A16_40656705_CHAM_3_Sole_Source_under_SAT_-_PDF_version_1.pdf
PDF 255 KB Posted
- Attached to
- CHAM-FIRE SPRINKLER REPAIR Federal contract opportunity
- Solicitation number
- 40656705
About this file
This document is a Justification & Approval for Other Than Full and Open Competition (J&A) for a simplified acquisition over the micro-purchase threshold up to the Simplified Acquisition Threshold (SAT) related to a fire sprinkler repair contract for Chamizal National Memorial (CHAM).
The J&A states that CHAM's deluge fire suppression system, installed by Western States Fire Protection, requires an upgrade. CHAM is sole sourcing the repair work to Western States Fire Protection, as they are the only responsible source that can perform the work due to the specialized coding and configuration of the system. The anticipated price will be determined fair and reasonable through price analysis. The contract is being awarded to Western States Fire Protection for an unknown amount on 2024-04-02 under solicitation number 40656705.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2
JUSTIFICATION & APPROVAL FOR OTHER THAN FULL AND OPEN COMPETITION for SIMPLIFIED ACQUISITIONS OVER THE MICROPURCHASE THRESHOLD (See FAR Part 2)
UP TO SAT
(See FAR 13.106-1)
Date:
PR Number:
1. Nature and/or description of the item/service being procured and its intended use (include the anticipated cost):
2. Sole Source Justification rationale (Check one and explain below):
Only one responsible source.
Urgent and compelling circumstances exist. Include critical delivery or performance dates, and when you became aware of the requirement. Provide a specific statement of the impact on Government operations, financial or otherwise, if the required delivery or performance dates are not met.
Other
Explain:
3. Market Research. Please explain the results or why one was not performed. State whether any other offers were received or anyone expressed interest:
ATTACHMENT 2
JUSTIFICATION & APPROVAL FOR OTHER THAN FULL AND OPEN COMPETITION for SIMPLIFIED ACQUISITIONS OVER THE MICROPURCHASE THRESHOLD (See FAR Part 2)
UP TO SAT
(See FAR 13.106-1)
PR Number
4. If this is a determination for sole source, the contracting officer certifies:
a. Only one source is available, or urgent and compelling circumstances exist.
b. The anticipated price will be determined fair and reasonable using the price analysis techniques described in FAR Part 13.106-3(a).
(Signature) (Date)
Type or Print Name:
Title:
(Signature) (Date) Type or Print Name:
Contracting Officer
Over $50,000:(if applicable)
(Date)(Signature)
Type or Print Name:
Warranted Individual 1 Level Above Contracting Officer
| Text3: Chamizal National Memorial's Fire Sprinkler system has a deluge suppression system. Deluge Fire Suppression System is a sprinkler system with an empty pipe system, meaning there is no water stored in the piping network. The water is instead stored behind a control valve. A typical Deluge system will have a control valve, a dedicated water supply, and a sprinkler operated detection system. CHAM's system is in need of an upgrade. | |
| Text4: Western States Fire Protection installed the deluge suppression system and have equipment needed to detect broken sensors and pipes and fix the impacted areas of the Visitor Center and the Theater. The Park is yellow tagged for this and became aware of the issue during the yearly inspection. | |
| Check Box5: Yes | |
| Check Box6: Off | |
| Check Box7: Off | |
| Text8: Chamizal NM’s deluge fire suppression system codes were established by Western States Fire Protection. Therefore, all coding is based solely on Western States Fire Protection specifications. Other companies that attempt to work on CHAM’s deluge fire suppression system will not be able to perform stand alone work and would have to constantly contact Western States Fire Protection in order to understand the coding and to have the codes cleared. In essence, the park would end up having to contract two companies to complete the necessary work on one system. Which would create additional cost that the park will have to pay. It is feasible to have the work completed by one company versus two. | |
| Text10: Jose Valdez | |
| 2024-04-02T12:25:09-0600 | |
| CLAIRE ROBERSON |
| 2024-03-25T14:55:27-0600 | |
| JOSE VALDEZ |
| Text12: |
| Text13: CLAIRE ROBERSON |
| Text2: 40656705 |
| Text5: |
| Other Sole Source Justification: |
| Date7_af_date: 4/1/24 |
| Date8_af_date: 03/25/24 |
| Date9_af_date: 4/2/24 |
| Date10_af_date: |