BuckskinSolicitation.pdf
PDF 751 KB Posted
- Attached to
- IPNF - Common Stand Exam (CSE) Buckskin Saddle Federal contract opportunity
- Solicitation number
- AG-02RC-S-15-0092
About this file
Buckskin Saddle CSE Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AmendmentBuckskinCSEpg8.pdf | ||
| BuckskinStandList.xlsx | XLSX spreadsheet | |
| WD95-0228Rev33.pdf | ||
| WorkersCompForm.docx | DOCX document | |
| SampleDesigns.doc | DOC document | |
| TolerancesStandards.docx | DOCX document | |
| VicinityMap.jpg | JPG image | |
| RelevantPastPerformanceExperience.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE 1 OF 31 Offeror to complete blocks 12, 17, 23, 24, & 30
2. CONTRACT NO.
3. AWARD/
EFFECTIVE DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION
ISSUE DATE
AG-02RC-S-15-0092 06/04/2015
7. FOR SOLICITATION
a. NAME b. TELEPHONE (No Collect Calls) 8. OFFER DUE
INFORMATION CALL Marion Daniel (Contracting)
Jamie Wynsma (Technical)
(208) 765-7282
(208) 267-6763
COB:
06/18/2015
9. ISSUED BY (MAIL ,EMAIL, OR FAX OFFERS
TO)
CODE 10. THIS ACQUISITION IS
UNRESTRICTED
SET-ASIDE. 100%
FOR
SMALL
BUSINESS,
HUBZONE SMALL
BUSINESS
8(A)
SOLE SOURCE
NAICS: 115310
SIZE STANDARD: 7mil.
11. DELIVERY FOR
FOB DESTINATION
UNLESS BLOCK IS
MARKED.
12. DISCOUNT TERMS
Idaho Panhandle National Forest
3815 Schreiber Way
Coeur d’Alene, ID 83815
Fax: 208-765-7229
SEE SCHEDULE
13a. THIS CONTRACT IS A RATED
ORDER
UNDER DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO: CODE 16. ADMINISTERED BY CODE
Bonners Ferry Ranger District
6286 Main Street
Bonners Ferry, Idaho 83805
Idaho Panhandle National Forest
3815 Schreiber Way
Coeur d’Alene, ID 83815
17a.
CONTRACTOR/OFFEROR
CAGE FACILITY
CODE
18a. PAYMENT WILL BE MADE BY CODE IPP
DUNS#___________________________
EMAIL___________________________
TELEPHONE:_____________________
All invoices will be processed using the Department of
Treasury’s Invoice Processing Platform (IPP). Visit www.ipp.gov to learn more. Contractors must follow the instructions on how to register and submit invoices via
IPP.
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH
ADDRESS IN OFFER :
IS CHECKED: SEE ADDENDA
19.
ITEM NO,
20.
ESTIMATED
ACRES
21.
UNIT OF
MEASURE
22.
ESTIMATED PLOT
QUANTITY
23.
UNIT PRICE
24.
TOTAL AMOUNT
001 CSE OG Plots
Buckskin Saddle
PLOTS
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28.
CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ORIGINAL TO ISSUING OFFICE.
CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
29.
AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION (BLOCK 5), DATED
(BLOCK 30c) INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING
OFFICER)
30b. NAME AND TITLE OF SIGNER (TYPE OR
PRINT)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER 31c. DATE
SIGNED
MARION P. DANIEL
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (Rev. 2/2012) PREVIOUS EDITION IS NOT USABLE Prescribed by GSA FAR (48 CFR) 53.212 http://www.ipp.gov/
IPNF NZ Buckskin Saddle CSE – Commercial Item Page 2 of 31
PERFORMANCE WORK STATEMENT
Scope of Contract. The scope of the contract is to furnish all labor, tools, equipment, transportation, and incidentals necessary to conduct statistically sound stand examinations with which management determination for the stands will be made. The work performed and the data collected shall be in compliance with terms, specifications, conditions, and provisions of the contract and the Common Stand Exam Field Guide for Region 1
(R1 March 2015) hereafter known as "R-1 CSE Handbook." If the contract specifications differ from the R-1
CSE Handbook the contract shall take precedence.
Collected data shall be submitted to the Forest Service on the Common Stand Examination Cover Sheet with accompanying map of plot locations, and in electronic format. The electronic copy will be produced by either transcribing field data sheets into the PCEXAMS software on a laptop or desktop PC, or by direct input into the
EXAMS software on a personal data recorder (PDR) in the field at the time of exam. For each stand surveyed, the Contractor shall submit a Common Stand Exam Cover Sheet with narrative write-up, a stand map detailing plot locations, and an electronic stand data file.
Copies or printouts of aerial photos of the project areas are available for inspection and will be made available to the successful offeror as provided in the Government Furnished Property.
Habitat Type information shall be identified in accordance with Forest Habitat Types of Northern Idaho:
Second Approximation.
Plant species shall be identified by using the Field Guide to Forest Plants of Northern Idaho, General Technical
Report INT-180. In the case of a question about species identification, Flora of the Pacific Northwest (1973), by C. Leo Hitchcock and Arthur Cronquist shall be the final authority. Most plant species in the contract will be those species found in the CSE Field Guide for Region 1, Appendix H and the Kaniksu, St. Joe, and Coeur d'Alene Threatened, Endangered, and Sensitive Plants and Forest Species of Concern by Rare Plant Habitat
Guild (October 2004).
Insect and Disease identification will be limited to those agents, pests, and diseases listed in the disturbance tables found in the R-1 CSE Handbook, and the Field Guide to Diseases and Insect Pests of Northern and
Central Rocky Mountain Conifers by Susan K. Hagle, Kenneth E. Gibson, and Scott Tunnock (2003).
Plot locations shall have GPS coordinates recorded and an electronic file given to Contracting Officer’s
Representative (COR). The plot location shall be projected into the coordinate system Datum NAD 1983
Conus. Settings shall be: Latitude and Longitude (Degrees: DD/MM/SSss), North Reference – True.
LOCATION AND DESCRIPTION
Project Location. This Solicitation is for Common Stand Exam (CSE) Plots on the North Zone (NZ) of the
Idaho Panhandle National Forests (please see note under B-3 as to what is included in the NZ). See in the attached documents for Project Area Vicinity Maps. Individual stand locations shall be delineated on Contract
Work Maps, which shall be furnished to the successful offeror at the scheduled pre-work meeting. Copies of aerial photos or computer generated images shall be provided upon Contractor request.
Accessibility. The project area may be accessed by Forest roads during the normal operating season. The
Government assumes no obligation to plow snow or do special maintenance to keep roads open. Individual stands are accessible by some combination of 2 or 4-wheel drive vehicle, motorcycle/ATV, mountain bicycle, horse, or foot travel.
IPNF NZ Buckskin Saddle CSE – Commercial Item Page 3 of 31
The Contractor shall be responsible for obtaining all necessary permission through privately owned land to gain access to stand locations. If the Contractor cannot obtain permission to access a stand location, the Contractor must notify the Government in writing within five (5) calendar days of denied access.
Accessibility may be determined from aerial photos and maps furnished by the Government. Contractor shall be responsible for adhering to the U.S. Forest Service travel management plans for all Ranger Districts and the
Idaho Panhandle National Forests. For roads and trails not designated for public motorized access District
Rangers may, in writing, grant limited use authorizations upon request of the Contractor. Requested use must be limited to short term use for purpose of accessing stands to be surveyed under the contract. All requests for motorized travel of closed roads by the Contractor must be submitted in writing to the COR. Requests shall specifically identify roads needed for access and the periods of time when use will occur. Gates in the contract area may be locked due to threatened and endangered species. A double lock system shall be provided for gates where the Contractor access has been authorized. Accessibility, depending on the season will be limited to number of trips. One vehicle equals one trip: Spring, April 1 st
– June 14 th = 19 trips; Summer, June 15 th
September 14 th
= 23 trips; Fall, September 15 th
- November 14 th
= 15 trips. The number of trips will be coordinated with other Forest Service Personnel and other Government Agencies and will not exceed the allotted amount of time. The Contractor will be responsible to ensure that the gates remain closed and locked at all times during their use.
Contractor shall request industrial camping authorization in writing within five (5) calendar days of camping date, specifying location, duration, and dates of use. Requests to camp behind locked gates will be assessed on a case-by-case basis. Authorization will require a camping permit issued by the Ranger District. No access to
Contractor or Contractor’s employees will be allowed behind locked gates after periods of work unless a valid camping permit has been authorized. Motorized access behind locked gates will generally not be permitted during hunting season for deer, elk, or bear. Requests may be considered on a case-by-case basis and may be authorized at the discretion of the District Ranger. Otherwise, Contractor shall adjust work schedule to take the closure time into consideration. No Suspend Work Orders will be issued; contract time will run during this period. Any misuse of gates may constitute loss of privileges.
TECHNICAL SPECIFICATIONS
Qualifications. The success of the field inventory is dependent primarily on the Contractor's professionalism and expertise. It is necessary that the Contractor's staff meet certain standards. Minimum technical qualifications are specifically defined as follows:
1. Each crew member must have a crew leader with undergraduate courses in mensuration, tree identification, plant identification, silviculture, ecology, and three (3) months prior experience collecting data for forest inventory or vegetation classification, preferably in the Pacific Northwest.
2. Other crew members must have undergraduate courses in mensuration and tree identification.
3. Each crew member must be able to satisfactorily interpret aerial photographs. Specific technical experience may be substituted for a given educational requirement.
The Contractor shall designate a crew leader for each crew. The crew leader shall be the individual responsible for ensuring plot measurements are taken in accordance with the accuracy standards.
The Contractor, by signing an offer, agrees to use only personnel meeting the qualifications for performance of the work specified herein. The Government reserves the right to make determination of employees' qualifications and any employee who does not meet the above described qualifications may be requested to leave the worksite with resubmission of any data supplied by that employee.
IPNF NZ Buckskin Saddle CSE – Commercial Item Page 4 of 31
Procedures and Standards.
1. At the pre-work meeting, the Contractor shall submit for the approval of the Contracting Officer (CO), a written Resource Plan specifying the resources (including people, equipment, and other factors) the Contractor shall use as well as the rate of progress the Contractor proposes to achieve. To be acceptable, the plan shall be reasonable in its detail and shall meet or exceed the rate of performance. Any modification to the plan shall be subject to the approval of the CO.
2. The Contractor shall identify plot center with a marker that can be a No. 9 wire flag, wooden stake, or native material. The marker shall extend a minimum of 12 inches above the ground. Flagging tied to the marker shall have the plot number, date, and examiner's initials written in grease pencil or waterproof maker.
Where Down Woody Material transects occur, Contractor shall also identify the end of the Down Woody
Materials transect with a marker similar to the plot center marker. The flag on the marker shall be labeled
"DWM."
3. Two pieces of flagging shall be hung near plot center as topography and available vegetation allow. The flagging shall be at least five (5) feet above the ground, 12" long, and reasonably visible within the area. Write the stand number, plot number, date, and examiner's initials on the flagging.
4. The Contractor shall maintain the rate of progress specified in the Contractor's Work Plan and Schedule.
The minimum acceptable rate of progress shall occur when the percent of work completed is within ten (10) percent of the time used.
5. When work performance of a crew is deficient, the Contractor shall correct the deficiencies before proceeding with any new work.
Plot Location and Establishment. The Contractor shall locate and evenly distribute plots throughout the stand on a systematic, unbiased basis from plot counts provided on the Detailed Unit List. Locate and identify these accurately on the provided stand (contour) map.
The Contractor shall navigate to plot centers using any method that maintains the accuracy standard for plot location, in accordance with the R1-CSE Handbook. Plot number 1 will be used to calculate all plot locations within the stand.
Flagging shall be used to facilitate the location of a plot or the relocation of a plot in order to check the original measurement. The COR and Contractor will jointly select the color of flagging to be used.
Flagging shall be provided by the Contractor and shall be biodegradable unless otherwise specified by COR.
Flagging shall be at least 12 inches long after tying.
Starting points (and reference points as needed) shall be established from survey markers, roads, lakes, and other reliable surface features. A minimum of one reference point per stand shall be established. Plots from adjacent stands shall not be used as reference points. Record the GPS reading for starting points (and reference points as needed) on the stand (contour) map.
Route to plot center shall be marked as follows:
a. Start of transect – three (3) ribbons at least five (5) feet above the ground with the stand number, date, azimuth and distance to the specified plot written on one ribbon.
b. Abrupt Change in Direction – Two (2) ribbons at least five (5) feet above the ground with the new azimuth, and distance to the next plot written on one ribbon.
IPNF NZ Buckskin Saddle CSE – Commercial Item Page 5 of 31
c. Remainder of Route – Single ribbons placed visibly, not to exceed one chain apart.
d. When the line of travel between two (2) plot centers crosses a road or trail, the closest plot number, azimuth, and distance shall be put on flagging on at least one side of the road.
No plot center shall be located within one chain of the stand boundaries.
Plot Acquisition Standards – GPS. The Contractor shall use a GPS unit capable of meeting the R1-CSE
Handbook GPS Requirements, including the ability to calculate the specified position averaging, to acquire the coordinates for each plot center in accordance with the tolerances and standards set forth for plot location and plot data in Appendix C.
The Contractor shall set up the GPS receiver and any related software as follows:
Geodetic Datum: NAD 1983 (Conus)
Coordinate System: Latitude/Longitude (DD.mm'ss.s")
North Reference: True
Declination: Auto
Plot Acquisition Data Collection – GPS. The Contractor shall acquire the daily almanac and assure a current position fix of three dimension "3D" status (four (4) or more satellites). Once the daily almanac has been collected the Contractor shall proceed to navigate.
Once the plot center has been located the Contractor shall collect a minimum of four (4) minutes of averaging.
While acquiring, the GPS unit must not move as satellite signals are continuously received. The emphasis of this mode is on high accuracy and stability in the position solution.
Once at least five (5) minutes of positional data have been collected the Contractor shall enter the latitude and longitude values on the appropriate fields on the Plot Data screen/form.
When the Contractor cannot record the latitude and longitude readings for any reason in the current position, a position from a documented reference point shall be used with the distance and azimuth between used to calculate the needed latitude and longitude.
Stand Examination Instruction. The Contractor shall establish, measure, and record data using variable and fixed radius subplots in accordance with the R-1 CSE Handbook. As stipulated by the contract, data shall be collected to complete the Setting Form, the Plot Data Screen/Form, the Tree Data Screen/Form, the Vegetation
Composition Data Screen/Form (if required), and the Down Woody Materials Data Screen/Form (if required) as specified in Section E. INSPECTION AND ACCURACY REQUIREMENTS.
The Contractor shall limit disease and insect identification to those agents, pests, and diseases listed in the attachment Tolerances and Standards and in Damage Categories, Agents, and Severity Ratings found in the R-1
CSE Handbook.
1. Setting Data
The Setting Data contains data about the overall stand and the narrative write-up. A narrative write-up on the
Setting Form is required for all stands. The stand examiner's view of current conditions in conjunction with the quantitative data can contribute towards the development of a more accurate mental image of the stand during diagnosis and prescriptive analysis. The Contractor shall complete one Setting Form for each stand.
IPNF NZ Buckskin Saddle CSE – Commercial Item Page 6 of 31
2. Sample Design
The Sample Design contains information about how the data was collected, which trees, shrubs, and down woody pieces are measured, and how the measurements will be converted into per-acre values. The sample design describes what kinds of plots are installed, such as fixed or variable radius. It defines the size of each type of plot and what will be collected on that plot. Each stand requires the completion of one Sample Design
Screen/Form. All fields are required. Valid Sample Designs are provided by the Government (see Appendix
A).
The Contractor shall enter the Sample Design used in the Sample Design Screen/Form.
The Government has identified the Basal Area Factor (BAF) for each stand (see Detailed Unit List).
3. Plot Data
The plot data contains information about a sample plot. This information is independent of the information collected on other forms. Record a separate set of plot data for each plot in the stand. Required fields are
Latitude, Longitude, Capable Growing Area, Plot Aspect, Plot Slope, Plot Potential Vegetation, and Residual
Descriptive Code (Fuel Photo Series). Plot Remarks is an optional field, but encouraged. Slope correction shall be calculated for any fixed radius plots on slopes greater than 10%.
A 1/10th acre fixed plot (37.2' radius) shall be used to determine the Plot Potential Vegetation (aka Habitat
Type). Habitat Types shall be identified to phase for each plot in accordance with instructions and descriptions in Forest Habitats of Northern Idaho: A Second Approximation. Canopy coverage terms for use in the contract are defined below:
"Depauparate": Unusually sparse undergrowth conditions resulting from dense shading or thick duff. This situation requires the adjustment of canopy coverage values in the key to the next lower class (for instance, "well represented" becomes "common”), or extrapolation from the nearest non-depauparate condition occurring on a nearby comparable site.
"Present": As applied to trees or large shrubs, requires at least 10 per acre, well scattered through the area, not restricted to microsites. "Present" as applied to low shrubs and herbaceous plants requires scattered individuals throughout the area, usually five (5) or more individuals or clumps per 1/10th acre, not restricted to microsites.
"Microsites" are small areas that influence the plant community in a way not typical of the stand, most often by providing cover and moisture holding markedly different from what is characteristic of the stand in general. Examples include wind-throw pockets, stump holes, seeps, well-rotted logs, or excessively rocky areas.
4. Tree Data
The Tree Data contains information about every individual tree or group of trees on an individual plot. A "Plot" is comprised of a Variable radius plot and a 1/300th acre fixed plot, both originating at plot center.
1/300th Acre Fixed Plot: The small tree fixed plot tallies live trees with diameters less than the breakpoint
DBH (normally 5.0" DBH). Measurable trees on the fixed plot include live trees greater than .5' in height and dead trees greater than 3.0" DBH. Both live and dead trees less than 5.0" DBH are grouped per IPNF Old
Growth Protocol (see Section C-4 Data Collection Specifications, Tree Data).
Variable Plot: Basal Area Factor (BAF) for each stand is provided in Appendix B, Detailed Unit List.
IPNF NZ Buckskin Saddle CSE – Commercial Item Page 7 of 31
Tally all live and dead trees > 5.0" DBH, starting with an azimuth of 0 o and proceeding in a clockwise direction.
If two (2) or more "in" trees lie in a straight line along the azimuth, the tree nearest to plot center shall be recorded first. A tree with less than 45 o lean shall be considered standing and be recorded. A tree with more than 45 lean shall be considered down and not be recorded.
5. Vegetation Composition Data & Ground Surface Cover
A 1/100th acre fixed radius plot shall be used to collect all vegetation data related to these forms. The
Vegetation Composition Data form records detailed information about shrubs and herbaceous plants on the plot.
The Ground Surface Cover form records actual surface cover characteristics of the plot.
6. Down Woody Material Data
This form records the dead woody material on a plot. Down Woody Material shall be measured following the
Browns Protocol Method procedures outlined in the R-1 CSE Handbook, section 7, with R-1 CSE Handbook
Appendix S, Down Woody Materials.
The Browns transect shall originate at plot center and extend seven (7) feet for tallied twigs with a diameter of
2.9" and smaller, and 27 feet (20 feet beyond the twig transect) for down woody material 3.0" diameter and larger.
Cardinal direction photos will be taken in conjunction with the down woody collection. Start at North, work in a clockwise manner, and produce a photo at each cardinal direction. Photos shall be clear and readable by
Government pc computers running Microsoft Windows 7 operating system.
Recording Instructions. The Contractor shall submit to the Government:
One Stand Examination Cover Sheet with narrative write-up for each stand.
One stand map with plot locations marked for each stand.
One (or more) electronic .cse files containing field data for all stands with submitted cover sheet and map. This is the file created by entering field data into the provided EXAMS/EXAMSPC software.
Acceptable methods of electronic data submission are by MS-DOS formatted compatible double-sided, double-density, 3.5” floppy disk, stick drive and CD-R disk or by E-Mail specified by the COR, with files written in the specified ExamsPC Software file format, .cse and pre-audited for any errors. In any case, data must be readable by the Government's computers running the Microsoft Windows 7 operating system (or a future upgraded system should one occur during the life of the contract). No adjustments will be made due to program errors that result in data errors or loss of data.
DATA COLLECTION SPECIFICATIONS
This section describes, in detail, the fields to be completed for each data collection screen or form. Data collection is per CSE Quick Plot Protocols.
Setting Data. A setting is normally a stand in which the stand exam is being done. Following is a list of data fields required for each setting, the source, and the default value (if one exists).
Field Name Requirement Data Source Default Value
Project Name Required Government 2015 Buckskin
Saddle OG
Proclaimed Region Required Government 01
Proclaimed National Forest Required Government 04
District Required Government 06/03
Location Required Government
IPNF NZ Buckskin Saddle CSE – Commercial Item Page 8 of 31
Stand Number Required Government
Date Required Contractor
Examination Level Required Government 1000
Exam Purpose Required Government SE
Existing Vegetation Composition Type* Optional Contractor
Potential Vegetation Reference Required Government 110
Potential Vegetation Required Contractor
Structure* Optional Contractor
Capable Growing Area Required Contractor
Elevation Required Contractor
Aspect Required Contractor
Slope Required Contractor
Acres Required Contractor
Fuel Photo Reference Required Contractor
Examiner Required Contractor
Precision Protocol Required Government CSE_Q
* Individual projects may specify these fields be recorded, otherwise they are not required.
Many of these fields exist on the Common Stand Exam Cover Sheet as well as the Setting Data entry screen in the exams software. Both forms must be filled out completely. Detailed information and lists of valid codes for each data field are found in the R1-CSE Handbook section 9 and Appendices.
Sample Design Data. The Sample Design describes the methods in which plots are taken and data is sampled.
It is the most important screen of the data entry process- an error on the Sample Design screen will cause ALL stand data to be incorrect when loaded into the FSVeg Database. Valid Sample Designs are provided by the government; See Appendix A. It is important to fill the Sample Design screen carefully with the values provided in Appendix A.
Plot Data. The following items are required to be recorded for each plot. The Exams software will automatically number the plots. The Contractor must insure that plot numbers match the actual plot locations on the stand contour map.
Field Name Requirement Data Source
Latitude (DD/mm’/ss.s”) Required Contractor
Longitude (DD/mm’/ss.s”) Required Contractor
Capable Growing Area Required Contractor
Aspect Required Contractor
Slope Required Contractor
Potential Vegetation Required Contractor
Residual Descriptive Code Required Contractor
Plot Remarks Not Required Contractor
Detailed information and lists of valid codes for each data item are found in the R1-CSE Handbook section 4 and Appendices.
In addition to collecting Residual Descriptive Code (Fuel Photo Series) for each fuel plot one photo shall be taken up hill or on a north aspect if ground is flat.
Tree Data. Begin recording standing tree data at azimuth 0 progressing in a clockwise direction around plot center. A standing tree is one with a lean angle somewhere between standing vertical and 45 o . Trees leaning more than 45 from the vertical will be considered down.
IPNF NZ Buckskin Saddle CSE – Commercial Item Page 9 of 31
Trees shall be recorded in the following order:
1. Variable radius subplot
2. Fixed radius subplot
The Exams software will automatically fill in the plot number and tree number for each line of data.
Tree Status All trees Contractor
Site/Growth Tree All trees Contractor
Species All trees Contractor
Tree Count All trees Contractor
DBH All trees > 4.5’ tall Contractor
Height Trees < 3.0” DBH and broken top trees Contractor
Age Growth Sample Trees >5” DBH Contractor
Crown Ratio All live trees Contractor
Snag Decay Class All standing dead trees Contractor
Tree Damage Category All live damaged trees Contractor
Tree Damage Agent All live damaged trees Contractor
Tree Damage Severity All live damaged trees Contractor
Tree Remarks Optional for all trees Contractor
Detailed information and lists of valid codes for each data field can be found in the R1-CSE Handbook section
10 and Appendices, except as noted below.
Growth Sample Trees (GST): Record a “G” for GST trees with a recorded age. Site Trees are not required.
Age must be recorded for all GST trees. On some data platforms, “G” is not a valid entry for this field. In this situation, “S” may be used.
A GST tree is the first live standing tree of each species encountered on each plot in each of the following diameter classes, moving clockwise from 0 azimuth. In addition, if not already tallied as the first tree of its size class, the largest tree of each species on each plot is also a GST tree.
GST Diameter Classes
5.0-14.99 inches
15.0-24.9 inches
25.0+ inches
Largest Tree
Boring of trees for age shall be in compliance with the R1-CSE Handbook, Appendix O. In the case of extensive rot preventing the Contractor from reaching the center of the tree, estimate total age as outlined in the
R1-CSE Handbook, Appendix O. Record the estimated age in the standard field. In the Remarks field for that tree, record AE1 followed by the measured age and length of measureable core actually bored (for example, “AE1 87@13”).
Tree Count: For live trees < 3.0” DBH, group by species within the following height classes:
Height Classes for Trees < 3” DBH
.5-4.4 feet tall
4.5 -12.0 feet tall
13+ feet tall
IPNF NZ Buckskin Saddle CSE – Commercial Item Page 10 of 31
For live trees 3.0 to 4.9 inch DBH, group by species and record the diameter and crown ratio of an average member of the group.
For dead trees 3.0 to 4.9 inch DBH, group by species and record the diameter and decay class of an average member of the group. Dead trees smaller than 3.0 inch DBH are not recorded.
Trees (live and dead) larger than 4.9 inch DBH are not grouped. Each tree is recorded on a separate data line.
DBH: In addition to the procedures for limiting distance of borderline trees in R-1 CSE Handbook, Appendix
K, record the limiting distance measurement to the nearest 0.1 feet along with the word limit in the tree remarks column.
Tree Damage Category, Agent, and Severity: Unless otherwise noted in order to meet specific data needs specific to a project, the following minimum required data shall be collected:
Bark Beetles (Category 11) – If tree damage severity is three (3) or greater, record the damage category, damage agent, and damage severity. It is acceptable to use the General agent code (000).
Defoliators (Category 12) – If tree damage severity is four (4) or greater, record the damage category, damage agent, and damage severity. It is acceptable to use the General agent code (000).
Root Disease (Category 21) – If tree damage severity is three (3) or greater, record the damage category, damage agent, and damage severity. It is acceptable to use the General agent code (000).
Stem Decays (Category 22) – If tree damage severity is four (4) or greater, record the damage category, damage agent, and damage severity. Damage agent codes 000 through 003 shall be used.
White Pine Blister Rust (Category 26) – If tree damage severity is two (2) or greater, record the damage category, damage agent, and damage severity. The agent code for White Pine Blister Rust is 001.
Broken Top (Category 99/Agent 001) – If tree damage severity is 25% or greater, record the damage category, damage agent, and damage severity. Note also that a tree height must be recorded when the damage category is used.
Dead Top (Category 99/ Agent 002) – If tree damage severity is 25% or greater, record the damage category, damage agent, and damage severity.
Vegetation Composition Data. This form is used to collect ocular estimates of height layering, cover, and maturity of trees, shrubs, forbs, and grass species within a fixed radius plot.
Field Name Requirement Source
Total Vegetation All recorded species Contractor
Canopy Cover by Lifeform All recorded species Contractor
Canopy Cover by Lifeform by Layer All recorded species Contractor
Remarks All recorded species Contractor
Detailed information and lists of valid codes for each data field are found in the R1-CSE Handbook section 6.4
Ground Surface Cover Data. Assess and record the estimated ground cover at the soil surface plane for each ground cover type within the fixed radius plot. Cover is defined as that portion of the horizontal surface layer intersected by the ground surface features. Total ground surface cover of all features must equal 100%. Foliar
IPNF NZ Buckskin Saddle CSE – Commercial Item Page 11 of 31 canopy cover above the soil surface plane is not considered ground surface cover. (In other words, the measurement has no height…only those things directly in contact with the soil surface, from above or below, and the soil itself, are counted.)
Field Name Requirement Source
Ground Surface Cover Type All recorded cover types Contractor
Ground Surface Cover Percent All recorded cover types Contractor
Remarks Optional Contractor
Detailed information and lists of valid codes for each data field are found in the R1-CSE Handbook section 6.6 and appendices.
Down Woody Material Data. Down Woody Materials (DWM) are simply dead tree parts or downed pieces of wood and brush that have fallen and lie on the ground or are suspended above it. The DWM includes downed, dead tree and shrub boles, limbs, and other woody pieces that are disconnected from their original source of growth or are uprooted and no longer self-supported by their roots. It also includes non-machine processed roundwood such as fence posts and cabin logs.
DWM does NOT include:
-Standing dead trees and shrubs self-supported by their roots.
-Vegetation showing any signs of life. Dead limbs within living trees or brush are not DWM.
-Stumps that are rooted in the ground.
-Dead foliage, bark, or other non-woody pieces that are not an integral part of a bole or limb. Bark attached to a piece of wood is an integral part of that piece.
-Roots or main bole below the root collar.
-Manufactured wood products such as lumber or furniture.
First Duff Required Contractor
Second Duff Required Contractor
Fuel Depth Required Contractor
Twig 1 (0-.24”) Required Contractor
Twig 2 (.25-.99”) Required Contractor
Twig 3 (1.0-2.99”) Required Contractor
Piece Count (>3” diameter) Required Contractor
Decay Class (>3” diameter) Required Contractor
Diameter (>3” diameter) Required Contractor
Piece Length (>3” diameter) Required Contractor
Detailed information and lists of valid codes for each data field are found in the R1-CSE Handbook section 7
Data Format. Detailed information for the use of ExamsPC/Exams data entry software can be found in the R1-
CSE Handbook section 12 and Appendices.
INSPECTION AND ACCEPTANCE
FAR 52.252.-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available. Also, the full text of
IPNF NZ Buckskin Saddle CSE – Commercial Item Page 12 of 31 a clause may be accessed electronically at this/these addess(es): www.acquisition.gov and the Agriculture
Acquisition Regulation may be accessed at www.usda.gov/procurement/policy/agar.html.
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-4 Inspection of Services – Fixed-Price (AUG 1996)
CONTRACTOR QUALITY CONTROL PLAN
The awarded Contractor shall provide a Quality Control Plan (QCP). The Contractor shall supplement the QCP within ten (10) days of contract award based on items awarded to the Contractor and Government comments.
The general QCP must demonstrate how the Contractor will assure quality meets the requirements and specifications of the contract. It shall specify how quality will be monitored to assure the performance standards are met, the supervision of crew and work, and the personnel that will be performing the quality control. Quality control includes monitoring of quality while work is in progress and an unbiased sample of plots to determine actual quality percentage.
Plot Inspections: The Contractor shall maintain an inspection system that provides an unbiased sample of CSE plot quality and represents the entire work force. A minimum of 10% of the installed plots shall be sampled within each inspection block. The Government may observe or re-inspect the Contractor’s plots at any time.
The Contractor shall provide written inspection data and electronic GPS inspection data by plot that meets contract requirements, if requested by the Government. All Contractor inspection records shall be provided to the Government based on the schedule proposed by the Contractor and agreed to by the CO for quality assurance assessment consistent with the Government Quality Assurance Surveillance Plan. All records shall be signed and dated by the person who conducted the inspection.
QUALITY ASSURANCE INSPECTIONS
1. The Government will perform periodic review and the Contractor’s Quality Control Procedures, Plan, Inspection Reports, and customer comments.
2. Quality Assurance Inspections will be made by random sampling or entire inspection of the work, and follow up of customer comments. When validating customer comments, the possible cause of unacceptable performance will be determined. If any Government action or lack of action was the cause, the complaint is not valid and deficiencies shall not be counted against the Contractor.
3. Periodic means one review each month, but may be done more frequently if necessary.
4. Work that does not meet the contract requirements will be brought to the Contractor’s attention. Repetitive or continuous failure to meet contract requirements may result in a quality adjustment to payment or the
Contractor’s right to proceed may be terminated.
GOVERNMENT INSPECTION PROCEDURES
An inspection block, as established by the Government, will contain a minimum of 50 plots and a maximum of
100 plots, +/- 10% due to individual stand plot counts. The final inspection block may be smaller by necessity.
Contractor may deviate from these numbers at the COR’s approval. No partial stands will be accepted. The
Contractor shall submit stands in designated blocks with respective data sheets, maps, and electronic data.
Compliance Inspection. The COR will, by formal review, determine if the specified progress and methods of work are being carried out. Failure to comply with specified work standards may be cause for termination of http://www.acquisition.gov/ http://www.usda.gov/procurement/policy/agar.html
IPNF NZ Buckskin Saddle CSE – Commercial Item Page 13 of 31 the Contractor’s right to proceed. See Rate of Progress stipulated in Technical Proposal (see Requirements-
Technical Proposal)
Inspection of Work. The Government will inspect the stand examinations to determine compliance with contract specifications and to provide a basis for payment. The Contractor shall submit completed stand information within seven (7) days after completion of each block to the COR.
Completed work, consisting of any required paper forms, maps, and electronic data, will be turned in for inspection in blocks. Field inspections will be made from the electronic data submitted. Inspection will only be made on completed stands. Within each block, at least 10% of the plots will be selected for inspection to determine if the prescribed work standards have been met. This will constitute the minimum sample plot inspection for determining satisfactory performance. Pass-fail inspection for compliance to other work standards and procedures shall be performed on all blocks.
The Government will make the initial inspection of each block of completed stands without cost to the
Contractor. Any re-inspection required due to the Contractor reworking a block will be at the Contractor’s expense. Re-inspection charges may include, but are not limited to: inspector’s wages for travel time to and from work site; inspector’s wages to re-inspect; per diem costs (meals, lodging, field costs); COR wages;
vehicle use rate and mileage.
All data submitted for inspection or payment that have omissions or exceed the tolerances allowed for the required fields will be returned to the Contractor for completion or rework. All hand written forms shall be turned in with their respective stands in an inspection block. All entries must be legible. Any missing, non-legible, or non-applicable entries shall be counted as discrepancies.
The Contractor’s electronic data shall load successfully into FSVeg or it shall be returned for rework.
The COR will record the global position of the plot during field inspection. A GPS receiver capable of measuring in “3D” status will be used, and coordinates will be gathered for a minimum of 4 minutes. This coordinate will be used to evaluate the field inspected plot using the tolerances specified in Appendix C.
The Government is not responsible for GPS down time due to Contractor negligence or satellite disturbances.
No Suspend Work Order will be issued, contract time will run during these periods.
Determination of Acceptable Work. An inspection, as stated above, will be performed by the Government for evaluation of contract specification compliance. The following will be used for determination of acceptable or unacceptable work.
1. Pass-Fail check of specified standards and procedures for each inspection block.
Site examinations deficient in the following specifications are unacceptable on a “pass-fail” basis and will be returned to the Contractor with the entire block for rework. The determination of noncompliance with these items may be made during the office edit or during field inspection.
a. All completed forms and electronic data not submitted to the Forest Service in a timely manner after
Contractor completion.
b. Electronic data that cannot be read by Government computers.
c. Any plot center located outside of tolerance, or within one chain of stand boundaries.
d. Stands having less than the prescribed number of sample plots examined.
e. Any sample plot center which cannot be located because of improper plot center labeling or because of improper GPS reference, or for any other reason attributable to noncompliance with specifications.
f. Any data with inaccurate stand location and stand number data.
g. Any plot having a missed live tree over breakpoint DBH.
h. Any plot that includes a live tree over breakpoint DBH that should not have been in the plot.
IPNF NZ Buckskin Saddle CSE – Commercial Item Page 14 of 31
i. Any plot with discrepancy between live and dead tree classifications.
j. Any stand with an incorrect BAF.
k. Any plot having incorrectly identified tree species over breakpoint DBH.
l. Any stand-level habitat type being incorrect beyond a discrepancy in phase.
2. Discrepancy Trend
If during inspection of selected plots or review of submitted data, the Government determines a similar discrepancy is occurring in the information being recorded by the Contractor, the COR shall notify the
Contractor of the findings. If the same trend continues in the future inspections, the block(s) will be returned for rework.
In addition, if the COR notices a discrepancy trend developing while inspecting plots on the ground, they may visit plots not selected in the random sample, to inspect the field(s) in question. These plots will be used to determine if a discrepancy trend exists, not for payment purposes. The COR will notify the Contractor of the findings. If the same trend continues in the future inspections, the block(s) will be returned for rework.
If an individual or crew repeatedly installs plots in the wrong location or makes inaccurate measurements or observations (e.g., missed heights, diameters, etc.), over two inspections, the COR may notify the Contractor and require the Contractor to replace the individual or crew.
3. Partial Payment Based on Discrepancy
See Section G-2 MEASUREMENT AND PAYMENT for partial payment schedule based on discrepancies per data line.
Rework of Unacceptable Work. The Government reserves the right to require unacceptable blocks, as determined under Section C, Determination of Acceptable Work, to be reworked. Upon written notification by the COR that a block is unacceptable, the Contractor may be required to complete and submit a rework before beginning another block of work.
1. Correction of Errors
a. Pass-fail failures require correction of errors throughout the block.
b. All plots in the inspection block will be returned to the Contractor when the block is determined to be unacceptable. The Contractor is required to rework all of the plots in the inspection block. The Contractor shall pay the actual costs incurred by the Government for any re-inspection.
c. At the Government’s option, on those inspection blocks reworked by the Contractor, a different colored ribbon shall be tied at each plot center. The COR shall specify the color of the ribbon. Each time a block is reworked, a different colored ribbon shall be used.
d. For acceptable blocks resulting in less than 100% payment, the contractor may elect to re-work the block or accept reduced payment. The re-inspection will be at the Contractor’s expense.
e. The Government is not required to provide more than two (2) re-inspections on any single inspection block. Results of last re-inspection will supercede any prior inspection results for determining acceptability and payment. Failure to pass inspection may result in contract default.
f. Trend error failures require rework of all items identified as having an error trend.
Demonstration of Inspection Procedures. At the Contractor’s request the Government may provide one free inspection to demonstrate inspection procedures. This inspection shall be performed on the first stand the
Contractor works.
Re-inspection Upon Contractor Request. If the Contracting Officer’s Representatives original inspection results are unacceptable to the Contractor, the Contractor has the option to request, in writing, a re-inspection.
Requests for re-inspection shall be made within five (5) calendar days of receipt of initial inspection results. A
IPNF NZ Buckskin Saddle CSE – Commercial Item Page 15 of 31 complete re-inspection of the original inspected plot(s) will be made. The Contactor may accompany the COR during the re-inspection.
If re-inspection does not result in additional payment for the Contractor, the Contractor must pay for the re-inspection. Re-inspection for resubmitted units will be done in accordance with the original inspection procedures.
Results of this re-inspection will supersede the original inspection for determining acceptability and payment.
FAR52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available. Also, the full text of a clause may be accessed electronically at this/these addess(es): www.acquisition.gov and the Agriculture
Acquisition Regulation may be accessed at www.usda.gov/procurement/policy/agar.html.
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
52.242-15 Stop-Work Order (AUG 1989)
52.242-17 Government Delay of Work (APR 1984)
GOVERNMENT FURNISHED PROPERTY
The Government will deliver to the Contractor the following listed materials, supplies, property, or services for use in the performance of this contract, hereafter referred to as the Government Furnished Property, at the places and times specified below. This property shall be used and maintained by the Contractor in accordance with the provisions of the “Government Property” FAR clause in this contract.
Item Description Where, When, How
1. Project Area Map Small scale map depicting all stand locations and road systems for the project area.
Provided at pre-work meeting or as attachment.
2. Stand List Table showing individual stand information.
Provided at pre-work meeting or as attachment.
3. Stand Maps Individual maps with stand boundary delineations.
Provided at pre-work meeting.
4. National Forest Map Provides travel route and road closure information.
Provided at pre-work meeting.
5. R-1 Common Stand Exam Field
Guide
Field Instruction Handbook for conducting Common Stand Exams.
Provided at pre-work meeting.
6. Field Guide to Plants of
Northern Idaho, GTR-INT-180.
Field guide to plant identification, 1 copies.
Provided at prework meeting.
7. Field Guide to Disease and
Insect Pests of Idaho and Montana
Forests by Susan K Hagle, Scott
Tunnock, Kenneth E. Gibson, and
Carma J. Gilligan (1987).
Field guide to insect and disease classification, 1 copies.
Provided at prework meeting.
8. Forest Habitat Types of
Northern Idaho: A Second
Approximation.
Field guide to habitat type identification, 1 copies.
http://www.acquisition.gov/ http://www.usda.gov/procurement/policy/agar.html
IPNF NZ Buckskin Saddle CSE – Commercial Item Page 16 of 31
9. Fischer 1981 GRTINT-96, 97, 98 fuels photo series
Photo Guides, 1 copy each. Provided at prework meeting.
10. ExamsPC and ExamsCE software and instructions.
Data entry software. Provided at prework meeting.
11. Copies of aerial photographs or computer generated aerial imagery.
Photography with stand numbers and stand boundaries identified.
Provided at prework meeting.
12. Threatened, Endangered, and
Sensitive Plants and Forest
Species of Concern by Rare Plant
Habitat Guild (Oct 2004).
Rare plant identification guide for
North, South, and Central zones of the IPNFs.
Provided at prework meeting.
13. All forms needed for exams. Appropriate data collection forms. Provided at prework meeting.
14. Project Area Vicinity Maps Large scale map depicting all stand locations and primary travel routes for the project areas.
All maps, overlays, and unused Government Furnished Property shall be returned to the Government upon completion of the contract. Aerial photographs must be given exceptional care and returned in essentially the same condition as delivered. Failure to do so may result in charges for damage or replacement.
MEASUREMENT AND PAYMENT
Method of Measurement. The unit of measure and payment will be the plot as described herein. The quantity of plots completed satisfactorily will be processed for payment in accordance with the payment rate provisions herein based on the unit price bid.
Method of Payment. No payment will be made for unacceptable blocks. After notification of unacceptable blocks, the Contractor shall not begin work on other plots until the unacceptable inspection block(s) have been reworked.
Payment will be based on the results of the field inspection. Each inspection block will be accepted for payment, returned for rework, or rejected based on the results of the field inspection on the selected plots in the block, along with an assessment of “Pass-Fail” criteria outlined in section C, above.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .