SUPPORT_DOCUMENT_B_-_SPECIFICATIONS_OFFICE_HVAC.pdf
PDF 1 MB Posted
- Attached to
- KETCHUM WAREHOUSE HVAC PROJECT 2014 Federal contract opportunity
- Solicitation number
- AG-0261-S-14-0095
About this file
SUPPORT DOCUMENT B
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment1.pdf | ||
| AMEND_1.pdf | ||
| AMEND_1_M101-REV1.pdf | ||
| AMEND_1_round_duct_hanger_detail.pdf | ||
| SUPPORT_DOCUMENT_A_-_SPECIFICATIONS_HOUSING_HVAC.pdf | ||
| SUPPORT_DOCUMENT_C_-_DRAWINGS_OFFICE_HVAC.pdf | ||
| SUPPORT_DOCUMENT_E_WORKERS_COMP_FORM.pdf | ||
| AG-0261-S-14-0095_KETCHUM_WAREHOUSE_HVAC_PROJECT_2014.pdf | ||
| SUPPORT_DOCUMENT_D_-_DRAWINGS_HOUSING_HVAV.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUPPORTING DOCUMENT – B
AG-0261-S-14-0095
KETCHUM WAREHOUSE HVAC PROJECT 2014
SPECIFICATIONS – OFFICE HVAC
105 Pages (including this header page)
Section C - Description/Specifications/Statement of Work
GENERAL SPECIFICATIONS
KETCHUM WAREHOUSE OFFICE AND MAINTENANCE
HVAC AND ELECTRICAL REMODEL
1.1 SCOPE OF CONTRACT
A. This project includes all requirements necessary for the construction of a complete and efficiently operating Vehicle Ventilation Systems, Air Pathways system, and Outside Intake air system, for the office and maintenance areas, lower floor, of the Ketchum Warehouse. This will include construction of vehicle ventilation systems, including necessary wall penetrations, louvers, venting, and power as shown in the drawings and specifications. Associated controls, systems, and other devices are to be demolished and disposed of. All demolished material is to be disposed of as required by the local jurisdiction. All equipment indicated is to be provided and installed. Controls, as directed in the drawings and specifications are to be provided. Outside air intakes, all wall penetrations, all ductwork, piping and supports, louvers for fresh air intakes are to be included. New thermostats are to be provided. All work shall be completed as given in the drawings and specifications.
B. This project is to be constructed while the building is occupied by the user.
Coordination and phasing of work is required. Staging and storage of materials are to be coordinated with the COR prior to the start of the project. Damages to any portion of the building while this project is completed are to be repaired with matching finishes of what is now installed.
C. This Project may be completed during the Ketchum Warehouse Housing HVAC and Electrical Remodel for the upper floor. Contractor may need to coordinate and schedule with other remodel.
D. Start up, commissioning, checkout, owner training, and warranty is to be included in the project.
1.2 PROJECT LOCATION
A. The existing Ketchum Warehouse Building is located west of Highway 75 at 330 Lewis St. Ketchum, ID 83340
1.3 PROJECT TIMELINE AND OPERATIONS
A. This project will be completed during the slow time of the operations of the Ketchum Warehouse in the winter months, and should be coordinated with the building manager so the interference of operations is kept to a minimum.
1. Installation of a new vehicle exhaust system as shown in drawings and specifications.
2. Installation of air Intakes, and Air circulation system as shown in the drawings and specifications.
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-1
1.4 SITE INFORMATION AND LIMITATIONS
A. The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:
1. Construction sites will not be closed to the public or forest service during construction. The contractor will be responsible for signing and limiting public and forest service access to the portions of the building where the construction is.
2. There is existing electrical service for the site. Contractor shall have permission to use existing electrical services during construction. Contractor shall be aware of the use of electrical services, and shall limit the use of electrical services to the construction alone. Contractor is responsible for turning off all lights and power so as not to waste electrical services. Contractor shall provide connections and extensions of services as required for construction operations.
3. There is Water service on site. Contractor is to provide connections and extensions of services as required for construction operations.
4. Sewer service to the site is available on site and will be available for construction operations.
5. Restrooms are available on site.
6. Construction Hours – Hours of operation for the construction, demolition, excavation and subsequent cleanup shall be only between the hours between 7:00 a.m. and 6:00 p.m. Monday through Friday.
1.5 TEMPORARY ACCESS
A. Parking: Use designated areas for construction personnel or as approved by the Contracting Officer. Parking directly next to the building, for construction, shall be limited to 4 stalls. Coordinate all other parking with the Contracting Officer.
1.6 WASTE MANAGEMENT AND DISPOSAL
A. Waste Management Plan: Submit 3 copies of plan within 14 days of date established for the Notice to Proceed.
B. Processing waste material for salvage and recycling is encouraged.
C. The Contractor shall provide and maintain appropriate waste disposal containers or bins at the project site for the duration of the project construction. Verify with Contracting Office for placement of disposal containers and bins on the project site.
D. Waste material and debris shall be picked up and deposited in the waste disposal bins on a daily basis. Containers must be emptied on a weekly basis unless more frequent empting is needed.
E. Burning or burying of construction waste material on site will not be permitted.
Material shall be disposed of in accordance with the Waste Material Disposal specification.
1.7 TRAFFIC CONTROL AND CONSTRUCTION SIGNING
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-2
A. No work that endangers, interferes, or conflicts with traffic or access to work sites shall be performed until a plan for satisfactory warning and handling of traffic has been submitted by the Contractor and approved by the CO and Local Transportation Authority. Construction signing for traffic control shall conform to the Manual of Uniform Traffic Control Devices (MUTCD). All traffic control signs will be placed in areas adequate for a truck pulling a fifth wheel trailer to be turned around. Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Schedule of Items.
B. Provide project signs as indicated. Unauthorized signs are not permitted.
1. Identification Signs: Provide Project identification signs.
2. Temporary Signs: Provide other signs as indicated and as required informing public and individuals seeking entrance to Project.
3. Provide temporary, directional signs for construction personnel and visitors as required.
4. Maintain and touchup signs so they are legible at all times.
1.8 FIELD OFFICES, WORK CAMPS, STAGING AND STORAGE AREAS
A. Within 15 day of Notice to Proceed, Contractor shall submit a site plan showing proposed staging areas, access and parking locations, locations for field offices, and storage areas for review and approval by the CO.
B. Areas for staging operations and storage of materials shall be approved by the CO. The Contractor must request in writing for approval from the CO to stage trailers (work) on site. Overnight camping and housing on site will not be allowed.
1.9 INSPECTION OF WORKSITE
A. The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work, and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.
1.10 START DATE
A. August 2014
1.11 CONTRACT TIME
A. 90 Calendar Days
1.12 SPECIFICATIONS
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-3
A. The following specifications are attached. Some sections in the schedule of items refer to other sections not listed and are subsidiary to, or are included in payment for other pay items in this contract. These items are considered incidental and no additional compensation will be made.
Section 000050 - Ketchum Warehouse Office And Maintenance Hvac And Electrical Remodel Section 011250 - Measurement And Payment Section 013300 - Submittal Procedures Section 014100 - Quality Control Section 017320 - Selective Demolition Section 024100 - Waste Material Disposal Section 089119 - Fixed Louvers Section 230553 - Identification For Hvac Piping And Equipment Section 230593 - Testing, Adjusting, And Balancing For Hvac Section 233113 - Metal Ducts Section 233300 - Air Duct Accessories Section 233413 - Axial Hvac Fans Section 233416 - Centrifugal Hvac Fans Section 233713 - Diffusers, Registers, And Grilles Section 260500 - Common Work Results For Electrical Section 260519 - Low-Voltage Electrical Power Conductors And Cables Section 260523 - Control-Voltage Electrical Power Cables Section 260526 - Grounding And Bonding For Electrical Systems Section 260533 - Raceways And Boxes For Electrical Systems Section 260553 - Identification For Electrical Systems Section 262416 - Panelboards Section 262726 - Wiring Devices
END OF SECTION C
April 2014
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-4
USDA FOREST SERVICE, R-4
KETCHUM WAREHOUSE OFFICE AND MAINTENANCE HVAC AND ELECTRICAL
SECTION 000050 - KETCHUM WAREHOUSE OFFICE AND MAINTENANCE HVAC AND
ELECTRICAL REMODEL
GENERAL
1.13 SUMMARY
A. This project includes all requirements and necessary construction to remodel HVAC systems, install new fresh air intakes and economizers as shown in the project drawings.
B. Work that will be completed in this project will include the following.
1. Installation of a new vehicle exhaust system as shown in drawings and specifications.
2. Installation of air Intakes, and Air circulation system as shown in the drawings and specifications.
C. Warranty of all new construction is to be included in the project.
1.14 REFERENCE SPECIFICATIONS
A. The publications listed below form a part of this specification to the extent referenced.
The publications are referred to in the text by the basic designation only.
2012 International Building Code 2012 International Residential Code 2012 International Plumbing Code 2012 International Mechanical Code 2012 International Fuel Gas Code 2009 International Energy Conservation Code 2014 National Electrical Code 2014 National Fire Protection Association Standards 13R and 13D.
2010 Americans with Disabilities Act/Architectural Barriers Act Guidelines (ADA/ABAG) (http://www.access-board.gov/adaag/html/adaag.htm
1.15 MEASUREMENT AND PAYMENT
A. Ketchum Warehouse Office and Maintenance HVAC and Electrical Remodel - Measurement and Payment shall be Lump Sum Quantity (LSQ) as shown in the Schedule of Items for the demolition and remodel of new HVAC mechanical systems, electrical systems, and architectural work of the Ketchum Warehouse Office and Maintenance portion of the Building to be completed and ready for use. Measurement shall include all work items included in the drawings and specifications.
KETCHUM WAREHOUSE OFFICE AND MAINTENANCE HVAC AND ELECTRICAL
REMODEL 000050-1
http://www.access-board.gov/adaag/html/adaag.htm
1.16 RELATED WORK
A. The work shall be in accordance with the contract drawings.
B. The work shall be in accordance with the following specifications. The subsidiary specifications are referred to in the text by the Section designation only.
DIVISION 01 GENERAL REQUIREMENTS
SECTION 000564 – KETCHUM WAREHOUSE OFFICE AND MAINTENANCE HVAC AND
ELECTRICAL REMODEL
SECTION 011250 – MEASUREMENT AND PAYMENT
SECTION 013300 – SUBMITTAL PROCEDURES
SECTION 014100 – QUALITY CONTROL
DIVISION 02 EXISTING CONDITIONS
SECTION 017320 – SELECTIVE DEMOLITION
SECTION 024100 – WASTE MATERIAL DISPOSAL
DIVISION 03-07 NOT USED
DIVISION 08 OPENINGS
SECTION 089119 – FIXED LOUVERS
DIVISION 08-22 NOT USED
DIVISION 23 HEATING VENTILATING & AIR CONDITIONING
SECTION 230553 – IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
SECTION 230593 – TESTING, ADJUSTING, & BALANCING FOR HVAC
SECTION 233113 – METAL DUCTS
SECTION 233300 – AIR DUCT ACCESSORIES
SECTION 233413 – AXIAL HVAC FANS
SECTION 233416 – CENTRIFUGAL HVAC FANS
SECTION 233713 – DIFFUSERS, REGISTERS, & GRILLES
DIVISION 26 ELECTRICAL
SECTION 260500 – LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS & CABLES
SECTION 260519 – CONTROL-VOLTAGE ELECTRICAL POWER CABLES
SECTION 260526 – GROUNDING & BONDING FOR ELECTRICAL SYSTEMS
SECTION 260533 – RACEWAY & BOXES FOR ELECTRICAL SYSTEMS
SECTION 260553 – IDENTIFICATION FOR ELECTRICAL SYSTEMS
SECTION 262416 – PANELBOARDS
SECTION 262726 – WIRING DEVICES
DIVISION 28-33 NOT USED
PART 2 - PRODUCTS - Not Applicable
PART 3 - EXECUTION
3.1 GENERAL
A. Work shall be completed in accordance with the contract drawings and specifications.
END OF SECTION 000050
March 2014
REMODEL 000050-2
SECTION 011250 - MEASUREMENT AND PAYMENT
PART 1 - GENERAL
1.1 SUMMARY
A. Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work, labor, materials, equipment, and incidentals necessary to successfully complete the project will be considered as included in the payment for items shown. This section defines the method of measurements and basis of payment for work items listed in the Schedule of Items.
B. When more than one class, size, type, thickness, etc. is specified in the Schedule of Items for any pay item, suffixes will be added to the item number to differentiate between the pay items.
1.2 DETERMINATION OF QUANTITIES
A. The following measurements and calculations shall be used to determine contract quantities for payment.
1. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting and erosion control blankets shall be along slope lines.
2. For excavation or embankment volumes, the average end area method shall be used to compute volumes. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three-dimensional methods.
3. For Structures, they shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions.
4. For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, piping, utilities, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed.
5. For aggregates weighed for payment, the tonnage shall not be adjusted for moisture content, unless otherwise provided for.
6. For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.
B. Earthwork Tolerances - Adjustments of horizontal or vertical alignment, within the tolerances specified in this contract, or shifts of balance points up to 100 feet shall be
MEASUREMENT AND PAYMENT 011250-1
made by the contractor as necessary to produce the designed sections and to balance earthwork. Such adjustments shall not be considered as "Changes."
1.3 UNITS OF MEASUREMENT
A. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:
1. Acre: Make longitudinal and transverse measurements for area computations horizontally.
2. 50lb Bag: Measurement will be for the actual number of 50lb bags of standard bentonite grout.
3. 94lb Bag: Measurement will be for the actual number of 94lb bags of standard cement or grout.
4. Cubic Yard (CY): A measurement computed by one of the following methods:
a. Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.
b. Material in Place or Stockpile. The measurement computed using the dimensions of the in-place material.
c. Material in the Delivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery.
Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.
5. Each (EA): One complete unit, which may consist of one or more parts.
6. Gallons (GAL): The quantity shall be measured by any of the following methods:
a. Measured volume in container.
b. Metered volume by approved metering system.
c. Commercially package volume.
7. Hour (HR): Measurement will be for the actual number of hours (or fraction thereof) ordered by the Contracting Officer and performed by the contractor.
8. Linear Foot (LF): Measurement of work along its length from point-to-point;
parallel to the base or foundation. Do not measure overlaps.
9. Lump Sum (LS): One complete unit.
10. Mile: Measured horizontally along the centerline of each roadway, approach, or ramp.
11. Pound (LB): For sacked or packaged material, measurement will be the net weight as packed by the manufacturer.
12. Square Foot (SF): Measured on a plane parallel to the surface being measured.
13. Square Yard (SY): Measured on a plane parallel to the surface being measured.
14. Ton: Measured as a short ton consisting of 2,000 pounds.
1.4 METHOD OF MEASUREMENT
MEASUREMENT AND PAYMENT 011250-2
A. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:
1. ACTUAL QUANTITIES (AQ) - These quantities are determined from actual measurements of completed work.
2. DESIGNED QUANTITIES (DQ) - These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units shown in the Schedule of Items may be authorized under any of the following conditions:
a. As a result of changes in the work authorized by the CO.
b. As a result of the CO determining that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.
c. As a result of the Contractor submitting to the CO a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.
3. LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.
4. STAKED QUANTITIES (SQ) - These quantities are determined from staked measurements prior to construction.
5. VEHICLE QUANTITIES (VQ) - These quantities are measured or weighed in hauling vehicles.
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION (NOT APPLICABLE)
END OF SECTION 011250
JUNE 2009
MEASUREMENT AND PAYMENT 011250-3
SECTION 013300 - SUBMITTAL PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. See Table 013300-1 for a summary of required submittals.
B. See other specification section within this package for additional requirements on submittal.
1.2 SUBMITTAL PROCEDURES
A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
1. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.
a. The Contracting Officer (CO) reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
B. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.
1. Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.
2. If intermediate submittal is necessary, process it in same manner as initial submittal.
3. Allow 14 days for processing each re-submittal.
4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.
C. Identification: Place a permanent label or title block on each submittal for identification.
1. Indicate name of firm or entity that prepared each submittal on label or title block.
2. Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO.
3. Include the following information on label for processing and recording action taken:
SUBMITTAL PROCEDURES 013300-1
a. Project name.
b. Date.
c. Name and address of Contractor.
d. Name of manufacturer.
e. Unique identifier, including revision number.
f. Number and title of appropriate Specification Section.
g. Drawing number and detail references, as appropriate.
h. If more than one item is shown on submittal sheet, identify item.
D. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.
E. Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.
F. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.
1.3 MEASUREMENT AND PAYMENT
A. No separate measurement and/or payment will be made for this section. Payment shall be included with work shown in the schedule of items.
PART 2 - PRODUCTS
2.1 ACTION SUBMITTALS – (Submittals requiring CO approval)
A. General: Prepare and submit Action Submittals required by individual Specification Sections.
1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document.
B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.
2. Mark each copy of each submittal to show which products and options are applicable.
3. Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
c. Manufacturer's installation instructions.
d. Manufacturer's catalog cuts.
e. Wiring diagrams showing factory-installed wiring.
f. Compliance with recognized trade association standards.
SUBMITTAL PROCEDURES 013300-2
g. Compliance with recognized testing agency standards.
C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.
1. Preparation: Include the following information, as applicable:
a. Dimensions.
b. Identification of products.
c. Fabrication and installation drawings.
d. Roughing-in and setting diagrams.
e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.
f. Notation of dimensions established by field measurement.
2. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.
D. Contractor's Construction Schedule: The contractor shall submit a Construction Schedule, for approval by CO, in accordance with the contract provisions within 5 day of commencement of work.
E. Samples: Prepare physical units of materials or products, including the following:
1. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.
2.2 INFORMATIONAL SUBMITTALS – (Submittals NOT requiring CO approval)
A. General: Prepare and submit Informational Submittals required by other Specification Sections.
1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will not return copies.
2. Certificates and Certifications: Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.
3. Test and Inspection Reports: Comply with requirements in Section 014100 "Quality Control."
B. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.
C. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.
SUBMITTAL PROCEDURES 013300-3
D. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment.
E. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.
PART 3 - EXECUTION
3.1 GENERAL
A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.
B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.
C. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.
D. Submittals not required by the Contract Documents will not be reviewed and may be discarded.
E. Substitutions – Whenever materials, products, and equipment are listed by name or brand in the specifications and/or on the drawings, it is used as a measure of quality, utility, or standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance and utility to that specified, he shall request substitution as provided below, not less than 30 days before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution.
F. Requests for substitutions will only be considered if contractor submits the following:
1. Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution. Submit additional information if required by Contracting Officer.
All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.
2. Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.
3. A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws.
4. The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.
SUBMITTAL PROCEDURES 013300-4
3.2 SUBMITTAL SCHEDULE – Submittals shall be made as required by and called for in the drawings and specifications. The following table is a summary of the required submittals for the project - the table is to assist the Contractor and may not be all inclusive – additional submittals may be required by specific specifications:
TABLE 013000-1
Spec. Section Section Title Subsection Required Submittal
Section C General Specifications 1.6A Waste Management Plan Section C General Specifications 1.8A Construction Site Plan
014100 Quality Control 1.3 A Contractor quality control plan
014100 Quality Control 1.3 B Permits, Licenses, and Cer-tificates
014100 Quality Control 1.3 C Test and inspection reports 014100 Quality Control 1.3 D As-Built drawings 089119 Fixed Louvers 1.2A Product Data
230553 Identification for HVAC Piping and Equipment 1.2A Product Data
230593 Testing, Adjusting, and Balancing for HVAC 1.3A Strategies and Procedures
Plan
230593 Testing, Adjusting, and Balancing for HVAC 1.3B Certified TAB Reports
233113 Metal Ducts 1.3A Product Data 233113 Metal Ducts 1.3B Shop Drawings 233113 Metal Ducts 1.3C Welding Certificates 233300 Air Duct Accessories 1.2A Product Data
233300 Air Duct Accessories 1.2B Operation and Maintenance Data
233413 Axial HVAC Fans 1.2A Product Data 233413 Axial HVAC Fans 1.2B Shop Drawings
233413 Axial HVAC Fans 1.2C Field Quality Control Re-ports
233413 Axial HVAC Fans 1.2D Operation and Maintenance Data
233413 Axial HVAC Fans 1.2E Belts 233416 Centrifugal HVAC Fans 1.2A Product Data 233416 Centrifugal HVAC Fans 1.2B Shop Drawings 233416 Centrifugal HVAC Fans 1.2C Coordination Drawings 233416 Centrifugal HVAC Fans 1.2D Field Quality Reports
233416 Centrifugal HVAC Fans 1.2E Operation and Maintenance Data
233416 Centrifugal HVAC Fans 1.2F Belts 233713 Diffusers, Registers, and Grilles 1.2A Product Data 260500 Common Work Results for Electrical 1.2A Product Data
END OF SECTION 013300
SUBMITTAL PROCEDURES 013300-5
SECTION 014100 - QUALITY CONTROL
PART 1 - GENERAL
1.1 SUMMARY
A. This work shall consist of providing quality control in conformance with the inspection, testing, and product certification requirements of this contract to ensure compliance with the drawings and specifications. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of the contract.
B. In addition to the required sampling, testing, and certifications listed in the specifications the contractor shall complete the testing and inspections called for on the structural drawings as “Special Inspections.” The “Special Inspections” shall be completed by an independent testing agency in accordance with the drawings and the International Building Code. When required sampling, testing, and certifications are in conflict, the most stringent requirement will apply – if there is still conflict, the contractor shall notify the Contracting Officer for direction.
1.2 QUALITY CONTROL
A. The Contractor shall provide and maintain a quality control system that will ensure all services, supplies, and construction work required under this contract conforms to the contract requirements. The Contractor shall perform, or cause to be performed, the sampling, inspection, and testing required to substantiate that all services, supplies, and construction conform to the contract requirements.
1.3 SUBMITTALS
A. Contractor Quality Control Plan
B. Permits, Licenses, and Certificates
C. Test and Inspection Reports
D. As-Built Drawings
1.4 MEASUREMENT AND PAYMENT
A. No separate payment will be made for the work included under this section; rather payment shall be considered to be included in the items of work listed in the Schedule of Items.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION
QUALITY CONTROL 014100-1
3.1 QUALITY CONTROL SYSTEM
A. General: Perform required testing, inspections, sampling, and similar services per direction specified in the contract drawings and specifications and in accordance with established industry standards.
3.2 CONTRACTOR QUALITY CONTROL PLAN
A. At the time of the preconstruction conference, the Contractor shall submit for approval a written Contractor Quality Control Plan.
1. If the plan requires any revisions or corrections, the Contractor shall resubmit the plan within 10 days.
2. The Government reserves the right to require changes in the plan during the contract period as necessary.
3. No change in the approved plan may be made without written concurrence by the Contracting Officer.
4. At a minimum, the plan shall include the following:
a. A list of personnel responsible for quality control and assigned duties.
Include each person's qualifications.
b. A copy of a letter of direction to the Contractor's Quality Control Supervisor outlining assigned duties.
c. Names, qualifications, and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms.
d. Methods of performing, documenting, and enforcing quality control of all work.
e. Methods of monitoring and controlling environmental pollution and contamination as required by all applicable regulations and laws.
3.3 TEST AND INSPECTION REPORTS
A. Submit three copies of complete test results no later than three calendar days after the test was performed.
B. Submit failing test results and proposed remedial actions within four hours of noted deficiency.
C. Testing and Inspection Reports shall include the following:
1. Date of issue.
2. Project title and number.
3. Name, address, and telephone number of testing agency.
4. Dates and locations of samples, tests, or inspections.
5. Names of individuals performing tests and inspections.
6. Reference Specification Section(s).
7. Complete test or inspection data.
8. Test and inspection results and an interpretation of test results.
9. Ambient conditions at time sample was taken, tested, or inspected.
QUALITY CONTROL 014100-2
10. Comments or professional opinion on whether tested or inspected work complies with the Contract Document requirements.
11. Name and signature of laboratory inspector.
12. Recommendations on retesting and reinspecting.
3.4 PERMITS, LICENSES, AND CERTIFICATES
A. For Contracting Officer’s records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations relevant to the on performance of the work.
3.5 AS-BUILT DRAWINGS
A. The Contractor shall maintain a set of the contract drawings depicting as-built conditions. These drawings shall be maintained in a current condition and shall be available for review. All variations from the original contract drawings shall be indicated in red on the drawings. Upon completion of the contract work, as-built drawings shall be submitted to the Contracting Officer.
3.6 SAMPLING, TESTING, AND CERTIFICATION REQUIREMENTS
A. Sampling, testing, and Certification requirements and frequency for specific items shall be as specified in the drawings and specifications.
END OF SECTION 014100
MAY 2009
QUALITY CONTROL 014100-3
SECTION 017320 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes demolition and removal of the following:
1. Selected portions of a building or structure.
2. Repair procedures for selective demolition operations.
1.2 MEASUREMENT AND PAYMENT
A. There will be no separate measurement or payment for work in this Section.
Demolition is considered incidental to other items of work shown in the Schedule of Items.
1.3 DEFINITIONS
A. Remove: Detach items from existing construction and legally dispose of them off-site, unless indicated to be removed and salvaged or removed and reinstalled.
B. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.
1.4 MATERIALS OWNERSHIP
A. Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain Government property, demolished materials shall become Contractor's property and shall be removed from Project site.
1.5 PROJECT CONDITIONS
A. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.
1. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from authorities having jurisdiction.
SELECTIVE DEMOLITION 017320-1
B. Government assumes no responsibility for condition of areas to be selectively demolished.
1. Conditions existing at time of inspection for bidding purpose will be maintained by Government as far as practical.
C. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.
1. Hazardous materials will be removed by Government before start of the Work.
2. If materials suspected of containing hazardous materials are encountered, do not disturb; immediately notify Contracting Officer (CO). Hazardous materials will be removed by Government under a separate contract.
D. Storage or sale of removed items or materials on-site will not be permitted.
E. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1. Maintain fire-protection facilities in service during selective demolition operations.
PART 2 - PRODUCTS
2.1 REPAIR MATERIALS
A. Use repair materials identical to existing materials.
1. If identical materials are unavailable or cannot be used for exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible.
2. Use materials whose installed performance equals or surpasses that of existing materials.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped.
B. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.
SELECTIVE DEMOLITION 017320-2
C. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict. Promptly submit a written report to CO.
3.2 UTILITY SERVICES
A. Existing Utilities: Maintain services indicated to remain and protect them against damage during selective demolition operations.
B. Do not interrupt existing utilities serving occupied or operating facilities unless authorized in writing by CO and authorities having jurisdiction. Provide temporary services during interruptions to existing utilities, as acceptable to CO and to authorities having jurisdiction.
1. Provide at least 72 hours notice to CO if shutdown of service is required during changeover.
C. Utility Requirements: Locate, identify, disconnect, and seal or cap off indicated utilities serving areas to be selectively demolished.
1. Arrange to shut off indicated utilities with utility companies.
2. If utility services are required to be removed, relocated, or abandoned, provide temporary utilities before proceeding with selective demolition that bypass area of selective demolition and that maintain continuity of service to other parts of building.
3. Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit after bypassing.
D. Utility Requirements: Do not start selective demolition work until utility disconnecting and sealing have been completed and verified in writing.
3.3 PREPARATION
A. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
1. Do not close or obstruct streets, walks, walkways, or other adjacent occupied or used facilities without permission from CO and authorities having jurisdiction.
Provide alternate routes around closed or obstructed traffic ways if required by governing regulations.
2. Erect temporary protection, such as walks, fences, railings, canopies, and covered passageways, where required by authorities having jurisdiction.
3. Protect existing site improvements, appurtenances, and landscaping to remain.
SELECTIVE DEMOLITION 017320-3
B. Temporary Facilities: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
3.4 POLLUTION CONTROLS
A. Dust Control: Use water mist, temporary enclosures, and other suitable methods to limit spread of dust and dirt. Comply with governing environmental-protection regulations.
B. Disposal: Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
C. Cleaning: Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. .
3.5 SELECTIVE DEMOLITION
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations.
1. Neatly cut openings and holes plumb, square, and true to dimensions required.
Use cutting methods least likely to damage construction to remain or adjoining construction.
2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
4. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
B. Existing Facilities: Comply with CO’s requirements for using and protecting walkways, building entries, and other building facilities during selective demolition operations.
3.6 PATCHING AND REPAIRS
A. General: Promptly repair damage to adjacent construction caused by selective demolition operations.
B. Repairs: Where repairs to existing surfaces are required, patch to produce surfaces suitable for new materials.
SELECTIVE DEMOLITION 017320-4
C. Finishes: Restore exposed finishes of patched areas and extend restoration into adjoining construction in a manner that eliminates evidence of patching and refinishing.
D. Floors and Walls: Where walls or partitions that are demolished extend one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform finish color, texture, and appearance. Remove existing floor and wall coverings and replace with new materials, if necessary, to achieve uniform color and appearance.
E. Ceilings: Patch, repair, or rehang existing ceilings as necessary to provide an even-plane surface of uniform appearance.
3.7 DISPOSAL OF DEMOLISHED MATERIALS
A. General: Promptly dispose of demolished materials. Do not allow demolished materials to accumulate on-site.
B. Burning: Do not burn demolished materials.
C. Disposal: Transport demolished materials off Government property and legally dispose of them.
END OF SECTION 017320
June 2009
SELECTIVE DEMOLITION 017320-5
SECTION 024100 - WASTE MATERIAL DISPOSAL
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes the loading, handling, hauling, and placing of construction debris.
1.2 MEASUREMENT AND PAYMENT
A. There will be no separate measurement or payment for work in this Section. Waste material disposal is considered incidental to other items of work shown in the Schedule of Items.
PART 2 - PRODUCTS – NOT APPLICABLE
PART 3 - EXECUTION
3.1 Waste material to be removed:
A. All demolition materials, excess building materials, garbage, and other refuse generated shall be hauled to a disposal area.
3.2 Disposal Site:
A. All waste material shall be removed from the project site and legally disposed off of Government property in an approved landfill.
1. The contractor is responsible for all costs and permits associated with landfill disposal.
2. The Government is not responsible for waste material upon its departure from the project site.
END OF SECTION 024100
July 2009
WASTE MATERIAL DISPOSAL 024100-1
SECTION 089119 - FIXED LOUVERS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes fixed, extruded-aluminum louvers.
1.2 SUBMITTALS
A. Product Data: For each type of product.
1. For louvers specified to bear AMCA seal, include printed catalog pages showing specified models with appropriate AMCA Certified Ratings Seals.
1.3 MEASUREMENT AND PAYMENT
A. No separate measurement or payment will be made for work specified in this section.
All work will be included in other items listed in the Schedule of Items.
PART 2 - PRODUCTS
2.1 FIXED, EXTRUDED-ALUMINUM LOUVERS
A. Horizontal, Drainable-Blade Louver:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Carnes Company.
b. Greenheck Fan Corporation.
c. Ruskin Company.
2. Louver Depth: 4 inches.
3. Frame and Blade Nominal Thickness: Not less than 0.080 inch for blades.
4. Mullion Type: Exposed.
5. Louver Performance Ratings:
a. Free Area: See drawings.
b. Point of Beginning Water Penetration: Not less than 900 fpm.
c. Air Performance: Not more than 0.10-inch wg static pressure drop at 700-fpm free-area intake velocity.
6. AMCA Seal: Mark units with AMCA Certified Ratings Seal.
FIXED LOUVERS 089119-1
http://www.specagent.com/Lookup?ulid=7059 http://www.specagent.com/Lookup?uid=123456838112 http://www.specagent.com/Lookup?uid=123456838116 http://www.specagent.com/Lookup?uid=123456838124
2.2 LOUVER SCREENS
A. General: Provide screen at each exterior louver.
1. Screen Location for Fixed Louvers: Interior face.
2. Screening Type: Bird screening.
2.3 MATERIALS
A. Aluminum Extrusions: ASTM B 221, Alloy 6063-T5, T-52, or T6.
B. Aluminum Sheet: ASTM B 209, Alloy 3003 or 5005 with temper as required for forming, or as otherwise recommended by metal producer for required finish.
C. Fasteners: Use types and sizes to suit unit installation conditions.
1. Use hex-head or Phillips pan-head screws for exposed fasteners unless otherwise indicated.
2. For fastening aluminum, use aluminum or 300 series stainless-steel fasteners.
3. For color-finished louvers, use fasteners with heads that match color of louvers.
D. Bituminous Paint: Cold-applied asphalt emulsion complying with ASTM D 1187.
2.4 ALUMINUM FINISHES
A. High-Performance Organic Finish: Three -coat fluoropolymer finish complying with AAMA 2605 and containing not less than 70 percent PVDF resin by weight in both color coat and clear topcoat. Prepare, pretreat, and apply coating to exposed metal surfaces to comply with coating and resin manufacturers' written instructions.
1. Color and Gloss: As selected by Architect from manufacturer's full range.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Locate and place louvers level, plumb, and at indicated alignment with adjacent work.
B. Use concealed anchorages where possible. Provide brass or lead washers fitted to screws where required to protect metal surfaces and to make a weathertight connection.
C. Provide perimeter reveals and openings of uniform width for sealants and joint fillers, as indicated.
D. Protect unpainted galvanized and nonferrous-metal surfaces that are in contact with concrete, masonry, or dissimilar metals from corrosion and galvanic action by applying a heavy coating of bituminous paint or by separating surfaces with waterproof gaskets or nonmetallic flashing.
FIXED LOUVERS 089119-2
3.2 ADJUSTING
A. Restore louvers damaged during installation and construction so no evidence remains of corrective work. If results of restoration are unsuccessful, as determined by Architect, remove damaged units and replace with new units.
END OF SECTION 089119
FIXED LOUVERS 089119-3
SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
PART 1 - GENERAL
1.1 SUMMARY, Section Includes:
1. Equipment labels.
2. Warning signs and labels.
3. Pipe labels.
4. Duct labels.
1.2 SUBMITTALS
A. Product Data: For each type of product.
1.3 MEASUREMENT AND PAYMENT
A. No separate measurement or payment will be made for work specified in this section.
All work will be included in other items listed in the Schedule of Items.
PART 2 - PRODUCTS
2.1 EQUIPMENT LABELS
A. Metal Labels for Equipment:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Brady Corporation.
b. Brimar Industries, Inc.
c. Carlton Industries, LP.
d. Champion America.
e. Craftmark Pipe Markers.
f. emedco.
g. Kolbi Pipe Marker Co.
h. LEM Products Inc.
i. Marking Services, Inc.
j. Seton Identification Products.
2. Material and Thickness: aluminum, 0.032-inch minimum thickness, and having predrilled or stamped holes for attachment hardware.
IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 230553-1
http://www.specagent.com/Lookup?ulid=9462 http://www.specagent.com/Lookup?uid=123456944705 http://www.specagent.com/Lookup?uid=123456944706 http://www.specagent.com/Lookup?uid=123456944707 http://www.specagent.com/Lookup?uid=123456944708 http://www.specagent.com/Lookup?uid=123456944709 http://www.specagent.com/Lookup?uid=123456944710 http://www.specagent.com/Lookup?uid=123456944711 http://www.specagent.com/Lookup?uid=123456944712 http://www.specagent.com/Lookup?uid=123456944713 http://www.specagent.com/Lookup?uid=123456944714
3. Letter Color: White.
4. Background Color: Black.
5. Minimum Label Size: Length and width vary for required label content, but not less than 2-1/2 by 3/4 inch.
6. Minimum Letter Size: 1/4 inch for name of units if viewing distance is less than
24 inches, 1/2 inch for viewing distances up to 72 inches, and proportionately larger lettering for greater viewing distances. Include secondary lettering two-thirds to three-quarters the size of principal lettering.
7. Fasteners: Stainless-steel rivets or self-tapping screws.
8. Adhesive: Contact-type permanent adhesive, compatible with label and with substrate.
B. Plastic Labels for Equipment:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Brady…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .