ATT_2b_-_McWilliams.Dwg.Final.Signed.03.07.2013.pdf
PDF 34 MB Posted
- Attached to
- McWilliams Campground Reconstruction Project Federal contract opportunity
- Solicitation number
- AG-0261-S-13-0025
About this file
ATT 2b Mcwilliams dwg. final signed 3-7-13
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_0001_-_AG-0261-S-13-0025.pdf | ||
| Amendment_001_-_Replacement_ATTACH_5-McWilliiams_Campround_Reconstruction_Cost_Estimate_Breakdown.xlsx | XLSX spreadsheet | |
| 04-09-13__McWilliams_RFP.pdf | ||
| ATT_2a_-_McWilliams.Dwg.Final.Signed.03.07.2013.pdf | ||
| ATT_1_-_McWilliams.Specs.Final.03.07.2013.pdf | ||
| ATT_4_-_McWilliams_Campground_Past_Performance_Questionnaire.pdf | ||
| ATT_3_-_NV100034_Highway_01-04-13.pdf | ||
| ATTACH_5_-_McWilliiams_Campround_Reconstruction_Cost_Estimate_Breakdown.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s R R .M c W il li a m s .R o a d s .d w g
P M
H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s R R .M c W il li a m s .R o a d s .d w g
H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s R R .M c W il li a m s .R o a d s .d w g
H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s R R .M c W il li a m s .R o a d s .d w g
H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s R R .M c W il li a m s .R o a d s .d w g
H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s R R .M c W il li a m s .R o a d s .d w g
H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s R R .M c W il li a m s .R o a d s .d w g
H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s R R .M c W il li a m s .R o a d s .d w g
H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s R R .M c W il li a m s .R o a d s .d w g
H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s R R .M c W il li a m s .R o a d s .d w g
H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s R R .M c W il li a m s .R o a d s .d w g
H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s R R .M c W il li a m s .R o a d s .d w g
H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s R R .M c W il li a m s .S p u rs .d w g
H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s R R .M c W il li a m s .S p u rs .d w g
H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s R .M c W il li a m s .R o a d .P a rk in g .S e c ti o n s .d w g
H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s R .M c W il li a m s .C u lv e rt s .d w g
H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s R .M c W il li a m s .H e a v y .R ip ra p .C h ic a n e .d w g
H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s R .M c W il li a m s .S p u r.
P o in ts .d w g
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WW
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
S
W
WW
W
W W
W
W
W
W
W
W
W
W -E
W -E
W-E
W-E
W-E
W-E
W-E
W-E
W-E
W-E
W
W
W
W
S S
SS
W-E
NOTES:
1. SEE SHEETS W2-15 FOR WATERLINE PLAN & PROFILES.
2. ALL WATERLINE SHALL BE SLOPED A MINIMUM 2% TO DRAIN.
3. BURY WATERLINE A MINIMUM OF 84 INCHES. ADDITIONAL DEPTH MAY BE REQUIRED
TO MAINTAIN A MINIMUM SLOPE OF 2%.
4. WHEN WATERLINES INTERSECT CULVERTS, INSTALL FROSTSHIELD AND SLEEVE(S)
ACCORDING TO DETAIL ON SHEET W19. WATERLINE INVERT DEPTH BELOW BOTTOM
OF CULVERT MUST BE AT LEAST 36 INCHES. FROSTSHIELD AND SLEEVES MUST
EXTEND AT LEAST 10 FEET ON BOTH SIDES OF THE CULVERT EDGE.
5. LOCATION AND ORIENTATION OF ALL STRUCTURES AND HYDRANTS SHALL BE
APPROVED BY THE CONTRACTING OFFICER PRIOR TO INSTALLATION.
6. AN EXTENSIVE EFFORT HAS BEEN MADE TO LOCATE ALL POSSIBLE EXISTING UTILITY
LINES FROM RECORDS AND EVIDENCE IN THE FIELD, HOWEVER, THE COMPLETENESS
OR ACCURACY OF THE LOCATIONS SHOWN CANNOT BE GUARANTEED. THE
CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING THE LOCATION OF ALL EXISTING
UTILITIES. ANY LOCATION STAKED OR SHOWN IS APPROXIMATE. CALL 811 TO HAVE
UTILITIES MARKED BEFORE BEGINNING CONSTRUCTION. IF CONFLICTS ARE FOUND,
NOTIFY THE CONTRACTING OFFICER.
7. THE MINIMUM ALLOWABLE BENDING RADIUS FOR HDPE PIPE IS 30 TIMES THE
NOMINAL PIPE DIAMETER.
NOM. PIPE DIA. MIN. BENDING RADIUS
2" 5'-0" 3" 7'-6" 4" 10'-0" 6" 15'-0"
8. INSTALL THE WATER SYSTEM ACCORDING TO APPLICABLE FEDERAL, STATE AND
LOCAL REGULATIONS FOR PUBLIC DRINKING WATER SYSTEMS, INCLUDING NEVADA
ADMINISTRATIVE CODE (NAC) 445A.
9. CLEARING LIMITS SHALL BE 5 FEET ON BOTH SIDES OF THE WATERLINE TRENCH.
THE CONTRACTOR SHALL USE CAUTION AND AVOID DAMAGE TO TREES AND
VEGETATION. THE CONTRACTOR SHALL CONFINE ALL OPERATIONS AND ACTIVITIES
TO WITHIN THE CLEARING LIMITS.
10. WHERE ENCOUNTERED, REMOVE AND DISPOSE OF EXISTING WATERLINE TO A DEPTH
OF 12" BELOW FINISHED GRADE. CAP AND ABANDON REMAINDER IN PLACE.
11. CONNECTIONS BETWEEN NEW AND EXISTING WATERLINES SHALL BE INSTALLED IN
MANNER RECOMMENDED BY THE PIPE MANUFACTURER AND APPROVED BY THE
CONTRACTING OFFICER. USE HDPE/GSP TRANSITION FITTINGS FOR CONNECTIONS
TO GALVANIZED STEEL. USE HDPE/PVC TRANSITION FITTINGS FOR CONNECTIONS TO
PVC PIPE. COMPRESSION-TYPE FITTINGS ARE NOT ALLOWED.
12. WATERLINES SHALL BE INSTALLED A MINIMUM OF 10 FEET FROM SEWERLINES AND
SEPTIC TANKS AND A MINIMUM OF 25 FEET FROM DRAINFIELDS.
13. ON LATERALS AND DRAINLINES, INSTALL CURB VALVES AND BOXES 2 FEET FROM
TEE OR LINE TO BE DRAINED UNLESS SHOWN OTHERWISE.
14. ALL RESTROOM AND HYDRANT LATERALS SHALL BE 2" HDPE UNLESS DESIGNATED
OTHERWISE. SLOPE ALL HYDRANT AND RESTROOM LATERALS TO DRAIN TOWARD
THE MAINLINE, UNLESS SHOWN OTHERWISE.
15. WHERE NEW WATERLINES INTERSECT SEWERLINES, THE NEW WATERLINES SHALL
BE INSTALLED ACCORDING TO APPLICABLE FEDERAL, STATE AND LOCAL
REGULATIONS, INCLUDING NEVADA ADMINISTRATIVE CODE (NAC) 445A.
16. DO NOT INSTALL HYDRANTS, AIR RELEASE VALVES, PRESSURE REDUCING VALVES
OR ANY OTHER PLUMBING IN THE UTILITY BOXES OR BUILDINGS UNTIL THE
UPSTREAM WATERLINES HAVE BEEN FULLY FLUSHED OF DEBRIS ACCORDING TO
THE SPECIFICATIONS.
17. AVOID CONSTRUCTION OF WATER LINES UNDER THE DRIP EDGE OF ALL LARGE
PONDEROSA TREES GREATER THAN 14 INCHES IN DIAMETER AT BREAST HEIGHT
(DBH).
SEE SHEET W7
SEE SHEET W2
SE
E
SH
EE
T W
LEGEND (1" = 50'):
NEW WATERLINE
NEW WATER AND ELECTRIC LINE IN SAME TRENCH
EXISTING WATERLINE
NEW SEWERLINE
NEW ELECTRICAL LINE
NEW GAS LINE
DAYLIGHT DRAIN (W16)
CURB VALVE AND BOX - SIZE VARIES (SEE SHEET W16)
HYDRANT - FROSTPROOF, TYPE D (SEE SHEET W17)
UTILITY BOX WITH PRESSURE REDUCING VALVE (W18)
UTILITY BOX WITH AIR RELEASE VALVE (SEE W18)
CLEANOUT (SEE SHEET WW16)
PROPOSED ASPHALT ROAD
MAJOR CONTOUR AND ELEVATION (FEET)
NEW DRAINFIELD
REPLACEMENT DRAINFIELD
W
W
S
E
G
SEE SHEET W3 SEE SHEET W4
SEE SHEET W5
SEE SHEET W6
SE
E
SH
EE
T W
SEE SHEET W9
SEE SHEET W10
W11
W12 & W13
SEE SHEET W14
W-E
CAMP LEE
EXISTING BOOSTER PUMP STATION
(SUPPLIES MCWILLIAMS CAMPGROUND)
PUMP ELEV. 8435'
EXISTING 185,000 GAL. WATER
STORAGE TANK AND SUPPLY WELL #2
HIGH WATER MARK ELEV: 8622'
MCWILLIAMS CAMPGROUND
TO SKI AREA
LEE CANYON ROAD (SR 156)
TO LAS VEGAS
MAIN WATERLINE
LATERAL #1
LATERAL #2
LATERAL #3
LATERAL #4
MAIN WATERLINE
X H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W W .W W .M c W il li a m s .W a te r-
S e w e r_ T e le w o rk .d w g
0+00 1+00 1+75
1+75 2+00 3+00 4+00
4+00 5+00 6+00 7+00
-6.4%
-51.3%
-10.8%
-31.4%
-19.5%
-15.3%
-11.3%
-7.9%
-31.0%
-6.5%
-33.8%
-23.1%
POINT TABLE
POINT
NORTHING
26813299.7
26813282.1
26813293.6
26813368.2
26813416.6
26813461.0
26813546.5
26813645.7
26813472.4
EASTING
625639.5
625733.5
625831.8
625898.3
625985.5
626075.1
626092.0
626079.8
626098.1
6" HDPE WATERLINE (DISTRIBUTION)
3" HDPE WATERLINE (SUPPLY)
ELECTRICAL CONTROL LINES
STA:5+26
DISTRIBUTION LINE: INSTALL TEE
TO LATERAL #1
STA:5+28
DISTRIBUTION LINE: INSTALL 6-INCH
CURB VALVE AND BOX
STA:0+00
CONNECT TO TANK #2 OUTLET
APPROX. OUTLET ELEV: 8798'
PROPOSED TOP OF SUBGRADE (TYP)
NEW PIPE INVERT
EXISTING GROUND
X H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W W .W W .M c W il li a m s .W a te r-
S e w e r_ T e le w o rk .d w g
P M
INSTALL TWO (2) 18,000 GALLON FIBERGLASS
WATER STORAGE TANKS, SEE SHEET W21
EXISTING GRADES ARE APPROX. 45 TO 60%
CONSTRUCT ACCESS ROAD FOR CONSTRUCTION OF
WATER STORAGE TANKS. ROAD TO BE OBLITERATED AND
RESTORED AFTER CONSTRUCTION, SEE SPECIFICATIONS.
MAIN WATERLINE
3" HDPE
3" HDPE
LATERAL #2 (3" HDPE)
SEE SHEET W12
LATERAL #1
SEE SHEET W7
NOTES:
1. NOTES AND LEGEND ON SHEET W1 APPLY.
2. COORDINATE ELECTRICAL CONTROL LINE (TO THE STORAGE TANK)
INSTALLATION SO LINE IS ROUTED BEYOND ASPHALT SURFACES
WHERE HANDHOLES ARE REQUIRED, TO ALLOW CLOSEST EDGE
OF HANDHOLE TO BE 24" MINIMUM FROM ASPHALT.
INSTALL TANK DRAIN
SEE SHEET W21
INSTALL PERIMETER DRAIN (TYP)
SEE SHEET W21
INSTALL TWO LINES IN TRENCH
6" HDPE (DISTRIBUTION)
3" HDPE (SUPPLY)
ELECTRICAL CONTROL LINES
INSTALL TWO LINES IN TRENCH
6" HDPE (DISTRIBUTION)
3" HDPE (SUPPLY)
ELECTRICAL CONTROL LINES
MAIN WATERLINE
INSTALL 6" CURB
VALVE AND BOX
CONNECT TO LATERAL #1
CONNECT TO LATERAL #2
INSTALL TWO LINES IN TRENCH
3" HDPE (DISTRIBUTION)
3" HDPE (SUPPLY)
ELECTRICAL CONTROL LINES
CONNECT TO OUTLET OF TANK #2
INTERSECT LOCATION OF EXISTING
TANK. ENSURE AREA HAS BEEN
PROPERLY BACKFILLED AND
COMPACTED PER SPECIFICATIONS
INSTALL 3" CURB VALVE AND BOX
TANK #1
TANK #2
MAIN ROAD
H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W W .W W .M c W il li a m s .W a te r-
S e w e r_ T e le w o rk .d w g
P M
MAIN WATERLINE
NOTES:
1. NOTES AND LEGEND ON SHEET W1 APPLY.
2. COORDINATE ELECTRICAL CONTROL LINE (TO THE STORAGE TANK) INSTALLATION SO
LINE IS ROUTED BEYOND ASPHALT SURFACES WHERE HANDHOLES ARE REQUIRED, TO
ALLOW CLOSEST EDGE OF HANDHOLE TO BE 24" MINIMUM FROM ASPHALT.
INSTALL TWO LINES IN TRENCH
3" HDPE (DISTRIBUTION)
3" HDPE (SUPPLY)
ELECTRICAL CONTROL LINES
3" HDPE
LATERAL #2 (3" HDPE)
SEE SHEET W12
INSTALL DAYLIGHT
DRAIN FOR LATERAL #2
INSTALL 2" HDPE LATERAL AND 2"
CURB VALVE AND BOX TO HYDRANT
INSTALL 3" CURB
VALVE AND BOX
14+00 15+00 16+00 17+00 18+00
18+00 19+00 20+00 21+00 21+25
-7.0%
-9.4%
-9.5%
-8.2%
STA:17+96
INVERT ELEV:8577.8
STA:19+72
INVERT ELEV:8561.3
STA:20+82
INVERT ELEV:8550.8
STA:21+15
INVERT ELEV:8548.1
DRAINFIELD #2 SEWERLINE
POINT TABLE
POINT
NORTHING
26813983.3
26814000.3
26814024.6
26814059.3
26814098.3
26814120.7
26814133.5
26813952.5
EASTING
626763.7
626862.0
626958.0
627051.5
627143.1
627240.5
627339.6
626722.3
POINT TABLE
POINT
NORTHING
26813955.1
26813957.6
26814050.3
26814059.7
26813959.7
26814105.4
26813981.6
26814092.3
EASTING
626728.0
626733.7
627029.0
627052.6
626747.8
627104.6
626758.4
627124.8
3" HDPE WATERLINE (DISTRIBUTION)
3" HDPE WATERLINE (SUPPLY)
ELECTRICAL CONTROL LINES
STA:14+52
DISTRIBUTION LINE:
INSTALL UTILITY BOX WITH PRESSURE
REDUCING VALVE #1
(SET OUTLET FOR 50 PSI)
STA:14+94
DISTRIBUTION LINE:
INSTALL TEE TO RESTROOM #2
AND HYDRANT LATERAL
STA:15+26
DISTRIBUTION LINE:
INTERSECT RESTROOM #2 DRAINLINE
STA:16+30
INTERSECT SEWERLINE
SPECIAL CONSTRUCTION REQUIRED
SEE SHEET W19
STA:18+81
DISTRIBUTION LINE:
INSTALL TEE TO HYDRANT LATERAL
STA:20+99
INTERSECT CULVERT, INSTALL
FROSTSHIELD AND SLEEVES
SEE SHEET W19
EXISTING GROUND
PROPOSED TOP OF SUBGRADE (TYP)
NEW PIPE INVERT
BOX CULVERT #5
NOTES:
1. NOTES AND LEGEND ON SHEET W1 APPLY.
2. COORDINATE ELECTRICAL CONTROL LINE (TO THE STORAGE TANK) INSTALLATION SO
LINE IS ROUTED BEYOND ASPHALT SURFACES WHERE HANDHOLES ARE REQUIRED, TO
ALLOW CLOSEST EDGE OF HANDHOLE TO BE 24" MINIMUM FROM ASPHALT.
MAIN WATERLINE
INSTALL TWO LINES IN TRENCH
3" HDPE (DISTRIBUTION)
3" HDPE (SUPPLY)
ELECTRICAL CONTROL LINES
INSTALL 2" HDPE LATERAL AND 2"
CURB VALVE AND BOX TO HYDRANT
INSTALL 2" HDPE LATERAL TO RESTROOM #2
AND HYDRANT. INSTALL 2" CURB VALVE AND
BOX. SLOPE ALL LATERAL LINES TO DRAIN
TOWARDS DAYLIGHT DRAIN
2" HDPE
EXTEND DRAINLINE TO DAYLIGHT AT 2%
SLOPE AND INSTALL 2" DAYLIGHT DRAIN
(APPROX. LOCATION)
INSTALL 2" CURB VALVE
AND BOX FOR DRAINLINE
DISTRIBUTION LINE:
INSTALL UTILITY BOX
WITH PRESSURE
REDUCING VALVE #1
(SET OUTLET TO 50 PSI)
SEE SHEET W18
INSTALL WATERLINE AT LEAST 25
FEET FROM EDGE OF DRAINFIELD #2
INTERSECT SEWERLINE
SPECIAL CONSTRUCTION
REQUIRED, SEE SHEET W19
INTERSECT BOX CULVERT #5
INSTALL FROSTSHIELD AND SLEEVES
SEE SHEET W19
X H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W W .W W .M c W il li a m s .W a te r-
S e w e r_ T e le w o rk .d w g
21+25 22+00 23+00 24+00 25+00
25+00 26+00 27+00 28+00
POINT TABLE
POINT
NORTHING
26814147.0
26814202.7
26814250.8
26814287.8
26814349.8
26814401.1
26814459.7
EASTING
627438.7
627520.8
627606.5
627688.8
627767.3
627853.0
627933.3
POINT TABLE
POINT
NORTHING
26814198.0
26814253.6
26814256.5
26814259.4
26814217.3
26814354.6
26814368.5
EASTING
627515.0
627655.9
627661.5
627667.1
627494.8
627794.2
627795.8
3" HDPE WATERLINE (DISTRIBUTION)
3" HDPE WATERLINE (SUPPLY)
ELECTRICAL CONTROL LINES
STA:22+93
DISTRIBUTION LINE:
INSTALL TEE TO RESTROOM #3
AND HYDRANT LATERAL
STA:24+57
DISTRIBUTION LINE:
INSTALL UTILITY BOX WITH
PRESSURE REDUCING VALVE #2
(SET OUTLET FOR 50 PSI)
STA:26+34
DISTRIBUTION LINE:
INSTALL TEE TO HYDRANT LATERAL
STA:27+11
INTERSECT SEWERLINE
SPECIAL CONSTRUCTION REQUIRED
SEE SHEET W19
-10.8%
-7.9%
-9.5%
-10.7%
-11.1%
-3.4%
-8.3%
STA:24+57
INVERT ELEV:8521.5
STA:25+28
INVERT ELEV:8515.9
STA:26+15
INVERT ELEV:8507.6
STA:22+30
INVERT ELEV:8537.0
STA:23+51
INVERT ELEV:8532.9
STA:21+74
INVERT ELEV:8543.3
EXISTING GROUND
PROPOSED TOP OF SUBGRADE (TYP)
NEW PIPE INVERT DRAINFIELD #3 SEWERLINE
3" HDPE
NOTES:
1. NOTES AND LEGEND ON SHEET W1 APPLY.
2. COORDINATE ELECTRICAL CONTROL LINE (TO THE STORAGE TANK) INSTALLATION SO
LINE IS ROUTED BEYOND ASPHALT SURFACES WHERE HANDHOLES ARE REQUIRED, TO
ALLOW CLOSEST EDGE OF HANDHOLE TO BE 24" MINIMUM FROM ASPHALT.
MAIN WATERLINE
INSTALL TWO LINES IN TRENCH
3" HDPE (DISTRIBUTION)
3" HDPE (SUPPLY)
ELECTRICAL CONTROL LINESINSTALL 2" HDPE LATERAL AND 2"
CURB VALVE AND BOX TO HYDRANT
INSTALL 2" HDPE LATERALS TO
RESTROOM #3 AND HYDRANT. INSTALL
2" CURB VALVE AND BOXES (2 REQ).
DISTRIBUTION LINE: INSTALL
UTILITY BOX WITH PRESSURE
REDUCING VALVE #2 (SET
OUTLET TO 50 PSI
SEE SHEET W18
INTERSECT SEWERLINE
SPECIAL CONSTRUCTION
REQUIRED, SEE SHEET W19
NEW WATER AND SEWER LINES MUST
BE SEPARATED BY AT LEAST 10 FEET
MAIN ROAD
EUREKA LOOP ROAD
X H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W W .W W .M c W il li a m s .W a te r-
S e w e r_ T e le w o rk .d w g
28+00 29+00 30+00 31+00
31+00 32+00 33+00 34+00 34+29
POINT TABLE
POINT
NORTHING
26814508.7
26814554.9
26814604.7
26814663.1
26814719.7
26814791.0
26814606.7
26814613.3
26814576.2
26814558.0
26814642.3
EASTING
628020.2
628108.9
628195.6
628276.7
628359.2
628428.5
628198.8
628222.4
628241.7
628114.8
628327.3
3" HDPE WATERLINE (DISTRIBUTION)
3" HDPE WATERLINE (SUPPLY)
ELECTRICAL CONTROL LINES
STA:29+78
INTERSECT CULVERT, INSTALL
FROSTSHIELD AND SLEEVES
SEE SHEET W19
STA:30+07
DISTRIBUTION LINE:
INSTALL TEE TO LATERAL #4
STA:31+04
END 2 LINES IN TRENCH
DISTRIBUTION LINE BRANCHES
TO DRAINLINE AND HOST #1
3" HDPE WATERLINE (SUPPLY)
ELECTRICAL CONTROL LINES
STA:33+54
INTERSECT CULVERT, INSTALL
FROSTSHIELD AND SLEEVE
SEE SHEET W19
STA:34+29
CONNECT TO EXISTING SUPPLY LINE
FROM BOOSTER PUMP STATION.
FUSE NEW PIPE DIRECTLY
TO EXISTING 3" HDPE
CULVERT #1
-3.5% -7.7%
-2.0%
-7.8%
-8.8%
STA:28+28
INVERT ELEV:8484.8
STA:29+12
INVERT ELEV:8481.8
STA:33+43
INVERT ELEV:8447.1
STA:31+03
INVERT ELEV:8465.7
STA:30+24
INVERT ELEV:8471.9
EXISTING GROUND
PROPOSED TOP OF SUBGRADE (TYP)
NEW PIPE INVERT
SLOPE NEW WATERLINE AT 2% MIN. TO TRANSITION
FROM 84" BURIAL DEPTH TO EXISTING LINE DEPTH
(APPROX. 48"). EXTEND NEW WATERLINE IF
NECESSARY TO MAINTAIN DRAINAGE.
CULVERT #2
NOTES:
1. NOTES AND LEGEND ON SHEET W1 APPLY.
2. COORDINATE ELECTRICAL CONTROL LINE (TO THE STORAGE TANK) INSTALLATION SO
LINE IS ROUTED BEYOND ASPHALT SURFACES WHERE HANDHOLES ARE REQUIRED, TO
ALLOW CLOSEST EDGE OF HANDHOLE TO BE 24" MINIMUM FROM ASPHALT.
CONNECT TO EXISTING
3" HDPE SUPPLY LINE
FROM BOOSTER PUMP
INSTALL 3" HDPE SUPPLY LINE AND
SZ 0.5C, 2#14(XHHW)&1#14GND.
ELECTRICAL CONTROL LINE
EXISTING 3" HDPE SUPPLY
LINE FROM BOOSTER PUMP
REMOVE EXISTING WATER METER
BOX FOR OLD MILL SUPPLY LINE
EXISTING OLD MILL PICNIC AREA SUPPLY
LINE TO BE ABANDONED IN PLACE
EXTEND DRAINLINE TO DAYLIGHT AT
2% SLOPE AND INSTALL 3" DAYLIGHT
DRAIN (APPROX. LOCATION)
3" HDPE DRAINLINE
2 WATER LINES IN TRENCH
EXISTING 3" HDPE SUPPLY LINE TO MCWILLIAMS
CAMPGROUND TO BE REUSED
EXISTING 2" HDPE SUPPLY LINE TO OLD MILL
PICNIC AREA TO BE ABANDONED
AND 2 ELECTRICAL LINES
EXISTING SZ 1.5C, 2 #4&1#6GND. TO REMAIN IN USE
EXISTING SZ 0.5C, 1CABLE, REMOVE CABLE AND
INSTALL 2#14(XHHW)&1#14GND.
AND TELEPHONE LINE
AT THIS POINT IT IS UNSURE WHERE
THE ELECTRICAL AND PHONE LINES GO
AT THIS LOCATION IS A GRADE LEVEL HANDHOLE
WHICH IS THOUGHT TO CONTAIN THE TELEPHONE LINE
BUT MAY BE THE STORAGE TANK CONTROL CABLE. IF
IT IS THE STORAGE TANK CONTROL CABLE, THIS
SHALL BE THE TIE-IN LOCATION FOR THE NEW SZ
0.5C, 2#14(XHHW)&1#14GND. TO THE STORAGE TANK
LOCATION UNDERSTOOD TO CONTAIN THE STORAGE
TANK CONTROL CABLE IN SZ 0.5C. IF IT IS, REWORK
CONDUIT TO NEW GRADE LEVEL HANDHOLE, REMOVE
AND REPLACE CABLE TO CAMP LEE WITH 2
#14(XHHW)&1#14GND. AND THIS SHALL BE THE TIE-IN
LOCATION FOR THE NEW SZ 0.5C,
2#14(XHHW)&1#14GND. TO THE STORAGE TANK
MAIN WATERLINE
INSTALL TWO LINES IN TRENCH
3" HDPE (DISTRIBUTION)
3" HDPE (SUPPLY)
ELECTRICAL CONTROL LINES
INSTALL 2" HDPE LATERAL
AND 2" CURB VALVE AND
BOX TO HYDRANT
CONNECT TO
LATERAL #4
LATERAL #4
(SEE SHEET W14)
3" HDPE
INTERSECT CULVERT #2
INSTALL FROSTSHIELD AND SLEEVES
SEE SHEET W19
END TWO WATERLINES IN TRENCH
3" HDPE DISTRIBUTION LINE CONTINUES TO
HOST HYDRANT LATERAL AND DRAINLINE
INSTALL 3" HDPE CURB VALVE
AND BOX TO DRAINLINE
3" HDPE
(DISTRIBUTION)
INTERSECT CULVERT #1
INSTALL FROSTSHIELD AND
SLEEVE, SEE SHEET W19
LE
E
CA
NY
O N
RO
AD
(S R
6)
TO SKI AREA
MAIN ROAD
EUREKA LOOP ROAD
X H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W W .W W .M c W il li a m s .W a te r-
S e w e r_ T e le w o rk .d w g
0+00 1+00 2+00 3+00
3+00 4+00 5+00 6+00 7+00
POINT TABLE
POINT
NORTHING
26813472.4
26813538.5
26813561.1
26813589.7
26813607.3
26813622.9
EASTING
626098.1
626166.5
626261.6
626357.4
626455.7
626554.5
POINT TABLE
POINT
NORTHING
26813638.4
26813612.2
26813615.7
26813586.3
26813572.6
26813632.4
EASTING
626653.3
626747.1
626615.3
626284.1
626305.6
626614.9
3" HDPE WATERLINE
STA:0+00
CONNECT TO MAIN WATERLINE
STA:0+02
INSTALL 3" CURB VALVE AND BOX
STA:0+14
INSTALL UTILITY BOX WITH
COMBINATION AIR VALVE
STA:2+46
INSTALL TEE TO HYDRANT LATERAL
STA:5+61
INSTALL TEE TO RESTROOM #5
AND HYDRANT LATERAL
-10.1%
-3.9%
-7.3%
STA:0+00
INVERT ELEV:8684.1
STA:0+53
INVERT ELEV:8678.7
STA:1+73
INVERT ELEV:8674.0
EXISTING GROUND
PROPOSED TOP OF SUBGRADE (TYP)
NEW PIPE INVERT
NOTES:
1. NOTES AND LEGEND ON SHEET W1 APPLY.
WATERLINE LATERAL #1
6" H
D
PE
(D
IS
TR
INSTALL UTILITY BOX
WITH AIR RELEASE VALVE
SEE SHEET W18
MAIN WATERLINE
SEE SHEET W2
CONNECT TO MAIN WATERLINE
INSTALL 3" CURB VALVE AND BOX
3" HDPE
3" HDPE
3" HDPE
INSTALL 2" HDPE LATERAL AND 2"
CURB VALVE AND BOX TO HYDRANT
INSTALL 2" HDPE LATERAL TO
RESTROOM #5 AND HYDRANT
INSTALL 2" CURB VALVE AND BOX
MAIN ROAD
X H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W W .W W .M c W il li a m s .W a te r-
S e w e r_ T e le w o rk .d w g
7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00
CULVERT #11
POINT TABLE
POINT
NORTHING
26813654.8
26813732.0
26813732.0
26813644.7
26813561.8
26813495.6
EASTING
626822.2
626845.2
626937.4
626978.8
626929.3
626854.3
POINT TABLE
POINT
NORTHING
26813414.3
26813767.7
26813706.0
26813712.0
26813718.0
26813747.2
EASTING
626798.5
626901.7
626812.1
626814.0
626815.9
626909.5
3" HDPE WATERLINE
STA:8+61
INSTALL UTILITY BOX WITH
PRESSURE REDUCING VALVE #3
(SET OUTLET FOR 50 PSI)
STA:9+68
INSTALL TEE TO HYDRANT LATERAL
STA:10+58
INTERSECT CULVERT
INSTALL FROSTSHIELD AND SLEEVE
SEE SHEET W19
-7.1%
-2.0% 3.4%
-6.0%
STA:8+36
INVERT ELEV:8625.6
STA:9+88
INVERT ELEV:8614.9
STA:10+69
INVERT ELEV:8613.2
STA:12+08
INVERT ELEV:8617.9
STA:13+80
INVERT ELEV:8607.6
EXISTING GROUND
PROPOSED TOP OF SUBGRADE (TYP)
NEW PIPE INVERT
STA:10+69
INSTALL TEE TO DRAINLINE
STA:12+08
INSTALL UTILITY BOX WITH
AIR RELEASE VALVE
NOTES:
1. NOTES AND LEGEND ON SHEET W1 APPLY.
4" HDPE
3" H
DPE
WATERLINE LATERAL #1
INSTALL 2" HDPE LATERAL AND 2"
CURB VALVE AND BOX TO HYDRANT
INSTALL UTILITY BOX WITH
PRESSURE REDUCING VALVE #3
(SET OUTLET TO 50 PSI)
SEE SHEET W18
ENSURE WATER AND SEWER LINES
ARE SEPARATED BY AT LEAST 10 FEET
3" HDPE
INTERSECT CULVERT #11
INSTALL FROSTSHIELD AND SLEEVE
SEE SHEET W19
INSTALL UTILITY BOX WITH AIR
RELEASE VALVE, SEE SHEET W18.
INSTALL WOOD POST AND VENT ON
UPHILL SIDE OF ROAD AT LEAST 5
FEET FROM EDGE OF ASPHALT.
INSTALL 3" CURB VALVE AND BOX. EXTEND 3" DRAINLINE AT 2%
TO DAYLIGHT (APPROX. 125') AND INSTALL 3" DAYLIGHT DRAIN.
CHOOSE ROUTE THAT AVOIDS DISTURBANCE TO TREES.
X H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W W .W W .M c W il li a m s .W a te r-
S e w e r_ T e le w o rk .d w g
14+00 15+00 16+00 17+00 18+00 19+00 20+00
CULVERT #12 CULVERT #13
CULVERT #14
POINT TABLE
POINT
NORTHING
26813315.8
26813238.6
26813223.1
26813253.9
26813307.2
EASTING
626797.5
626857.4
626953.8
627048.8
627133.1
POINT TABLE
POINT
NORTHING
26813359.9
26813339.8
26813215.2
26813227.3
26813293.3
EASTING
627217.9
627081.5
626877.2
626881.7
627114.3
3" HDPE WATERLINE
STA:14+49
INTERSECT CULVERT
INSTALL FROSTSHIELD AND SLEEVE
SEE SHEET W19
STA:15+86
INTERSECT CULVERT
INSTALL FROSTSHIELD AND SLEEVE
SEE SHEET W19
STA:16+27
INSTALL UPWARD FACING TEE
TO HYDRANT LATERAL.
HYDRANT TO PROVIDE AIR RELEASE
FUNCTION FOR LATERAL #1.
STA:17+87
INTERSECT CULVERT
INSTALL FROSTSHIELD AND SLEEVE
SEE SHEET W19
STA:18+77
INSTALL TEE TO RESTROOM #6
AND HYDRANT LATERAL
2.2%
-7.7%
-5.4%
-9.4%
-4.1% -2.0%
STA:16+27
INVERT ELEV:8608.4
STA:18+01
INVERT ELEV:8595.0
STA:19+02
INVERT ELEV:8589.5
STA:19+65
INVERT ELEV:8583.6
STA:14+36
INVERT ELEV:8605.3
STA:14+62
INVERT ELEV:8604.8 STA:16+29
INSTALL 3" CURB VALVE AND BOX
EXISTING GROUND
PROPOSED TOP OF SUBGRADE (TYP)
NEW PIPE INVERT
STA:14+62
INSTALL TEE TO DRAINLINE
NOTES:
1. NOTES AND LEGEND ON SHEET W1 APPLY.
WATERLINE LATERAL #1
3" HDPE
INSTALL 2" HDPE LATERAL AND 2" CURB VALVE AND
BOX TO HYDRANT. CONNECT TO LATERAL USING
UPWARD FACING TEE. HYDRANT TO PROVIDE AIR
RELEASE FUNCTION FOR LATERAL #1
INSTALL 2" HDPE LATERAL TO
RESTROOM #6 AND HYDRANT
INSTALL 2" CURB VALVE AND BOX
3" H
D
PE
INTERSECT CULVERT #12
INSTALL FROSTSHIELD AND SLEEVE
SEE SHEET W19
INTERSECT CULVERT #13
INSTALL FROSTSHIELD AND SLEEVE
SEE SHEET W19
INTERSECT CULVERT #14
INSTALL FROSTSHIELD AND
SLEEVE, SEE SHEET W19
INSTALL WATERLINE AT LEAST 25
FEET FROM EDGE OF DRAINFIELD #6
INSTALL 3" CURB
VALVE AND BOX
INSTALL 3" CURB
VALVE AND BOX
EXTEND 3" DRAINLINE AT 2% TO DAYLIGHT AND
INSTALL 3" DAYLIGHT DRAIN. CHOOSE ROUTE
THAT AVOIDS DISTURBANCE TO TREES.
MAIN ROAD
3" HDPE
X H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W W .W W .M c W il li a m s .W a te r-
S e w e r_ T e le w o rk .d w g
20+00 21+00 22+00 23+00
23+00 24+00 25+00 26+00
POINT TABLE
POINT
NORTHING
26813407.7
26813472.9
26813546.2
26813616.3
26813669.9
26813728.1
26813678.5
26813547.6
26813424.4
26813452.1
26813620.7
26813624.3
26813628.0
26813568.6
EASTING
627305.7
627380.4
627448.5
627519.6
627592.5
627673.8
627587.4
627591.8
627366.8
627361.1
627548.9
627554.0
627559.1
627583.5
3" HDPE WATERLINE
STA:21+72
INSTALL TEE TO HYDRANT LATERAL
STA:24+37
INSTALL UTILITY BOX WITH
PRESSURE REDUCING VALVE #4
(SET OUTLET TO 60 PSI)
STA:24+43
INSTALL TEE TO RESTROOM #7
AND HYDRANT LATERAL
STA:25+00
INSTALL TEE TO HYDRANT LATERAL
-7.9%
-10.1%
-8.0%
STA:21+53
INVERT ELEV:8568.8
STA:23+56
INVERT ELEV:8548.4
EXISTING GROUND
PROPOSED TOP OF SUBGRADE (TYP)
NEW PIPE INVERT
NOTES:
1. NOTES AND LEGEND ON SHEET W1 APPLY.
WATERLINE LATERAL #1
INSTALL 2" HDPE LATERAL
AND 2" CURB VALVE AND
BOX TO HYDRANT
INSTALL 2" HDPE LATERAL TO
RESTROOM #7 AND HYDRANT
INSTALL 2" CURB VALVE AND BOX
3" HDPE
3" HDPE
INSTALL UTILITY BOX
WITH PRESSURE
REDUCING VALVE #4
(SET OUTLET TO 60 PSI)
SEE SHEET W18
INSTALL 2" HDPE LATERAL
AND 2" CURB VALVE AND
BOX TO HYDRANT
MAIN ROAD
MAIN ROAD
X H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W W .W W .M c W il li a m s .W a te r-
S e w e r_ T e le w o rk .d w g
26+00 27+00 28+00 29+00 29+49
CULVERT #16
POINT TABLE
POINT
NORTHING
26813786.4
26813841.2
26813846.1
26813806.5
26813843.3
26813841.1
26813853.3
EASTING
627755.1
627838.7
627934.5
627886.5
627896.7
627912.5
627960.1
3" HDPE WATERLINE
STA:28+57
INTERSECT CULVERT
FROSTSHIELD NOT REQUIRED
MAINTAIN 84" MIN. BURIAL DEPTH
BELOW CULVERT
STA:28+61
INSTALL TEE TO HYDRANT LATERAL
STA:29+49
INSTALL DAYLIGHT DRAIN
(APPROX. LOCATION)
-10.2%
-3.1% -2.0%
STA:26+03
INVERT ELEV:8528.5
STA:28+31
INVERT ELEV:8505.2
STA:28+57
INVERT ELEV:8504.4
STA:29+49
INVERT ELEV:8502.5
STA:28+63
INSTALL CURB VALVE AND BOX
EXISTING GROUND
PROPOSED TOP OF SUBGRADE (TYP)
NEW PIPE INVERT
NOTES:
1. NOTES AND LEGEND ON SHEET W1 APPLY.
WATERLINE LATERAL #1
INSTALL 2" HDPE LATERAL
AND 2" CURB VALVE AND
BOX TO HYDRANT
3" HDPE
3" HDPE
INSTALL WATERLINE AT LEAST 10 FEET
FROM SEPTIC TANK AND SEWERLINE
INSTALL 3" CURB VALVE
AND BOX TO DRAINLINE
EXTEND DRAINLINE TO DAYLIGHT AT
2% SLOPE AND INSTALL 3" DAYLIGHT
DRAIN (APPROX. LOCATION)
INTERSECT CULVERT #16
INSTALL DRAINLINE AT LEAST 10 FEET
FROM EDGE OF DRAINFIELD #10
EXIT ROAD
MAIN ROAD
X H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W W .W W .M c W il li a m s .W a te r-
S e w e r_ T e le w o rk .d w g
0+00 1+00 2+00 3+00 4+00 4+40
POINT TABLE
POINT
NORTHING
26813650.3
26813665.8
26813649.6
26813648.3
26813662.7
26813672.9
26813674.7
26813663.5
EASTING
626079.3
626000.3
625901.6
625801.9
625703.0
626043.4
625667.2
626077.7
3" HDPE
WATERLINE 2" HDPE WATERLINE
STA:0+00
CONNECT TO MAIN WATERLINE
STA:0+02
INSTALL 3" CURB VALVE AND BOX
STA:0+13
INSTALL TEE TO DRAINLINE
STA:0+56
INSTALL TEE TO LATERAL #3
STA:0+58
INSTALL 2" CURB VALVE AND BOX
STA:2+91
INTERSECT CULVERT
INSTALL FROSTSHIELD AND SLEEVE
SEE SHEET W19
STA:4+40
INSTALL HYDRANT
3.8%
8.3%
4.6%
6.5%
9.6%
9.5%
STA:0+00
INVERT ELEV:8659.0
STA:0+24
INVERT ELEV:8659.9
STA:1+46
INVERT ELEV:8670.1
STA:2+08
INVERT ELEV:8672.9
STA:4+40
INVERT ELEV:8694.6
STA:4+25
INVERT ELEV:8693.6
STA:3+21
INVERT ELEV:8683.7
CULVERT #22
EXISTING GROUND
PROPOSED TOP OF SUBGRADE (TYP)
NEW PIPE INVERT
WATERLINE
LATERAL #2
WATERLINE
LATERAL #3
(SEE SHEET W13)
2" HDPE
CONNECT TO LATERAL #3
MAIN WATERLINE
(SEE SHEETS W2 AND W3)
CONNECT TO MAIN WATERLINE
EXTEND DRAINLINE TO DAYLIGHT AT
2% SLOPE AND INSTALL 3" DAYLIGHT
DRAIN (APPROX. LOCATION)
INTERSECT CULVERT #22
INSTALL FROSTSHIELD AND
SLEEVE, SEE SHEET W19
INSTALL HYDRANT
3" H D
PE
3" HDPE (DISTR.)
6" H D
P E
(D
ISTR
3" HDPE
DRAINLINE INTERSECTS
MAIN WATERLINE
INSTALL 3" CURB VALVE
AND BOX TO DRAINLINE
INSTALL 3" CURB VALVE
3" HDPE
INSTALL 2" CURB VALVE
NOTES:
1. NOTES AND LEGEND ON SHEET W1 APPLY.
2. SLOPE ALL LATERAL LINES ON THIS SHEET TO DRAIN
TOWARDS DAYLIGHT DRAIN SHOWN ON THIS SHEET.
DOLOMITE
LOOP ROAD
MAIN ROAD
X H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W W .W W .M c W il li a m s .W a te r-
S e w e r_ T e le w o rk .d w g
0+00 1+00 2+00 3+00 4+00 4+35
POINT TABLE
POINT
NORTHING
26813672.9
26813738.9
26813804.0
26813813.2
26813821.9
26813772.2
26813830.4
26813741.5
26813764.8
EASTING
626043.4
625981.6
625916.5
625817.0
625717.4
625944.5
625684.2
625964.5
625943.0
3" HDPE WATERLINE 2" HDPE WATERLINE
STA:0+00
CONNECT TO LATERAL #2
STA:0+02
INSTALL 3" CURB VALVE AND BOX
STA:1+17
INSTALL TEE TO RESTROOM #1 LATERAL
STA:1+51
INSTALL TEE TO HYDRANT LATERAL STA:4+35
INSTALL HYDRANT
2.0%
13.5%
10.1%
3.7%
9.9%
7.6%
STA:0+00
INVERT ELEV:8660.5
STA:0+40
INVERT ELEV:8661.3
STA:0+99
INVERT ELEV:8669.3
STA:1+53
INVERT ELEV:8674.8
STA:1+86
INVERT ELEV:8676.0
STA:2+65
INVERT ELEV:8683.8
STA:4+35
INVERT ELEV:8696.6
EXISTING GROUND
PROPOSED TOP OF SUBGRADE (TYP)
NEW PIPE INVERT
NOTES:
1. NOTES AND LEGEND ON SHEET W1 APPLY.
2. SLOPE ALL LATERAL LINES ON THIS SHEET TO DRAIN
TOWARDS DAYLIGHT DRAIN SHOWN ON SHEET W12.
2" HDPE
WATERLINE LATERAL #2
(SEE SHEET W12)
WATERLINE LATERAL #3
MAIN WATERLINE
(SEE SHEETS W2 AND W3)
CONNECT TO
LATERAL #2
INSTALL DAYLIGHT DRAIN
SEE SHEET W12
3" HDPE (DISTR.) INSTALL 3" CURB VALVE
INSTALL 2" CURB VALVE
INSTALL 2" HDPE
LATERAL TO HYDRANT
INSTALL 2" HDPE LATERAL TO RESTROOM #1
3" H
DPE
INSTALL HYDRANT
WATERLINE LATERAL #2
(SEE SHEET W12)
MAIN ROAD DOLOMITE
LOOP ROAD
X H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W W .W W .M c W il li a m s .W a te r-
S e w e r_ T e le w o rk .d w g
0+00 1+00 2+00 3+00 4+00
4+00 5+00 6+00 6+89
DRAINFIELD #4 SEWERLINE
POINT TABLE
POINT
NORTHING
26814558.0
26814473.5
26814384.5
26814291.8
26814210.5
26814155.4
EASTING
628114.8
628072.7
628051.3
628018.6
627960.5
627877.4
POINT TABLE
POINT
NORTHING
26814093.2
26814422.7
26814363.3
26814044.6
26814369.5
EASTING
627799.6
628085.6
628030.3
627730.0
628050.1
3" HDPE WATERLINE 2" HDPE WATERLINE
STA:0+00
CONNECT TO MAIN WATERLINE
3.0%
9.0%
17.1%
3.8%
4.5%
8.6%
7.9%
9.3%
4.5%
7.3%
STA:0+00
INVERT ELEV:8473.2
STA:0+39
INVERT ELEV:8474.3
STA:1+18
INVERT ELEV:8481.5
STA:1+34
INVERT ELEV:8484.2
STA:1+94
INVERT ELEV:8486.5
STA:6+89
INVERT ELEV:8522.7
STA:5+05
INVERT ELEV:8509.4
STA:6+54
INVERT ELEV:8521.2
STA:3+95
INVERT ELEV:8499.9
STA:3+32
INVERT ELEV:8494.0
STA:2+42
INVERT ELEV:8490.0
STA:0+02
INSTALL 3" CURB VALVE AND BOX
STA:0+90
INSTALL TEE TO RESTROOM #8
AND HYDRANT LATERAL
STA:2+04
INTERSECT SEWERLINE
STA:2+15
INSTALL TEE TO RESTROOM #4
AND HYDRANT LATERAL
STA:2+17
INSTALL 2" CURB VALVE AND BOX
STA:3+15
INTERSECT BOX CULVERT #19
INSTALL FROSTSHIELD AND SLEEVE
SEE SHEET W19
STA:6+89
INSTALL HYDRANT
EXISTING GROUND
PROPOSED TOP OF
SUBGRADE (TYP)
NEW PIPE INVERT
BOX CULVERT #19
NOTES:
1. NOTES AND LEGEND ON SHEET W1 APPLY.
WATERLINE LATERAL #4
CONNECT TO MAIN WATERLINE
INSTALL 3" CURB VALVE AND BOX
3" HDPE
INSTALL 2" HDPE LATERAL TO
RESTROOM #8 AND HYDRANT
INSTALL 2" CURB VALVE AND BOXES
INSTALL 2" HDPE LATERAL TO
RESTROOM #4 AND HYDRANT
INSTALL 2" CURB VALVE AND BOXES
3"
HDPE
2" HDPE
INSTALL HYDRANT
MAIN WATERLINE
(SEE SHEET W6)
INTERSECT SEWERLINE
SPECIAL CONSTRUCTION
REQUIRED, SEE SHEET W19
INSTALL 2" CURB VALVE AND BOX
INTERSECT BOX CULVERT #19
INSTALL FROSTSHIELD AND SLEEVE
SEE SHEET W19
EUREKA LOOP ROAD
X H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W W .W W .M c W il li a m s .W a te r-
S e w e r_ T e le w o rk .d w g
NOTES:
1. NOTES AND LEGEND ON SHEET W1 APPLY.
2. COORDINATE WORK ON THIS SHEET WITH CAMP LEE. WATER AND
ELECTRICAL SERVICE SHALL NOT BE INTERRUPTED TO CAMP LEE
WITHOUT PRIOR NOTICE, SEE SPECIFICATIONS.
REPLACE EXISTING BOOSTER PUMPS WITH NEW 3 HP PUMP.
SEE DETAIL ON SHEET W22.
SEE SHEETS E1-3 FOR ELECTRICAL DETAILS INCLUDING
REBUILDING BOOSTER PUMP CONTROLS LOCATED HERE
CAP AND ABANDON OLD MILL PICNIC AREA SUPPLY LINE. REMOVE
EXISTING SHUT-OFF VALVE. INSTALL FUSION WELDED CAP WITHIN 12
INCHES OF THE EXISTING WATER MAIN. CAP TO MATCH EXISTING PIPE
TYPE AND DIAMETER. FINAL CAP TO BE WATERTIGHT, SANITARY AND
SUITABLE FOR 160 PSI. IF ACTUAL CONDITIONS PREVENT THE WORK FROM
BEING COMPLETED AS SPECIFIED, NOTIFY THE CONTRACTING OFFICER.
EXISTING 2" HDPE SUPPLY LINE TO OLD
MILL PICNIC AREA TO BE ABANDONED
2 WATER LINES IN TRENCH
EXISTING 3" HDPE SUPPLY LINE TO MCWILLIAMS CAMPGROUND TO BE REUSED
EXISTING 2" HDPE SUPPLY LINE TO OLD MILL PICNIC AREA TO BE ABANDONED
AND
2 ELECTRICAL LINES (SHOULD EXIST SOME SEPARATION FROM WATER LINES
EXCEPT NEAR MAIN ROAD CROSSING)
EXISTING SZ 1.5C, 2 #4&1#6GND. TO REMAIN IN USE
EXISTING SZ 0.5C, 1CABLE, REMOVE CABLE AND INSTALL 2#14(XHHW)&1#14GND.
AND
TELEPHONE LINE
LOCATE AND REMOVE TWO EXISTING DRAIN VALVES AND DAYLIGHT DRAINS.
POSITIVELY IDENTIFY EACH LINE. CAP AND ABANDON TEE FROM OLD MILL SUPPLY
LINE. CONNECT TO MCWILLIAMS SUPPLY LINE AND INSTALL NEW 3" CURB VALVE
AND BOX, NEW 3" HDPE DRAIN LINE AND NEW DAYLIGHT DRAIN
CAMP MANAGER
JUNIPER CABIN
POWER SHOP
WOOD SHOP
CAMP LEE
INSTALL NEW 3" HDPE DRAIN LINE
EXTEND DRAINLINE TO DAYLIGHT AT
2% SLOPE AND INSTALL 3" DAYLIGHT
DRAIN (APPROX. LOCATION)
INSTALL NEW 3" CURB
VALVE AND BOX
TO SKI AREA
LEE
C
AN
YO
N R
O
AD
(SR
156)
TO LAS VEGAS
X H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W W .W W .M c W il li a m s .W a te r-
S e w e r_ T e le w o rk .d w g
H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W .M c W il li a m s .V a lv e .T re n c h .d w g
* SEE HYDRANT TYPES ABOVE
MATERIAL SCHEDULE
NOTES:
1. HYDRANT TYPES INCLUDE:
TYPE D - FROSTPROOF, POLLUTION PROOF, PISTON-ACTUATED.
2. ALIGN THE PIPING AT BOTTOM OF HYDRANT AS NECESSARY TO OBTAIN PROPER ORIENTATION OF
HYDRANT AS SHOWN ON THE WATER SYSTEM DRAWINGS.
3. HYDRANT LOCATION SHALL BE AS STAKED IN THE FIELD OR AS SHOWN ON THE DRAWINGS. ALTER
HYDRANT LOCATION OR PAD SIZE ONLY WITH APPROVAL FROM THE CONTRACTING OFFICER.
4. HYDRANT PADS MAY BE IN CUT OR FILL ALONG SIDE OF ROADWAY. CUT AND FILL SLOPES SHALL
MATCH ADJACENT ROADSIDE SLOPES.
5. CONSTRUCT REDWOOD FRAME BOX USING ANODIZED GRABBER SCREWS (2 EACH CORNER).
6. FROST DEPTH AT THIS SITE IS ANTICIPATED TO BE 5 FEET (60 INCHES).
7. ALL HYDRANTS ARE TO BE INSTALLED FOR YEAR-ROUND USE. ORDER HYDRANTS WITH A BURY DEPTH
OF 5 FEET.
DESCRIPTION
FREEZEFLOW EXECUTIVE MODEL WITH ADA HANDLE
DUAL CHECK, ASSE 1011 APPROVED (INCLUDED WITH HYDRANT)
OPEN GRADED 1
4" TO 1" RANGE
ANODIZED GRABBER SCREWS
FREEZEFLOW STANDARD MODEL WITH ADA HANDLE
D & E
D & E
D & E
D & E
D & E
SCREWS
BACKFLOW
PREVENTER
GRAVEL SUMP
LUMBER
DRAIN GRATE
REDWOOD
HYDRANT
TYPE
REF.
NO.
HYDRANT
HYDRANT
D
E
ITEM
8P2 1/2"x2" O.C. PRESS-LOCKED CLOSE MESH, ADA COMPLIANT, HOT DIPPED GALVANIZED STEEL, 23 3/4" x 35 3/4", & 1 1/2" DEPTH WITH WELDED LUGS
MURDOCK EXPELLOHYDRANTF
2' WIDTH OF GRATE
2" X 4" WOOD
FRAME (INNER)
2" X 8" WOOD
FRAME (OUTER)
2" X 8" X 36" 2" X 4" X 36"
INSTALL GRATE IN
DIRECTION SHOWN
2" X 4" X 36" 2" X 8" X 36"
2" X
8" X
2" X
4" X
2" X
4" X
2" X
8" X
EXPANSION
JOINT
AROUND
HYDRANT
FRAME PLAN
3' LENGTH OF GRATE
SECTION A-A
2" X 8" WOOD FRAME
2" X 4" WOOD
SUPPORT BOX
DRAIN
GRATE
SET GRATE 1/8" BELOW
FINISHED GRADE
ANCHOR GRATE IN 4 PLACES AT WELD
LUGS WITH 1/4" DIA. X 2" LAG BOLTS TO
2" X 4" TIMBER FRAME. PRE-DRILL HOLES
IN GRATE THE DIAMETER OF BOLTS.
FINISHED GRADE
1-1/2"
3" CRUSHED AGGREGATE
4" CONCRETE
HYDRANT DETAIL
3' WIDTH
OF GRATE
BURY DEPTH
12" - TYPE D
6" - TYPE E
2" MAX.
28"
BACKFLOW PREVENTER
HYDRANT
TYPE D HYDRANTS: REMOVE INTERNAL
CHECK VALVE IF NOT USED YEAR-ROUND
GRAVEL SUMP UNDER
GRATE (24" MIN. DEPTH)
COMPACTED BACKFILL
FINISH GRADE
DRAIN GRATE
FROSTLINE
SCH 40 PVC ELBOW
HDPE TO PVC
TRANSITION FITTING
HDPE SUPPLY LINE
SLOPE TO MAIN (2% MIN)
3" CRUSHED AGGREGATE
4" CONCRETE
3" CRUSHED AGGREGATE
4" CONCRETE
EXPANSION JOINT
3'-0"
3'-0" 6'-0"
12'-0"
HYDRANT PAD DETAIL
10'-0"
6' MAX.
FROSTPROOF HYDRANT
DRAIN GRATE
ROAD OR PATH SURFACE
NOTE:
ASSURE 3'-0" MINIMUM CLEARANCE
AROUND ALL SIDES OF HYDRANT
FOR UNIVERSAL ACCESS.
PIPING, SEE NOTE 2
CONCRETE, GRADE AT
1% MIN. TO 2% MAX.
AWAY FROM HYDRANT
X H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W .M c W il li a m s .F ro s tp ro o fH y d ra n t.
d w g
H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W .M c W il li a m s .U ti li ty B o x e s .d w g
H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W .M c W il li a m s .W a te r-
S e w e r.
C ro s s in g .d w g
H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W .M c W il li a m s .T a n k M a n w a y .d w g
12"
STOCKPILE 6" OF TOPSOIL
PRIOR TO EXCAVATION.
USE STOCKPILED TOPSOIL FOR
TOP 4" OF BACKFILL
UNDISTURBED EXISTING GROUND
OR FILL MATERIAL COMPACTED TO
95% OF ASTM D 698
UNDISTURBED EXISTING GROUND
6"
PERIMETER DRAIN
2'-0"
7' -0
"M
IN
18"
12"
NOTES:
1. EACH FIBERGLASS WATER STORAGE TANK SHALL BE DESIGNED FOR THE FOLLOWING:
- NOMINAL LIQUID CAPACITY OF 18,000 GALLONS (2 TANKS TOTAL REQUIRED FOR A COMBINED CAPACITY OF 36,000 GALLONS)
- MINIMUM INTERNAL DESIGN PRESSURE OF 5 PSI (VENT TO ATMOSPHERE)
- EXTERNAL DESIGN PRESSURE - THE TANK (EMPTY) SHALL BE DESIGNED TO WITHSTAND BURIAL IN SEVEN FEET OF WATER
SATURATED SOIL OVERBURDEN AND SHALL BE ABLE TO WITHSTAND SURFACE H-20 AXLE LOADS
2. ALL PIPING SHALL BE SLOPED A MINIMUM OF 2% TO DRAIN.
3. CONNECT TO STORAGE TANK WITH THREADED NPT OR FLANGED FITTINGS. ALL FITTINGS ON THE STORAGE TANK SHALL BE 150 LB. RATED
FOR ALL CONNECTIONS 4-INCH DIAMETER AND LARGER: INSTALL NSF-APPROVED DRESSER-STYLE FLEXIBLE CONNECTOR WITHIN 3 FEET OF
THE TANK .
4. CLEARING AND GRUBBING OF THE TANK INSTALLATION SITE SHALL BE COMPLETED PRIOR TO BEGINNING ANY EXCAVATION.
5. TANK BEDDING MATERIAL IMMEDIATELY SURROUNDING THE TANK SHALL BE PEA GRAVEL OR CRUSHED STONE AS REQUIRED BY THE TANK
MANUFACTURER. OBTAIN MATERIAL FROM A COMMERCIAL SOURCE OR FROM THE DESIGNATED BORROW AREA.
6. CONTRACTING OFFICER SHALL APPROVE BOTTOM OF TANK ELEVATION PRIOR TO BACKFILLING.
7. NONE OF THE TANK, EXCEPT ACCESS OPENINGS, SHALL EXTEND ABOVE NATURAL GROUND LINE.
8. THE CONTROL VALVES SHALL BE INSTALLED WITH AT LEAST 84" OF COVER. ALL OF THE TANK, EXCEPT ACCESS OPENINGS, SHALL HAVE AT
LEAST 60" OF COVER.
9. FABRICATE AND INSTALL TWO 30" DIAMETER ACCESS OPENINGS PER TANK. SEE DETAIL, SHEET W20.
10. THE TANK SHALL BE FITTED WITH A LADDER FOR ACCESS OPENINGS "A" AND "C".
11. SEE SHEET W16 FOR DAYLIGHT DRAIN DETAIL.
12. INSTALL GRADE LEVEL ACCESS BOX FOR WATER LEVEL SENSOR/CONTROLS WHEN PROBES ARE REQUIRED, WHERE FLOATS ARE CALLED
FOR INSTALL A GASKETED FLANGE COVER OF THE SAME MATERIAL AS THE TANK WITHOUT HANDHOLE. INSTALL ELECTRICAL CONTROLS IN TANK #1 ONLY (SEE "E" SHEETS). PROVIDE FLANGE WITH WATERTIGHT CAP IN TANK #2 FOR FUTURE USE.
13. TANK SHALL BE EQUIPPED WITH ADEQUATE LIFTING LUGS.
14. ALL HARDWARE IN CONTACT WITH WATER, INCLUDING BOLTS, NUTS, WASHERS, CONDUITS AND LOCK NUTS SHALL BE STAINLESS STEEL.
OTHER HARDWARE SHALL BE GALVANIZED STEEL.
15. ALL FLANGES AND ACCESS OPENINGS SHALL BE GUSSETED.
16. COMPLETELY SURROUND TANK BEDDING MATERIAL WITH FILTER FABRIC.
17. INSTALL VENT ACCORDING TO DETAIL ON SHEET W19.
18. APPROXIMATELY 5-0" TALL FLANGED EXTENSION REQUIRED BETWEEN TANK AND ACCESS OPENING/COVER.
19. FURNISH 24" THICK, 29" DIA. REMOVABLE STYROFOAM INSULATION PLUGS. INSTALL ONE PER TANK ACCESS OPENING. SECURELY FASTEN TO
ACCESS OPENING. MAKE PROVISIONS FOR LADDER RUNGS. PLUG EVEN WITH FLANGED CONNECTIONS TO TANK.
20. TANKS TO BE INSTALLED ON A STEEP SLOPE (SEE SHEET W2). THE CONTRACTOR MAY PROPOSE ALTERNATIVE CONSTRUCTION METHODS, SUCH AS THE USE OF ROCKERY RETAINING WALLS TO REDUCE EXCAVATION VOLUME, BLUEBOARD "FROSTBLOCK" TO REDUCE BURIAL DEPTH, OR OTHER METHODS. SUBMIT PROPOSAL FOR ALTERNATIVE CONSTRUCTION METHODS AT LEAST 4 WEEKS PRIOR TO BEGINNING
CONSTRUCTION ON THE WATER TANKS.
8' MIN.
SLOPE -2%
LADDER
NATIVE BACKFILL OR
SELECT BORROW
PIPING LEGEND:
90 DEGREE ELBOW
TEE
HIGH DENSITY POLYETHYLENE PIPE (160 PSI)
GALVANIZED STEEL PIPE (SCH 40)
DAYLIGHT DRAIN
TANK AND LINE VENT - 2" VENT WITH #24 MESH SCREEN.
INSTALL 24" ABOVE FINISHED GROUND LINE.
HDPE
GSP
TANK BEDDING MATERIAL
NATURAL GROUND
8 O'CLOCK 4 O'CLOCK
BACKFILLING BELOW THIS LINE
REQUIRES SPECIAL TECHNIQUE, SEE
SPECIFICATIONS FOR DETAILS.
FILTER FABRIC BETWEEN BEDDING AND
SUBSEQUENT BACKFILL
FILTER FABRIC BETWEEN BEDDING AND
SUBSEQUENT BACKFILL
3" CURB VALVE AND BOX
INSTALL DAYLIGHT
DRAIN (TYP)
3" HDPE
3" HDPE OVERFLOW/DRAIN3" HDPE OVERFLOW
3" HDPE OVERFLOW
3" HDPE DRAINLINE6" HDPE SUPPLY
ACCESS OPENING A
ACCESS OPENING B
ACCESS OPENING C
ACCESS OPENING D
TANK #1
TANK #2
FL
O
W
3" HDPE SUPPLY FROM
BOOSTER PUMP
PERIMETER DRAIN
3" PERFORATED HDPE (TYP)
GRADE LEVEL HANDHOLE (TYP), SEE NOTE 12
2" FLANGED OPENING (TYP)
3" HDPE
2" GSP VENT
2" GSP VENT
2" HDPE VENT LINE
6" HDPE DISTRIBUTION 6" HDPE TO
DISTRIBUTION SYSTEM
6" CURB VALVE AND BOX
INSTALL DAYLIGHT
DRAIN
1% SLOPE
1% SLOPE
3" CURB VALVE AND BOX
INSTALL DAYLIGHT
DRAIN (TYP)
3" HDPE
3" HDPE OVERFLOW LINE
INVERT 6" BELOW TOP OF EACH TANK
3" HDPE DRAINLINE
6" HDPE CONNECTOR LINE
INVERT 4" ABOVE BOTTOM OF EACH TANK
ACCESS OPENING A
ACCESS OPENING B
ACCESS OPENING C
ACCESS OPENING D
TANK #1
TANK #2
3" HDPE INLET FROM
BOOSTER PUMP, INVERT
4" BELOW TOP OF TANK
PERIMETER DRAIN
3" PERFORATED HDPE (TYP)
GRADE LEVEL HANDHOLE (TYP), SEE NOTE 12
2" FLANGED OPENING (TYP)
2" GSP VENT LINE
2" GSP VENT
6" CURB VALVE AND BOX
INSTALL DAYLIGHT
DRAIN
FLOW
3" HDPE
3" HDPE
DRAIN/OVERFLOW
6" DISTRIBUTION LINE
INVERT 4" ABOVE BOTTOM OF TANK
2" GSP VENT LINE INSTALL AT 12
O'CLOCK POSITION ON TANK
SEE DETAIL ON SHEET W19 (TYP)
2" HDPE VENT LINE
GSP TO HDPE TRANSITION, 30" BELOW GRADE
6" HDPE DISTRIBUTION LINE
6" HDPE SUPPLY LINE TO
DISTRIBUTION SYSTEM
SEE NOTE 18
X H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W .M c W il li a m s .S to ra g e T a n k .d w g
0 10 20 30 40 50 60
He ad
(F ee t)
Flow (GPM)
Pump and System Curve
Pump
System-Hi
System-Lo
System Operating Range
X H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W .M c W il li a m s .B o o s te rP u m p .d w g
W
W W W
W
W
W
W W
W
W
W
W
W
W W
WW
W
W
W
W
W
W W
W
W
W
W
WW
W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W W
W
W
W
S
W
W
W W
W
W
W
W W
W
W
W
W
W
W
W
W-E
W-E
W-E
W -E
W -E
W-E W-E
W-E
W-E
W-E
W-E W-E
W-E
W-E
W-E
W-E
T
T
W W
W
W
S
W
W
W
SS
S
S
S
S
S
W-E
NOTES:
1. SEE SHEETS WW2-WW12 FOR SEWERLINE PROFILES.
2. ALL SEWERLINE SHALL BE SLOPED A MINIMUM 2% TO DRAIN.
3. BURY SEWERLINE A MINIMUM OF 30 INCHES. ADDITIONAL DEPTH MAY BE REQUIRED TO MAINTAIN A MINIMUM SLOPE OF 2%.
4. LOCATION AND ORIENTATION OF ALL STRUCTURES SHALL BE APPROVED BY THE CONTRACTING OFFICER PRIOR TO INSTALLATION.
5. AN EXTENSIVE EFFORT HAS BEEN MADE TO LOCATE ALL POSSIBLE EXISTING UTILITY LINES FROM RECORDS AND EVIDENCE IN THE FIELD, HOWEVER, THE COMPLETENESS OR ACCURACY OF THE LOCATIONS SHOWN CANNOT BE GUARANTEED. THE CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING THE LOCATION OF ALL EXISTING UTILITIES. ANY LOCATION STAKED OR SHOWN IS APPROXIMATE.
CALL 811 TO HAVE UTILITIES MARKED BEFORE BEGINNING CONSTRUCTION. IF CONFLICTS ARE FOUND, NOTIFY THE CONTRACTING OFFICER. THE LOCATION OF THE EXISTING DRAINFIELDS ARE UNKNOWN. APPROXIMATE LOCATIONS HAVE BEEN SHOWN ON THIS
SHEET.
6. INSTALL THE SEWER SYSTEM ACCORDING TO APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS, INCLUDING NEVADA
ADMINISTRATIVE CODE (NAC) 445A AND 444.
7. CLEARING LIMITS SHALL BE 5 FEET ON BOTH SIDES OF THE SEWERLINE TRENCH. THE CONTRACTOR SHALL USE CAUTION AND AVOID DAMAGE TO TREES AND VEGETATION. THE CONTRACTOR SHALL CONFINE ALL OPERATIONS AND ACTIVITIES TO WITHIN THE CLEARING
LIMITS.
8. WHERE ENCOUNTERED, REMOVE AND DISPOSE OF EXISTING SEWERLINE TO A DEPTH OF 12" BELOW FINISHED GRADE. CAP AND
ABANDON REMAINDER IN PLACE.
9. WATERLINES SHALL BE INSTALLED A MINIMUM OF 10 FEET FROM SEWERLINES AND SEPTIC TANKS AND A MINIMUM OF 25 FEET FROM DRAINFIELDS. SEWERLINES, SEPTIC TANKS AND DRAINFIELDS SHALL BE INSTALLED AT LEAST 25 FEET FROM DRAINAGE CHANNELS.
ALL TREES WITHIN 10 FEET OF SEPTIC TANKS OR DRAINFIELDS SHALL BE REMOVED. ADDITIONAL SETBACKS ARE LISTED IN NAC 445A.965 AND NAC 444.792. NO EXISTING WATERCOURSES OR POTABLE WATER WELLS ARE KNOWN TO BE WITHIN 500 FEET OF THE
PROJECT SITE.
10. WHERE NEW SEWERLINES INTERSECT WATERLINES, THE NEW SEWERLINES SHALL BE INSTALLED ACCORDING TO APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS, INCLUDING NEVADA ADMINISTRATIVE CODE (NAC) 445A.
11. AVOID CONSTRUCTION OF SEWER LINES UNDER THE DRIP EDGE OF ALL LARGE PONDEROSA TREES GREATER THAN 14 INCHES IN
DIAMETER AT BREAST HEIGHT (DBH).
12. SEE E-SHEETS FOR DOSING TANK COUNTER AND ALARM CONTROLS.
SEE SHEET WW2
SEE SHEET WW3
SEE SHEETS WW4 & 5
SEE SHEET WW11
WW10
SEE SHEETS WW8 & 9
WW6
WW7
WW12
SEE SHEET WW12
FUTURE REPLACEMENT DRAINFIELD
AREA FOR SYSTEM #5, DO NOT DISTURB
LEGEND (1" = 30' SCALE):
NEW WATERLINE
NEW WATER AND ELECTRIC LINE IN SAME TRENCH
EXISTING WATERLINE
NEW SEWERLINE
NEW ELECTRICAL LINE
NEW GAS LINE
DAYLIGHT DRAIN (SEE SHEET W16)
CURB VALVE AND BOX - SIZE VARIES (SEE SHEET W16)
HYDRANT - FROSTPROOF, TYPE D (SEE SHEET W17)
UTILITY BOX WITH PRESSURE REDUCING VALVE (W18)
UTILITY BOX WITH AIR RELEASE VALVE (SEE SHEET W18)
CLEANOUT (SEE SHEET WW16)
PROPOSED ASPHALT ROAD
MAJOR CONTOUR AND ELEVATION (FEET)
NEW DRAINFIELD
REPLACEMENT DRAINFIELD
PERCOLATION TEST LOCATION
SOIL PROFILE LOCATION
W
W
S
E
G
W-E
WASTEWATER SYSTEM #8
WASTEWATER SYSTEM #4
WASTEWATER SYSTEM #9 (HOST UNIT #1)
WASTEWATER SYSTEM #3
WASTEWATER SYSTEM #2
WASTEWATER SYSTEM #1
WASTEWATER SYSTEM #5
WASTEWATER SYSTEM #6
WASTEWATER SYSTEM #7
WASTEWATER SYSTEM #10 (HOST UNIT #2)
FUTURE REPLACEMENT DRAINFIELD
AREA FOR SYSTEM #7, DO NOT DISTURB
FUTURE REPLACEMENT
DRAINFIELD AREA FOR
SYSTEM #2, DO NOT DISTURB
MCWILLIAMS CAMPGROUND
TO SKI AREA
LEE CANYON ROAD (SR 156)
TO LAS VEGAS
APPROX. LOCATION OF
EXISTING DRAINFIELD
APPROX. LOCATION OF
EXISTING DRAINFIELD
APPROX. LOCATION OF
EXISTING DRAINFIELD
APPROX. LOCATION OF
EXISTING DRAINFIELD
X H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W W .W W .M c W il li a m s .W a te r-
S e w e r_ T e le w o rk .d w g
0+00 1+00 2+00 3+00 3+51
WASTEWATER SYSTEM #1 (PRIMARY)
PLAN & PROFILE
1' = 30' HORIZ., 1" = 6' VERT.
-3.0%
-2.0%
0.0%
-2.0%
-9.6%
-2.0%
STA:0+64
INVERT ELEV:8676.1
S
TA
:1 +6
IN
V E
R T
E
LE
V :8
2.
STA:2+94
INVERT ELEV:8659.8
S
TA
:0 +8
IN
V E
R T
E
LE
V :8
4.
0+00 0+73
-10.1%
0.0%
STA:0+00
INVERT ELEV:8667.6
WASTEWATER SYSTEM #1
(SECONDARY)
PLAN & PROFILE
1' = 30' HORIZ., 1" = 6' VERT.
SAND
GRAVEL
SAND
GRAVEL
DRAINFIELD BOTTOM ELEV: 8655.6
DRAINFIELD BOTTOM
ELEV: 8658.9
POINT TABLE
POINT
NORTHING
26813807.5
26813824.1
26813834.4
26813841.7
26813880.3
26813934.3
26813934.3
26813929.3
EASTING
625967.8
625969.0
625974.5
625978.3
625997.7
626128.0
626151.2
626156.2
POINT TABLE
POINT
NORTHING
26813902.3
26813902.3
26813913.1
26813902.3
26813902.3
26813931.3
26813873.3
26813873.3
EASTING
626156.2
626182.2
626076.9
626148.2
626124.2
626148.2
626148.2
626124.2
POINT TABLE
POINT
NORTHING
26813931.3
26813931.3
26813873.3
26813873.3
26813931.3
EASTING
626158.2
626182.2
626182.2
626158.2
626124.2
EXISTING GROUND
NEW PIPE INVERT
PROPOSED TOP OF
SUBGRADE (TYP)
INSTALL NEW 1,000 GAL. DOSING TANK
WITH TWO ALTERNATING SIPHONS
INSTALL NEW 4,000 GAL. SEPTIC TANK
4" PVC SEWERLINE
(2 LINES IN TRENCH)
2" PVC MANIFOLD
4" PVC SEWERLINE 4" PVC SEWERLINE
STA. 2+13
PIPELINES AND ALIGNMENTS
SPLIT TO EACH ZONE
4" PVC SEWERLINE
ZONE 2
ZONE 1
STA. 0+00
CONNECT TO NEW
COMFORT STATION
STA. 0+16
INSTALL CLEANOUT
PERFORATED LATERAL PIPE INVERT ELEV: 8658.6
INSTALL DRAINFIELD, SEE SHEET WW14
INSTALL DRAINFIELD,
SEE SHEET WW14
PERFORATED LATERAL PIPE
INVERT ELEV: 8661.9
2" PVC MANIFOLD
NOTES:
1. NOTES AND LEGEND ON SHEET WW1 APPLY.
2. DIMENSIONS SHOWN TYPICAL FOR BOTH DRAINFIELD ZONES.
3. THE FOLLOWING INVERT ELEVATIONS ARE CRITICAL FOR THIS SYSTEM :
DOSING TANK OUTLET AND DRAINFIELD PERFORATED LATERAL PIPE. INVERTS
MUST BE INSTALLED TO WITHIN 0.1 FEET OF ELEVATIONS SHOWN IN ORDER
FOR PRESSURIZED SYSTEM TO OPERATE AS DESIGNED.
4. THE MAXIMUM SLOPE ACROSS DRAINFIELD #1 IS EXPECTED TO BE 12%.
CONNECT TO NEW COMFORT STATION #1
INSTALL NEW 4" PVC SEWERLINE (TYP)
INSTALL DRAINFIELD #1
2 ZONES REQUIRED
SEE SHEET WW14
INSTALL NEW 4,000 GAL. SEPTIC TANK
SEE SHEET WW13
INSTALL NEW 1,000 GAL. DOSING TANK
WITH TWO ALTERNATING SIPHONS
SEE SHEET WW13
INSTALL COUNTER AND
ALARM CONTROLS
24' (TYP)
TY
P)
(T
YP
ZONE 1
ZONE 2
RESERVE AREA FOR FUTURE REPLACEMENT
DRAINFIELD. DO NOT DISTURB EXCEPT FOR
INSTALLATION OF NEW SEWERLINE. EXISTING
DRAINFIELD MAY EXIST IN THIS AREA.
PRESSURIZED LATERAL (TYP)
PRIMARY ALIGNMENT
SECONDARY ALIGNMENT
PRIMARY ALIGNMENT
NEW TRAIL MUST BE CONSTRUCTED
IN FILL. DO NOT CREATE CUT SLOPE
BELOW DRAINFIELD ZONE 1
INSTALL NEW 4" PVC SEWERLINE
(2 LINES IN TRENCH)
INSTALL NEW 4" PVC
SEWERLINE (TYP)
INSTALL SEWER CLEANOUT
SEE SHEET WW16
BEGIN SECONDARY ALIGNMENT
DOLOMITE LOOP ROAD
MAIN ROAD
X H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W W .W W .M c W il li a m s .W a te r-
S e w e r_ T e le w o rk .d w g
0+00 1+00 2+00 3+00 3+77
SAND
GRAVEL
WASTEWATER SYSTEM #2
PLAN & PROFILE
1' = 30' HORIZ., 1" = 6' VERT.
-3.0%
0.0%
-14.7%
-22.1%
-5.9%
-7.8%
-2.0%
STA:2+14
INVERT ELEV:8591.0
STA:0+24
INVERT ELEV:8602.8
STA:0+40
INVERT ELEV:8598.6
S
TA
:1 +2
IN
V E
R T
E
LE
V :8
3.
S
TA
:3 +3
IN
V E
R T
E
LE
V :8
1.
DRAINFIELD BOTTOM ELEV: 8577.8
4" PVC SEWERLINE
EXISTING GROUND
NEW PIPE INVERT
PROPOSED TOP OF
SUBGRADE (TYP)
INSTALL NEW 620 GAL.
DOSING TANK WITH SIPHON
INSTALL NEW 1,500 GAL. SEPTIC TANK
STA. 0+00
CONNECT TO NEW
COMFORT STATION
STA. 0+10
INSTALL CLEANOUT
POINT TABLE
POINT
NORTHING
26814112.7
26814123.4
26814085.8
26814075.1
26813937.2
26813934.7
26813932.4
26813931.0
EASTING
627001.1
627022.6
627041.4
627019.9
626758.1
626768.4
626778.2
626784.2
POINT TABLE
POINT
NORTHING
26813992.8
26814012.7
26814023.2
26814059.6
26814074.2
26814091.2
26814093.9
26814104.6
EASTING
626893.2
626891.6
626930.2
627013.3
627018.1
627009.6
627010.5
627032.0
INSTALL DRAINFIELD, SEE SHEET WW14
PERFORATED LATERAL PIPE INVERT ELEV: 8580.8
2" PVC MANIFOLD
STA: 1+76
INTERSECT WATERLINE
NOTES:
1. NOTES AND LEGEND ON SHEET WW1 APPLY.
2. RESERVE AREA FOR FUTURE REPLACEMENT
AREA SHOWN ON SHEET WW1.
3. THE MAXIMUM SLOPE ACROSS DRAINFIELD #2
IS EXPECTED TO BE 8%.
CONNECT TO NEW
COMFORT STATION #2
INSTALL NEW 1,500 GAL. SEPTIC TANK
SEE SHEET WW13
INSTALL NEW 4" PVC SEWERLINE
INSTALL DRAINFIELD #2
SEE SHEET WW14
INSTALL NEW 620 GAL. DOSING TANK WITH SIPHON
SEE SHEET WW13
WATER/SEWER LINE CROSSING
SPECIAL CONSTRUCTION REQUIREMENTS APPLY
SEE SHEET W19
INSTALL COUNTER AND ALARM CONTROLS
24'
42' 18'
( TY
P)
PRESSURIZED LATERAL (TYP)
INSTALL SEWER CLEANOUT
SEE SHEET WW16
MAIN ROAD
X H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W W .W W .M c W il li a m s .W a te r-
S e w e r_ T e le w o rk .d w g
0+00 1+00 2+00 2+50
-12.9%
-8.3%
-3.0%
STA:1+01
INVERT ELEV:8533.4
STA:1+35
INVERT ELEV:8529.3
S
TA
:1 +9
IN
V E
R T
E
LE
V :8
7.
WASTEWATER SYSTEM #3
PLAN & PROFILE 0+00 TO 2+50
1' = 30' HORIZ., 1" = 6' VERT.
4" PVC SEWERLINE
(2 LINES IN TRENCH)4" PVC SEWERLINE
EXISTING GROUND
NEW PIPE INVERT
PROPOSED TOP OF
SUBGRADE (TYP)
INSTALL NEW 1,000 GAL. DOSING TANK
WITH TWO ALTERNATING SIPHONS
INSTALL NEW 2,500 GAL. SEPTIC TANK
STA. 0+00
CONNECT TO NEW
COMFORT STATION
STA. 0+20
INSTALL CLEANOUT
POINT TABLE
POINT
NORTHING
26814365.3
26814385.0
26814343.6
26814323.9
26814274.3
26814279.6
26814295.1
26814299.8
26814306.0
26814301.4
26814293.9
26814270.1
26814392.0
26814417.1
26814397.7
26814352.7
26814333.9
26814354.9
EASTING
627907.7
627930.3
627966.5
627943.9
627583.9
627586.0
627579.4
627577.3
627591.6
627593.6
627596.8
627638.8
627808.0
627856.6
627867.5
627916.1
627932.5
627956.6
PLAN & PROFILE CONTINUES
ON SHEET WW5
NOTES:
1. NOTES AND LEGEND ON SHEET WW1 APPLY.
CONNECT TO NEW COMFORT STATION #3
INSTALL NEW 4" PVC SEWERLINE
INSTALL NEW 2,500 GAL. SEPTIC TANK
SEE SHEET WW13 INSTALL NEW 1,000 GAL. DOSING TANK
WITH TWO ALTERNATING SIPHONS
SEE SHEET WW13
INSTALL COUNTER AND ALARM CONTROLS
INSTALL NEW 4" PVC SEWERLINE
(2 LINES IN TRENCH)
INSTALL SEWER CLEANOUT
SEE SHEET WW16
MAIN ROAD
X H u m b o ld t T o iy a b e M c W il li a m s C a m p g ro u n d .2 D ra w in g s W W .W W .M c W il li a m s .W a te r-
S e w e r_ T e le w o rk .d w g
2+50 3+00 4+00 5+00 5+92
-2.0%
0.0%
-9.9%
-2.3% S
TA
:4
+4
IN
V
E R
T E
LE
V
:8
2.
STA:4+65
INVERT ELEV:8501.9
SAND
GRAVEL
WASTEWATER SYSTEM #3
PLAN & PROFILE 2+50 TO END
1' = 30' HORIZ., 1" = 6' VERT.
4" PVC SEWERLINE
(2 LINES IN TRENCH) 4" PVC SEWERLINE
DRAINFIELD BOTTOM ELEV: 8496.4
STA. 5+35
PIPELINES SPLIT TO EACH ZONE
EXISTING GROUND
NEW PIPE INVERT
PROPOSED TOP OF
SUBGRADE (TYP)
INSTALL DRAINFIELD, SEE SHEET WW14
PERFORATED LATERAL PIPE INVERT ELEV: 8499.4
2" PVC MANIFOLD
STA: 4+58
INTERSECT WATERLINE
NOTES:
1. NOTES AND LEGEND ON SHEET WW1 APPLY.
2. SEE POINT TABLE ON SHEET WW4..
3. THE FOLLOWING INVERT ELEVATIONS ARE
CRITICAL FOR THIS SYSTEM: DOSING TANK
OUTLET AND DRAINFIELD PERFORATED
LATERAL PIPE. INVERTS MUST BE INSTALLED
TO WITHIN 0.1 FEET OF ELEVATIONS SHOWN
IN ORDER FOR PRESSURIZED SYSTEM TO
OPERATE AS DESIGNED.
4. THE MAXIMUM SLOPE ACROSS DRAINFIELD #3
IS EXPECTED TO BE 9%.
INSTALL NEW 4" PVC SEWERLINE
(2 LINES IN TRENCH)
WATER/SEWER LINE CROSSING
SPECIAL CONSTRUCTION REQUIREMENTS APPLY
SEE SHEET W19
30'
55'
12'
(TYP)
INSTALL DRAINFIELD #3
2 ZONES REQUIRED
SEE SHEET WW14
PRESSURIZED LATERAL (TYP)
ZONE 1
ZONE 2
MAIN ROAD
AREA RESERVED FOR FUTURE
REPLACEMENT DRAINFIELD
(DO NOT DISTURB)
X H u m b o ld t T o iy a b e M c W il li a m s C a m…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .