AG-0116-S-09-0097_greentop-cabin_amend3.pdf

PDF 30 KB Posted

Attached to
Greentop Cabin and Trail Restoration Federal contract opportunity
Solicitation number
AG-0116-S-09-0097
Issued by
Department of Agriculture Forest Service R10-Alaska Region

About this file

Amendment 3 (Revises schedule of items new trail log etc. Close remains 8/7/09 at 2 00 pm local time)

View the file

Other files for this federal contract opportunity

Other files attached to Greentop Cabin and Trail Restoration, newest first.
File Type Posted
Greentop Amendment 3 - trail log changes.pdf PDF
AG-0116-S-09-0097_greentop-cabin_amend2.pdf PDF
AG-0116-S-09-0097_greentop-cabin_amend2.pdf PDF
AG-0116-S-09-0097_greentop-cabin_amend1.pdf PDF
AG-0116-S-09-0097_greentop-cabin.pdf PDF
Cover_Sheet_RFP.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1 4

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

Three (3) July 27, 2009

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

Tongass National Forest Fed. Bldg., 648 Mission St.

Ketchikan, AK 99901

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

AG-0116-S-09-0097

Greentop Cabin and Trail Restoration

9B. DATED (SEE ITEM 11)

06/11/2009

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

After Forest Service review of the project area, this amendment incorporates a revised trail log, changes to Section B - Schedule of Items, and contains revisions to the specifications.

This solicitation closing date and time remains at August 7, 2009 at 2:00 PM.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Tonya Rymer, Contracting Officer

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Greentop Cabin and Trail Restoration Project

Amendment #3

Item #1:

Revised Schedule of Items as follows:

Change Est. Qty. from 1526 LF to 1297 LF. This quantity includes 1197 LF that are designated in the Trail Restoration Log and an additional 100 LF that will be designated on the ground by the Government.

Item #2:

There have been inquiries about the availability of suitable Yellow Cedar material for corduroy within a reasonable distance from the corduroy work areas. The Government has reviewed the situation and believes there is suitable material for corduroy within a reasonable distance.

There were also inquiries about the installation of corduroy where there is a substantial root mat.

Corduroy work areas are primarily over muskeg and fens with few woody roots; however within the work areas there are short, intermittent sections of rooty soil. The Government will mark areas to be excluded from corduroy installation.

Specification 932.03 Corduroy. - Delete and replace with:

Use Alaska Yellow Cedar Trees according to the following requirements:

- use only dead, sound snags within 30 feet either side of the trail centerline

- use snags or live trees found beyond 30 feet from the trail centerline

- where suitable Yellow Cedar trees are not available within 200 feet of the trail centerline, use other species of suitable size as approved.

Specification H.7 1). Delete and replace with:

1). Alaska Yellow Cedar timber or other species as approved for constructing the various timber structures in this contract. Cut stumps flush with the ground or “rusticate” the tops of stumps and place soil and moss on them to provide a natural appearance. Place tops and branches in locations out of sight of the trail. Utilize all suitable timber to a 4” top. Cut only what is needed for work as staked.

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

(REVISED – 7/27/2009)

ITEM NO. DESCRIPTION PAY

UNIT

UNIT UNIT

PRICE

TOTAL

932(01) Corduroy

LF

1,297

931(01) Corduroy Bridge LF 66 $_______ $__________ 937(01) Log Riser Steps (LRS) EA 8 $_______ $__________ 912(01) Full Bench LF 76 $_______ $__________ 938(01) Sign Post (SP) EA 3 $_______ $__________ 940(01) Cabin Restoration LSQ 1 $_______ $__________ 940(02) Pit Toilet LSQ 1 $_______ $__________ 951(01) Mobilization LSQ 1 $_______ $__________

TOTAL ALL ITEMS

* METHOD OF MEASUREMENT: AQ = ACTUAL QUANTITIES; LS = LUMP SUM

NOTE: This contract presents two options for construction which will be implemented fully and exclusively. Please indicate which OPTION (A or B) will be selected for your proposal.

Prices Submitted By:

Signature: Phone:

Vendor Name: Fax:

Address: Email:

City/State/Zip TIN#

DUNS#

SCHEDULE OF ITEMS