This is a combined synopsis/solicitation for multiple award IDIQ contracts for credit reporting services. The Defense Counterintelligence and Security Agency seeks proposals for two tasks: single credit bureau reports in specified formats, and tri-merge reports merging data from all three credit bureaus. The base period of performance is five years with five one-year options. The minimum order quantity is 3,000 single reports or 100 tri-merge reports, and the maximum per order or series of orders within 30 days is 5 million single reports or 1.5 million tri-merge reports. The NAICS code is 561450 with a small business size standard of $41 million. Proposals are due by April 24, 2023. Award will be made to the responsible offerors with the most advantageous proposals based on price and other factors.

View the file

Other files for this federal contract opportunity

Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0 0 0

Adobe Professional 8.0

*001, *002

Quality Control Plan TBD Awardee

A001 Quality Control Plan

FAR 46.105(a-d) Deliverable A001 TBD

60 days after award 60 days after award

A Quality Management Plan sample has been provided as an attachment to this DD1423-1. This is only an example and will need to be worked to match the service being provided. If the Contractor already has a quality control plan they may submit that instead.

In accordance with FAR 46.105:

Contractor responsibilities.

(a) The contractor is responsible for carrying out its obligations under the contract by-

(1) Controlling the quality of supplies or services;

(2) Tendering to the Government for acceptance only those supplies or services that conform to contract requirements;

(3) Ensuring that vendors or suppliers of raw materials, parts, components, subassemblies, etc., have an acceptable quality control system;

and

(4) Maintaining substantiating evidence, when required by the contract, that the supplies or services conform to contract quality requirements, and furnishing such information to the Government as required.

(b) The contractor may be required to provide and maintain an inspection system or program for the control of quality that is acceptable to the Government (see 46.202).

(c) The control of quality by the contractor may relate to, but is not limited to-

(1) Manufacturing processes, to ensure that the product is produced to, and meets, the contract’s technical requirements;

(2) Drawings, specifications, and engineering changes, to ensure that manufacturing methods and operations meet the contract’s technical requirements;

Cont'd on pg 2 remarks.

1 2

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

(3) Testing and examination, to ensure that practices and equipment provide the means for optimum evaluation of the characteristics subject to inspection;

(4) Reliability and maintainability assessment (life, endurance, and continued readiness);

(5) Fabrication and delivery of products, to ensure that only conforming products are tendered to the Government;

(6) Technical documentation, including drawings, specifications, handbooks, manuals, and other technical publications;

(7) Preservation, packaging, packing, and marking; and

(8) Procedures and processes for services to ensure that services meet contract performance requirements.

(d) The contractor is responsible for performing all inspections and test required by the contract except those specifically reserved for performance by the Government (see 46.201(c)).

End Remarks.

*001, *002

TBD AwardeeQuality Control Plan

2 2

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

Sample Quality Management Plan

This reference documents project-specific quality assurance and quality control procedures appropriate to the size, complexity, and nature of the project. Quality improvements are also documented and may be included as an integral part of the Project Management Plan (PMP). Plans are developed concurrently in the iterative Program/Project Planning Phase.

In addition to quality management objectives developed as part of PMPs for projects, the system for Quality Management is defined in an organizational level Quality Management Plan (QMP). Project-specific Quality Management objectives accompanying each PMP shall be consistent with the organization

QMP unless documented.

Quality is planned for and managed through the “Plan-Do-Check-Act” cycle for project execution, program management, and business processes.

The Project Manager (PM) is responsible for

Documenting customer expectations and consensus quality management objectives at a project-level that supports the implementation of the PMP.

Utilizing the expertise of their project delivery teams to determine the procedures necessary (such as independent technical review) to achieve the target level of quality.

Ensuring the customer endorses all quality objectives included in the

Quality Management Plan.

Understanding the customer’s role in project success; the PM’s relationship with the customer is pivotal to providing quality service

Working with the customer early in the Project Scope and Customer

Requirements Definition Process to determine customer needs, and refining those requirements in light of safety, fiscal, schedule, and other constraints; considers the cost/benefit of all quality improvements.

The Project Delivery Team (PDT) is responsible for

Delivering a quality project

Performing an active role to ensure the customer's quality objectives are clearly articulated and that the customer understands the essential professional standards, laws, and codes which must be incorporated into the project

Monitoring the quality of their own work

Keeping the commitments for completion of their portion of the project, as documented in the Quality Management Plan

The Resource Provider(s) is responsible for

Monitoring the quality of the products and services produced by their team members serving on PDTs or the contractors they use to supplement their in-house capability

Teaching, coaching, mentoring and training staff so that they have technically competent staff to assign to PDT’s

Participating in selection of outside consultants and service/goods providers to ensure they are qualified to perform assigned work

Assigning team members to project teams commensurate with their ability and experience

Consulting with PDT members on a periodic basis to get feedback and make adjustments as necessary

Ensuring that there are processes in place and qualified staff or contractors are available to guarantee that an independent technical review is conducted

Serving on an independent technical review team, when appropriate.

Distribution of Information and Data - Communications to all project

Stakeholders

Project Delivery Team (PDT)

Project Manager (PM)

Resource Provider(s)

Ownership

Quality Management Relationships

Quality Planning Quality Control

(QC)

Quality Assurance (QA)

Quality Improvement

Plan Do Check Act

What Is Done

Determine what will be quality on the project and how quality will be measured

Monitor specific project products to determine if they meet performance measurement thresholds defined in the quality management plan

Determine if measurement of quality is appropriate by evaluating overall performance on a regular basis to insure the project will satisfy customer quality expectations

Increase the effectiveness and efficiency of the project when corrective actions such as Change

Requests are identified.

Changes to the

Quality Management Plan and the PMP may be required.

When It Is Done

Project Planning Phase

Processes

PMP

Development

Project Scope &

Customer

Requirements

Definition

Team

Establishment

Activity/Schedule

Development

Resource Estimate

Development

Project Delivery

Acquisition

Strategy

Project Execution, &

Control Phase

Project

Execution &

Control

Lessons

Learned

Project Execution, &

Control Phase

Project

Execution &

Control

Project Execution, & Control Phase and Project

Planning Phase

Processes

Change

Management

PMP

Development

Quality Management Plan Content

Overview of Quality Management Plan

Purpose

Overview of Plan, Do, Check, Act

Customer Quality Objectives

Identify Customer Quality Objectives

Identify Quality Threshold for each Quality Objective

Quality Control Plans

Address each major deliverable

Identify Independent Technical Review Team(s)

Quality Assurance

Organizational Quality System Requirements (Organizational Quality

Management Plan)

Project-specific requirements

Other Project Specific Information as required

Quality Management Plan Methodology

Plan

Identify the customers Quality Objectives. Help customers express quality expectations in objective, quantitative terms.

Identify professional standards including legal, environmental, economic, code, life safety and health.

Balance needs and expectations of customers and stakeholders with cost, schedule, and professional standards. Evaluate the costs and benefits of selected quality objectives and the processes to be used to achieve objectives.

Develop an effective plan and processes, including quality assurance and quality control procedures, to achieve objectives. Consider risk/hazard factors and complexity of the project and adapt processes to provide the requisite level of quality. Document in the risk management plan any project variations from the local QMP requirements.

Develop performance measure thresholds to ensure agreement on the definition of success relative to Quality Objectives.

Ensure customer endorsement of all quality objectives included in the

Quality Management Plan.

Do

Do the work according to the approved PMP and standard operating procedures.

Project execution is a dynamic process. The PDT must communicate, meet on a regular basis, and adapt to changing conditions. The

Quality Management Plan and PMP may require modification to ensure that project objectives are met.

Document in Lessons Learned – PROC3020, as required.

Check

Perform independent technical review, management oversight, and verification to ensure that quality objectives are met consistent with

District Quality Management Plans.

Check performance against the PMP and Customer Quality Objectives performance measures thresholds to verify that performance will accomplish Quality Objectives and to verify sufficiency of the plan.

Share findings with all project stakeholders to facilitate continuous improvement.

Act

If performance measures thresholds are exceeded, take specific corrective actions to fix the systemic cause of any non-conformance, deficiency, or other unwanted effect.

Document quality improvements that could include appropriate revisions to the quality management plan, alteration of quality assurance and control procedures, and adjustments to resource allocations.

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0 0 0

Adobe Professional 8.0

*001, *002

Monthly Status Report TBD Awardee

DI-MGMT-80368A

A002 Monthly Status Reports

TBDA002

Monthly 5 days following prior month

Award of Contract

The contractor will provide a written monthly status report to the KO, CS, and COR following completion of prior month

Must be provided within 5 business days of prior month ending

The monthly status report shall summarize the work ordered and work performed

To include summary of the number of credit reports provided, itemized list of reports provided with sufficient detail to validate invoices

To include performance issues.

Monthly status reports shall be submitted in conjunction with monthly invoices.

The monthly status report shall include quality control information; total number of queried items, number provided, number provided with errors, and other information as requested by the COR, KO, or CS.

1 1

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data

DATA ITEM DESCRIPTION

Title: Status Report

Number: DI-MGMT-80368A Approval Date: 30 OCT 2006 AMSC Number: 7619 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/DA02 Applicable Forms: N/A

Use/relationship:

The Status Report documents the status of contractor effort towards achieving contract objectives. It identifies accomplishments to date and difficulties encountered, and compare the status achieved to planned goals and the resources expended. It is used by the Government to monitor and evaluate contractor performance.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

It is not intended that all requirements herein should be applied to every program.

Portions of the DID are subject to tailoring by deletion depending on the specific status reporting requirements of the project.

This DID is related to DI-FNCL-80331, Funds and Man-Hour Expenditure Report which can be used in conjunction with this report if paragraph 3.2.3 below is deleted.

This DID supersede DI-MGMT-80368.

Requirements:

1. Reference documents. None.

2. Format. The Status Report shall be in contractor format.

2.1 Identification. The data indicated below shall be contained on a title page or on the first page of the report.

a. Title/identification of the system/component/program/project.

Source: http://assist.dla.mil -- Downloaded: 2023-01-04T16:25Z Check the source to verify that this is the current version before use.

DI-MGMT-80368A

b. Type of report (e.g., monthly, interim, final).

c. Period covered by the report.

d. Contract number.

e. Preparing activity or contractor’s title.

f. Security classification, when required.

g. Distribution Statement.

2.2 Page size. The report shall be on 8 ½ by 11 inch (metric A4) paper.

3. Content. The report shall contain the following:

3.1 Summary. The summary shall include a brief statement of the overall project status , covering the accomplished technical activities and development, objectives of efforts, summary results of efforts, identification of major problems/deficiencies with impact, and recommended solutions.

3.2 Body of report. The Status Report shall contain the following items, where applicable:

3.2.1 Milestone/task status. The status of each milestone/task as defined by the statement of work or contract, as applicable:

a. A statement as to whether or not the program/project/task is on schedule; if not, the effort planned to meet the schedule shall be indicated. Include an overall status of each milestone, task, or unit of work. Include update schedule sheets, milestone charts, or task synopsis sheets identifying phase of task and percentage of completion of each task, technical instruction, or order.

b. A comparison of achieved end-product performance capabilities projected against contract baseline values, requirements, or allocations.

c. Effort expended on each task to date, and a brief description of technical developments and accomplishments.

d. Key dates in any testing program and description of tests performed and significant test results. If applicable, a description of the amount and type of down time on the equipment or system under test.

e. A list of all designs completed and a brief description of each item. For designs in process, provide estimated dates for design and drawing completion.

f. A narrative of outstanding problems existing as of the previous status report, and their resolution status. 2

DI-MGMT-80368A

g. New problem areas encountered or anticipated, their effect on the overall work effort/project and steps being taken to remedy problem situations.

h. Significant results of conferences, trips, or directives for the Contracting officer’s representatives.

i. Any other information which may cause significant changes in the program schedule.

3.2.2 Future plans. Summary of future plans, recommendations and proposals both for the next reporting period and for any long term plans.

3.2.3 Itemized man-hours and costs. Itemized man-hour and cost expenditure incurred for the reporting period by category and task, total contractual expenditures, and funds remaining as of the reporting date.

3.2.4 Contract deliveries status. The status of each deliverable end item, including data deliverables, as required by the contract. Provide item and contract identification, shipping/transmittal data, acceptance status, security classification, and schedule due date information.

3.2.5 Report preparer. Name of person(s) preparing report and telephone number(s).

3.3 Appendices. Appendices where applicable, for tables, references, charts, or other descriptive material. Each appendix shall be identified and referenced in the appropriate area of the report.

4. END OF DI-MGMT-80368A

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

Phase-Out Transition Plan

A003 Phase-Out Transition Plan

DI-MGMT-81945 A003

once then as updated 6 MACS

0 0 0

The Contractor shall submit the Phase-Out Continuity Plan to the COR for evaluation and approval six- months (180 days) after contract start.

The Phase-Out Transition Plan shall include:

a. A written comprehensive plan explaining actions required to complete the total transition effort within a sixty (60) calendar day transition period.

b. Details of accounts and subscription services to be terminated or transferred.

c. Process to conduct a full joint inventory and transference of all Government Furnished Material inventory including all records.

d. Status of all items in inventory as well as the items that have been inducted into repair facilities, being modified or are being purchased.

e. Details for the removal of all contractor owned items.

f. Critical path schedule for risk mitigation of the transition period.

g. Plan to make training and certification records available of contractor personnel who are considering employment with the succeeding contractor.

MACS = Months after Contract Start

Adobe Professional 8.0

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data

Title: Phase-Out Transition Plan

Number: DI-MGMT-81945 Approval Date: 20130916

AMSC Number: N9430 Limitation: N/A

DTIC Applicable: N/A GIDEP Applicable: N/A

Office of Primary Responsibility: AS/PMA-207

Applicable Forms: N/A

Use/relationship:

The Phase-Out Transition Plan provides a detailed description of the transfer of full assumption of duties at each site to the follow-on contractor.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract and described in the Performance Work Statement (PWS). It should be tailored to the minimum data requirements of the applicable contract or purchase order.

Requirements:

1. Format. Contractor format is acceptable.

2. Content. The Phase-Out Transition Plan shall include:

a. A written comprehensive plan explaining actions required to complete the total transition effort within a sixty (60) calendar day transition period.

b. Details of accounts and subscription services to be terminated or transferred.

c. Process to conduct a full joint inventory and transference of all Government

Furnished Material inventory including all records.

d. Status of all items in inventory as well as the items that have been inducted into repair facilities, being modified or are being purchased.

e. Details for the removal of all contractor owned items.

f. Critical path schedule for risk mitigation of the transition period.

g. Plan to make training and certification records available of contractor personnel who are considering employment with the succeeding contractor.

3. End of DI-MGMT-81945.

Source: http://assist.dla.mil -- Downloaded: 2023-02-06T12:37Z

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

MEETING MINUTES

A004 MEETING MINUTES

DI-ADMN-81250C A004

as needed 3 BDAM

0 0 0

The contractor shall attend an initial kick-off meeting 5 days after contract award. The KO, COR, and other Government personnel, as appropriate, may meet quarterly with the contractor to review the contractor's performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.

Appropriate action shall be taken to resolve outstanding issues. The contractor shall provide minutes of these meetings to the Government within 3 business days. These meetings shall be at no additional cost to the Government.

See DID for instructions.

BDAM = Business Days After Meetings

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data

Title: MEETING MINUTES

Number: DI-ADMN-81250C Approval Date: 20210730

AMSC Number: F10264 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: 11 (AFLCMC/EZSC) Project Number: ADMN-2021-002

Applicable Forms: N/A

Use/Relationship: Meeting minutes provide documentation of technical information provided, and decisions and agreements reached, at meetings and conferences. For the purposes of this DID, a conference is considered to be a type of meeting.

a. This Data Item Description (DID) contains the format, content, and intended use information for the data deliverable resulting from the work task described in the solicitation.

b. This DID relates to DI-ADMN-81249, Meeting Agenda. (Copies of this document are available online at https://quicksearch.dla.mil.)

c. This DID supersedes DI-ADMN-81250B.

Requirements:

1. Reference documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

2. Format. Contractor format, compatible with government applications, is acceptable.

3. Content. The meeting minutes shall include the following:

a. A title page containing the following:

(1) Meeting title, type of meeting, and meeting date(s).

(2) Identification of the system, equipment, o r contract number for which the meeting was held.

(3) Space for signatures of the designated representatives of the contractor and government activity.

(4) The name of the contractor and address to which the government activity will acknowledge receipt of comments.

b. The purpose and objective of the meeting.

c. The meeting location (or virtual conferencing application, if applicable).

d. A summary of the discussions, decisions, a n d agreements reached during the meeting or during individual subcommittee meetings.

e. A list of attendees by name, rank, grade or position, activity represented, activity symbol or code, phone number, and email address, as appropriate.

f. Action items resulting from the meeting, including, for each action item: a description, responsible party, suspense date, closure criteria, and status.

g. Briefing charts, if any were presented, shall be provided for information only.

Source: http://assist.dla.mil -- Downloaded: 2023-02-06T12:40Z https://quicksearch.dla.mil/

DI-ADMN-81250C

h. A list of documents reviewed during the meeting, where applicable.

3.1 Distribution Statement. The applicable Distribution Statement, as necessary, in accordance with Department of Defense Instruction (DoDI) 5230.24, Distribution Statements on Technical Documents, Enclosure 4. (Copies of this document are available online at www.esd.whs.mil/DD.)

3.2 Classification Marking. The applicable classification marking, as necessary, in accordance with Department of Defense Manual (DoDM) 5200.01, Volume 2, DoD Information Security Program: Marking of Information, or Controlled Unclassified Information (CUI) markings (when applicable) in accordance with DoDI 5200.48, Controlled Unclassified Information (CUI).

(Copies of these documents are available online at www.esd.whs.mil/DD.)

End of DI-ADMN-81250C.

Source: http://assist.dla.mil -- Downloaded: 2023-02-06T12:40Z http://www.esd.whs.mil/DD http://www.esd.whs.mil/DD

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

Code of Business…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .