Amendment1.pdf
PDF 11 KB Posted
- Attached to
- KETCHUM WAREHOUSE HVAC PROJECT 2014 Federal contract opportunity
- Solicitation number
- AG-0261-S-14-0095
About this file
PREBID NOTES
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMEND_1.pdf | ||
| AMEND_1_M101-REV1.pdf | ||
| AMEND_1_round_duct_hanger_detail.pdf | ||
| SUPPORT_DOCUMENT_A_-_SPECIFICATIONS_HOUSING_HVAC.pdf | ||
| SUPPORT_DOCUMENT_C_-_DRAWINGS_OFFICE_HVAC.pdf | ||
| SUPPORT_DOCUMENT_B_-_SPECIFICATIONS_OFFICE_HVAC.pdf | ||
| SUPPORT_DOCUMENT_E_WORKERS_COMP_FORM.pdf | ||
| AG-0261-S-14-0095_KETCHUM_WAREHOUSE_HVAC_PROJECT_2014.pdf | ||
| SUPPORT_DOCUMENT_D_-_DRAWINGS_HOUSING_HVAV.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ketchum Warehouse HVAC Project 2014
AG-0261-S-14-0095
Amendment #1
The following changes have been made to the contract solicitation for the above named project. Please incorporate the following information into your bid.
Drawings
Housing:
Housing Sheet 3 of 9, delete note that lower level will not receive additional insulation and replace with the following note (entire building with attic space to be hatched to receive additional insulation):
ADDITIONAL INSULATION SHALL BE ADDED TO THE ATTIC ABOVE THE 2ND
FLOOR HOUSING. ADDITIONAL INSULATION SHALL ALSO BE ADDED TO
THE ATTIC AREA ABOVE THE 1ST FLOOR WAREHOUSE SPACE. BAFFLES
SHALL BE CLEANED AND INSTALLED AS PER DETAIL 1/A501. ALL WORK
WILL BE INCLUDED IN THE BASE BID FOR THE HOUSING INSULATION.
Housing Sheet 4 of 9, delete note stating “INSTALL IN ALT. TRUSS BAYS” and replace with the following:
INSTALL IN ALL TRUSS BAYS
Office:
Housing Sheet 4 of 5, detail 2 delete F/4 and replace with the following:
F/5
Housing Sheet 5 of 5 replace sheet with the attached sheet and add round duct hanger detail.
Questions and Answers
Q: What is to be done with the possibility of the furnace condensate freezing in the furnace and the condensate line and the possibility of it freezing?
A: The condensate line shall be routed to a plumbing drain. The condensate line shall be protected with heat tape. Use 3 to 6 watts per foot at 115 volt, 40 degree F self-regulating shielded and waterproof heat tape. Wrap the drain trap and drain line with the heat tape and secure with ties. Follow the heat tape manufacturer’s recommendations. Cover the heat tape with 1-inch of pipe insulation.