specsApril_26_2012.docx

DOCX document 174 KB Posted

Attached to
Mayflower Box Culvert Federal contract opportunity
Solicitation number
AG-0261-S-12-0036
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Mayflower Box Culvert, newest first.
File Type Posted
Highway ID120015 04-27-2012 ID15.pdf PDF
SF 30 S-12-0036 00001.pdf PDF
Mayflower culvert PhotoBefore.docx DOCX document
AG-0261-S-12-0036 Mayflower Box Culvert.pdf PDF
Heavy ID120012 04-27-2012 ID12.pdf PDF
Construction Cost Estimate Breakdown 0036.xlsx XLSX spreadsheet
MAYFLOWER_DWG_PACKAGE.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAYFLOWER STREAM CROSSING

TABLE OF CONTENTS

Preface4
101 - Terms, Format, and Definitions5
101.01 Meaning of Terms.5
101.03 Abbreviations.5
101.04 Definitions.5
102 - Bid, Award, and Execution of Contract8
102 Bid, Award, and Execution of Contract8
103 - Scope of Work9
103 Scope of Work9
104 - Control of Work10
104 Control of Work10
104.06 Use of Roads by Contractor10
105 - Control of Material11
105.02 Material Sources.11
105.02(a) Government-provided sources.11
105.05 Use of Material Found in the Work.11
106 - Acceptance of Work12
106.01 Conformity with Contract Requirements.12
106.07 Partial and Final Acceptance13
107 - Legal Relations and Responsibility to the Public14
107.05 Responsibility for Damage Claims.14
107.06 Contractor’s Responsibility for Work.14
107.09 Legal Relationship of the Parties.14
107.10 Environmental Protection.14
108 - Prosecution and Progress16
108 Prosecution and Progress16
109 - Measurement and Payment17
109 Measurement and Payment17
109.02 Measurement Terms and Definitions.17
151 – Mobilization18
151.01 Description18
152 - Construction Survey and Staking19
152.01 Description19
152.06 Payment19

153 - Contractor Quality Control……………………………………………………………… 153-07 Project Submittals……………………………………………………………………..20

155 - Schedules for Construction Contracts20
155 Schedules for Construction Contracts20
156 - Public Traffic21
156.01 Description21
156.02 Material21
156.03 General21
156.04 Temporary Traffic Control.21
156.05 Temporary Closures22
156.06 Acceptance23
156.07 Measurement and Payment23
157 – Soil Erosion Control24
157.03 General24
157.13 Maintenance and cleanup25
201 - Clearing and Grubbing26
201.04 Clearing26
201.06 Disposal.26
201.09 Payment.26
203 - Removal of Structures and Obstructions27
203.01 Description27
203.05 Disposing of Material.27
208 – Structure Excavation and Backfill For Selected Major Structures29
208.01 Description29
208.04 General.29
208.10 Backfill30
208.11 Compaction30
208.12 Acceptance.30
308 - Minor Crushed Aggregate31
308.01 Description31
308.02 Material31
308.03 Preparing Surface.31
308.04 Placing Crushed Aggregate.31
308.05 Compacting and Finishing Crushed Aggregate.31
308.06 Acceptance32
308.07 Measurement32
308.08 Payment32
576 - MAYFLOWER Precast Box Culvert33
576.01 Description33
576.02 Requirements33
576.03 Design Requirements.33
576.04 Design Calculations and Drawings.34
576.05 General34
576.06 Performance34
576.07 Measurement34
576.08 Payment34
625 – TURF ESTABLISHMENT35
625.01 Description35
625.02 Material35
625.03 Preparing Surface.35
625.04 Measurement35
625.05 Payment35
648 - Stream Simulation36
648.01 Description36
648.02 Material36
648.03 General.36
648.04 Placed Stream Bed Simulation Rock and Cross Vanes.37
648.05 Foundation fill37
648.06 Acceptance37
648.07 Measurement37
648.07 Payment38
705 - Rock39
705.07 Streambed Simulation Rock.39
705.08 Channel Rock.39

Preface Preface_wo_03_15_2004_m Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.

101 - Terms, Format, and Definitions 101.01_nat_us_02_17_2005

101.01 Meaning of Terms.

Add the following:

Delete all references in FP-03 to Transportation Acquisition Regulations (TAR).

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp
Milepost
ppm
Part Per Million

101.04_nat_us_06_16_2006

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the Contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005 102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work 103.00_nat_us_02_16_2005 103 Scope of Work

Delete all but subsection 103.01 Intent of Contract.

104 - Control of Work 104.00_nat_us_06_16_2006 104 Control of Work

Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005 Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material 105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Add the following:

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - Acceptance of Work 106.01_nat_us_03_29_2005

106.01 Conformity with Contract Requirements.

Delete Subsection 106.01 and substitute the following:

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

(1) Sampling method;

(2) Number of samples;

(3) Sample transport;

(4) Test procedures;

(5) Testing laboratories;

(6) Reporting;

(7) Estimated time and costs; and

(8) Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

(1) Have the work accepted at a reduced price; or

(2) Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

106.07_nat_us_05_11_2004

106.07 Partial and Final Acceptance

Delete subsection 106.07.

107 - Legal Relations and Responsibility to the Public 107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_r04f12_5-20-2009

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. The hazardous spill plan will describe how the contractor will comply with the following three methods to minimize fuel/oil leakage from construction equipment into the stream channel include the following:

i. All equipment used for instream work will be cleaned of external oil, grease, dirt and mud; and leaks repaired; prior to arriving at the project site. All equipment will be inspected by the Contracting Officer’s Representative before unloading at site. Any leaks or accumulations of grease will be corrected before entering streams or areas that drain directly to streams or wetlands.

ii. Equipment used for in-stream or riparian work (including chainsaws and other hand power tools) will be fueled and serviced in an established staging area (site-specifically recommended by COR). When not in use, vehicles will be stored in the designated staging area. The staging area should be in an area that will not deliver fuel, oil, etc. to streams.

iii. Oil-absorbing floating booms, and other equipment such as pads and absorbent “peanuts” appropriate for the size of the stream, will be available on-site during all phases of construction. For very small streams with few pools or slack water, booms may not be effective. More pads and straw bales to anchor booms may be necessary. Booms will be placed in a location that facilitates an immediate response to potential petroleum leakage.

Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

· Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

· Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom. Federal and Idaho state regulations regarding spills will be followed: Any spills resulting in a detectable sheen on water shall be reported to the EPA National Response Center (1-800-424-8802). Any spills over 25 gallons will be reported to the IDEQ (1-800-632-800) (or Nevada equivalent), and cleanup will be initiated within 24 hours of the spill.

· Exact time and location of spill including a description of the area involved.

· Containment procedures.

· Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

· Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

108 - Prosecution and Progress 108.00_nat_us_02_16_2005 108 Prosecution and Progress

Delete Section 108 in its entirety.

109 - Measurement and Payment 109.00_nat_us_02_17_2005 109 Measurement and Payment Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

151 – Mobilization 151_R04F12_4_26_2012

151.01 Description

Add the following:

This work consists of washing and treating construction equipment and vehicles necessary for equipment transport to remove seeds, plants, and plant fragments before the equipment is used on Forest Service lands.

Wash the sides, tops, and undercarriages of all construction equipment. Perform all wor at a location designated on the plans or other locations approved in writing. Provide the CO with an opportunity to monitor the washing and inspection.

Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment. Only equipment cleaned and inspected will be allowed to operate within the project area. All subsequent move-ins of equipment to the project area will be treated in the same manner as the initial move-in. This requirement does not apply to cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas off the National Forest.

Equipment will be considered free of soil, seed, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment, components or the need for specialized inspection tools is not required.

Notify the CO in writing at least 7 days before moving any construction equipment onto the National Forest, and at least 24 hours before changing locations within the project area. Notification will include an agreed upon location where the equipment will be available for inspection by the Forest Service. Inspection will be required after every cleaning.

Use methods of cleaning and locations for cleaning approved by the C.O.

For work on national Forest System lands, use a washing system that traps all wash water and either stores it for removal from National Forest System lands or recycles the water for continued use. If the equipment recycles the water, provide adequate filters for seed removal. Dispose of the filter material and removed seeds offsite in a legal and approved manner. Do not mix soaps, detergents, or other chemicals with the wash water.

