ATT 5 McWilliams CG Reconstruction Cost Estimate
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_0001_-_AG-0261-S-13-0025.pdf | ||
| Amendment_001_-_Replacement_ATTACH_5-McWilliiams_Campround_Reconstruction_Cost_Estimate_Breakdown.xlsx | XLSX spreadsheet | |
| 04-09-13__McWilliams_RFP.pdf | ||
| ATT_2a_-_McWilliams.Dwg.Final.Signed.03.07.2013.pdf | ||
| ATT_1_-_McWilliams.Specs.Final.03.07.2013.pdf | ||
| ATT_4_-_McWilliams_Campground_Past_Performance_Questionnaire.pdf | ||
| ATT_3_-_NV100034_Highway_01-04-13.pdf | ||
| ATT_2b_-_McWilliams.Dwg.Final.Signed.03.07.2013.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| ATTACH 5 -McWilliams Campround Reconstruction Project AG-0261-S-13-0025 | |
| CONSTRUCTION COST ESTIMATE BREAKDOWN |
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
| MATERIAL COST | LABOR COSTS | |||||||||
| UNIT | OTHER | |||||||||
| LINE | ITEM | OF | QUANTITY | UNIT | TOTAL | MANHOUR | AVERAGE | TOTAL | DIRECT | LINE |
| NO | MEASURE | MANDAYS | RATE | COSTS | TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| 000501-1 | Fireplace | EA | 2 | |||||||
| 000501-2 | Stone Veneered Walls | LF | 160 | |||||||
| 000501-3 | Stone Veneered Column Bases | EA | 12 | |||||||
| 502 | Modifications to Existing 6-Unit Comfort Station | LS | 1 | |||||||
| 10250 | Construction Staking | LS | 1 | |||||||
| 11900 | Mobilization | LS | 1 | |||||||
| 26460 | Concrete Dumpster Pads and Enclosure Screen Walls | EA | 1 | |||||||
| 33520 | Low Water Crossing | LS | 1 | |||||||
| 033540-1 | Colored Concrete Sidewalks - 5.5-feet wide | LF | 808 | |||||||
| 033540-2 | Exterior 30 Inch Colored Concrete Curb & Gutter | LF | 808 | |||||||
| 033540-3 | Accessible Ramp | EA | 4 | |||||||
| 033540-4 | Colored Concrete Sidewalks / Paths - 4-feet wide | LF | 970 | |||||||
| 033540-5 | Kiosk Concrete Pad- 6" Thick 4" aggregate base | EA | 3 | |||||||
| 033540-6 | Interpretive Exhibit Concrete Pad - 4" Thick 4" aggregate base | EA | 1 | |||||||
| 101400 | Signs - Regulatory & Directional | EA | 20 | |||||||
| 101415 | Major Site ID Sign (NRA-REC) | EA | 1 | |||||||
| 129310 | Trash Receptacles | EA | 8 | |||||||
| 129400-1 | Group Site - 30 PAOT (6-Table) | EA | 5 | |||||||
| 129400-2 | Group Site - 40 PAOT (8 table) | EA | 2 | |||||||
| 133402-1 | Utility Box - 48-inch Dia. Concrete w/ Pressure Reducing Valve | EA | 1 | |||||||
| 133402-2 | Utility Box - 48-inch Dia. Concrete w/ Electric Actuator Valve | EA | 1 | |||||||
| 133442 | Shelter - Group Site, Includes Concrete Footing | EA | 2 | |||||||
| 133450 | Comfort Station Installation (2-Unit), Including Utilities and Sidewalks | EA | 2 | |||||||
| 133470 | Entrance Station Installation, Including Utilities, Sidewalks and Curb | EA | 1 | |||||||
| 133480 | Concession Building Installation, Including Utilities and Sidewalks | EA | 1 | |||||||
| 221100-1 | Pipeline, 2" HDPE, 160 PSI with Heat Fusion Joints, Including Trench | LF | 2,115 | |||||||
| 221100-2 | Pipeline, 3" HDPE, 160 PSI with Heat Fusion Joints, Including Trench | LF | 255 | |||||||
| 221100-3 | Pipeline, 6" HDPE, 160 PSI with Heat Fusion Joints, Including Trench | LF | 4,340 | |||||||
| 221100-4 | Drain - 2" Daylight Drain | EA | 1 | |||||||
| 221100-5 | Drain - 3" Daylight Drain | EA | 1 | |||||||
| 221100-6 | Drain - 6" Daylight Drain | EA | 1 | |||||||
| 221100-7 | Pipe Sleeve - 10" HDPE | LF | 50 | |||||||
| 221102-1 | 2" Poly Curb Valve and Box | EA | 8 | |||||||
| 221102-2 | 3" Poly Curb Valve and Box | EA | 1 | |||||||
| 221102-2 | 6" Poly Curb Valve and Box | EA | 2 | |||||||
| 221105 | Frost Proof Hydrant, Type D | EA | 7 | |||||||
| 221200 | Water Storage Tank - Single 30,000 Gallon Fiberglass | LS | 1 | |||||||
| 221300-1 | Sewerline - Gravity, 4" PVC, SDR 35 Including Trench | LF | 155 | |||||||
| 221300-2 | Drainfield #1 (North Toilet) - Includes Distribution Box | LS | 1 | |||||||
| 221300-3 | Drainfield #2 (South Toilet) - Includes Distribution Box | LS | 1 | |||||||
| 221300-4 | Septic Tank & Installation - 2,000 Gallon Precast Concrete | EA | 2 | |||||||
| 231126 | Exterior Propane Gas System - 500 Gallon Tank | EA | 4 | |||||||
| 260500 | Electrical System | LS | 1 | |||||||
| 312000-1 | Pipe Zone - Imported (Commercial Source) | CY | 670 | |||||||
| 312000-2 | Special Bedding - Imported (Commercial Source) | CY | 320 | |||||||
| 312100-1 | Project Site Preparation and Grading | LS | 1 | |||||||
| Total |
| INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN | ||
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit | ||
| itemizing of all direct costs. | ||
| Col 2 Units of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF, | ||
| linear feet - LF, board feet - BF, each - EA, pound - LB). | ||
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the | ||
| Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, | ||
| the contractor is responsible for determining quantity estimates. | ||
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of the material to be supplied and total cost (col 5); for item listed in column 1. | ||
| Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. | ||
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of | ||
| significant dollar value. | ||
| Col 10 Line Total. Self-explanatory. | ||
| NOTE: | In addition to other totals derived on various pages, the grand total of column 10, plus overhead and profit will be shown on the last | |
| page as follows | ||
| TOTAL MATERIAL COSTS | $ |
TOTAL LABOR COSTS $
TOTAL OTHER DIRECT COSTS $
TOTAL DIRECT COSTS $
OVERHEAD % $
SUBTOTAL $
PROFIT % $
TOTAL PRICE $
DATE FIRM NAME
| TITLE | BY | |
| (Signature) |
| INSTRUCTIONS TO OFFERORS | ||
| 1. | The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and | |
| estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from | ||
| this proposal the offeror may be required to submit a certificate of current cost or pricing data | ||
| 2. | In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this | |
| form any additional data, supporting schedules, or substantiation which are reasonable required for the conduct of an appropriate review and | ||
| analysis in the light of the specific facets of this procurement. For effective negotiations, it is essential that there be a clear understanding of | ||
| a. | The existing, verifiable data. | |
| b. | The judgmental factors applied in projecting from known data to the estimate, and | |
| c. | The contingencies used by the offeror in his proposed price. | |
| In short, the offeror's estimating process itself needs to be disclosed. | ||
| 3. | When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), | |
| and made available to the contracting officer his authorized representative upon request. | ||
| 4. | By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the | |
| purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate | ||
| evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection | ||
| with any negotiations prior to contract award. |