Shingle_Hall_Construction_Cost_Estimate_Breakdown.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Shingle Hall Stewardship Project Federal contract opportunity
Solicitation number
AG-0261-S-13-0055
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

Section J attachments 11

View the file

Other files for this federal contract opportunity

Other files attached to Shingle Hall Stewardship Project, newest first.
File Type Posted
AG-0261-2-13-0055_0002.pdf PDF
Heli_Rand_Plots.txt TXT text file
AG-0261-S-13-0055_0001.pdf PDF
Rand_Plots.txt TXT text file
Attach_6-10.pdf PDF
Attach_12-15.pdf PDF
Attach_1-5.pdf PDF
AG-0261-S-13-0055_Shingle_Hall.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

MATERIAL COSTLABOR COSTS
UNITESTIMATEDOTHER
LINEITEMOFQUANTITYUNITTOTALMANHOURAVERAGETOTALDIRECTLINE
NOMEASUREMANDAYSRATECOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
15101Mobilization (for entire project)Lump Sum10.000.000.00
EAST FORK WEISER ROAD 50172
20426AGrade dips, earthenEach10.000.000.00
*23050BrushingMile4.40.000.000.00
*30326Road reconditioningMile4.40.000.000.00
30801Pit-run aggregate, 4” minusCubic Yard (loose)10.000.000.00
60201A18-inch pipe culvertFoot3740.000.000.00
61909Recondition, cattle guard, clean out, reset, repair wingsLump Sum10.000.000.00
SHINGLE FLAT ROAD 50183
*20401Roadway excavation, compaction method 1Cubic Yard150.000.000.00
*23050BrushingMile1.80.000.000.00
*30326Road reconditioningMile1.80.000.000.00
30801Pit-run aggregate, 4” minusCubic Yard (loose)380.000.000.00
60201A18-inch pipe culvertFoot4580.000.000.00
60201B24-inch pipe culvertFoot1160.000.000.00
61908Cattle guard modification, removalEach10.000.000.00
61909Recondition cattle guard, clean out, re-set, repair wingsEach20.000.000.00
FORT HALL RIDGE ROAD 50285
*20103Light clearing and grubbing, disposal of tops and limbs f, logs m, stumps lMile1.190.000.000.00
*20419Drainage excavation, type ditchFoot1380.000.000.00
20426BGrade dips, armoredEach30.000.000.00
*23050BrushingMile0.360.000.000.00
*30326Road reconditioningMile1.550.000.000.00
30801Pit-run aggregate, 4” minusCubic Yard (loose)2160.000.000.00
60201A18-inch pipe culvertFoot3600.000.000.00
60201B24-inch pipe culvertFoot360.000.000.00
61902Gate, 16’ metalEach10.000.000.00
MILL SPRING ROAD 50996
*57101Install temporary bridge, Government-furnishedLump sum10.000.000.00
60201C24- inch pipe culvert, plasticFoot340.000.000.00
LAYOVER ROAD 51382
*20103ALight clearing and grubbing, disposal of tops and limbs f, logs m, stumps lMile0.710.000.000.00
*20401Roadway excavation, compaction method 1Cubic Yard900.000.000.00
20426AGrade dips, earthenEach110.000.000.00
20426BGrade dips, armoredEach10.000.000.00
*23050BrushingMile0.950.000.000.00
*30326Road reconditioningMile1.660.000.000.00
30801Pit-run aggregate, 4” minusCubic Yard (loose)2090.000.000.00
61902Gate, 16’ metalEach10.000.000.00
OCEAN SPRAY ROAD 51385
*20401Roadway excavation, compaction method 1Cubic Yard250.000.000.00
20426AGrade dips, earthenEach10.000.000.00
20426BGrade dips, armoredEach80.000.000.00
*21250Linear gradingStation60.000.000.00
*23050BrushingMile1.40.000.000.00
*30326Road reconditioningMile1.40.000.000.00
30801Pit-run aggregate, 4” minusCubic Yard (Loose)2680.000.000.00
60201A18-inch pipe culvertFoot660.000.000.00
61902Gate, 16’ metalEA10.000.000.00
WEST SHINGLE ROAD 51845
*20103Light clearing and grubbing, disposal of tops and limbs f, logs m, stumps lMile0.440.000.000.00
*20401Roadway excavation, compaction method 1Cubic Yard6000.000.000.00
20426AGrade dips, earthenEach50.000.000.00
*30326Road reconditioning - heavyMile0.440.000.000.00
30801Pit-run aggregate, 4” minusCubic Yard (loose)7380.000.000.00
*32203Aggregate surface, grading e, for Rd 50172Cubic Yard (in place)49440.000.000.00
*32203Aggregate surface, grading e, for Rd 50183Cubic Yard (in place)19440.000.000.00
0.000.000.000.00
NOTES: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.0.00
Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.
* Next to an Item Number indicates that the quantity shown as a Contract Quantity per FP-03 Specification 109.02. The supplemental specification 109.02 states “contract quantities will be adjusted only when there are errors in the original design of 15% or more.”

Shingle Hall Attachment 11

INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit
itemizing of all direct costs.
Col 2 Units of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF,
linear feet - LF, board feet - BF, each - EA, pound - LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the
Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise,
the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of the material to be supplied and total cost (col 5); for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of
significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE:In addition to other totals derived on various pages, the grand total of column 10, plus overhead and profit will be shown on the last
page as follows
TOTAL MATERIAL COSTS$

TOTAL LABOR COSTS $

TOTAL OTHER DIRECT COSTS $

TOTAL DIRECT COSTS $

OVERHEAD % $

SUBTOTAL $

PROFIT % $

TOTAL PRICE $

DATE FIRM NAME

TITLEBY
(Signature)
INSTRUCTIONS TO OFFERORS
1.The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from
this proposal the offeror may be required to submit a certificate of current cost or pricing data
2.In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this
form any additional data, supporting schedules, or substantiation which are reasonable required for the conduct of an appropriate review and
analysis in the light of the specific facets of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a.The existing, verifiable data.
b.The judgmental factors applied in projecting from known data to the estimate, and
c.The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3.When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate),
and made available to the contracting officer his authorized representative upon request.
4.By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the
purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate
evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection
with any negotiations prior to contract award.

Shingle Hall Attachment 11