Job Order Pricing Worksheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| pre-bid_meeting_transcript.doc | DOC document | |
| amend_1.pdf | ||
| AG-0116-S-11-0016_1_solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JOC Data
| Location | Contractors Coefficient |
| Ketchikan | |
| Thorne Bay | |
| Wrangell | |
| Petersburg | |
| Sitka | |
| Hoonah | |
| Yakutat | |
| Craig | |
| Juneau | |
| Shoal Cove | |
| Margaret Bay | |
| El Cap | |
| Polk Inlet | |
| Anita Bay | |
| Saint John | |
| Deep Bay | |
| Bradfield Canal | |
| Rowan Bay | |
| Portage Bay | |
| Kake | |
| False Island | |
| Corner Bay | |
| Kennel Creek | |
| Angoon | |
| Barges | |
| Girdwood | |
| Portage Valley | |
| Seward | |
| Cordova | |
| Hope | |
| Kenai Lake WC | |
| Broadview | |
| Coopers Landing | |
| Ktn Comm Sites | |
| Psg Comm Sites | |
| Sit Comm Sites | |
| Yak Comm Sites | |
| CNF Comm Sites |
Job Order Request (F.4a)
| Job Order Request Form | |||
| Tongass NF Contract #AG-0116-C-11-xxxxx | |||
| Job Order Contract Number: | |||
| Government Request | Contractor's Clarification and Adjustment | ||
| a. | Date of Job Order Request: | a. | Date of Job Order Proposal: |
b. Project Name and Location: b. Project Name and Location:
Yakutat
c. General Description of Work: c. General Description of Work:
d. Define Volume of Work d. Define Volume of Work:
| e. | General Conditions: | e. | General Conditions: |
| The nature of the work requires acceptable weather conditions. | |||
| Protect existing vegetation and improvements. Stain to be oil based, semi-transparent, color same as existing. | |||
| All cut in edges to be clean and straight. Spills and drips shall be immediately cleaned up before it drys. | |||
| f. | Special Conditions: | f. | Special Conditions: |
| General: The bunkhouse is currently occupied. Contractor shall coordinate with CO to minimize impact to occupants and visitors. Contractor shall minimize materials and equipment on-site and not interfere with pedestrian traffic. |
| g. | Time: | g. | Time: |
| Job Order Time: 60 days | |||
| Performance Period: 10 days | |||
| h. | Required Submittals: | h. | Required Submittals: |
| Work Schedule: Provide a written schedule showing start and end dates and how contractor will accommodate weather conditions. |
i. Flat Fee Items: i. Flat Fee Items:
| j. | Government Contact: | j. | Name of Site Superintendent: |
| Kent Bowers | |||
| 907-228-6223 |
k. Attachments: k. Attachments:
| JOC 8 Data from JOC Tab | |
| Ketchikan | 0.00 |
| Thorne Bay | 0.00 |
| Wrangell | 0.00 |
| Petersburg | 0.00 |
| Sitka | 0.00 |
| Hoonah | 0.00 |
| Yakutat | 0.00 |
| Craig | 0.00 |
| Juneau | 0.00 |
| Shoal Cove | 0.00 |
| Margaret Bay | 0.00 |
| El Cap | 0.00 |
| Polk Inlet | 0.00 |
| Anita Bay | 0.00 |
| Saint John | 0.00 |
| Deep Bay | 0.00 |
| Bradfield Canal | 0.00 |
| Rowan Bay | 0.00 |
| Portage Bay | 0.00 |
| Kake | 0.00 |
| False Island | 0.00 |
| Corner Bay | 0.00 |
| Kennel Creek | 0.00 |
| Angoon | 0.00 |
| Barges | 0.00 |
| Girdwood | 0.00 |
| Portage Valley | 0.00 |
| Seward | 0.00 |
| Cordova | 0.00 |
| Hope | 0.00 |
| Kenai Lake WC | 0.00 |
| Broadview | 0.00 |
| Coopers Landing | 0.00 |
| Ktn Comm Sites | 0.00 |
| Psg Comm Sites | 0.00 |
| Sit Comm Sites | 0.00 |
| Yak Comm Sites | 0.00 |
| CNF Comm Sites | 0.00 |
Job Order Price Proposal F4.b.
| Job Order Price Proposal | |
| Tongass NF Contract #AG-0116-C-11-xxxxx | Job Order Contract # |
FSDefaultUser: JOB ORDER CONTRACT NUMBER; Not Parent Contract.
| Job Order Data | Flat Fee Schedule | |||||||||||
| Project: | 0 | Description | Quant. | Unit | Unit Cost | Total | ||||||
| Location: | Yakutat | Operation/Main.t Mnls: | 0 | each | $ 150.00 | $ - 0 | ||||||
| Community Location Factor: | 0.00 | On-Site Operation Inst.: | 0 | l.s. | $ 250.00 | $ - 0 | ||||||
| RS Means Version | 2011 | As-Built Drawings: | 0 | sheet | $ 250.00 | $ - 0 | ||||||
| Date Prepared: | Permit and Fees: | 0 | l.s. | $ - 0 | $ - 0 | |||||||
| Prepared By: | Airline Fare - Origin to/from nearest FS District | 0 | each | $ 500.00 | $ - 0 | |||||||
| Site Superintendent: | Commercial Lodging per person | 0 | each | $ 150.00 | $ - 0 | |||||||
| Job Order Time: | Food/Ground Trans at Commercial Lodging | 0 | each | $ 100.00 | $ - 0 | |||||||
| Job Order Performance Period: | Food/Ground Trans at Government Lodging | 0 | each | $ 50.00 | $ - 0 | |||||||
| Sub-Contractors: | Float Plane-Ranger Dist. To/From Remote Site | 0 | l.s. | $ 500.00 | $ - 0 | |||||||
| NOTES: | Food/Ground Trans at Remote Site | 0 | each | $ 50.00 | $ - 0 | |||||||
| Entries are only made in light blue cells; other cells not to be manipulated; Form Updated 13 Jan 2011 | Freight on Incidental Tools & Equipment | 0 | l.s. | $ 500.00 | $ - 0 | |||||||
| Helicopter To/From Mtn. Comm Site | 0 | hour | $ 1,500.00 | $ - 0 | ||||||||
| Total Flat Fees | $ - 0 | |||||||||||
| Item | Description of Work Specific to Project | Qty | CSI Number | Description of RS Means Item | Labor Hours | Unit | Bare Mat. | Bare Labor | Bare Equip. | City Cost Index by Div. | Total | |
| <- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - These Columns Imported from RSMeans CDROM - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -> | ||||||||||||
| Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract---------- | 1.01 | Item Name |
| 1.12233E11 | Ea. | $ - 0 | $ - 0 | $ - 0 | 1.197 | $ - 0 |
| 1.12233E11 | Ea. | $ - 0 | $ - 0 | $ - 0 | 1.197 | $ - 0 |
| 1.12233E11 | Ea. | $ - 0 | $ - 0 | $ - 0 | 1.197 | $ - 0 |
| 1.12233E11 | Ea. | $ - 0 | $ - 0 | $ - 0 | 1.197 | $ - 0 |
| 1.12233E11 | Ea. | $ - 0 | $ - 0 | $ - 0 | 1.197 | $ - 0 |
| Subtotal | $ - 0 | ||||||||
| Contractors Community Coefficent | $ - 0 | ||||||||
| Prepriced Subtotal | $ - 0 | ||||||||
| NPP Labor | Prime Contractor NPP Carpenter Labor Hours | 60.00 | hr | NPP Labor | $ - 0 | $ - 0 | 1.197 | $ - 0 |
FSDefaultUser: Contract Section B.4-e:
NPP labor is RSMeans rates marked up by Contractor's Community Coefficient and the RSMeans City Cost Index (by division) for Ketchikan NPP Material Prime Contractors NPP Materials NPP Mat'l ls 0.00 $ - 0 $ - 0 1.000 $ - 0 FSDefaultUser: Contract Section B.4-d:
NPP Materials and Equipment are marked up by contractors community coefficient only;
NPP Subcon NPP Subcontractor Contract Cost Ea. 0.00 $ - 0 $ 1.00 1.250 $ - 0 FSDefaultUser: Contract Section B.4-f:
NPP Subcontracts are marked up by 25% only
| Non-Prepriced Subtotal | $ - 0 | ||||
| 1.01 | Item Subtotal | $ - 0 | |||
| Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract---------- | 1.02 | Item Name |
| 1.12233E11 | Ea. | $ - 0 | $ - 0 | $ - 0 | 1.197 | $ - 0 |
| 1.12233E11 | Ea. | $ - 0 | $ - 0 | $ - 0 | 1.197 | $ - 0 |
| 1.12233E11 | Ea. | $ - 0 | $ - 0 | $ - 0 | 1.197 | $ - 0 |
| 1.12233E11 | Ea. | $ - 0 | $ - 0 | $ - 0 | 1.197 | $ - 0 |
| 1.12233E11 | Ea. | $ - 0 | $ - 0 | $ - 0 | 1.197 | $ - 0 |
| Subtotal | $ - 0 | ||||||||
| Contractors Community Coefficent | $ - 0 | ||||||||
| Prepriced Subtotal | $ - 0 | ||||||||
| NPP Labor | Prime Contractor NPP Carpenter Labor Hours | 0.00 | hr | NPP Labor | $ - 0 | $ - 0 | 1.197 | $ - 0 |
FSDefaultUser: Contract Section B.4-e:
NPP labor is RSMeans rates marked up by Contractor's Community Coefficient and the RSMeans City Cost Index (by division) for Ketchikan
FSDefaultUser: Contract Section B.4-d:
NPP Materials and Equipment are marked up by contractors community coefficient only; NPP Material Prime Contractors NPP Materials NPP Mat'l ls 0.00 $ - 0 $ - 0 1.000 $ - 0 FSDefaultUser: Contract Section B.4-d:
NPP Materials and Equipment are marked up by contractors community coefficient only;
FSDefaultUser: Contract Section B.4-f:
NPP Subcontracts are marked up by 25% only NPP Subcon NPP Subcontractor Contract Cost Ea. 0.00 $ - 0 $ 1.00 1.250 $ - 0 FSDefaultUser: Contract Section B.4-f:
NPP Subcontracts are marked up by 25% only
| Non-Prepriced Subtotal | $ - 0 | ||
| 1.02 | Item Subtotal | $ - 0 | |
| Original Contract----------Original Contract | Original Contract Totals |
| Adjusted Subtotal Prepriced Items | $ - 0 |
| Adjusted Subtotal Non-Prepriced Items | $ - 0 |
| Flat Fees Listed at Top | $ - 0 |
Original Job Order Total $ - 0
| JOC 8 Data from JOC Tab | |
| Ketchikan | 0 |
| Thorne Bay | 0 |
| Wrangell | 0 |
| Petersburg | 0 |
| Sitka | 0 |
| Hoonah | 0 |
| Yakutat | 0 |
| Craig | 0 |
| Juneau | 0 |
| Shoal Cove | 0 |
| Margaret Bay | 0 |
| El Cap | 0 |
| Polk Inlet | 0 |
| Anita Bay | 0 |
| Saint John | 0 |
| Deep Bay | 0 |
| Bradfield Canal | 0 |
| Rowan Bay | 0 |
| Portage Bay | 0 |
| Kake | 0 |
| False Island | 0 |
| Corner Bay | 0 |
| Kennel Creek | 0 |
| Angoon | 0 |
| Barges | 0 |
| Girdwood | 0 |
| Portage Valley | 0 |
| Seward | 0 |
| Cordova | 0 |
| Hope | 0 |
| Kenai Lake WC | 0 |
| Broadview | 0 |
| Coopers Landing | 0 |
| Ktn Comm Sites | 0 |
| Psg Comm Sites | 0 |
| Sit Comm Sites | 0 |
| Yak Comm Sites | 0 |
| CNF Comm Sites | 0 |
Mod 1
| Job Order Price Proposal Modification #1 | |
| Tongass NF Contract #AG-0116-C-11-xxxxx | Job Order Contract # |
FSDefaultUser: JOB ORDER CONTRACT NUMBER; Not Parent Contract.
| Job Order Modification Data | Modification Flat Fee Schedule | |||||||||||
| Project: | 0 | Description | Quant. | Unit | Unit Cost | Total | ||||||
| Location: | Yakutat | Operation/Main.t Mnls: | 0 | each | $ 150.00 | $ - 0 | ||||||
| Community Location Factor: | 0.00 | On-Site Operation Inst.: | 0 | l.s. | $ 250.00 | $ - 0 | ||||||
| RS Means Version | 2011 | As-Built Drawings: | 0 | sheet | $ 250.00 | $ - 0 | ||||||
| Date Prepared: | Permit and Fees: | 0 | l.s. | $ - 0 | $ - 0 | |||||||
| Prepared By: | Airline Fare - Origin to/from nearest FS District | 0 | each | $ 500.00 | $ - 0 | |||||||
| Site Superintendent: | Commercial Lodging per person | 0 | each | $ 150.00 | $ - 0 | |||||||
| Job Order Time: | Food/Ground Trans at Commercial Lodging | 0 | each | $ 100.00 | $ - 0 | |||||||
| Job Order Performance Period: | Food/Ground Trans at Government Lodging | 0 | each | $ 50.00 | $ - 0 | |||||||
| Sub-Contractors: | Float Plane-Ranger Dist. To/From Remote Site | 0 | l.s. | $ 500.00 | $ - 0 | |||||||
| NOTES: | Food/Ground Trans at Remote Site | 0 | each | $ 50.00 | $ - 0 | |||||||
| Entries are only made in pink cells; other cells not to be manipulated; Form Updated 13 Jan 2011 | Freight on Incidental Tools & Equipment | 0 | l.s. | $ 500.00 | $ - 0 | |||||||
| Helicopter To/From Mtn. Comm Site | 0 | hour | $ 1,500.00 | $ - 0 | ||||||||
| Total Flat Fees | $ - 0 | |||||||||||
| Item | Description of Work Specific to Project | Qty | CSI Number | Description of RS Means Item | Labor Hours | Unit | Bare Mat. | Bare Labor | Bare Equip. | City Cost Index by Div. | Total | |
| <- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - These Columns Imported from RSMeans CDROM - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -> | ||||||||||||
| Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification---------- | Mod 1.1 | Item Name |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | ||||||||
| Contractors Community Coefficent | $ - 0 | ||||||||
| Prepriced Subtotal | $ - 0 | ||||||||
| 0 | NPP Labor | Prime Contractor NPP Carpenter Labor Hours | 0.00 | hr | NPP Labor | $ - 0 | NPP Labor | $ - 0 |
FSDefaultUser: Contract Section B.4-e:
NPP labor is RSMeans rates marked up by Contractor's Community Coefficient and the RSMeans City Cost Index (by division) for Ketchikan 0 NPP Material Prime Contractors NPP Materials NPP Mat'l ls 0.00 NPP Mat'l NPP Mat'l 1.000 $ - 0 FSDefaultUser: Contract Section B.4-d:
NPP Materials and Equipment are marked up by contractors community coefficient only;
0 NPP Subcon NPP Subcontractor Contract Cost 0.00 1.250 $ - 0 FSDefaultUser: Contract Section B.4-f:
NPP Subcontracts are marked up by 25% only
| Non-Prepriced Subtotal | $ - 0 | ||
| Mod 1.1 | Item Subtotal | $ - 0 | |
| Modification----------Modification | Modification 1 Totals |
| Adjusted Subtotal Prepriced Items | $ - 0 |
| Adjusted Subtotal Non-Prepriced Items | $ - 0 |
| Flat Fees Listed at Top | $0.00 |
| Modification 1 Total | $ - 0 |
| Original Job Order Total | $0.00 |
| New Job Order Total | $0.00 |
Mod 2
| Job Order Price Proposal Modification #2 | |
| Tongass NF Contract #AG-0116-C-11-xxxxx | Job Order Contract # |
FSDefaultUser: JOB ORDER CONTRACT NUMBER; Not Parent Contract.
| Job Order Modification Data | Modification Flat Fee Schedule | |||||||||||
| Project: | 0 | Description | Quant. | Unit | Unit Cost | Total | ||||||
| Location: | Yakutat | Operation/Main.t Mnls: | 0 | each | $ 150.00 | $ - 0 | ||||||
| Community Location Factor: | 0.00 | On-Site Operation Inst.: | 0 | l.s. | $ 250.00 | $ - 0 | ||||||
| RS Means Version | 2011 | As-Built Drawings: | 0 | sheet | $ 250.00 | $ - 0 | ||||||
| Date Prepared: | Permit and Fees: | 0 | l.s. | $ - 0 | $ - 0 | |||||||
| Prepared By: | Airline Fare - Origin to/from nearest FS District | 0 | each | $ 500.00 | $ - 0 | |||||||
| Site Superintendent: | Commercial Lodging per person | 0 | each | $ 150.00 | $ - 0 | |||||||
| Job Order Time: | Food/Ground Trans at Commercial Lodging | 0 | each | $ 100.00 | $ - 0 | |||||||
| Job Order Performance Period: | Food/Ground Trans at Government Lodging | 0 | each | $ 50.00 | $ - 0 | |||||||
| Sub-Contractors: | Float Plane-Ranger Dist. To/From Remote Site | 0 | l.s. | $ 500.00 | $ - 0 | |||||||
| NOTES: | Food/Ground Trans at Remote Site | 0 | each | $ 50.00 | $ - 0 | |||||||
| Entries are only made in pink cells; other cells not to be manipulated; Form Updated 13 Jan 2011 | Freight on Incidental Tools & Equipment | 0 | l.s. | $ 500.00 | $ - 0 | |||||||
| Helicopter To/From Mtn. Comm Site | 0 | hour | $ 1,500.00 | $ - 0 | ||||||||
| Total Flat Fees | $ - 0 | |||||||||||
| Item | Description of Work Specific to Project | Qty | CSI Number | Description of RS Means Item | Labor Hours | Unit | Bare Mat. | Bare Labor | Bare Equip. | City Cost Index by Div. | Total | |
| <- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - These Columns Imported from RSMeans CDROM - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -> | ||||||||||||
| Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification---------- | Mod 2.1 | Item Name |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | ||||||||
| Contractors Community Coefficent | $ - 0 | ||||||||
| Prepriced Subtotal | $ - 0 | ||||||||
| 0 | NPP Labor | Prime Contractor NPP Carpenter Labor Hours | 0.00 | hr | NPP Labor | $ - 0 | NPP Labor | $ - 0 |
FSDefaultUser: Contract Section B.4-e:
NPP labor is RSMeans rates marked up by Contractor's Community Coefficient and the RSMeans City Cost Index (by division) for Ketchikan 0 NPP Material Prime Contractors NPP Materials NPP Mat'l ls 0.00 NPP Mat'l NPP Mat'l 1.000 $ - 0 FSDefaultUser: Contract Section B.4-d:
NPP Materials and Equipment are marked up by contractors community coefficient only;
0 NPP Subcon NPP Subcontractor Contract Cost 0.00 1.250 $ - 0 FSDefaultUser: Contract Section B.4-f:
NPP Subcontracts are marked up by 25% only
| Non-Prepriced Subtotal | $ - 0 | ||
| Mod 2.1 | Item Subtotal | $ - 0 | |
| Modification----------Modification | Modification 2 Totals |
| Adjusted Subtotal Prepriced Items | $ - 0 |
| Adjusted Subtotal Non-Prepriced Items | $ - 0 |
| Flat Fees Listed at Top | $0.00 |
| Modification 2 Total | $ - 0 |
| Original Job Order Total | $0.00 |
| Modification 1 Total | $ - 0 |
| New Job Order Total | $ - 0 |
Quality Control (1300-1.02)
| Job Order Quality Control Plan | |
| Tongass NF Contract #AG-0116-C-11-xxxxx | Job Order Contract #AG-0116-D-xx-xxxx |
FSDefaultUser: JOB ORDER CONTRACT NUMBER; Not Parent Contract.
| Project: | 0 | ||
| Community: | Yakutat | Site Superintendent: | Signature: |
| Note: The user fills in only cells with colored font; cells with black font should be left alone. | |||
| Project Manager: | Signature: | ||
| Note: Protection is enabled for the user's convenience; it may be disabled and reenabled with no password | |||
| Subcontractor | Signature: |
| Other | Name | Signature: | |||
| Line # | Work Description | Quality Standard | Notification | Passed (Date) | Failed (Date) |
As the Site Superintendent, I have supervised the work identified above and certify that all work has been completed in workmanshipmanner in full accordance with the requirements as identified.
(Site Superintendent)