLSQ 1

GEOCELL ABUTMENT STABILIZATION, 6" DEPTH

27201

Square YardCQ 98

EQUIPMENT RENTAL, HYDRAULIC EXCAVATOR WITH THUMB

62201 HourAQ 8

EQUIPMENT RENTAL, LARGE DUMP TRUCK

62202

HourAQ 8

SEEDING WITH MULCH, DRY METHOD

62503

Lump SumLSQ 1

REMOVAL OF EXISTING CULVERT20301 EachAQ 2

CRUSHED AGGREGATE, SURFACING, COMPACTION METHOD

30801

Cubic YardCQ 55

PRECAST CONCRETE MEMBER, CULVERT FOOTING553A02

Linear FootCQ 142

18' SPAN x 7'-8" RISE STRUCTURAL PLATE ARCH, 60304

Linear FootAQ 70

7GRADE CONTROL STRUCTURES, ROCK WEIR

64801

EachAQ

CONTRACTOR TESTING

15401

Lump SumLSQ 1

Cubic YardCQ 275CRUSHED AGGREGATE, SELECT CULVERT BACKFILL

20806

90PLACED RIPRAP, CLASS 4 (COMMERCIAL SOURCE)

25101

Cubic YardCQ

CQ= Contract Quantity; LSQ= Lump Sum Quantity; AQ= Actual Quantity

(COMMERCIAL SOURCE)

0.111" THICKNESS

(COMMERCIALL SOURCE)

Lump SumLSQ 1STRUCTURAL EXCAVATION

20812

1STREAMBED SIMULATION MATERIAL

64810

Lump SumLSQ

(AVAILABLE ON SITE)

CENTERLINE POINTS

CONTROL POINT TABLE

5711.07

QUARTZ CREEK

CULVERT REPLACEMENT

QUARTZ CREEK NO. 334 - 2.25

ROADWAY TYPICAL SECTIONS

K. GAUTHIER

K. GAUTHIER

C. THOMPSON

M. JENSEN

May-16

5711.07

QUARTZ CREEK

CULVERT REPLACEMENT

QUARTZ CREEK NO. 334 - 2.25

ROAD PLAN & PROFILE

K. GAUTHIER

K. GAUTHIER

C. THOMPSON

M. JENSEN

May-16

Q

U

A

R

T

Z

C

R

E

E

K

LAYOUT POINTS

Q

U

A

R

T

Z

C

R

E

E

K

5711.07

QUARTZ CREEK

CULVERT REPLACEMENT

QUARTZ CREEK NO. 334 - 2.25

CULVERT LAYOUT

K. GAUTHIER

K. GAUTHIER

C. THOMPSON

M. JENSEN

CULVERT REPLACEMENT

QUARTZ CREEK NO. 334 - 2.25

EXCAVATION DETAILS

K. GAUTHIER

K. GAUTHIER

C. THOMPSON

M. JENSEN

ESTIMATED QUANTITIES

CULVERT REPLACEMENT

QUARTZ CREEK NO. 334 - 2.25

FOUNDATION DETAILS

K. GAUTHIER

K. GAUTHIER

C. THOMPSON

M. JENSEN

May-16

STREAM SIDEFILL SIDE

1/4

CULVERT REPLACEMENT

QUARTZ CREEK NO. 334 - 2.25

PRECAST FOOTING DETAILS

K. GAUTHIER

K. GAUTHIER

C. THOMPSON

M. JENSEN

May-16

PLAN SECTION

ELEVATION

BOLTED ALTERNATE

ELEVATION

PLAN SECTION

WELDED ALTERNATE

ELEVATION

POST-INSTALLED ANCHORS ALTERNATE

CULVERT REPLACEMENT

QUARTZ CREEK NO. 334 - 2.25

STREAM DETAILS

K. GAUTHIER

K. GAUTHIER

C. THOMPSON

M. JENSEN

May-16

5711.07

QUARTZ CREEK

CULVERT REPLACEMENT

QUARTZ CREEK NO. 334 - 2.25

STREAM DEWATERING PLAN

K. GAUTHIER

K. GAUTHIER

C. THOMPSON

M. JENSEN

May-16

PUMP

PUMP

PUMP

PUMP

Q

U

A

R

T

Z

C

R

E

E

K

File details come from the government source that posted it. Updated .