A40 Att 2 PWS CDRLS.pdf
PDF 1 MB Posted
- Attached to
- Credit Reporting Federal contract opportunity
- Solicitation number
- HS0021-23-R-0016
About this file
This is a combined synopsis/solicitation for multiple award IDIQ contracts for credit reporting services. The Defense Counterintelligence and Security Agency seeks proposals for two tasks: single credit bureau reports in specified formats, and tri-merge reports merging data from all three credit bureaus. The base period of performance is five years with five one-year options. The minimum order quantity is 3,000 single reports or 100 tri-merge reports, and the maximum per order or series of orders within 30 days is 5 million single reports or 1.5 million tri-merge reports. The NAICS code is 561450 with a small business size standard of $41 million. Proposals are due by April 24, 2023. Award will be made to the responsible offerors with the most advantageous proposals based on price and other factors.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0 0 0
Adobe Professional 8.0
*001, *002
Quality Control Plan TBD Awardee
A001 Quality Control Plan
FAR 46.105(a-d) Deliverable A001 TBD
60 days after award 60 days after award
A Quality Management Plan sample has been provided as an attachment to this DD1423-1. This is only an example and will need to be worked to match the service being provided. If the Contractor already has a quality control plan they may submit that instead.
In accordance with FAR 46.105:
Contractor responsibilities.
(a) The contractor is responsible for carrying out its obligations under the contract by-
(1) Controlling the quality of supplies or services;
(2) Tendering to the Government for acceptance only those supplies or services that conform to contract requirements;
(3) Ensuring that vendors or suppliers of raw materials, parts, components, subassemblies, etc., have an acceptable quality control system;
and
(4) Maintaining substantiating evidence, when required by the contract, that the supplies or services conform to contract quality requirements, and furnishing such information to the Government as required.
(b) The contractor may be required to provide and maintain an inspection system or program for the control of quality that is acceptable to the Government (see 46.202).
(c) The control of quality by the contractor may relate to, but is not limited to-
(1) Manufacturing processes, to ensure that the product is produced to, and meets, the contract’s technical requirements;
(2) Drawings, specifications, and engineering changes, to ensure that manufacturing methods and operations meet the contract’s technical requirements;
Cont'd on pg 2 remarks.
1 2
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
(3) Testing and examination, to ensure that practices and equipment provide the means for optimum evaluation of the characteristics subject to inspection;
(4) Reliability and maintainability assessment (life, endurance, and continued readiness);
(5) Fabrication and delivery of products, to ensure that only conforming products are tendered to the Government;
(6) Technical documentation, including drawings, specifications, handbooks, manuals, and other technical publications;
(7) Preservation, packaging, packing, and marking; and
(8) Procedures and processes for services to ensure that services meet contract performance requirements.
(d) The contractor is responsible for performing all inspections and test required by the contract except those specifically reserved for performance by the Government (see 46.201(c)).
End Remarks.
*001, *002
TBD AwardeeQuality Control Plan
2 2
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
Sample Quality Management Plan
This reference documents project-specific quality assurance and quality control procedures appropriate to the size, complexity, and nature of the project. Quality improvements are also documented and may be included as an integral part of the Project Management Plan (PMP). Plans are developed concurrently in the iterative Program/Project Planning Phase.
In addition to quality management objectives developed as part of PMPs for projects, the system for Quality Management is defined in an organizational level Quality Management Plan (QMP). Project-specific Quality Management objectives accompanying each PMP shall be consistent with the organization
QMP unless documented.
Quality is planned for and managed through the “Plan-Do-Check-Act” cycle for project execution, program management, and business processes.
The Project Manager (PM) is responsible for
Documenting customer expectations and consensus quality management objectives at a project-level that supports the implementation of the PMP.
Utilizing the expertise of their project delivery teams to determine the procedures necessary (such as independent technical review) to achieve the target level of quality.
Ensuring the customer endorses all quality objectives included in the
Quality Management Plan.
Understanding the customer’s role in project success; the PM’s relationship with the customer is pivotal to providing quality service
Working with the customer early in the Project Scope and Customer
Requirements Definition Process to determine customer needs, and refining those requirements in light of safety, fiscal, schedule, and other constraints; considers the cost/benefit of all quality improvements.
The Project Delivery Team (PDT) is responsible for
Delivering a quality project
Performing an active role to ensure the customer's quality objectives are clearly articulated and that the customer understands the essential professional standards, laws, and codes which must be incorporated into the project
Monitoring the quality of their own work
Keeping the commitments for completion of their portion of the project, as documented in the Quality Management Plan
The Resource Provider(s) is responsible for
Monitoring the quality of the products and services produced by their team members serving on PDTs or the contractors they use to supplement their in-house capability
Teaching, coaching, mentoring and training staff so that they have technically competent staff to assign to PDT’s
Participating in selection of outside consultants and service/goods providers to ensure they are qualified to perform assigned work
Assigning team members to project teams commensurate with their ability and experience
Consulting with PDT members on a periodic basis to get feedback and make adjustments as necessary
Ensuring that there are processes in place and qualified staff or contractors are available to guarantee that an independent technical review is conducted
Serving on an independent technical review team, when appropriate.
Distribution of Information and Data - Communications to all project
Stakeholders
Project Delivery Team (PDT)
Project Manager (PM)
Resource Provider(s)
Ownership
Quality Management Relationships
Quality Planning Quality Control
(QC)
Quality Assurance (QA)
Quality Improvement
Plan Do Check Act
What Is Done
Determine what will be quality on the project and how quality will be measured
Monitor specific project products to determine if they meet performance measurement thresholds defined in the quality management plan
Determine if measurement of quality is appropriate by evaluating overall performance on a regular basis to insure the project will satisfy customer quality expectations
Increase the effectiveness and efficiency of the project when corrective actions such as Change
Requests are identified.
Changes to the
Quality Management Plan and the PMP may be required.
When It Is Done
Project Planning Phase
Processes
PMP
Development
Project Scope &
Customer
Requirements
Definition
Team
Establishment
Activity/Schedule
Development
Resource Estimate
Development
Project Delivery
Acquisition
Strategy
Project Execution, &
Control Phase
Project
Execution &
Control
Lessons
Learned
Project Execution, &
Control Phase
Project
Execution &
Control
Project Execution, & Control Phase and Project
Planning Phase
Processes
Change
Management
PMP
Development
Quality Management Plan Content
Overview of Quality Management Plan
Purpose
Overview of Plan, Do, Check, Act
Customer Quality Objectives
Identify Customer Quality Objectives
Identify Quality Threshold for each Quality Objective
Quality Control Plans
Address each major deliverable
Identify Independent Technical Review Team(s)
Quality Assurance
Organizational Quality System Requirements (Organizational Quality
Management Plan)
Project-specific requirements
Other Project Specific Information as required
Quality Management Plan Methodology
Plan
Identify the customers Quality Objectives. Help customers express quality expectations in objective, quantitative terms.
Identify professional standards including legal, environmental, economic, code, life safety and health.
Balance needs and expectations of customers and stakeholders with cost, schedule, and professional standards. Evaluate the costs and benefits of selected quality objectives and the processes to be used to achieve objectives.
Develop an effective plan and processes, including quality assurance and quality control procedures, to achieve objectives. Consider risk/hazard factors and complexity of the project and adapt processes to provide the requisite level of quality. Document in the risk management plan any project variations from the local QMP requirements.
Develop performance measure thresholds to ensure agreement on the definition of success relative to Quality Objectives.
Ensure customer endorsement of all quality objectives included in the
Quality Management Plan.
Do
Do the work according to the approved PMP and standard operating procedures.
Project execution is a dynamic process. The PDT must communicate, meet on a regular basis, and adapt to changing conditions. The
Quality Management Plan and PMP may require modification to ensure that project objectives are met.
Document in Lessons Learned – PROC3020, as required.
Check
Perform independent technical review, management oversight, and verification to ensure that quality objectives are met consistent with
District Quality Management Plans.
Check performance against the PMP and Customer Quality Objectives performance measures thresholds to verify that performance will accomplish Quality Objectives and to verify sufficiency of the plan.
Share findings with all project stakeholders to facilitate continuous improvement.
Act
If performance measures thresholds are exceeded, take specific corrective actions to fix the systemic cause of any non-conformance, deficiency, or other unwanted effect.
Document quality improvements that could include appropriate revisions to the quality management plan, alteration of quality assurance and control procedures, and adjustments to resource allocations.
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0 0 0
Adobe Professional 8.0
*001, *002
Monthly Status Report TBD Awardee
DI-MGMT-80368A
A002 Monthly Status Reports
TBDA002
Monthly 5 days following prior month
Award of Contract
The contractor will provide a written monthly status report to the KO, CS, and COR following completion of prior month
Must be provided within 5 business days of prior month ending
The monthly status report shall summarize the work ordered and work performed
To include summary of the number of credit reports provided, itemized list of reports provided with sufficient detail to validate invoices
To include performance issues.
Monthly status reports shall be submitted in conjunction with monthly invoices.
The monthly status report shall include quality control information; total number of queried items, number provided, number provided with errors, and other information as requested by the COR, KO, or CS.
1 1
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data
DATA ITEM DESCRIPTION
Title: Status Report
Number: DI-MGMT-80368A Approval Date: 30 OCT 2006 AMSC Number: 7619 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/DA02 Applicable Forms: N/A
Use/relationship:
The Status Report documents the status of contractor effort towards achieving contract objectives. It identifies accomplishments to date and difficulties encountered, and compare the status achieved to planned goals and the resources expended. It is used by the Government to monitor and evaluate contractor performance.
This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
It is not intended that all requirements herein should be applied to every program.
Portions of the DID are subject to tailoring by deletion depending on the specific status reporting requirements of the project.
This DID is related to DI-FNCL-80331, Funds and Man-Hour Expenditure Report which can be used in conjunction with this report if paragraph 3.2.3 below is deleted.
This DID supersede DI-MGMT-80368.
Requirements:
1. Reference documents. None.
2. Format. The Status Report shall be in contractor format.
2.1 Identification. The data indicated below shall be contained on a title page or on the first page of the report.
a. Title/identification of the system/component/program/project.
Source: http://assist.dla.mil -- Downloaded: 2023-01-04T16:25Z Check the source to verify that this is the current version before use.
DI-MGMT-80368A
b. Type of report (e.g., monthly, interim, final).
c. Period covered by the report.
d. Contract number.
e. Preparing activity or contractor’s title.
f. Security classification, when required.
g. Distribution Statement.
2.2 Page size. The report shall be on 8 ½ by 11 inch (metric A4) paper.
3. Content. The report shall contain the following:
3.1 Summary. The summary shall include a brief statement of the overall project status , covering the accomplished technical activities and development, objectives of efforts, summary results of efforts, identification of major problems/deficiencies with impact, and recommended solutions.
3.2 Body of report. The Status Report shall contain the following items, where applicable:
3.2.1 Milestone/task status. The status of each milestone/task as defined by the statement of work or contract, as applicable:
a. A statement as to whether or not the program/project/task is on schedule; if not, the effort planned to meet the schedule shall be indicated. Include an overall status of each milestone, task, or unit of work. Include update schedule sheets, milestone charts, or task synopsis sheets identifying phase of task and percentage of completion of each task, technical instruction, or order.
b. A comparison of achieved end-product performance capabilities projected against contract baseline values, requirements, or allocations.
c. Effort expended on each task to date, and a brief description of technical developments and accomplishments.
d. Key dates in any testing program and description of tests performed and significant test results. If applicable, a description of the amount and type of down time on the equipment or system under test.
e. A list of all designs completed and a brief description of each item. For designs in process, provide estimated dates for design and drawing completion.
f. A narrative of outstanding problems existing as of the previous status report, and their resolution status. 2
DI-MGMT-80368A
g. New problem areas encountered or anticipated, their effect on the overall work effort/project and steps being taken to remedy problem situations.
h. Significant results of conferences, trips, or directives for the Contracting officer’s representatives.
i. Any other information which may cause significant changes in the program schedule.
3.2.2 Future plans. Summary of future plans, recommendations and proposals both for the next reporting period and for any long term plans.
3.2.3 Itemized man-hours and costs. Itemized man-hour and cost expenditure incurred for the reporting period by category and task, total contractual expenditures, and funds remaining as of the reporting date.
3.2.4 Contract deliveries status. The status of each deliverable end item, including data deliverables, as required by the contract. Provide item and contract identification, shipping/transmittal data, acceptance status, security classification, and schedule due date information.
3.2.5 Report preparer. Name of person(s) preparing report and telephone number(s).
3.3 Appendices. Appendices where applicable, for tables, references, charts, or other descriptive material. Each appendix shall be identified and referenced in the appropriate area of the report.
4. END OF DI-MGMT-80368A
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
Phase-Out Transition Plan
A003 Phase-Out Transition Plan
DI-MGMT-81945 A003
once then as updated 6 MACS
0 0 0
The Contractor shall submit the Phase-Out Continuity Plan to the COR for evaluation and approval six- months (180 days) after contract start.
The Phase-Out Transition Plan shall include:
a. A written comprehensive plan explaining actions required to complete the total transition effort within a sixty (60) calendar day transition period.
b. Details of accounts and subscription services to be terminated or transferred.
c. Process to conduct a full joint inventory and transference of all Government Furnished Material inventory including all records.
d. Status of all items in inventory as well as the items that have been inducted into repair facilities, being modified or are being purchased.
e. Details for the removal of all contractor owned items.
f. Critical path schedule for risk mitigation of the transition period.
g. Plan to make training and certification records available of contractor personnel who are considering employment with the succeeding contractor.
MACS = Months after Contract Start
Adobe Professional 8.0
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data
Title: Phase-Out Transition Plan
Number: DI-MGMT-81945 Approval Date: 20130916
AMSC Number: N9430 Limitation: N/A
DTIC Applicable: N/A GIDEP Applicable: N/A
Office of Primary Responsibility: AS/PMA-207
Applicable Forms: N/A
Use/relationship:
The Phase-Out Transition Plan provides a detailed description of the transfer of full assumption of duties at each site to the follow-on contractor.
This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract and described in the Performance Work Statement (PWS). It should be tailored to the minimum data requirements of the applicable contract or purchase order.
Requirements:
1. Format. Contractor format is acceptable.
2. Content. The Phase-Out Transition Plan shall include:
a. A written comprehensive plan explaining actions required to complete the total transition effort within a sixty (60) calendar day transition period.
b. Details of accounts and subscription services to be terminated or transferred.
c. Process to conduct a full joint inventory and transference of all Government
Furnished Material inventory including all records.
d. Status of all items in inventory as well as the items that have been inducted into repair facilities, being modified or are being purchased.
e. Details for the removal of all contractor owned items.
f. Critical path schedule for risk mitigation of the transition period.
g. Plan to make training and certification records available of contractor personnel who are considering employment with the succeeding contractor.
3. End of DI-MGMT-81945.
Source: http://assist.dla.mil -- Downloaded: 2023-02-06T12:37Z
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
MEETING MINUTES
A004 MEETING MINUTES
DI-ADMN-81250C A004
as needed 3 BDAM
0 0 0
The contractor shall attend an initial kick-off meeting 5 days after contract award. The KO, COR, and other Government personnel, as appropriate, may meet quarterly with the contractor to review the contractor's performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. The contractor shall provide minutes of these meetings to the Government within 3 business days. These meetings shall be at no additional cost to the Government.
See DID for instructions.
BDAM = Business Days After Meetings
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data
Title: MEETING MINUTES
Number: DI-ADMN-81250C Approval Date: 20210730
AMSC Number: F10264 Limitation: N/A
DTIC Applicable: No GIDEP Applicable: No
Preparing Activity: 11 (AFLCMC/EZSC) Project Number: ADMN-2021-002
Applicable Forms: N/A
Use/Relationship: Meeting minutes provide documentation of technical information provided, and decisions and agreements reached, at meetings and conferences. For the purposes of this DID, a conference is considered to be a type of meeting.
a. This Data Item Description (DID) contains the format, content, and intended use information for the data deliverable resulting from the work task described in the solicitation.
b. This DID relates to DI-ADMN-81249, Meeting Agenda. (Copies of this document are available online at https://quicksearch.dla.mil.)
c. This DID supersedes DI-ADMN-81250B.
Requirements:
1. Reference documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
2. Format. Contractor format, compatible with government applications, is acceptable.
3. Content. The meeting minutes shall include the following:
a. A title page containing the following:
(1) Meeting title, type of meeting, and meeting date(s).
(2) Identification of the system, equipment, o r contract number for which the meeting was held.
(3) Space for signatures of the designated representatives of the contractor and government activity.
(4) The name of the contractor and address to which the government activity will acknowledge receipt of comments.
b. The purpose and objective of the meeting.
c. The meeting location (or virtual conferencing application, if applicable).
d. A summary of the discussions, decisions, a n d agreements reached during the meeting or during individual subcommittee meetings.
e. A list of attendees by name, rank, grade or position, activity represented, activity symbol or code, phone number, and email address, as appropriate.
f. Action items resulting from the meeting, including, for each action item: a description, responsible party, suspense date, closure criteria, and status.
g. Briefing charts, if any were presented, shall be provided for information only.
Source: http://assist.dla.mil -- Downloaded: 2023-02-06T12:40Z https://quicksearch.dla.mil/
DI-ADMN-81250C
h. A list of documents reviewed during the meeting, where applicable.
3.1 Distribution Statement. The applicable Distribution Statement, as necessary, in accordance with Department of Defense Instruction (DoDI) 5230.24, Distribution Statements on Technical Documents, Enclosure 4. (Copies of this document are available online at www.esd.whs.mil/DD.)
3.2 Classification Marking. The applicable classification marking, as necessary, in accordance with Department of Defense Manual (DoDM) 5200.01, Volume 2, DoD Information Security Program: Marking of Information, or Controlled Unclassified Information (CUI) markings (when applicable) in accordance with DoDI 5200.48, Controlled Unclassified Information (CUI).
(Copies of these documents are available online at www.esd.whs.mil/DD.)
End of DI-ADMN-81250C.
Source: http://assist.dla.mil -- Downloaded: 2023-02-06T12:40Z http://www.esd.whs.mil/DD http://www.esd.whs.mil/DD
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
Code of Business…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .