SF 30 S-12-0036 00001.pdf
PDF 344 KB Posted
- Attached to
- Mayflower Box Culvert Federal contract opportunity
- Solicitation number
- AG-0261-S-12-0036
About this file
00001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Highway ID120015 04-27-2012 ID15.pdf | ||
| Mayflower culvert PhotoBefore.docx | DOCX document | |
| specsApril_26_2012.docx | DOCX document | |
| AG-0261-S-12-0036 Mayflower Box Culvert.pdf | ||
| Heavy ID120012 04-27-2012 ID12.pdf | ||
| Construction Cost Estimate Breakdown 0036.xlsx | XLSX spreadsheet | |
| MAYFLOWER_DWG_PACKAGE.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-0261-S-12-0036
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
BOISE ID 83709-1663
1249 S VINNELL WAY STE 200
ATTN MATT MORRIS
SW IDAHO-NEVADA ACQUISITION CENTER
05/15/2012000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/15/2012
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Mayflower Creek Concrete Box Culvert
The purpose of this Amendment is to change the wage determination from Heavy to Highway, and replace page 16 of the solicitation
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
MATTHEW A. MORRIS
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
award the contractor acknowledges that it –
(1) does not have a tax delinquency, meaning that it is not subject to any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, and
(2) has not been convicted (or had an officer or agent acting on its behalf convicted) of a felony criminal violation under any Federal law within 24 months preceding the award, unless a suspending and debarring official of the United States Department of Agriculture has considered suspension or debarment of the awardee, or such officer or agent, based on these convictions and/or tax delinquencies and determined that suspension or debarment is not necessary to protect the interests of the Government.
(b) If the awardee fails to comply with these provisions, the Forest Service may terminate this contract for default and may recover any funds the awardee has received in violation of sections 433 or 434.
Order of Precedence--Construction
Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:
11) The Schedule of Items
12) Representations and other instructions
13) Contract clauses
14) Other documents, exhibits, and attachments
15) Forest Service Supplemental Specifications(FSSS)
16) Standard Specifications(FP-03)
17) Plans, figured dimensions over scaled dimensions
18) Plans, large scale contract plans over small scale contract plans
19) Schedules on contract plans over any conflicting notations on contract plans
20) Shop drawings
SECTION J - List of Documents, Exhibits, and Other Attachments
Davis-Bacon Act: If this is a contract in excess of $2,000, the Davis Bacon Act requires the Contractor to pay certain minimum wages and benefits to employees working under this contract. These required minimum wages are stated in the attached Wage Decision.
The following attachments are a part of this solicitation and any resulting contract (see separate document(s)).
Description File Name Date of File Number of Pages Drawing package MAYFLOWER_DWG_PACKAGE.pdf 5/8/2012 7 Specifications specsApril_26_2012.docx 5/8/2012 41 Wage Determination Highway ID120015 04-27-2012 ID15.pdf 5/1/2012 21 Construction Cost Estimate Construction Cost Estimate Breakdown 0036.xlsx 5/15/2012 2
AG-0261-S-12-0036 Page 16 of 23
File details come from the government source that posted it. Updated .