Construction_Cost_Estimate_Breakdown(1).xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- Leavitt Meadows Trail Bridge Replacement Federal contract opportunity
- Solicitation number
- AG-0261-S-13-0075
About this file
Construction Cost Estimate Breakdown
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| amendment__3.pdf | ||
| amendment_2.pdf | ||
| Revision__2_07152013-Construction_Cost_Estimate_Breakdown(1).xlsx | XLSX spreadsheet | |
| LeavittBridgeComments.docx | DOCX document | |
| SignIn.PDF | ||
| amendment_1.pdf | ||
| Amendment__1-revised-Construction_Cost_Estimate_Breakdown(1).xlsx | XLSX spreadsheet | |
| ag0261s130075.pdf | ||
| ag0261s130075_Attachments_2-4.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
| CONTRACT FOR (Work to be performed) | PROPOSED CONTRACT PRICE | |||||||||
| Leavitt Meadows Bridge Replacement | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| AG-0261-S-13-0075 | Multiple | |||||||||
| MATERIAL COST | LABOR COSTS | |||||||||
| UNIT | OTHER | |||||||||
| LINE | ITEM | OF | QUANTITY | UNIT | TOTAL | MANHOUR | AVERAGE | TOTAL | DIRECT | LINE |
| NO | MEASURE | MANDAYS | RATE | COSTS | TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| 1 | Mobilization/bond | 1 | EA | 0.00 | 0.00 | 0.00 | ||||
| 2 | Prefabricated Steel Truss Bridge | 1 | EA | 0.00 | 0.00 | 0.00 | ||||
| 3 | Concrete Abutements | 1 | EA | 0.00 | 0.00 | 0.00 | ||||
| 4 | Wingwalls | 1 | EA | 0.00 | 0.00 | 0.00 | ||||
| 5 | Approach Fill | 1 | EA | 0.00 | 0.00 | 0.00 | ||||
| 6 | Option #1 Removal of Existing Briges Superstructure-Disposal Method A | 1 | EA | 0.00 | 0.00 | 0.00 | ||||
| 7 | 0.00 | 0.00 | 0.00 | |||||||
| 8 | 0.00 | 0.00 | 0.00 | |||||||
| 9 | 0.00 | 0.00 | 0.00 | |||||||
| 10 | 0.00 | 0.00 | 0.00 | |||||||
| 11 | 0.00 | 0.00 | 0.00 | |||||||
| 12 | 0.00 | 0.00 | 0.00 | |||||||
| 13 | 0.00 | 0.00 | 0.00 | |||||||
| 0.00 | 0.00 | 0.00 | 0.00 |
OVERHEAD 0% $ - 0
SUBTOTAL 0.00
PROFIT 0% $ - 0
TOTAL PRICE $ - 0
AG-0261-S-13-0075 Attachment 1
| INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN | ||
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit | ||
| itemizing of all direct costs. | ||
| Col 2 Units of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF, | ||
| linear feet - LF, board feet - BF, each - EA, pound - LB). | ||
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the | ||
| Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, | ||
| the contractor is responsible for determining quantity estimates. | ||
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of the material to be supplied and total cost (col 5); for item listed in column 1. | ||
| Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. | ||
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of | ||
| significant dollar value. | ||
| Col 10 Line Total. Self-explanatory. | ||
| NOTE: | In addition to other totals derived on various pages, the grand total of column 10, plus overhead and profit will be shown on the last | |
| page as follows | ||
| TOTAL MATERIAL COSTS | $ |
TOTAL LABOR COSTS $
TOTAL OTHER DIRECT COSTS $
TOTAL DIRECT COSTS $
OVERHEAD % $
SUBTOTAL $
PROFIT % $
TOTAL PRICE $
DATE FIRM NAME
| TITLE | BY | |
| (Signature) |
| INSTRUCTIONS TO OFFERORS | ||
| 1. | The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and | |
| estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from | ||
| this proposal the offeror may be required to submit a certificate of current cost or pricing data | ||
| 2. | In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this | |
| form any additional data, supporting schedules, or substantiation which are reasonable required for the conduct of an appropriate review and | ||
| analysis in the light of the specific facets of this procurement. For effective negotiations, it is essential that there be a clear understanding of | ||
| a. | The existing, verifiable data. | |
| b. | The judgmental factors applied in projecting from known data to the estimate, and | |
| c. | The contingencies used by the offeror in his proposed price. | |
| In short, the offeror's estimating process itself needs to be disclosed. | ||
| 3. | When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), | |
| and made available to the contracting officer his authorized representative upon request. | ||
| 4. | By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the | |
| purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate | ||
| evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection | ||
| with any negotiations prior to contract award. |