joc8_current_spreadsheet_of_forms_2011_0622.xlsx

XLSX spreadsheet 65 KB Posted

Attached to
Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for construction projects Federal contract opportunity
Solicitation number
AG-0116-S-11-0016_1
Issued by
Department of Agriculture Forest Service R10-Alaska Region

About this file

Job Order Pricing Worksheet

View the file

Other files for this federal contract opportunity

Other files attached to Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for construction projects, newest first.
File Type Posted
pre-bid_meeting_transcript.doc DOC document
amend_1.pdf PDF
AG-0116-S-11-0016_1_solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JOC Data

LocationContractors Coefficient
Ketchikan
Thorne Bay
Wrangell
Petersburg
Sitka
Hoonah
Yakutat
Craig
Juneau
Shoal Cove
Margaret Bay
El Cap
Polk Inlet
Anita Bay
Saint John
Deep Bay
Bradfield Canal
Rowan Bay
Portage Bay
Kake
False Island
Corner Bay
Kennel Creek
Angoon
Barges
Girdwood
Portage Valley
Seward
Cordova
Hope
Kenai Lake WC
Broadview
Coopers Landing
Ktn Comm Sites
Psg Comm Sites
Sit Comm Sites
Yak Comm Sites
CNF Comm Sites

Job Order Request (F.4a)

Job Order Request Form
Tongass NF Contract #AG-0116-C-11-xxxxx
Job Order Contract Number:
Government RequestContractor's Clarification and Adjustment
a.Date of Job Order Request:a.Date of Job Order Proposal:

b. Project Name and Location: b. Project Name and Location:

Yakutat

c. General Description of Work: c. General Description of Work:

d. Define Volume of Work d. Define Volume of Work:

e.General Conditions:e.General Conditions:
The nature of the work requires acceptable weather conditions.
Protect existing vegetation and improvements. Stain to be oil based, semi-transparent, color same as existing.
All cut in edges to be clean and straight. Spills and drips shall be immediately cleaned up before it drys.
f.Special Conditions:f.Special Conditions:
General: The bunkhouse is currently occupied. Contractor shall coordinate with CO to minimize impact to occupants and visitors. Contractor shall minimize materials and equipment on-site and not interfere with pedestrian traffic.
g.Time:g.Time:
Job Order Time: 60 days
Performance Period: 10 days
h.Required Submittals:h.Required Submittals:
Work Schedule: Provide a written schedule showing start and end dates and how contractor will accommodate weather conditions.

i. Flat Fee Items: i. Flat Fee Items:

j.Government Contact:j.Name of Site Superintendent:
Kent Bowers
907-228-6223

k. Attachments: k. Attachments:

JOC 8 Data from JOC Tab
Ketchikan0.00
Thorne Bay0.00
Wrangell0.00
Petersburg0.00
Sitka0.00
Hoonah0.00
Yakutat0.00
Craig0.00
Juneau0.00
Shoal Cove0.00
Margaret Bay0.00
El Cap0.00
Polk Inlet0.00
Anita Bay0.00
Saint John0.00
Deep Bay0.00
Bradfield Canal0.00
Rowan Bay0.00
Portage Bay0.00
Kake0.00
False Island0.00
Corner Bay0.00
Kennel Creek0.00
Angoon0.00
Barges0.00
Girdwood0.00
Portage Valley0.00
Seward0.00
Cordova0.00
Hope0.00
Kenai Lake WC0.00
Broadview0.00
Coopers Landing0.00
Ktn Comm Sites0.00
Psg Comm Sites0.00
Sit Comm Sites0.00
Yak Comm Sites0.00
CNF Comm Sites0.00

Job Order Price Proposal F4.b.

Job Order Price Proposal
Tongass NF Contract #AG-0116-C-11-xxxxxJob Order Contract #

FSDefaultUser: JOB ORDER CONTRACT NUMBER; Not Parent Contract.