For work at a commercial washing facility, use an approved facility.

New infestations of noxious weeds of concern to Forest Service and identified by either Contractor or Forest Service, on the Project Area or on the haul route, will be promptly reported to the other party. Contractor and Forest Service will agree on treatment methods to reduce or stop the spread of noxious weeds when new infestations are found. A current list of noxious weeds of concern to Forest Service is available at each Forest Service office.

152 - Construction Survey and Staking 152.00_nat_us_08_05_2005 Description

152.01 Description

Add the following:

The government has set three survey control stakes at Mayflower Creek. The coordinates and elevations are shown on the drawings.

The contractor shall set adequate horizontal and vertical control and reference points for the structure, establish and reference the centerline of the new structure, and maintain the reference stakes.

152.01(c) Material Delete the entire subsection

152.02 General

Delete the entire subsection

152.03 Survey and Staking Requirements

Delete the entire subsection

152.04 Acceptance

Delete the entire subsection

152.05 measurement Delete the entire subsection

152.06 Payment

Delete this section and add the following:

Payment will be considered incidental to pay item 208, structure excavation and backfill.

153 – Contractor Quality Control Add the following.

153.07. Project Submittals

At a minimum the contractor shall provide project submittals as shown on the below Submittal Log. Submittal requirements are listed in the Standard Specifications, Supplemental Specifications, and Plans.

Submittal Log

Log No.
Incidental to

Pay Item(s)

Description of Submittal
Type of Submittal
Requirement found in Specification No.

/Drawings Additional Specification References

1
151
Weed Free Material Source Certification
Material

Certification FSSS 105.02(b)

2
151
Hazardous Spill Plan
Plan
FSSS 107.10
3
151
Contractor Quality Control Plan
Plan
153.02
552.09
4
151
Traffic Control Plan
Plan
FSSS 156.03
5
157
Soil Erosion and Pollution Control Plan
Plan
FSSS 157.03
6
204
Material Moisture/Density Testing
Test Results
Table 204-1
106
7
204
Structural Backfill Compaction Testing
Test Results
204.11
106
8
208
Material Moisture/Density Testing
Test Results
Table 208-1
106
9
208
Structural Backfill Compaction Testing
Test Results
208.11, 208.12
106
11
308
Aggregate Gradation
Material

Certification

301.08
703.05, Drawings
12
552
Structural Concrete: Mix Design
Mix Design
552.03
553, 553A, Drawings
13
552
Structural Concrete: Testing
Test Results
552.19
106, Drawings
14
553
Reinforcing Steel and Wire Rope
Material

Certification

709.01
553, Drawings
15
553A
Precast Concrete Structures
Shop Drawing
FSSS 553A.04
104, 552, 553, 554
16
553A
Precast Concrete Structures: Testing
Test Results
FSSS 553A.02
106, 554, 562
17
553A
Precast Concrete Structures: Design
Design Calculations
FSSS 553A.04
106, 554, 562
19
625
Weed Free Straw
Material

Certification

625.10
FSSS 713.05

155 - Schedules for Construction Contracts 155.00_nat_us_05_11_2004 155 Schedules for Construction Contracts Delete Section 155 in its entirety.

156 - Public Traffic 156.00_R04F12_03_01_2007

Delete Section 156 in its entirety and replace with the following:

Description

156.01 Description

This work consists of controlling and protecting public traffic adjacent to and within the project.

Material

156.02 Material

Conform to the MUTCD and the following Sections and Subsections:

Construction sign panels633
Retroreflective sheeting718.01
Temporary concrete barrier618
Temporary plastic fence710.11
Temporary traffic control devices718.22

156.03 General

This contract will allow closure of the Warren profile Gap road #340 for two weeks during construction.

Note- There are homes beyond the Mayflower site at Trails End subdivision, and at Hettinger Ranch. The Warren Profile Gap road #340 also continues and eventually makes a loop to Big Creek and Yellowpine. Consequently traffic may come up from the other side of the Mayflower work site.

Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic.

Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved. Post construction signs and traffic control devices in conformance with MUTCD. All required signs will be in place and approved prior to beginning work on project.

If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.

156.04 Temporary Traffic Control.

Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:

(a) Furnish and install traffic control devices before the start of construction operations.

(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.

(c) Install only those traffic control devices needed for each stage or phase.

(d) Relocate temporary traffic control devices as necessary.

(e) Remove devices that no longer apply to the existing conditions.

(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.

(g) Keep temporary traffic control devices clean.

(h) Remove all temporary traffic control devices upon contract completion or when approved.

(i) When required, use flaggers certified by the American Traffic Safety Services Association, the National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.

156.05 Temporary Closures

Road segments shall be closed as shown in Table 156-1. The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown. Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.

Prior to closing roads during construction, give written notice to the Contracting Officer at least 14 days in advance, so the CO can have the legal closure order signed by the Forest Supervisor.

Close road 50340 by providing and installing four Type III barricades with reflectorized panels meeting MUTCD standards.

Install the first and second Type III barricades at the excavation site (one on each side of the excavation site), with a sign mounted on the barricade that says in black letters on white background:

ROAD CLOSED

In front of these signs install signs on a post that says in black letters on orange background:

500 FEET

Install the third Type III barricade on road 50340 at the junction with road Pony Meadows Road 50359 that says in black letters on white background

LOCAL TRAFFIC ONLY

Install the fourth type III barricade at the Warren Summit in Section 20, T. 22 N., R 7E. , with a sign mounted on the barricade that says in black letters on white background:

ROAD CLOSED

1 MILE AHEAD

LOCAL TRAFFIC ONLY

Table 156-1 Temporary Road Closures

Road Number
From Terminus
To Terminus
Maximum Consecutive Days of Closure
Minimum Consecutive Days Open
50340
Jct with road 50359
Warren summit, which is junction with road 50337
14 days
Not needed

156.06 Acceptance

Public traffic work will be evaluated under Subsection 106.02.

Measurement and Payment

156.07 Measurement and Payment

Do not measure Public Traffic for payment. Compensation is made as an indirect payment.

157 – Soil Erosion Control 157.03_nat_us_02_24_2005

157.03 General

Delete the entire subsection and replace with the following:

Prior to the start of construction, submit a written plan that provides permanent and temporary erosion-control measures to minimize erosion and sedimentation during and after construction. Do not begin work until the necessary controls for that particular phase of work have been implemented. Do not modify the type, size, or location of any control. Submit the erosion-control plan proposal to the Contracting Officer for approval at least 14 days before operations begin.

Incorporate all permanent erosion control features into the project at the earliest practicable time, as outlined in the approved plan.

When erosion control measures are not functioning as intended, immediately take corrective action.

57.03_R04F12__4_16_2009

This work also includes work according to FSSS 625, Turf Establishment.

The erosion control plan shall include all necessary measures to protect resources and Government improvements. The plan shall include, but is not limited to the following:

1. The construction activities and sequence of implementation relating to specific erosion control measures.

2. The location and type of PERMANENT controls to be implemented during construction.

3. The location and type of TEMPORARY controls to be implemented during construction.

157.03_R04F12_03_27_2012

4. For work in stream channels with running water a detailed dewatering plan. Water shall be conveyed around the construction area during the operating season and higher flows in the event of a storm. The dewatering plan shall state that the COR shall be notified at least 10 days in advance of any streamwork or dewatering. The COR will notify the District Fish biologist who will be available during dewatering to move fish from the dewatering area using a combination of dipnetting and electrofishing. The contractor shall schedule the start of dewatering to occur in the midmorning, so the fish crew will have the afternoon to remove the fish. After the COR approves the stream simulation placement ( with consultation of the Fisheries Biologist) the contractor shall rewater the area slowly in order to help the movement of fish.

157.03_0510_11_10_2004

In Mayflower Creek, the reconstructed stream channel will be “pre-washed” into a reach equipped with sediment capture devices such as Sedimat, prior to reintroduction of flow to the stream.

The construction site will be rewatered slowly to prevent loss of surface water downstream as the construction site streambed absorbs water and to minimize a sudden increase in turbidity.

In-channel sediment-abatement barriers such as Sedimat will capture sediment that is liberated during rewatering of dewatered channels, barriers will be appropriately cleaned out and removed, and captured sediment will be disposed of so it is not reintroduced into stream channels. Such barriers shall be maintained throughout the related construction and removed only when construction is complete and erosion control is assured.

5. The location of each temporary stockpile site for the excavated material, and location of erosion control measures to prevent sediment from washing off of stockpile.

6. A supply of erosion-control materials (e.g. silt fence, straw bales and/ or straw wattles) will be kept on hand to respond to sediment emergencies. Sterile straw or certified “weed-free” straw will be used to prevent introduction of noxious weeds.

Add to the third paragraph:

Upon completion of construction at the site, the Contractor shall remove all temporary dewatering materials and equipment from Government property. This includes items such as pumps, pipes and hoses, sand bags and Sedimat.

Add the following:

The Contractor shall adhere to the following practices:

a) In order to protect aquatic organisms, install screens on the intake of pumps with opening of 3/32 inch.

b) Centrifugal pumps used for removing water from structure excavation (if needed) shall sit in a secondary spill container with sufficient capacity to contain the quantity of fuel in the pump fuel tank.

c) Construct the Dewatering and Sediment Control according to the Contractor’s approved plan.

d) Maintain the roads and stockpiles of material in a manner that prevents direct entry of sediment into the stream, by either preventing the erosion of sediments or collecting the sediments before it reaches the stream.

e) Construct permanent and temporary control features to intercept sediments. A settling basin will be constructed, or a portable one used, that is able to handle the volume of water anticipated, and that provides filtering capability. Dewatering of the excavation site, (of ground water from the excavation) will be done by pumping water to the settling basin, and the basin shall be cleaned out when full of sediments.

f) Any sanitation facilities established by the Contractor shall be located as designated by the CO.

g) All project operations will cease, except efforts to minimize storm or high-flow erosion, under precipitation and high-flow conditions that result in uncontrollable erosion in the construction area.

157.13 Maintenance and cleanup

Delete the third paragraph and insert the following:

Erosion-control materials, such as hay bales, silt fences, and straw wattles will be removed by the Forest Service when the sites have revegetated. Any Sedimat used shall be removed from the stream channel by the contractor.

201 - Clearing and Grubbing 201.04_nat_us_02_22_2005

201.04 Clearing

Delete paragraph (c) and replace with the following:

(c) In areas outside the excavation, embankment, and slope rounding limits, cut stumps to within 12 inches or one-third of the stump diameter of the ground, whichever is higher, measured on the side adjacent to the highest ground.

Delete subsection (d) and replace with the following:

(d) Do not cut vegetation less than 3 feet tall and less than 3 inches in diameter, that is within the clearing limits but beyond the roadway and not in a decking area, and that does not interfere with sight distance along the road.

Add the following:

(e) Trim branches of remaining trees or shrubs to give a clear height of 14 feet above the roadbed unless otherwise indicated. Trim tree limbs as near flush with the trunk as practicable.

(f) Remove brush from log decks. Deck logs so that logs are piled parallel to one another; can be removed by standard log loading equipment; will not damage standing trees; will not interfere with drainage, and will not roll. Keep logs in log decks free of brush and soil.

201.06 Disposal.

Delete the section and add the following:

Dispose of limbs, tree trunks, and stumps using 203.05 (l) placing slash on embankment slopes.

201.09 Payment.

Delete the section and add the following:

Work under this section will be incidental to pay item 203, Removal of Structures and Obstructions.

203 - Removal of Structures and Obstructions 203.05_forest_03_01_2007

203.01 Description

Add the following:

Dispose of the existing culvert by method (a), remove from project The existing corrugated metal pipe culvert with concrete wingwalls and related appurtenances shall be removed and disposed of away from Forest land according to all applicable local, state, and federal regulations and 203.05(a). Temporary soil erosion control measures shall be in place prior to commencing.

203.05_nat_us_02_18_2005

203.05 Disposing of Material.

Add the following:

For Mayflower Creek box culvert, dispose of construction slash by method (l) placing slash on embankment slopes.

(e) Windrowing Construction Slash. Place construction slash outside the roadway in neat, compacted windrows approximately parallel to and along the toeline of embankment slopes. Do not permit the top of the windrows to extend above subgrade. Use construction equipment to matt down all material in a windrow to form a compact and uniform pile. Construct breaks of at least 15 feet at least every 200 feet in a windrow. Do not place windrows against trees. Obtain approval for pioneer roads. A pioneer road may be constructed to provide an area for placement of windrows, provided the excavated material is kept within the clearing limits and does not adversely affect the road construction.

(f) Scattering. Scatter construction slash outside the clearing limits without damaging trees. Limb all logs. Place logs and stumps away from trees, positioned so they will not roll, and are not on top of one another. Limb and scatter other construction slash to reduce slash concentrations.

(g) Chipping or Grinding. Use an approved chipping machine to grind slash and stumps greater than 3 inches in diameter and longer than 3 feet. Deposit chips or ground woody material on embankment slopes or outside the roadway to a loose depth less than 6 inches. Minor amounts of chips or ground woody material may be permitted within the roadway if they are thoroughly mixed with soil and do not form a layer.

(h) Debris Mat. Use tree limbs, tops, cull logs, split stumps, wood chunks, and other debris to form a mat upon which construction equipment is operated. Place stumps upside down and blend stumps into the mat.

(i) Decking Firewood Material. Remove brush from decks. Limb and deck logs that do not meet Utilization Standards according to Subsection 201.04 as directed by the CO. Cut logs to lengths less than 30 feet. Ensure that logs stacks are stable and free of brush and soil.

(j) Removal to designated locations. Remove construction slash to designated locations.

(k) Piling. Pile construction slash in designated areas. Place and construct piles so that if the piles are burned, the burning will not damage remaining trees. Keep piles free of dirt from stumps. Cut unmerchantable logs into lengths of less than 20 feet.

(l) Placing Slash on Embankment Slopes. Place construction slash on completed embankment slopes to reduce soil erosion. Place construction slash as flat as practicable on the completed slope. Do not place slash closer than 2 feet below subgrade. Priority for use of available slash is for: (1) through fills; (2) insides of curves; and (3) ditch relief outlets.

(m) Hydrological Sensitive Placement. Where required use this method in combination with other designated methods to dispose of material to reduce erosion and to aid in re-vegetation:

1. Place windrow segments on contours, wrap in type I geotextile.

2. Place logs as log erosion barriers on contours. Place logs so that 80% of their length is on the ground surface.

3. Scatter slash on bare or disturbed areas within or outside the clearing limits as directed.

4. Scatter chips or ground woody material on bare or disturbed areas within or outside the clearing limits as directed.

Place stumps in swales or on sites to form planting pockets. Place windrow segments on contours, wrap in type I geotextile.

208 – Structure Excavation and Backfill For Selected Major Structures 208.02_forest_04_02_2005

208.01 Description

Add to the first paragraph: Payment will include, but not be limited to, the complete work to excavate road embankment, and sort the material, haul the material to a temporary stockpile site shown on the drawings, excavate for the footings, furnish and place aggregate base bedding under the precast footings, backfill the footings and backfill of the box culvert, and construct a new embankment to the lines and grades of the finish subgrade shown on the drawings. Payment for construction survey and staking will be incidental to this item.

208.02 Material

add the following: 704.03 backfill material.

704.06 Unclassified borrow

208.04 General.

Add the following:

A plan of work shall be submitted in writing and shall describe the procedures, methods, materials, and equipment the Contractor proposes to use to conduct his excavating operations, including details of shoring, cribbing, and cofferdam construction and/or plans for construction of earthen, or rockfill dikes, dams, or embankments in lieu of a cofferdam. Submit the plan of work at least 14 days before operations begin to the Contracting Officer for approval.

Add the following to the sixth paragraph:

Structural backfill necessary to construct the box culvert approaches to the lines and grades AS SHOWN ON THE PLANS or AS STAKED ON THE GROUND shall be obtained by utilizing suitable surplus excavation from the box culvert construction.

Delete the seventh paragraph and add the following:

Dispose of unsuitable or excess material from Mayflower culvert by hauling to the the existing pit area next to road 50340 one mile west of Warren . Place and spread the material as directed by the COR.

208.10 Backfill

Delete the second sentence of the first paragraph and add the following:

Compact each layer according to Subsection 209.

208.11 Compaction

Delete the entire section and add the following.

Compact each layer according to Subsection 209.11.

208.12_forest_04_02_2005

208.12 Acceptance.

Table 208-1 Sampling and Testing Requirements.

Add the following notes to the table:

(2) Structural backfill AASHTO T 27 & T11 (gradation) and AASHTO T89 (liquid limit) test methods are not required.

(3) For structural backfill compaction, AASHTO T 310, change the sampling frequency to 3 per abutment.

308 - Minor Crushed Aggregate 308.00_01_us_10_11_2006 Delete section 308 in its entirety and replace with the following:

Description

308.01 Description

This work consists of furnishing and placing crushed aggregate for roadway aggregate course, from a commercial source.

Material

308.02 Material

Conform to the following Subsections:

Crushed aggregate703.06
Water725.01

Construction Requirements

308.03 Preparing Surface.

Prepare the roadway surface on which aggregate course is placed as shown on the plans.

308.04 Placing Crushed Aggregate.

(a) Roadway aggregate. Mix the aggregate and adjust the moisture content to obtain a uniform mixture with a moisture content suitable for compaction. Spread and shape the mixture on the prepared surface in a uniform layer.

Do not place the mixture in a layer exceeding 6 inches in compacted thickness. When more than one layer is necessary, compact each layer according to Subsection 308.05(a) before placing the next layer.

(b) Bedding and backfill aggregate. Place and shape the mixture in layers that, when compacted, do not exceed 6 inches in depth.

308.05 Compacting and Finishing Crushed Aggregate.

(a) Roadway aggregate. Compact using the methods below, specified in the Schedule of Items.

(1) Method 1. Operate equipment over the full width of spread aggregate.

(2) Method 2. Compact the aggregate by operating compaction equipment over the total width until visible deformation ceases. A minimum of three complete roller passes shall be made at a moisture content suitable for compaction.

(b) Bedding and backfill aggregate. Compact in 6 inch lifts by using a COR approved mechanical compactor until no visible deformation is observed over the entire area of aggregate.

308.06 Acceptance

Crushed aggregate will be evaluated under Subsections 106.02 and 106.03. Furnish a production certification including gradation and quality properties for each source.

Construction of roadway aggregate courses will be evaluated under Subsections 106.02 and 106.04. Method 2 compaction will be evaluated under Section 106.04.

Placement of bedding and backfill aggregate will be evaluated under Subsection 106.02 and Section 209.

Preparation of the surfaces on which crushed aggregate is placed will be evaluated under Section 303 and 209 as applicable.

Measurement

308.07 Measurement

Measure the Section 308 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.

Measure crushed aggregate by the cubic yard in-place on the road.

Measure width horizontally to include the top of aggregate width including designed widening. Measure the length horizontally along the centerline of the roadway.

Payment

308.08 Payment

The accepted quantities will be paid at the contract price per unit of measurement for the Section 308 pay item listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

576 – MAYFLOWER Precast Box Culvert 576.00_forest_12_13_2010 Description

576.01 Description

This work consists of designing, fabricating, and installing precast concrete box culvert including footings, stemwalls and wingwalls AS SHOWN ON THE DRAWINGS. The precast concrete sections shall be contractor designed units to the overall dimensions shown on the drawings. The contractor’s design shall be submitted for approval (see section 576.03 below). The work also includes steel connection plates for deck joints, grout for joints, shop drawings, and other incidentals as required.

Materials

576.02 Requirements

Furnish materials that meet the requirements specified in the following sections:

Concrete compressive strength, structural steel tensile strength, concrete finish and designation, and other material specifications shall be as required or if not listed in the contract documents, take them from the manufacturer’s drawings, and have them approved by the Contracting Officer prior to fabrication. Maintain adequate records of all inspections and tests.

Construction Requirements

576.03 Design Requirements.

Design in accordance with the “LFRD Bridge Design Specifications, 4th Edition by AASHTO.

Submit plans and calculations signed and stamped by a professional engineer registered in the state of Idaho.

Design requirements are:

Vehicle design loads: HL-93
Soil Pressure:Allowable= 4,000 pounds per square foot.
Internal friction= 36 degrees
Lateral Earth Pressure passive = 45 pounds per square foot.
Cover: There will be a layer of aggregate placed on top of the deck in order to match the grades of the existing road. The aggregate layer will vary in thickness up to a maximum of 12 inches. The design of the box will need to account for the dead load of the aggregate layer.
Deck weldment and deck joint to be designed by contractor for a lateral distribution of a 16, 000 pound wheel load.
All exposed corners shall have a ¾ inch chamfer.
The joint between the footing and the wall: the location of the joint and the design of the joint shall be at the contractor’s option, and shall be shown on the submitted plans. Fill the fill with nonshrink grout.

Rig precast concrete box culvert and precast footings with stemwalls with permanent lifting devices to facilitate efficient installation and removal of these items. Place lifting devices so as not to interfere with traffic when the culvert is installed as a road crossing over a stream.

576.04 Design Calculations and Drawings.

Submit design drawings (8 ½ inches by 11 inches), calculations, or shop drawings at least 14 days in advance of the start of fabrication to allow time for review and correction of any changes and approval by the CO. Include plan, elevation, and section views of the box culvert and footings with stemwalls, dimensions of all components, welding and connection details, and general and specific notes regarding design and construction.

576.05 General

Perform excavation, backfill, and embankment work under Sections 204, 208, 209 and 308.

576.06 Performance

Notify the Contracting Officer at least 7 days before delivering the concrete box culvert sections and footings with stem walls.

Measurement

576.07 Measurement

Measure the Section 576 items listed in the bid schedule according to Subsection 109.02 Payment

576.08 Payment

The accepted quantities, measured as provided in Subsection 109.02 and above, will be paid at the contract price per unit of measurement for the Section 576 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See subsection 109.05.

625 – TURF ESTABLISHMENT

625.00_forest_02_24_2011

Delete section 625 in its entirety and replace with the following:

Description

625.01 Description

This work consists of spreading weed free straw and government supplied seed on all disturbed ground.

Material

625.02 Material

Conform to the following Subsections:

weed free straw 713.05

Construction Requirements

625.03 Preparing Surface.

Scatter slash on embankments according to section 203.05 (l)

Then scatter the government supplied seed at a rate of 18 pounds per acre.

Then scatter straw so that there is between 50 % to 75% coverage of slash and straw.

Measurement

625.04 Measurement

Measure the Section 625 listed in the bid according to Subsection 109.02

648 - Stream Simulation 648.00_forest_03_01_2007

648.01 Description

This work consists of placing rock and fill to simulate natural stream profile and streambed though culverts and other structures. This work also includes constructing cross vanes.

Obtain rocks that meet the specifications for stream simulation rock in 705.08 from either of two sources:

1. From the excavation for the box culvert. The Contractor shall replace the volume of material that is used as stream simulation rock with an equal volume of suitable embankment material from off the site, at no additional cost to the Government.

2. If additional stream simulation rock is needed, obtain from a commercial source.

648.00_nat_us_03_15_2005

648.02 Material

Conform to the following Subsections.

Foundation Fill704.01
Stream bed Simulation Rock705.07
Channel Rock705.8

Construction Requirements

648.03 General.

Place stream simulation rock on a prepared surface to form a well-graded, low permeability mass, similar in appearance and texture to the natural streambed. Do not drive metal track or rubber tired equipment directly on metal or concrete structure surfaces.

648.04 Placed Stream Bed Simulation Rock and Channel Rock

(a) Method A, Machine Placed. Place stream simulation rock in one or more layers with a layer depth less than 1 ½ times the maximum dimension of the stream simulation rock. Place stream simulation bedrock by methods that do not cause segregation or damage to the prepared surface. Place or rearrange individual rocks by mechanical methods to obtain a compact low permeability mass matching stream simulation bed details. Fill voids before placing the next lift. Place channel rock as designated on the drawings.

(b) Method B, End Dumped. Dump stream simulation rock in one or more layers with a layer depth less than 1 ½ times the maximum dimension of the stream simulation rock. Distribute larger rocks throughout the mass of stone. Obtain a uniformly dense, compact, low permeability bed with a surface matching stream simulation bed details. Fill voids before placing the next lift. Place channel rock as designated on the drawings.

(c) Method C, Hand Placed. Place stream simulation rock using hand labor.