RedRiverLagoon_Sand_Decom_Plans.pdf
PDF 6 MB Posted
- Attached to
- Red River Lagoon Filter Decommissioning Federal contract opportunity
- Solicitation number
- AG-02RC-S-16-0077
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMEND_001_RR_LAGOON.pdf | ||
| Amendment_001_S-16-0077.pdf | ||
| RedRiverDecom_FSSSpecs.docx | DOCX document | |
| Nez_Perce-Clearwater_NF_Red_River_Lagoon_Filter_Decomm_(AG-02RC-S-16-0077).doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E
F
M
E
F
M
E6S
E S
E
S
E
S
E S
E
S
E 6S
E S
E S
E 6S
E
S
E
S
E
S
E
S
E
S
E S
E S
E S
E S
E S
E S
E
S
E
S
E S
E S
E S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
F
M
E
F
M
E
F
M
E
F
M
E
S
E
S
E
S
E
S
E
S
E S
E S
E S
E S
E
S
E
S
E
S
E
S
E
W
E
W
E
W
E
W
E
W
E
W
E W
E W
E
W
E
W
E
W
E
W
E
W
E W
E W
E W
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
O
H
P
P
P
P
P
P
P
P
P
P
P
T.V.
T.V.
P
T
P
T
T
T
T
T
P
T
T
P
P
P
P
P
P
P
P
P
P
P
P
P
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E 4S
E S
E
W
E
W
E4W
E
W
E W
E W
E W
E W
E W
E W
E W
E
W
E W
E W
E
W
E
W
E
W
E4W
E4W
E
W
E
W
E
W
E
W
E
W
E
W
E W
E W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E W
E W
E
W
E
W
E
W
E W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W E
W
E
W
E W
E W
E
W
E
W
E
W
E S
E
W
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
E
E
E
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
A
A
A
A
A
A
E
W
E
W
E
W
E
F
M
E
F
M
E
F
M
E
F
M
E
F
M
E
F
M
E
F
M
E
F
M
E
F
M
E
F
M
E
F
M
E
F
M
E
W
E
W
E
W
E W
E2W
E2WE2W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E18W E18W
E W
E
W
E
W
E
W
E
S
E
S
E
W
P
S
MH
MH
MH
MH
MH
MH
W
W
W
W
W
W
W
W
W
W
W
1W
W
W
W
W
4W
4W
W
W
W
W
W
W
W
W
W
W
W
1W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
2W
W
W
W
W
W
W
W
W
W
W
4W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
4W
4W
4W
W
W
W
W
W
W
W
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
6S
6S
6S
6S
6S
6S
6S
6S
6S
S
S
S
S
S
S
S
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
F
M
4FM
4FM
4FM
4FM
4FM
4FM
4FM
4FM
4FM
4FM
4FM
4FM
4FM
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
F
M
F
M
F
M
F
M
E
E
E
E
PROJECT:
SHEET TITLE:
SHEET NO.
R E
G I O
N
O
N E
F O
R E
S T
R
V I C
E
O
A
G R
I C
U L T
U R
E
C L E
A R
W A
T E
R
U S
D
E P
A R
T M
E N
T
N A
T I O
N A
L
F
O R
E S
T S
D
ES
IG
N
ED
C
HE
C
KE
D
D
RA
W N
SU
BM
ITT
ED
A
PP
RO
V
ED
D
ES
IG
N
ED
C
HE
C
KE
D
D
RA
W N
N
Z
P
R
C
PROJECT SIGHT
MAP
S.
G
RA
V
ES
3/
C . W
O
LF
FI
N
G
C . W
O
LF
FI
N
G
1/
1/
RED RIVER WC
LAGOONS &
FILTER DECOM
Existing Lagoons
Ditch to River
R e d
R i v e r
C o u n t y o a
C o u n a
C o u n t y
R o a d
S o u h r k v e r
Sand Filter
New Operational
Leach Field
Bunk Houses
Old Ranger
Station
State Fish Rearing
Public Pond
Fire Buildings
New Sewer System
(Typ.)
Not to Scale
Control House
Demolition Notes:
General Notes:
1. The schedule for demolition of the lagoons and sand filters is anticipated to begin in the summer and/or fall of 2016. The IDEQ and
Idaho Heal District will be notified prior to construction work.
2. A pre-closure meeting will be held with the
IDEQ prior to the project start date.
3. The Contractor shall submit a demolition plan for approval of the CO prior to commencement of construction work.
4. Structures/Equipment to be Removed:
A. Lagoons - The lagoon cells will be drained.
Any sludge, membrane liners and other above grade structures and piping will be removed and disposed of properly offsite.
Any below grade piping will be capped and abandoned in place.
B. Sand Filter - The membrane liner shall be removed and disposed properly offsite along with equipment/piping above grade will be properly disposed of offsite, Below grade piping will be capped and abandoned in place.
5. The Contractor is responsible to cap or plug all cut and abandoned sewer pipes during or as a result of this project.
The new sewer system structures and existing utilities shown are from the Red
River Waste Water Collection and Treatment
Project. Locations of items shown are approximate.
v
Q u a r
M
F
M
F
M
4FM 4FM
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
F
M
E
F
M
EFM
EFM
EFM
EFM
EFM
EFM
EFM
EFM
EFM
EFM
EFM
EFM
E
F
M
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
S
E
W
E
W
E 1W
E 1W
E 1W
E 1W
E 1W
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
E
W
W
W
W
W
W
W
W
W
W
W
W
W
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
PROJECT:
SHEET TITLE:
SHEET NO.
R E
G I O
N
O
N E
F O
R E
R
V I C
E
R
I C
U L T
U R
E
C L E
A R
W A
T E
R
U S
D
E P
A R
T M
E N
T
N A
T I O
N A
L
F
O R
E S
T S
D
ES
IG
N
ED
C
HE
C
KE
D
D
RA
W N
SU
BM
ITT
ED
A
PP
RO
V
ED
D
ES
IG
N
ED
C
HE
C
KE
D
D
RA
W N
N
R
PROPOSED
DECOMMISSIONING
PLAN
SHEET 1
S.
G
RA
V
ES
3/
C . W
O
LF
FI
N
G
C . W
O
LF
FI
N
G
1/
1/
RED RIVER WC
LAGOONS &
FILTER DECOM
NEW 4" FORCE MAIN
NEW EFFLUENT PUMP
STATION
4" PVC
EFFLUENT
SEWER
NEW 4" EFFLUENT SEWER
CONNECT 4" S TO
EXIST. 3" SEWER
NEW SEPTIC TANKS, LIFT
STATION AND VALVE VAULT
4"S
REPLACE EXISTING SERVICE DISCONNECT
AND METER WITH A NEW SERVICE
DISCONNECT AND METER.
NEW ELECTRIC
SERVICE PER
S
F
M
" F
M
Lagoon Effluent Line
Existing
Power Line
Grade to Drain To
Existing Flat Bottom Ditch and to field on east Grade to
Drain
General Notes:
1. Soil stockpiled at the Red River
Quarry will be used to fill the lagoons to a grade that allows for drainage into the adjacent grass lined flat bottom ditch. Any below grade piping will be capped and remain in place.
2. Sand in the sand filter will be salvaged and used as fill material at for the sand filter after removal of the membrane. The difference in fill needed to bring the filter area to grade to drain will be from the soil stockpiles at the Red River Quarry.
Cap outlet pipe of sand filter and fill in adjacent abandoned manhole with
"- chips as directed by the
CO. Manhole work incidental to
Item 20401.
3. All disturbed areas shall be seeded once final grade has been reached for the lagoons and sand filter.
Total Volume of Fill Soil:
2,140 CY
Approx. Disturbance Area:
0.5 Acres
Main Source for Fill Source:
Red River Quarry.
Backup Source: Stockpiles of Soil
Highway 14 near Crooked River
Road (County Road 233) turnout.
Note: Original background plans are the original lagoon design plans prepared the Forest Service in 1978. Locations of structure are approximate and may vary from what is on the ground.
The new sewer system structures shown are from the Red River
Waste Water Collection and
Treatment Project. Locations of items shown are approximate.
Northern Lagoon Volume
Imported Soil needed to fill to grade: 1,020 CY
Southern Lagoon Volume
Imported Soil needed to fill to grade: 1,020 CY
Sand Filter Volume
Imported Soil needed to fill to grade: 98 CY
Grass Lined Ditch which will be graded to.
South Fork of Red River
Not to Scale
Excavate Embankment and use for fill.
Remove and dispose fence
Mound slightly
Grade to Drain
Manhole to be filled in with minus chips
PROJECT:
SHEET TITLE:
SHEET NO.
R E
G I O
N
O
N E
F O
R E
R
V I C
E
R
I C
U L T
U R
E
C L E
A R
W A
T E
R
U S
D
E P
A R
T M
E N
T
N A
T I O
N A
L
F
O R
E S
T S
D
ES
IG
N
ED
C
HE
C
KE
D
D
RA
W N
SU
BM
ITT
ED
A
PP
RO
V
ED
D
ES
IG
N
ED
C
HE
C
KE
D
D
RA
W N
N
R
S.
G
RA
V
ES
3/
C . W
O
LF
FI
N
G
C . W
O
LF
FI
N
G
1/
1/
RED RIVER WC
LAGOONS &
FILTER DECOM
PROPOSED
DECOMMISSIONING
PLAN
SHEET 2
2-4%
Grade to Drain
Structures to be
Removed and disposed offsite (Typ.)
Sand to be salvaged
Soil imported from Red River Quarry (Typ)
Note: Original background plans are the original lagoon design plans prepared the Forest Service in 1978. Locations of structure are approximate and may vary from what is on the ground.
Grass Lined Ditch which will be graded to (Typ.)
0+20
0+50
0+80
1+10
1+40
1+70
2+00
2-4%
Use Embankment material to fill in lagoons
Mound slightly
2-4%
2-4%
2-4%
2-4%
File details come from the government source that posted it. Updated .