Job Order DataFlat Fee Schedule
Project:0DescriptionQuant.UnitUnit CostTotal
Location:YakutatOperation/Main.t Mnls:0each$ 150.00$ - 0
Community Location Factor:0.00On-Site Operation Inst.:0l.s.$ 250.00$ - 0
RS Means Version2011As-Built Drawings:0sheet$ 250.00$ - 0
Date Prepared:Permit and Fees:0l.s.$ - 0$ - 0
Prepared By:Airline Fare - Origin to/from nearest FS District0each$ 500.00$ - 0
Site Superintendent:Commercial Lodging per person0each$ 150.00$ - 0
Job Order Time:Food/Ground Trans at Commercial Lodging0each$ 100.00$ - 0
Job Order Performance Period:Food/Ground Trans at Government Lodging0each$ 50.00$ - 0
Sub-Contractors:Float Plane-Ranger Dist. To/From Remote Site0l.s.$ 500.00$ - 0
NOTES:Food/Ground Trans at Remote Site0each$ 50.00$ - 0
Entries are only made in light blue cells; other cells not to be manipulated; Form Updated 13 Jan 2011Freight on Incidental Tools & Equipment0l.s.$ 500.00$ - 0
Helicopter To/From Mtn. Comm Site0hour$ 1,500.00$ - 0
Total Flat Fees$ - 0
ItemDescription of Work Specific to ProjectQtyCSI NumberDescription of RS Means ItemLabor HoursUnitBare Mat.Bare LaborBare Equip.City Cost Index by Div.Total
<- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - These Columns Imported from RSMeans CDROM - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ->
Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------1.01Item Name
1.12233E11Ea.$ - 0$ - 0$ - 01.197$ - 0
1.12233E11Ea.$ - 0$ - 0$ - 01.197$ - 0
1.12233E11Ea.$ - 0$ - 0$ - 01.197$ - 0
1.12233E11Ea.$ - 0$ - 0$ - 01.197$ - 0
1.12233E11Ea.$ - 0$ - 0$ - 01.197$ - 0
Subtotal$ - 0
Contractors Community Coefficent$ - 0
Prepriced Subtotal$ - 0
NPP LaborPrime Contractor NPP Carpenter Labor Hours60.00hrNPP Labor$ - 0$ - 01.197$ - 0

FSDefaultUser: Contract Section B.4-e:

NPP labor is RSMeans rates marked up by Contractor's Community Coefficient and the RSMeans City Cost Index (by division) for Ketchikan NPP Material Prime Contractors NPP Materials NPP Mat'l ls 0.00 $ - 0 $ - 0 1.000 $ - 0 FSDefaultUser: Contract Section B.4-d:

NPP Materials and Equipment are marked up by contractors community coefficient only;

NPP Subcon NPP Subcontractor Contract Cost Ea. 0.00 $ - 0 $ 1.00 1.250 $ - 0 FSDefaultUser: Contract Section B.4-f:

NPP Subcontracts are marked up by 25% only

Non-Prepriced Subtotal$ - 0
1.01Item Subtotal$ - 0
Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------Original Contract----------1.02Item Name
1.12233E11Ea.$ - 0$ - 0$ - 01.197$ - 0
1.12233E11Ea.$ - 0$ - 0$ - 01.197$ - 0
1.12233E11Ea.$ - 0$ - 0$ - 01.197$ - 0
1.12233E11Ea.$ - 0$ - 0$ - 01.197$ - 0
1.12233E11Ea.$ - 0$ - 0$ - 01.197$ - 0
Subtotal$ - 0
Contractors Community Coefficent$ - 0
Prepriced Subtotal$ - 0
NPP LaborPrime Contractor NPP Carpenter Labor Hours0.00hrNPP Labor$ - 0$ - 01.197$ - 0

FSDefaultUser: Contract Section B.4-e:

NPP labor is RSMeans rates marked up by Contractor's Community Coefficient and the RSMeans City Cost Index (by division) for Ketchikan

FSDefaultUser: Contract Section B.4-d:

NPP Materials and Equipment are marked up by contractors community coefficient only; NPP Material Prime Contractors NPP Materials NPP Mat'l ls 0.00 $ - 0 $ - 0 1.000 $ - 0 FSDefaultUser: Contract Section B.4-d:

NPP Materials and Equipment are marked up by contractors community coefficient only;

FSDefaultUser: Contract Section B.4-f:

NPP Subcontracts are marked up by 25% only NPP Subcon NPP Subcontractor Contract Cost Ea. 0.00 $ - 0 $ 1.00 1.250 $ - 0 FSDefaultUser: Contract Section B.4-f:

NPP Subcontracts are marked up by 25% only

Non-Prepriced Subtotal$ - 0
1.02Item Subtotal$ - 0
Original Contract----------Original ContractOriginal Contract Totals
Adjusted Subtotal Prepriced Items$ - 0
Adjusted Subtotal Non-Prepriced Items$ - 0
Flat Fees Listed at Top$ - 0

Original Job Order Total $ - 0

JOC 8 Data from JOC Tab
Ketchikan0
Thorne Bay0
Wrangell0
Petersburg0
Sitka0
Hoonah0
Yakutat0
Craig0
Juneau0
Shoal Cove0
Margaret Bay0
El Cap0
Polk Inlet0
Anita Bay0
Saint John0
Deep Bay0
Bradfield Canal0
Rowan Bay0
Portage Bay0
Kake0
False Island0
Corner Bay0
Kennel Creek0
Angoon0
Barges0
Girdwood0
Portage Valley0
Seward0
Cordova0
Hope0
Kenai Lake WC0
Broadview0
Coopers Landing0
Ktn Comm Sites0
Psg Comm Sites0
Sit Comm Sites0
Yak Comm Sites0
CNF Comm Sites0

Mod 1

Job Order Price Proposal Modification #1
Tongass NF Contract #AG-0116-C-11-xxxxxJob Order Contract #

FSDefaultUser: JOB ORDER CONTRACT NUMBER; Not Parent Contract.

Job Order Modification DataModification Flat Fee Schedule
Project:0DescriptionQuant.UnitUnit CostTotal
Location:YakutatOperation/Main.t Mnls:0each$ 150.00$ - 0
Community Location Factor:0.00On-Site Operation Inst.:0l.s.$ 250.00$ - 0
RS Means Version2011As-Built Drawings:0sheet$ 250.00$ - 0
Date Prepared:Permit and Fees:0l.s.$ - 0$ - 0
Prepared By:Airline Fare - Origin to/from nearest FS District0each$ 500.00$ - 0
Site Superintendent:Commercial Lodging per person0each$ 150.00$ - 0
Job Order Time:Food/Ground Trans at Commercial Lodging0each$ 100.00$ - 0
Job Order Performance Period:Food/Ground Trans at Government Lodging0each$ 50.00$ - 0
Sub-Contractors:Float Plane-Ranger Dist. To/From Remote Site0l.s.$ 500.00$ - 0
NOTES:Food/Ground Trans at Remote Site0each$ 50.00$ - 0
Entries are only made in pink cells; other cells not to be manipulated; Form Updated 13 Jan 2011Freight on Incidental Tools & Equipment0l.s.$ 500.00$ - 0
Helicopter To/From Mtn. Comm Site0hour$ 1,500.00$ - 0
Total Flat Fees$ - 0
ItemDescription of Work Specific to ProjectQtyCSI NumberDescription of RS Means ItemLabor HoursUnitBare Mat.Bare LaborBare Equip.City Cost Index by Div.Total
<- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - These Columns Imported from RSMeans CDROM - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ->
Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Mod 1.1Item Name
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Subtotal$ - 0
Contractors Community Coefficent$ - 0
Prepriced Subtotal$ - 0
0NPP LaborPrime Contractor NPP Carpenter Labor Hours0.00hrNPP Labor$ - 0NPP Labor$ - 0

FSDefaultUser: Contract Section B.4-e:

NPP labor is RSMeans rates marked up by Contractor's Community Coefficient and the RSMeans City Cost Index (by division) for Ketchikan 0 NPP Material Prime Contractors NPP Materials NPP Mat'l ls 0.00 NPP Mat'l NPP Mat'l 1.000 $ - 0 FSDefaultUser: Contract Section B.4-d:

NPP Materials and Equipment are marked up by contractors community coefficient only;

0 NPP Subcon NPP Subcontractor Contract Cost 0.00 1.250 $ - 0 FSDefaultUser: Contract Section B.4-f:

NPP Subcontracts are marked up by 25% only

Non-Prepriced Subtotal$ - 0
Mod 1.1Item Subtotal$ - 0
Modification----------ModificationModification 1 Totals
Adjusted Subtotal Prepriced Items$ - 0
Adjusted Subtotal Non-Prepriced Items$ - 0
Flat Fees Listed at Top$0.00
Modification 1 Total$ - 0
Original Job Order Total$0.00
New Job Order Total$0.00

Mod 2

Job Order Price Proposal Modification #2
Tongass NF Contract #AG-0116-C-11-xxxxxJob Order Contract #

FSDefaultUser: JOB ORDER CONTRACT NUMBER; Not Parent Contract.

Job Order Modification DataModification Flat Fee Schedule
Project:0DescriptionQuant.UnitUnit CostTotal
Location:YakutatOperation/Main.t Mnls:0each$ 150.00$ - 0
Community Location Factor:0.00On-Site Operation Inst.:0l.s.$ 250.00$ - 0
RS Means Version2011As-Built Drawings:0sheet$ 250.00$ - 0
Date Prepared:Permit and Fees:0l.s.$ - 0$ - 0
Prepared By:Airline Fare - Origin to/from nearest FS District0each$ 500.00$ - 0
Site Superintendent:Commercial Lodging per person0each$ 150.00$ - 0
Job Order Time:Food/Ground Trans at Commercial Lodging0each$ 100.00$ - 0
Job Order Performance Period:Food/Ground Trans at Government Lodging0each$ 50.00$ - 0
Sub-Contractors:Float Plane-Ranger Dist. To/From Remote Site0l.s.$ 500.00$ - 0
NOTES:Food/Ground Trans at Remote Site0each$ 50.00$ - 0
Entries are only made in pink cells; other cells not to be manipulated; Form Updated 13 Jan 2011Freight on Incidental Tools & Equipment0l.s.$ 500.00$ - 0
Helicopter To/From Mtn. Comm Site0hour$ 1,500.00$ - 0
Total Flat Fees$ - 0
ItemDescription of Work Specific to ProjectQtyCSI NumberDescription of RS Means ItemLabor HoursUnitBare Mat.Bare LaborBare Equip.City Cost Index by Div.Total
<- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - These Columns Imported from RSMeans CDROM - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ->
Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Modification----------Mod 2.1Item Name
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Subtotal$ - 0
Contractors Community Coefficent$ - 0
Prepriced Subtotal$ - 0
0NPP LaborPrime Contractor NPP Carpenter Labor Hours0.00hrNPP Labor$ - 0NPP Labor$ - 0

FSDefaultUser: Contract Section B.4-e:

NPP labor is RSMeans rates marked up by Contractor's Community Coefficient and the RSMeans City Cost Index (by division) for Ketchikan 0 NPP Material Prime Contractors NPP Materials NPP Mat'l ls 0.00 NPP Mat'l NPP Mat'l 1.000 $ - 0 FSDefaultUser: Contract Section B.4-d:

NPP Materials and Equipment are marked up by contractors community coefficient only;

0 NPP Subcon NPP Subcontractor Contract Cost 0.00 1.250 $ - 0 FSDefaultUser: Contract Section B.4-f:

NPP Subcontracts are marked up by 25% only

Non-Prepriced Subtotal$ - 0
Mod 2.1Item Subtotal$ - 0
Modification----------ModificationModification 2 Totals
Adjusted Subtotal Prepriced Items$ - 0
Adjusted Subtotal Non-Prepriced Items$ - 0
Flat Fees Listed at Top$0.00
Modification 2 Total$ - 0
Original Job Order Total$0.00
Modification 1 Total$ - 0
New Job Order Total$ - 0

Quality Control (1300-1.02)

Job Order Quality Control Plan
Tongass NF Contract #AG-0116-C-11-xxxxxJob Order Contract #AG-0116-D-xx-xxxx

FSDefaultUser: JOB ORDER CONTRACT NUMBER; Not Parent Contract.

Project:0
Community:YakutatSite Superintendent:Signature:
Note: The user fills in only cells with colored font; cells with black font should be left alone.
Project Manager:Signature:
Note: Protection is enabled for the user's convenience; it may be disabled and reenabled with no password
SubcontractorSignature:
OtherNameSignature:
Line #Work DescriptionQuality StandardNotificationPassed (Date)Failed (Date)

As the Site Superintendent, I have supervised the work identified above and certify that all work has been completed in workmanshipmanner in full accordance with the requirements as identified.

(Site Superintendent)

File details come from the government source that posted it. Updated .