Building 112 Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HINU_BLDG_112_-ADDENDUM_FIVE.pdf | ||
| Sol_A15PS00217_Amd_000004.pdf | ||
| Sol_A15PS00217_Amd_000003.pdf | ||
| Sol_A15PS00217_Amd_000002.pdf | ||
| Sol_A15PS00217_Amd_000001.pdf | ||
| HASKELL_BLDG_112_SPECS.pdf | ||
| Wage_Rates_KS150010.pdf | ||
| Sol_A15PS00217.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION MAP
CAMPUS MAP
GENERAL NOTES
SHEET NUMBER
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
D
A T
E R
E M
A R
K S
IS
S
U E
D A
T E
S U
B M
IT
T
A L
D R
A W
IN
G
S C
A L E
D R
A W
IN
G
F
IL
E N
A M
E P
R O
JE
C
T N
U M
B E
R
M A
N A
G E
M E
N T
R E
V
IS
IO
N
S
A D
D E
N D
U M
S
DRAWING INDEX
P
B
IA
\0 W
\D e s ig n \B
IM
\B
U
IL
D
IN
G
\L
O C
A L
F
IL
E S
\H A
S K
E L
L A
R C
H C
E N
T R
A L
K
H a rr is .r v t
/9
/2
:1 :0
P
M
BUILDING 112 - ROOM 110 LECTURE HALL
155 EAST INDIAN AVE., LAWRENCE, KS
HASKELL INDIAN NATIONS UNIVERSITY
G-001
C O
V E
R S
H E
E T
IN
D E
X
H A
S K
E L
L
IN
D
IA
N N
A T
IO
N
S U
N
IV
E R
S
IT
Y
B U
IL
D
IN
G
R
O O
M
L
E C
T U
R E
H A
L L
P
7W
W F
K H
F F
P
7W G
-0
CONSTRUCTION SUBMITTAL
A m e ri c a s P k w y N
E S u it e
A lb q u e r q u e
N
M
-2
-0
F a x
-2
-4 w w w .w h p a ci fic .c o m
GENERAL
G-001 COVERSHEET & INDEX
G-101 BLDG 112 - CODE & LIFE SAFETY ANALYSIS
ARCHITECTURAL
AD-100 BLDG 112 - OVERALL DEMO. FLOOR PLAN
AD-101 BLDG 112 - DEMO. PHOTOS & DETAILS
AD-102 BLDG 112 - DEMO. REFL. CEILING PLAN
A-100 BLDG 112 - OVERALL NEW WORK PLAN
A-101 BLDG 112 - FLOOR & REFL. CEILING PLAN
A-102 BLDG 112 - ENLARGED PLAN & ELEV.
A-401 BLDG 112 - ELEVATIONS & DETAILS
A-501 BLDG 112 - DETAILS
A-601 BLDG 112 - DOOR/WINDOW SCHEDULES
A-602 BLDG 112 - SCHEDULES
PROJECT LOCATION
HASKELL INDIAN NATIONS
UNIVERSITY
PARKER HALL BUILDING 112
ELECTRICAL
E-001 LEGEND,SCHEDULES & ABBREVIATIONS
ED-101 BLDG 112 - ELECTRICAL DEMO. PLAN
E-101 BLDG 112 - LIGHTING PLAN
E-201 BLDG 112 - POWER PLAN
E-301 BLDG 112 - SPECIAL SYSTEM PLAN
E-501 BLDG 112 - SCHEDULES & DETAILS
PLUMBING
P-001 PLUMBING NOTES AND LEGENDS
PD-101 BLDG 112 - PLUMBING DEMOLITION PLAN
P-101 BLDG 112 - PLUMBING PLAN
P-501 BLDG 112 - PLUMBING DETAILS
P-601 BLDG 112 - PLUMBING SCHEDULES
MECHANICAL
M-001 MECHANICAL NOTES AND LEGENDS
MD-101 BLDG 112 - HVAC DEMOLITION PLAN
M-101 BLDG 112 - HVAC PLAN
M-102 BLDG 112 - HVAC ROOF PLAN
M-301 BLDG 112 - HVAC SECTIONS
M-501 BLDG 112 - MECHANICAL DETAILS
M-601 BLDG 112 - MECHANICAL SCHEDULES
M-701 BLDG 112 - HVAC CONTROL DIAGRAMS
STRUCTURAL
S-101 BLDG 112 - CANOPY PLAN & DETAILS
A. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL EQUIPMENT
AND FURNITURE IN ORDER TO EXECUTE AND COMPLETE THE SCOPE
OF WORK IDENTIFIED IN THE CONSTRUCTION DOCUMENTS. THE EXISTING
FURNITURE SHALL EITHER BE REMOVED AND STORED
WHERE INDICATED BY THE HASKELL REPRESENTATIVE, REMOVED AND
RELOCATED TO ANOTHER AREA OF WORK, OR REMOVED AND
REINSTALLED IN THE SAME LOCATION. THE FURNITURE AND EQUIPMENT
LIST MAY NOT BE ENTIRELY CONCLUSIVE. CONTRACTOR SHALL
DOCUMENT, BY PHOTO, THE LOCATION OF ALL FURNITURE PRIOR TO
REMOVAL FROM THE SPACES. IF THE LOCATION OF THE FURNITURE AND
EQUIPMENT IS UNCLEAR OR CONFLICTS WITH AN EXISTING CONDITION,
CONSULT WITH THE HASKELL UNIVERSITY REPRESENTATIVE FOR
CLARIFICATION. THE CONTRACTOR WILL RETURN ALL UNUSED
FURNITURE AND EQUIPMENT BACK TO THE UNIVERSITY.
B. EXISTING CONDITIONS COULD AFFECT THE INSTALLATION OF ANY
WORK SET FORTH IN THESE PLANS. CONSTRACTOR IS RESPONSIBLE
FOR VERIFYING ALL DIMENSIONS.
C. SMOKE SEAL ALL PENETRATIONS AROUND PIPE/CONDUIT AT
ALL FLOOR, WALL, DECK AND ROOF PENETRATIONS.
D. ALL TERMINATIONS OF ONE FLOOR MATERIAL TO ANOTHER FLOOR
MATERIAL SHALL HAVE TRANSITION OR REDUCER STRIPS.
E. ALL MATERIALS REQUIRED SHALL BE OF A GRADE AND QUALITY
CONSISTENT WITH THE SURROUNDING MATERIAL AND APPROVED
BY THE OWNER.
F. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE
EXISTENCE AND LOCATION OF ANY CONCEALED LINES THAT MAY BE
REQUIRED TO BE REMOVED OR AVOIDED DURING CONSTRUCTION.
G. INSTALL GYPSUM BOARD CONTROL JOINTS AT ALL LOCATIONS
INDICATED OR IF NOT INDICATED AS ACCORDING TO THE
REQUIREMENTS THAT ARE ESTABLISHED IN THE SPECIFICATIONS.
H. REFER TO CODE ANAYLSIS PLANS AND WALL TYPES FOR THE FIRE
RATED ASSEMBLIES AND COMPLETE DESCRIPTIONS OR WALL
CONSTRUCTION.
I. INSTALL A CONTINUOUS BEAD OF SEALANT AT ALL GAPS/SEAMS
BETWEEN FIXED EQUIPMENT AND WALLS OR OTHER ASSEMBLIES.
J. STUD PARTITIONS ARE DIMENSIONED TO FACE OF STUD. ALL ROUGH
OPENINGS ARE LOCATED 4" TO NEAREST ADJACENT WALL UNLESS
INDICATED OTHERWISE.
K. REFERENCE ALL DISCIPLINES FOR COORDINATION OF WORK.
L. CONTRACTOR SHALL MAINTAIN A CLEAN, DUST FREE SEPARATION
BETWEEN WORK AREAS AND OCCUPIED AREAS OF THE BUILDING.
M. UNLESS NOTED OTHERWISE ALL BLOCKING OR BACKING MATERIAL
SHALL BE 18 GAUGE SHEET METAL FOR ALL WALL MOUNTED ITEMS.
N. CONTRACTOR SHALL REVIEW ASBESTOS & LEAD PAINT REPORT ON
WORK AREAS FROM HASKELL AND SHALL ABATE/REMOVE ALL
MATERIALS REQUIRED TO INSTALL NEW FINISHES
**NOTES APPLY TO ALL SHEETS**
CIVIL
C-101 DEMO AND NEW PARKING PLANS
/0
/2
DN
UP
STORAGE
STORAGE
109A
VESTIBULE
110B
MECHANICAL
110A
LECTURE HALL
WOMEN
104AMEN
104B
JANITOR
104C
2012 NFPA 5000 - BUILDING CONSTRUCTION AND SAFETY CODE
ASCE/SEI 7-10 - MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER
STRUCTURES
2012 UNIFORM PLUMBING CODE
2012 UNIFORM MECHANICAL CODE
2014 NATIONAL ELECTICAL CODE
2012 NFPA 101, NFPA 10, & NFPA 80
2009 NFPA 54 NATIONAL FUEL GAS CODE
2004 NFPA 45 - FIRE PROTECTION FOR LABORATORIES USING
CHEMICALS
2004 AMERICANS WITH DISABILITY ACT AND ARCHITECTURAL BARRIERS
ACT ACCESSIBILITY GUIDELINES (26 CFR, PART 1191: ADAABAAG
CODE ANALYSIS (NFPA 5000):
BUILDING AREA: EXISTING - 33,178 TOTAL GSF
NEW - NONE
TOTAL GROSS FLOOR AREA = 33,178 TOTAL GSF
MAJOR OCCUPANCY: BUSINNESS/ASSEMBLY (SEC. 6.1.11 & 6.1.2)
THIS BUILDING WORK IS CLASSIFIED AS RECONSTRUCTION (SEC.15.2.2.4). WORK IS
RECONFIGURATION OF THE SPACE WITH A NEW EXTERIOR ACCESSIBLE EXIT. LECTURE HALL 110 WILL
BE MODIFIED FROM A CLASSROOM TO A LECTURE SPACE. THE EXISTING RESTROOM WILL BE
RECONFIGURED TO ADD A FEMALE RESTROOM AND EXISTING SURFACES WILL BE REMOVED AND
REPLACED. THE EXISTING OFFICES AND STORAGE AREAS WILL HAVE ASBESTOS REMEDIATED AND
NEW FINISHES INSTALLED. NO OTHER WORK WILL OCCUR IN THESE AREAS.
OCCUPANT LOAD FACTOR: (TABLE 11.3.1.2)
OFFICE 103 - 796 SF/100 GSF 8 OCCUPANTS - NO CHANGE
OFFICE 103A - 425 SF/100 GSF 5 OCCUPANTS - NO CHANGE
MENS 104A - 112 SF - N/A 0 OCCUPANTS
WOMEN'S 104B - 66 SF - N/A 0 OCCUPANTS
JANITOR 104C - 42 SF - N/A 0 OCCUPANTS
CLASSROOM 105 - 525 SF/20 NSF 27 OCCUPANTS - NO CHANGE
STORAGE 108 - 111 SF/500 SF 1 OCCUPANT - NO CHANGE
STORAGE 109 - 97 SF/500 SF 1 OCCUPANT - NO CHANGE
STORAGE 109A - 157 SF/500 SF 1 OCCUPANT - NO CHANGE
LECTURE HALL 110 - 2,112 SF/ 15 NSF 141 OCCUPANTS
TOTAL MODIFIED AREA OCCUPANCY: 184 OCCUPANTS
CONSTRUCTION TYPE: TYPE II 000 - NON SPRINKLERED
FIRE RESISTANCE RATING: (TABLE 7.2.1.1)
EXTERIOR NON-BEARING WALLS: 0 HR
INTERIOR NON-BEARING WALLS: 0 HR
FLOOR/CEILING ASSEMBLIES: 0 HR
NO AUTOMATIC SPRINKLER SYSTEM PROVIDED
MEANS OF EGRESS:
CLASSROOMS AND OFFICES (CHAPTER 11 & 28):
EGRESS WIDTH (WORST CASE): .2 x 42 = 8.4" REQUIRED 32" PROVIDED (TABLE 11.3.3.1)
NUMBER OF MEANS OF EGRESS: 2 REQUIRED 2 PROVIDED (SEC. 28.2.4.1 - 2)
COMMON PATH OF EGRESS TRAVEL: 75 FEET MAX 25 ACTUAL
LECTURE HALL (CHAPTER 11 & 16):
EGRESS WIDTH = .2 x 141 = 28.2" REQUIRED 96" PROVIDED (TABLE 11.3.3.1)
NUMBER OF MEANS OF EGRESS: 2 REQUIRED 2 PROVIDED (SEC. 11.4.1.1)
MAIN EXISTING EXIT PASSAGE WAY IS ASSUMED TO BE ONE-HOUR RATED PER CHAPTER 11.1.3.2.1.1.
NFPA 10: FIRE EXTINGUISER REQUIREMENTS:
CHAPTER 5.2.1 - BUILDING FIRE CLASSIFICATION TYPE: CLASS A
CHAPTER 5.4.1.1 - LIGHT HAZARD OCCUPANCY CLASSIFICATION
CHAPTER 6.2.1.1 - LIGHT (LOW) HAZARD OCCUPANCY REQUIREMENTS
MIN. RATED EXTINGUISHER - TYPE 2A
MAX DISTANCE TO EXTINGUISHER - 75 FT
MAX AREA (PER UNIT 'A') - 3000 SF
CLASSROOM/OFFICE/STORAGE: 1 REQUIRED 3 PROVIDED (IN CLASSROOM & OFFICES)
LECTURE HALL: 1 REQUIRED 1 PROVIDED
ALL FIRE EXTINGUISHERS SHALL BE BRACKET MOUNTED ON THE WALLS 48" A.F.F.
PROVIDE TYPE "ABC 5-ALV-W" BY STRIKE FIRST CORPORATION OF AMERICA (OR EQUAL).
SEE SHEET CODE PLAN FOR LOCATIONS.
FIXTURE ANALYSIS:
PLUMBING FIXTURES REQUIRED (UPC TABLE 422.1) - ANALYSIS FOR NEW LECTURE HALL ONLY:
TOTAL A-3 OCCUPANTS: 72 36- MALE 36- FEMALE
WATERCLOSETS: REQUIRED: EXISTING NEW TOTAL
MALE 1 1 0 1
FEMALE 2 0 2 2
URINALS:
MALE 1 0 0
LAVATORIES:
MALE 1 1 0 1
FEMALE 1 0 1 1
DRINKING FOUNTAINS: 1 1 0 1
SERVICE SINKS: 1 1 0 1
APPLICABLE CODES:
4' - 0" 4' - 0"
BRACKET MOUNTED
FIRE EXTINGUISHER
BRACKET MOUNTED
FIRE EXTINGUISHER
1-HR RATED
AREA OF NEW WORK
SHOWN IN B1/G101
AC CESSIBLE
DRINKING
FOUNTAIN
SHEET NUMBER
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
D
A T
E R
E M
A R
K S
IS
S
U E
D A
T E
S U
B M
IT
T
A L
D R
A W
IN
G
S C
A L E
D R
A W
IN
G
F
IL
E N
A M
E P
R O
JE
C
T N
U M
B E
R
M A
N A
G E
M E
N T
R E
V
IS
IO
N
S
A D
D E
N D
U M
S
P
B
IA
\0 W
\D e s ig n \B
IM
\B
U
IL
D
IN
G
\L
O C
A L
F
IL
E S
\H A
S K
E L
L A
R C
H C
E N
T R
A L
K
H a rr is .r v t
/9
/2
:1 :0
P
M
A s in d ic at ed
G-101
B L
D G
C
O D
E
L
IF
E S
A F
E T
Y A
N A
L Y
S
IS
H A
S K
E L
L
IN
D
IA
N N
A T
IO
N
S U
N
IV
E R
S
IT
Y
B U
IL
D
IN
G
R
O O
M
L
E C
T U
R E
H A
L L
P
7W
W F
K H
F F
P
7W G
-1
A m e ri c a s P k w y N
E S u it e
A lb q u e rq u e N
M
-2 -0
F a x
-2
-4 w w w .w h p a c ifi c .c o m
1/8" = 1'-0" B1
BUILDING 112 - CODE & LIFE SAFETY ANALYSIS
N
SCALE: 1/8" = 1'-0"
0' 4' 8' 16' 32'
1" = 30'-0" A1
FLOOR PLAN
37' - 0"9' - 2" 4' - 8" 9' - 2" 2' - 4" 4
SHEET NUMBER
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
D
A T
E R
E M
A R
K S
IS
S
U E
D A
T E
S U
B M
IT
T
A L
D R
A W
IN
G
S C
A L E
D R
A W
IN
G
F
IL
E N
A M
E P
R O
JE
C
T N
U M
B E
R
M A
N A
G E
M E
N T
R E
V
IS
IO
N
S
A D
D E
N D
U M
S
C
U s e rs
\w fr a n k \D o c u m e n ts \H
A S
K E
L L
A
R C
H C
E N
T R
A L w fr a n k .r v t
/8
/2
:2 :2
P
M
/8
'-0
C-101
D E
M O
A N
D N
E W
P A
R K
IN
G
P L
A N
S
H A
S K
E L
L
IN
D
IA
N N
A T
IO
N
S U
N
IV
E R
S
IT
Y
B U
IL
D
IN
G
R
O O
M
L
E C
T U
R E
H A
L L
P
7W
C h e ck e r
A u th o r
D e si g n e r
P
7W C
-1
A m e ri c a s P k w y N
E S u it e
A lb q u e rq u e N
M
-2 -0
F a x
-2
-4 w w w .w h p a c ifi c .c o m
1/8" = 1'-0"
NEW PARKING PLAN
1/8" = 1'-0"
FLOOR PLAN
KEYED NOTES
1 REMOVE EXISTING PARKING STRIPING
2 REMOVE ASPHALT & BASE COURSE
3 REMOVE EXISTING CONCRETE LANDING,
STAIRS, & RAILING
4 EXISTING CONCRETE DRAIN SWALE TO
REMAIN
5 EXISTING PARKING STRIPING TO REMAIN
6 EXISTING ASPHALT TO REMAIN
7 BRICK PAVERS TO MATCH TYPE AND COLOR
OF SIMILAR SITE BRICK PAVING ON CAMPUS
SEE DETAIL B1/A-501
8 CONCRETE LANDING, RAMP, & STAIRS SEE
D1/A-401
9 CONCRET PARKING CURB
10 VAN ACCESSIBLE HANDICAP PARKING
SPACES WITH SIGNAGE
11 HANDICAP ACCESSIBLE PARKING SIGN
myazzie
FRANK
UP
STORAGE
STORAGE CLOSET
CLASSROOM
RESTROOM
CLASSROOM
CLASSROOM
OFFICE
103A
344 2
23' - 11" 18' - 2" 42' - 2"
/2
39' - 0"
GENERAL NOTES
A. PHOTOS SHOW EXISTING LAYOUTS, CONTRACTOR
RESPONSIBLE FOR ALL ITEMS TO COMPLETE WORK,
SHOWN OR NOT
B. CONTRACTOR TO DOCUMENT LOCATION OF ALL
EQUPMENT TO BE REINSTALLED
SHEET NUMBER
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
D
A T
E R
E M
A R
K S
IS
S
U E
D A
T E
S U
B M
IT
T
A L
D R
A W
IN
G
S C
A L E
D R
A W
IN
G
F
IL
E N
A M
E P
R O
JE
C
T N
U M
B E
R
M A
N A
G E
M E
N T
R E
V
IS
IO
N
S
A D
D E
N D
U M
S
P
B
IA
\0 W
\D e s ig n \B
IM
\B
U
IL
D
IN
G
\L
O C
A L
F
IL
E S
\H A
S K
E L
L A
R C
H C
E N
T R
A L
K
H a rr is .r v t
/9
/2
:1 :5
P
M
A s in d ic at ed
AD100
B L
D G
O
V E
R A
L L
D E
M O
. F L
O O
R P
L A
N
H A
S K
E L
L
IN
D
IA
N N
A T
IO
N
S U
N
IV
E R
S
IT
Y
B U
IL
D
IN
G
R
O O
M
L
E C
T U
R E
H A
L L
P
7W
W F
K H
F F
P
7W A
D
A m e ri c a s P k w y N
E S u it e
A lb q u e rq u e N
M
-2 -0
F a x
-2
-4 w w w .w h p a c ifi c .c o m
3/16" = 1'-0" A2
BUILDING 112 - OVERALL DEMOLITION FLOOR PLAN
KEYED NOTES
1 ABATE & REMOVE FLOOR TILE, BASE AND ADHESIVE.
PREPARE FLOOR FOR INSTALLATION OF NEW TILE
2 REMOVE WALL COMPLETELY, RELOCATE ANY ITEMS
ON WALL TO ADJACENT LOCATION. REFER TO SHEET
A101.
3 REMOVE DOOR & FRAME ASSOCIATED HARDWARE
COMPLETELY, INFILL WALL
4 REMOVE WALL FOR NEW DOOR. SEE DOOR
SCHEDULE ON SHEET A601 FOR SIZE
5 REMOVE TOILET PARTITIONS, PATCH WALL @
ATTACHMENTS
6 REMOVE PLUMBING FIXTURES, SEE PLUMBING FOR
PIPING DEMOLITION
7 REMOVE ALL EQUIPMENT & FURNISHING, RETURN TO
UNIVERSITY
8 REMOVE SLAB & FOUNDATION, TO GRADE
9 REMOVE STEPS AND HANDRAIL
10 REMOVE HANDRAIL
11 PROTECT MURAL DURING CONSTRUCTION
12 REMOVE CHALK BOARD AND RETURN TO UNIVERSITY
13 REMOVE CARPET
14 REMOVE DOWNSPOUT, PATCH GUTTER AND HOLD
FOR REINSTALLATION
15 REMOVE ROLL-UP DOOR FRAME AND HARDWARE
16 REMOVE EXISTING STOREFRONT & DOOR. PREP
OPENING FOR NEW SYSTEM
17 REMOVE DOOR & FRAME, ASSOCIATED HARDWARE.
PREP OPENING FOR NEW DOOR & FRAME
18 REMOVE HVAC EQUIPMENT, SEE MECHANICAL
19 REMOVE ACOUSTIC CEILING TILES, GRID TO REMAIN
20 REMOVE ALL FLOOR & WALL TILE & PREP WALLS FOR
NEW TILE INSTALLATION
21 REMOVE ASPHALT PAVING THE WIDTH OF THE NEW
STAIR TO THE DRAINAGE SWALE NEAR THE
DRIVEWAYAND 5' WEST OF NEW RAMP
22 REMOVE DOOR & FRAME ASSOCIATED HARDWARE
COMPLETELY
23 REMOVE ALL FURNITURE, CASEWORK, SHELVING,
AND ASSOCIATED ITEMS. STORE ITEMS WHERE
DIRECTED BY HASKELL UNIVERSITY
24 SCRAPE FLOOR & PATCH & REPAIR AS NEEDED FOR
NEW FLOORING
1/64" = 1'-0" A5
KEY PLAN
SCALE: 3/16" = 1'-0"
0' 2' 8' 12'4'
N
GENERAL NOTES
A. PHOTOS SHOW EXISTING LAYOUTS, CONTRACTOR
RESPONSIBLE FOR ALL ITEMS TO COMPLETE WORK,
SHOWN OR NOT
B. CONTRACTOR TO DOCUMENT LOCATION OF ALL
EQUPMENT TO BE REINSTALLED
SHEET NUMBER
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
D
A T
E R
E M
A R
K S
IS
S
U E
D A
T E
S U
B M
IT
T
A L
D R
A W
IN
G
S C
A L E
D R
A W
IN
G
F
IL
E N
A M
E P
R O
JE
C
T N
U M
B E
R
M A
N A
G E
M E
N T
R E
V
IS
IO
N
S
A D
D E
N D
U M
S
P
B
IA
\0 W
\D e s ig n \B
IM
\B
U
IL
D
IN
G
\L
O C
A L
F
IL
E S
\H A
S K
E L
L A
R C
H C
E N
T R
A L
K
H a rr is .r v t
/9
/2
:1 :0
P
M
A s in d ic at ed
AD101
B L
D G
D
E M
O . P
H O
T O
S A
N D
D E
T A
IL
S
H A
S K
E L
L
IN
D
IA
N N
A T
IO
N
S U
N
IV
E R
S
IT
Y
B U
IL
D
IN
G
R
O O
M
L
E C
T U
R E
H A
L L
P
7W
W F
K H
F F
P
7W A
D
A m e ri c a s P k w y N
E S u it e
A lb q u e rq u e N
M
-2 -0
F a x
-2
-4 w w w .w h p a c ifi c .c o m
KEYED NOTES
1 REMOVE DOOR & FRAME ASSOCIATED HARDWARE
COMPLETELY, INFILL WALL
2 ABATE & REMOVE FLOOR TILE, BASE AND ADHESIVE.
PREPARE FLOOR FOR INSTALLATION OF NEW TILE
3 REMOVE PLUMBING FIXTURES, SEE PLUMBING FOR
PIPING DEMOLITION
4 REMOVE TOILET PARTITIONS, PATCH WALL @
ATTACHMENTS
5 REMOVE ALL EQUIPMENT & FURNISHING, RETURN TO
UNIVERSITY
6 REMOVE STEPS AND HANDRAIL
7 REMOVE HANDRAIL
8 REMOVE SLAB & FOUNDATION, TO GRADE
9 REMOVE DOWNSPOUT, PATCH GUTTER AND HOLD
FOR REINSTALLATION
10 REMOVE STOREFRONT GLAZING, DOORS, AND FRAME
11 REMOVE ASPHALT PAVING THE WIDTH OF THE NEW
STAIR TO THE DRAINAGE SWALE NEAR THE
DRIVEWAYAND 5' WEST OF NEW RAMP
12 REMOVE WALL TILE, PATCH WALL FOR NEW TILE
13 REMOVE ALL FURNITURE, CASEWORK, SHELVING,
AND ASSOCIATED ITEMS. STORE ITEMS WHERE
DIRECTED BY HASKELL UNIVERSITY
14 REMOVE CARPET
12" = 1'-0" C2
HALL 102A
12" = 1'-0" A2
EXISTING RESTROOM - NORTH EAST
12" = 1'-0" C3
CLASSROOM 103
12" = 1'-0" B3
EXISTING RESTROOM - NORTH WEST
12" = 1'-0" A3
ENTRY TO CLASSROOM 110
12" = 1'-0" B4
OFFICE 103A
12" = 1'-0" A4
CLASSROOM 105
GENERAL NOTES
A. PHOTOS SHOW EXISTING LAYOUTS, CONTRACTOR
RESPONSIBLE FOR ALL ITEMS TO COMPLETE WORK,
SHOWN OR NOT
B. CONTRACTOR TO DOCUMENT LOCATION OF ALL
EQUPMENT TO BE REINSTALLED
SHEET NUMBER
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
D
A T
E R
E M
A R
K S
IS
S
U E
D A
T E
S U
B M
IT
T
A L
D R
A W
IN
G
S C
A L E
D R
A W
IN
G
F
IL
E N
A M
E P
R O
JE
C
T N
U M
B E
R
M A
N A
G E
M E
N T
R E
V
IS
IO
N
S
A D
D E
N D
U M
S
P
B
IA
\0 W
\D e s ig n \B
IM
\B
U
IL
D
IN
G
\L
O C
A L
F
IL
E S
\H A
S K
E L
L A
R C
H C
E N
T R
A L
K
H a rr is .r v t
/9
/2
:1 :0
P
M
A s in d ic at ed
AD102
B L
D G
D
E M
O . R
E F
L . C
E
IL
IN
G
P L
A N
H A
S K
E L
L
IN
D
IA
N N
A T
IO
N
S U
N
IV
E R
S
IT
Y
B U
IL
D
IN
G
R
O O
M
L
E C
T U
R E
H A
L L
P
7W
W F
K H
F F
P
7W A
D
A m e ri c a s P k w y N
E S u it e
A lb q u e rq u e N
M
-2 -0
F a x
-2
-4 w w w .w h p a c ifi c .c o m
3/16" = 1'-0" A2
DEMOLITION REFLECTED CEILING PLAN
N
SCALE: 3/16" = 1'-0"
0' 2' 8' 12'4'
KEYED NOTES
1 REMOVE THE GYPSUM BOARD CEILING SYSTEM
2 REMOVE SKYLIGHT DIFFUSER & INNER SKYLIGHT
LINING. FRAMING TO REMAIN. DO NOT DISTURB
ROOFING OR SKYLIGHT LENS
3 REMOVE CEILING OPENING DUCTING & FRAME WORK
TO DECK
4 REMOVE ALL EXISTING LIGHTING FIXTURES, SEE
ELEC
5 LIGHTING TO BE REMOVED, SEE ELECTRICAL
6 REMOVE WALL COMPLETELY, RELOCATE AND ITEMS
ON WALL TO ADJACENT LOCATION, REFER TO SHEET
A101
12" = 1'-0" C1
LECTURE HALL 110 - NORTH
12" = 1'-0" B1
LECTURE HALL 110 - EAST
1/64" = 1'-0" A5
KEY PLAN
8" 23' - 3" 8" 17' - 6" 8" 42' - 2" 8"
70 seats
+6" A.F.F
+12" A.F.F.
67 SF
MECHANICAL
110A
76 SF
VESTIBULE
110B
153 SF
STORAGE
109A
97 SF
STORAGE
39 SF
JANITOR
104C
+6"+12"
+18" A.F.F
+18"
17' - 6"
18' - 2"
9' - 0"
23' - 3"
/2
66 SF
MEN
104B 112 SF
WOMEN
104A
S
F
L E
C T
U R
E H
A L L
A-101
A1
A-102
C1
D A
D C
D
D A
D B
16' - 0"
A-401
D1
A-100
A1
D109A
A AA
C D
B
W1
STORAGE
CLASSROOM
OFFICE
OFFICE
103A
HALL
102A
1/4" / 12"
C3
A-501
STORAGE
STORAGE
CLASSROOM
OFFICE
HALL
102A
OFFICE
103A
GENERAL NOTES
A. SEE SHEET A-501 FOR WALL TYPES
1/8" = 1'-0" B3
BUILDING 112 - OVERALL NEW WORK PLAN
SHEET NUMBER
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
D
A T
E R
E M
A R
K S
IS
S
U E
D A
T E
S U
B M
IT
T
A L
D R
A W
IN
G
S C
A L E
D R
A W
IN
G
F
IL
E N
A M
E P
R O
JE
C
T N
U M
B E
R
M A
N A
G E
M E
N T
R E
V
IS
IO
N
S
A D
D E
N D
U M
S
P
B
IA
\0 W
\D e s ig n \B
IM
\B
U
IL
D
IN
G
\L
O C
A L
F
IL
E S
\H A
S K
E L
L A
R C
H C
E N
T R
A L
K
H a rr is .r v t
/9
/2
:1 :5
P
M
A s in d ic at ed
A-100
B L
D G
O V
E R
A L
L N
E W
W O
R K
P L
A N
H A
S K
E L
L
IN
D
IA
N N
A T
IO
N
S U
N
IV
E R
S
IT
Y
B U
IL
D
IN
G
R
O O
M
L
E C
T U
R E
H A
L L
P
7W
W F
K H
F F
P
7W A
-1
A m e ri c a s P k w y N
E S u it e
A lb q u e rq u e N
M
-2 -0
F a x
-2
-4 w w w .w h p a c ifi c .c o m
N
SCALE : 1/4" = 1'-0"
0' 2' 4' 8' 16' 1/4" = 1'-0" A3
CANOPY ROOF PLAN
N
KEYED NOTES
1 60 MIL TPO MEMBRANE ROOF OVER SLOPED
INSULATION (1/4" PER 1'-0") & RECOVERY BOARD
OVER STEEL DECK
2 TPO MEMBRANE LINED GUTTER, SEE DETAIL
C3/A501
3 6" X 6" DROP TO PREFORMED METAL GUTTER
4 INSTALL VCT TILE & BASE, SEE FINISH SCHEDULE
5 PATCH & REPAIR ADJACENT SURFACES AS
NECESSARY
6 INSTALL CARPET & BASE, SEE FINISH SCHEDULE
7 INSTALL SUSPENDED ACOUTIC CEILING
TILES,REPAIR & REPAINT GRID AS NEEDED TO
LOOK NEW
8 (2) WHITEBOARD 6' LONG X 4' TALL
9 PAINT ALL WALLS
10 HOLLOW STEEL TUBE, SEE STRUCTURAL
SCALE: 1/8" = 1'-0"
0' 4' 8' 16' 32'
3/16" = 1'-0" A1
ROOM 102A, 103, 103A, 105, & 108 FLOOR PLAN
1/64" = 1'-0" A5
KEY PLAN
SCALE: 3/16" = 1'-0"
0' 2' 8' 12'4'
S S
S S
S S
S S
C
C
DN VESTIBULE
110B
STORAGE
109A MECHANICAL
110A
LECTURE HALL
9' - 0"
12' - 0"
8' - 0"
1010' - 0"
10' - 6"
10' - 6"
10' - 6"
10' - 6"
8' - 8 1/2"
7' - 0"
B4
A-601
TYP
B3
A-501
TYP.
4' - 0"
24 24
4' - 10"
A4
A-501
Sim
A-401
C3
A-401
VESTIBULE
110B
MECHANICAL
110ASTORAGE
109A
LECTURE HALL
A-401
B3
B1
A-401A1
A-401
A3
D
D A
D C
A-401C2 A-401 C1
6' - 5 1/2" 6' - 5 1/2" 6' - 5 1/2"
C L E
A R
1' - 6" 1' - 0" 0' - 6" 0' - 0"
1' - 6" 1' - 0" 0' - 6" 0' - 0"
A.F.F.A.F.F.A.F.F.A.F.F.
A.F.F.A.F.F.A.F.F.A.F.F.
1818 18
18 18 18
SLOPE 1"/12" MAX
D109A
W1
A-401
D1
D B
39' - 0"
/2
6' - 1"
3' - 11 1/2" 3' - 11 1/2"
4' - 0" 4' - 0"
3' - 11 1/2"
RCP SYMBOL LEGEND
10'-0" SOFFIT OR CEILING HEIGHT A.F.F.
FLOURESCENT LIGHT FIXTURE
DOWNLIGHT FIXTURE
SUPPLY AIR DIFFUSER
RETURN AIR GRILL
ACOUSTICAL LAY-IN CEILING PANELS
GYPSUM BOARD CEILNG
SHEET NUMBER
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
D
A T
E R
E M
A R
K S
IS
S
U E
D A
T E
S U
B M
IT
T
A L
D R
A W
IN
G
S C
A L E
D R
A W
IN
G
F
IL
E N
A M
E P
R O
JE
C
T N
U M
B E
R
M A
N A
G E
M E
N T
R E
V
IS
IO
N
S
A D
D E
N D
U M
S
P
B
IA
\0 W
\D e s ig n \B
IM
\B
U
IL
D
IN
G
\L
O C
A L
F
IL
E S
\H A
S K
E L
L A
R C
H C
E N
T R
A L
K
H a rr is .r v t
/9
/2
:1 :5
P
M
A s in d ic at ed
A-101
B L
D G
F
L O
O R
R
E F
L . C
E
IL
IN
G
P L
A N
H A
S K
E L
L
IN
D
IA
N N
A T
IO
N
S U
N
IV
E R
S
IT
Y
B U
IL
D
IN
G
R
O O
M
L
E C
T U
R E
H A
L L
P
7W
W F
K H
F F
P
7W A
-1
A m e ri c a s P k w y N
E S u it e
A lb q u e rq u e N
M
-2 -0
F a x
-2
-4 w w w .w h p a c ifi c .c o m
3/16" = 1'-0" A3
REFLECTED CEILING PLAN
3/16" = 1'-0"
A1
ROOM110 PLAN
N N
SCALE: 3/16" = 1'-0"
0' 2' 8' 12'4'
SCALE: 3/16" = 1'-0"
0' 2' 8' 12'4'
KEYED NOTES
1 SUSPENDED ACOUSTICAL LAY-IN CEILING.SEE
SCHEDULE ON SHEET A-602
2 SUSPENDED GYPSUM BOARD CEILING.
3 EXISTING SKYLIGHT. PATCH, TEXTURE & PAINT
TO MATCH LECTURE HALL WALLS. INSTALL
HORIZONTAL SHADES ABOVE DIFFUSER.
4 COMPUTER TABLE. SEE FURNITURE
SCHEDULE SHEET A-602
5 INSTALL NEW CHAIRS AT COMPUTER TABLES.
SEE FURNITURE SCHEDULE SHEET A-602
6 STOREFRONT SYSTEM & ADA COMPLIANT
DOORS.
7 INFILL DOOR WITH CMU, FINISH TO MATCH
ADJACENT WALL
8 NEW WALL, SEE SHEET A-100 FOR WALL TYPES
9 GYPSUM BOARD SUSPENDED CEILING OVER
FURRING CHANNELS
10 OPEN TO STRUCTURE ABOVE
11 CEILING MOUNTED PROJECTION SCREEN
12 SMART BOARD MOUNTED TO WALL. SEE
ELECTRICAL AND FURNITURE SCHEDULE ON
SHEET A-602
13 WHITE BOARD MOUNTED TO WALL. SEE
FURNITURE SCHEDULE ON SHEET A-602
14 SMART PODIUM. REFER TO ELECTRICAL AND
FURNITURE SCHEDULE ON SHEET A-602
15 TEXTURE, PRIME, AND PAINT ENTIRE WALL.
SEE SCHEDULE SHEET A-602
16 ADA WALK-OFF MAT. REFER TO FURNITURE
SCHEDULE.
17 EXISTING WALL TO REMAIN.
18 ELEVATED SEATING LEVEL, SEE STRUCTURAL
DETAILS
19 EXTERIOR GYPSUM BOARD SOFFIT CEILING
20 CEILING PROJECTOR
21 STEEL COLUMN, SEE STRUCTURAL
22 ACOUSTICALLY SEAL EXISTING WALLS AT
DECK, & OPENINGS WITH ACOUSTICAL
SEALANT
23 STEEL TUBE, SEE STRUCTURAL, PAINT
24 SPEAKERS SEE ELECTRICAL
25 PERIMETER SOFFIT, SEE DETAIL B3/A-501
26 PROVIDE HANDRAIL 2 1/4" MIN. CLEARANCE TO
WALL
1/64" = 1'-0"
JANITOR
104C
WOMEN
104A
MEN
104B
A-102 B1
A-102B4
A-102 C5
B3
A1
A2
A3
B2
D
B
D A
1' - 3 1/2"
8' - 0 1/2"
1' - 4 1/2"
8' - 1" 4"
8' - 1"
5' - 2" 2' - 11"
1' - 6" 1' - 6"
1' - 8 1/2"
D1
FIN. FLR.
0' - 0"
FIN. FLR.
0' - 0"
FIN. FLR.
0' - 0"
FIN. FLR.
0' - 0"
FIN. FLR.
0' - 0"
FIN. FLR.
0' - 0"
4 5
FIN. FLR.
0' - 0"
FIN. FLR.
0' - 0"
SEMI-RECESSED
PAPER TOWEL
DISPENSER/
WASTE
RECEPTACLE
SURFACE
MOUNTED
SOAP
DISPENSER
SURFACE
MOUNTED
SEAT COVER
DISPENSER
SURFACE MOUNTED
DOUBLE ROLL TOILET
TISSUE HOLDER
18"
VERTICAL
GRAB BAR
BARRIER FREE
TOILET
42"
HORIZONTAL
GRAB BAR
NOTE:
PROVIDE BACKING AT
GRAB BAR ANCHOR LOCATIONS
AND ALL WALL MOUNTED
ACCESSORIES
36"
HORIZONTAL
GRAB BAR
SEMI-RECESSED
SANITARY
NAPKIN/TAMPON
DISPENSER
(TO TOP OF
OPERATOR)
SURFACE MOUNTED
SANITARY
NAPKIN/TAMPON
RECEPTACLE
BARRIER FREE
WALL MOUNT
URINAL
TOILET
PARTITION
MOP HOLDER/
UTILITY SHELF
NOTE:
COVER ALL EXPOSED
DRAIN PIPES AND
WATER LINES.
TO FINISH
MAX
1' - 6"
3' - 6"
MAX
1' - 0"
TO FINISH
MIN
1' - 0"
MIN
2' - 0"
M
IN
MAX
9"
M
IN
TO FINISH TO FINISH TO FINISH TO FINISH
TO FINISH
M A
X
M A
X
M A
X
1' - 10"
1' - 3"
MIRROR
M A
X
B .O
M
IR
R
O R
M A
X
SINK HEIGHT
M
IN
SHEET NUMBER
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
D
A T
E R
E M
A R
K S
IS
S
U E
D A
T E
S U
B M
IT
T
A L
D R
A W
IN
G
S C
A L E
D R
A W
IN
G
F
IL
E N
A M
E P
R O
JE
C
T N
U M
B E
R
M A
N A
G E
M E
N T
R E
V
IS
IO
N
S
A D
D E
N D
U M
S
P
B
IA
\0 W
\D e s ig n \B
IM
\B
U
IL
D
IN
G
\L
O C
A L
F
IL
E S
\H A
S K
E L
L A
R C
H C
E N
T R
A L
K
H a rr is .r v t
/9
/2
:1 :5
P
M
A s in d ic at ed
A-102
B L
D G
E
N L
A R
G E
D P
L A
N
E L
E V
H A
S K
E L
L
IN
D
IA
N N
A T
IO
N
S U
N
IV
E R
S
IT
Y
B U
IL
D
IN
G
R
O O
M
L
E C
T U
R E
H A
L L
P
7W
W F
K H
F F
P
7W A
-1
A m e ri c a s P k w y N
E S u it e
A lb q u e rq u e N
M
-2 -0
F a x
-2
-4 w w w .w h p a c ifi c .c o m
3/8" = 1'-0" C1
ENLARGED RESTROOMS
3/8" = 1'-0" B1
MENS RM 104B - EAST
3/8" = 1'-0"
B2
MENS RM 104B - SOUTH
3/8" = 1'-0" B3
MENS RM 104B - NORTH
3/8" = 1'-0"
B4
WOMENS RM104A - WEST
3/8" = 1'-0" A1
WOMENS RM 104A - NORTH
3/8" = 1'-0"
A2
WOMENS RM 104A - EAST
3/8" = 1'-0" A3
WOMENS RM 104A - SOUTH
3/8" = 1'-0" C5
JANITOR RM 104C - EAST
N
1/4" = 1'-0" C2
ADA ACCESSIBLE MOUNTING HEIGHTS
KEYED NOTES
1 24" x 36" MIRROR IN 1/2" STAINLESS
STEEL FRAME
2 18" VERTICAL GRAB BAR
3 36" HORIZONTAL GRAB BAR
4 42" HORIZONTAL GRAB BAR
5 TOILET PAPER HOLDER
6 TOILET SEAT COVERS AND DISPENSER.
7 SANITARY NAPKINS DISPOSAL
8 TOILET PARTITION
9 SEMI-RECESSED PAPER TOWEL
DISPENSER & WASTE RECPTACLE
10 SOAP DISPENSER
11 FINISH AS SCHEDULED
12 MOP BASIN, SEE PLUMBING
13 WALL TILE 12 X 12 FIELD COLOR
14 WALL TILE ACCENT COLOR 1
15 WALL TILE ACCENT COLOR 2
16 FLOOR DRAIN, SEE MECHANICAL
17 WALL HUNG LAVATORY, SEE PLUMBING
SCALE : 1/4" = 1'-0"
0' 2' 4' 8' 16'
SCALE: 3/8" = 1'-0"
0' 2' 8'4' 6'
SCALE: 3/8" = 1'-0"
0' 2' 8'4' 6'
SCALE: 3/8" = 1'-0"
0' 2' 8'4' 6'
SCALE: 3/8" = 1'-0"
0' 2' 8'4' 6'
SCALE: 3/8" = 1'-0"
0' 2' 8'4' 6'
SCALE: 3/8" = 1'-0"
0' 2' 8'4' 6'
SCALE: 3/8" = 1'-0"
0' 2' 8'4' 6'
SCALE: 3/8" = 1'-0"
0' 2' 8'4' 6'
SCALE: 3/8" = 1'-0"
0' 2' 8'4' 6'
1/64" = 1'-0"
FIN. FLR.
0' - 0"
SOFFIT
10' - 6"
10' - 0"8"10' - 0"1' - 0"
/2
FIN. FLR.
0' - 0"
1 2
SOFFIT
10' - 6"
(BEHIND)
8' - 0"
8' - 0"
FIN. FLR.
0' - 0"
SOFFIT
10' - 6"
2' - 0" 10' - 0" 2' - 0" 10' - 0" 2' - 7" 10' - 0" 2' - 0" 10' - 0" 2' - 0"
/2
6 666
7 7
FIN. FLR.
0' - 0"
SOFFIT
10' - 6"
5 5 3
1' - 6"10' - 0"2' - 0"10' - 0"1' - 1"10' - 0"1' - 6"
6 6 6
A-401C2
A-401 C1
16' - 0"
1' - 0"
/2
/2
14' - 8"
/2
/2
A-401
C3
15 1515
FIN. FLR.
0' - 0"
GRADE
-1' - 4"
A-FP09
8' - 8 1/2"
1' - 6 1/2"4' - 0" 1' - 8"
FIN. FLR.
0' - 0"
GRADE
-1' - 4"
A-FP09
8' - 8 1/2"
3' - 2" 3' - 2" 1' - 6" 4' - 1 1/2"
R
2T @11" = 22"
FIN. FLR.
0' - 0"
GRADE
-1' - 4"
A-FP09
8' - 8 1/2"
1' - 0"
6' - 0" 6' - 0" 6' - 1 1/2"
1"
12"
9 7
/2
SHEET NUMBER
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
D
A T
E R
E M
A R
K S
IS
S
U E
D A
T E
S U
B M
IT
T
A L
D R
A W
IN
G
S C
A L E
D R
A W
IN
G
F
IL
E N
A M
E P
R O
JE
C
T N
U M
B E
R
M A
N A
G E
M E
N T
R E
V
IS
IO
N
S
A D
D E
N D
U M
S
P
B
IA
\0 W
\D e s ig n \B
IM
\B
U
IL
D
IN
G
\L
O C
A L
F
IL
E S
\H A
S K
E L
L A
R C
H C
E N
T R
A L
K
H a rr is .r v t
/9
/2
:1 :5
P
M
/4
'-0
A-401
B L
D G
IN
T . E
L E
V A
T
IO
N S
D
E T
A
IL
S
H A
S K
E L
L
IN
D
IA
N N
A T
IO
N
S U
N
IV
E R
S
IT
Y
B U
IL
D
IN
G
R
O O
M
L
E C
T U
R E
H A
L L
P
7W
W F
K H
F F
P
7W A
-4
A m e ri c a s P k w y N
E S u it e
A lb q u e rq u e N
M
-2 -0
F a x
-2
-4 w w w .w h p a c ifi c .c o m
1/4" = 1'-0" B3
LECTURE HALL RM 110 - NORTH
1/4" = 1'-0"
B1
LECTURE HALL RM 110 - EAST
1/4" = 1'-0" A1
LECTURE HALL RM 110 - WEST
1/4" = 1'-0"
A3
LECTURE HALL RM 110 - SOUTH
SCALE : 1/4" = 1'-0"
0' 2' 4' 8' 16'
SCALE : 1/4" = 1'-0"
0' 2' 4' 8' 16'
SCALE : 1/4" = 1'-0"
0' 2' 4' 8' 16'
1/4" = 1'-0" D1
ENLARGED CANOPY PLAN
N
1/4" = 1'-0" C1
CANOPY EAST ELEVATION
1/4" = 1'-0"
C2
CANOPY WEST ELEVATION
1/4" = 1'-0" C3
CANOPY NORTH ELEVATION
SCALE : 1/4" = 1'-0"
0' 2' 4' 8' 16'
SCALE : 1/4" = 1'-0"
0' 2' 4' 8' 16'
SCALE : 1/4" = 1'-0"
0' 2' 4' 8' 16'
KEYED NOTES
8 STRUCTURAL STEEL TUBE, SEE STUCTURAL.
9 CONCRETE ENCASED COLUMN, SMOOTH FINISH,
CLEAR SEALANT
10 CONCRETE LANDING, SEE STRUCTURAL
11 CONCRETE STEPS AND LANDING, SEE STRUC
12 CONCRETE RAMP, MAX 1:12 SLOPE, SEE
STRUCTURAL
13 ALUMINUM STOREFRONT, SEE PLAN
14 STEEL TUBE CANOPY, SEE DETAIL A3/A100, SEE
ALSO STUCTURAL, PAINT
15 BRICK PAVERS TO MATCH TYPE AND COLOR OF
SIMILAR SITE BRICK PAVING EXISTING ON CAMPUS
SEE DETAIL B1/A-501
16 METAL COPING
17 TACTILE EXIT SIGN SEE SPECIFICATION
KEYED NOTES
1 SMART BOARD MOUNTED TO WALL. SEE
ELECTRICAL AND FURNITURE SCHEDULE ON SHEET
A-602
2 WHITE BOARD MOUNTED TO WALL. SEE FURNITURE
SCHEDULE ON SHEET A-602
3 CEILING MOUNTED PROJECTION SCREEN
4 ELEVATED SEATING LEVEL, SEE STRUCTURAL
DETAILS
5 PROVIDE RUBBER TREAD NOSING AT INTERIOR
STEPS, TYP.
6 ACOUSTICAL WALL PANEL, 2" THICK, MIN NRC 1.15.
ABUSE RESISTANT WITH HALF BEVEL EDGE
7 1 1/2" O.D. STEEL PIPE HANDRAIL, PAINTED
REFERENCE ASCE 7-05
NOTES:
1. HANGER WIRES MUST BE 12 GA. IN.
SOFT ANNEALED, MILD STEEL WIRE.
WIRES SHALL BE WRAPPED TIGHTLY
RUNNERS AND SUPPORTS WITH A
MIN. OF THREE TURNS.
2. CLIPS SHALL HOLD RUNNERS
TIGHTLY TOGETHER. SPLICE CLIPS
SHALL BE CAPABLE OF RESISTING
AT LEAST 50 LBS IN TENSION OR
COMPRESSION.
3. FOR MANUFACTURED SYSTEMS,
SUBMIT SUBSTANTIATION IN
ACCORDANCE WITH IBC
STANDARDS.
4. RUNNERS SHALL BE CAPABLE OF
SUPPORTING CEILING SYSTEM WITH
DEFLECTIONS LESS THAN 0.133
INCHES.
5. LOCAL KINKS AND BENDS SHALL NOT
BE MADE HANGER WIRES FOR
LEVELING.
6. ALL SUSPENDED SYSTEMS SHALL BE
HUNG IN A SIMILAR FASHION,
INCLUDING, BUT NOT LIMITED
TO, DUCTWORK, LIGHT FIXTURES,
AND PIPING.
VERTICAL STRUT - 16 GA,
1 1/2" x 1/2" CRC @ CENTER
OF SEISMIC HANGER WIRES
TO DECK ABOVE
VERTICAL HANGER WIRES @
4'-0" EACH WAY AND 8" FROM
WALL, TYP.
IF HANGERS MUST BE SPLAYED
MORE THAN 1 IN 6 OUT OF
PLUMB PROVIDE
CONUTERSLOPED HANGER.
SEISMIC HANGER WIRES SHALL
BE SPLAYED AT 45° DEGREES FROM
MAIN RUNNER IN EACH DIRECTION,
AND 45° DEGREES FROM CROSS
RUNNER IN EACH DIRECTION AT
12'-0" MAX. EACH WAY AND 6'-0" MAX.
FROM WALLS, TYP.
DO NOT BEND WIRE
AROUND INTERFERING
EQUIPMENT. PROVIDE
1 1/4" CHANNEL TRAPEZE
WITH TWO (MIN.) HANGER
WIRES.
45° 45°
45°45°
SEISMIC BRACING DETAIL
SCALE: N.T.S.
1/4" / 12"
1/4" / 12"
FIN. FLR.
0' - 0"
A
FIN. FLR.
0' - 0"
B
HALL
JANITOR
FIN. FLR.
0' - 0"
SEE PLAN
4 4
C
SIDEWALK SECTION
12 13
1% CROSS SLOPE
EXPANSION JOINT
R=1/8"
FIN. FLR.
0' - 0"
D
1-HR RATED
WALL/CEILING
SOFFIT
10' - 6"
CEILING
12' - 0"
SHEET NUMBER
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
D
A T
E R
E M
A R
K S
IS
S
U E
D A
T E
S U
B M
IT
T
A L
D R
A W
IN
G
S C
A L E
D R
A W
IN
G
F
IL
E N
A M
E P
R O
JE
C
T N
U M
B E
R
M A
N A
G E
M E
N T
R E
V
IS
IO
N
S
A D
D E
N D
U M
S
P
B
IA
\0 W
\D e s ig n \B
IM
\B
U
IL
D
IN
G
\L
O C
A L
F
IL
E S
\H A
S K
E L
L A
R C
H C
E N
T R
A L
K
H a rr is .r v t
/9
/2
:1 :5
P
M
A s in d ic at ed
A-501
B L
D G
D
E T
A
IL
S
H A
S K
E L
L
IN
D
IA
N N
A T
IO
N
S U
N
IV
E R
S
IT
Y
B U
IL
D
IN
G
R
O O
M
L
E C
T U
R E
H A
L L
P
7W
W F
K H
F F
P
7W A
-5
A m e ri c a s P k w y N
E S u it e
A lb q u e rq u e N
M
-2 -0
F a x
-2
-4 w w w .w h p a c ifi c .c o m
1 1/2" = 1'-0" C3
SECTION DETAIL @ CANOPY
3/4" = 1'-0" A1
WALL @ STORAGE & MECH.
3/4" = 1'-0"
A2
WALL @ JANITOR
3/4" = 1'-0" A3
PLUMBING WALL
KEYED NOTES
1 NEW WALL, SEE SHEET A-100 FOR WALL TYPES
3 5/8" GYPSUM BOARD TYPE 'X'.
4 4" METAL STUD.
5 SCHEDULED CEILING. REFER TO REFLECTED CEILING
PLAN A-101.
6 SOUND ATTENUATION BATT INSULATION.
7 VINYL BASE
8 5/8" WATER RESISTIVE GYPSUM BOARD.
9 8" METAL STUD WALL
10 BRICK PAVERS
11 PROVIDE 1/2" EXPANSION JOINT WHEN ABUTTING TO
EXISTING CONCRETE PAVEMENT
12 4" SAND BASE COURSE
13 PREPARED SUBGRADE - SCARIFY AND COMPACT TO
95% DENSITY PER ASTM D-1557
14 PREMOLDED EXP. JOINT FILLER -TRAFFIC RATED
15 EXISTING CONCRETE OR ASPHALT
16 EXISTING DECK
17 3 LAYERS 5/8" TYPE "X" GYPSUM BOARD WITH
STAGGERED JOINTS
18 3 5/8" METAL STUD CEILING FRAMING
19 STEEL SUPPORT AT OPENING, SEE STUCTURAL
20 STRUCTURAL STEEL TUBES, SEE STUCTURAL
DRAWINGS FOR SIZE AND LOCATION.PAINT SEE
COLOR LEGEND ON SHEET A-601
21 SUSPENDED EXTERIOR GYP. BOARD CEILING, SEE
COLOR LEGEND ON SHEET A-601
22 LIGHTING FIXTURE, SEE ELECTRICAL
23 SHEET METAL GUTTER SYSTEM
24 RECOVERY BOARD OVER METAL DECK
25 MEMBRANE ROOFING
26 TAPERED RIGID INSULATION
27 EXISTING CMU
28 3 5/8" METAL STUDS
29 SUSPENDED ACOUSTICAL LAY-IN CEILING.SEE
SCHEDULE ON SHEET A-602
30 EXISTING RIGID INSULATION AND ROOFING
31 EXISTING ROOF DECK
32 METAL COPING
SCALE: 1 1/2" = 1'-0"
1' 9" 3" 0 1'6"
SCALE: 3/4" = 1'-0"
0' 1' 2' 3'
1 1/2" = 1'-0" B1
SIDEWALK SECTION @ 110 ENTRY
1 1/2" = 1'-0"
B2
EXPANSION JOINT DETAIL
3/4" = 1'-0" A4
LECTURE HALL WALL
1" = 1'-0" B3
TYPICAL SOFFIT DETAIL
4" 2' - 4" 4"1' - 10" 8" 6"
AS SCHED.
A S
S C
H E
D U
L E
D
D1 D2 D3
T
T
2" AS SCHED. 2"
A S
S C
H E
D U
L E
D
2" AS SCHED. 2"
A S
S C
H E
D U
L E
D
2" AS SCHEDULED 2"
A S
S C
H E
D U
L E
D
2" 2' - 10" 2"
AS SCHEDULED 2"
9' - 4"
" 1
A S
S C
H E
D U
L E
D
F1 F2 F3 F4
T
T
T T
" 1
2" 2' - 8" 2"
3' - 0"
FIN. FL.
W1
T
T
T
8"
6"
8" STUDS
10 1/8" @
2"
/8
S
T U
D S
FIN. FL.
10 10
151 5
2"
12 12
18 18
5 1/2"
F
IE
L D
V E
R
IF
Y D
IS
T
A N
C E
12 12
SHEET NUMBER
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
D
A T
E R
E M
A R
K S
IS
S
U E
D A
T E
S U
B M
IT
T
A L
D R
A W
IN
G
S C
A L E
D R
A W
IN
G
F
IL
E N
A M
E P
R O
JE
C
T N
U M
B E
R
M A
N A
G E
M E
N T
R E
V
IS
IO
N
S
A D
D E
N D
U M
S
P
B
IA
\0 W
\D e s ig n \B
IM
\B
U
IL
D
IN
G
\L
O C
A L
F
IL
E S
\H A
S K
E L
L A
R C
H C
E N
T R
A L
K
H a rr is .r v t
/9
/2
:1 :5
P
M
A s in d ic at ed
A-601
B L
D G
D
O O
R /W
IN
D
O W
S C
H E
D U
L E
S
H A
S K
E L
L
IN
D
IA
N N
A T
IO
N
S U
N
IV
E R
S
IT
Y
B U
IL
D
IN
G
R
O O
M
L
E C
T U
R E
H A
L L
P
7W
W F
K H
F F
P
7W A
-6
A m e ri c a s P k w y N
E S u it e
A lb q u e rq u e N
M
-2 -0
F a x
-2
-4 w w w .w h p a c ifi c .c o m
1/4" = 1'-0" C1
DOOR TYPES
1/4" = 1'-0" B1
FRAME TYPES
1/4" = 1'-0" C2
WINDOW TYPE
1 1/2" = 1'-0" D3
CMU HEAD DETAIL
1 1/2" = 1'-0"
D4
TYP. HEAD DETAIL
1 1/2" = 1'-0" C4
TYP. JAMB DETAIL
1 1/2" = 1'-0" B3
STOREFRONT HEAD DETAIL
1 1/2" = 1'-0" A3
STOREFRONT SILL DETAIL
1 1/2" = 1'-0"
A1
STOREFRONT JAMB DETAIL
KEYED NOTES
1 EXISTING CMU
2 BACKER ROD & SEALANT ON BOTH SIDES
3 HOLLOW METAL FRAME
4 3 5/8" METAL STUDS
5 SEALANT ON BOTH SIDES
6 5/8" GYPSUM BOARD TYPE 'X'.
7 METAL BOX HEADER
8 FRAME ANCHOR
9 ALUMINUM STOREFRONT
10 GLAZING
11 FINISH AS SCHEDULED
12 EXISTING SKYLIGHT AND CURB
13 EXISTING RIGID INSULATION AND ROOFING
14 EXISTING ROOF DECK
15 EXISTING HAT CHANNEL FURRING
16 5/8" GYPSUM BOARD FINISH IN SKYLIGHT WELL
AND SKYLIGHT SOFFIT
17 MOTORIZED SKYLIGHT BLACKOUT SHADE, INSTALL
PER MANUFACTURER
18 ACOUSTICAL LAY-IN CEILING
19 GROUT SOLID, TYP AT JAMBS IN CMU
20 ALUMINUM THRESHOLD
1 1/2" = 1'-0" C3
CMU JAMB DETAIL
SCALE : 1/4" = 1'-0"
0' 2' 4' 8' 16'
SCALE: 1 1/2" = 1'-0"
1' 9" 3" 0 1'6"
1" = 1'-0" B4
SKYLIGHT SECTION
SHEET NUMBER
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
D
A T
E R
E M
A R
K S
IS
S
U E
D A
T E
S U
B M
IT
T
A L
D R
A W
IN
G
S C
A L E
D R
A W
IN
G
F
IL
E N
A M
E P
R O
JE
C
T N
U M
B E
R
M A
N A
G E
M E
N T
R E
V
IS
IO
N
S
A D
D E
N D
U M
S
P
B
IA
\0 W
\D e s ig n \B
IM
\B
U
IL
D
IN
G
\L
O C
A L
F
IL
E S
\H A
S K
E L
L A
R C
H C
E N
T R
A L
K
H a rr is .r v t
/9
/2
:1 :5
P
M
A-602
E Q
U
IP
M E
N T
F
U R
N
IT
U R
E S
C H
E D
U L
E S
H A
S K
E L
L
IN
D
IA
N N
A T
IO
N
S U
N
IV
E R
S
IT
Y
B U
IL
D
IN
G
R
O O
M
L
E C
T U
R E
H A
L L
P
7W
W F
K H
F F
P
7W A
-6
A m e ri c a s P k w y N
E S u it e
A lb q u e rq u e N
M
-2 -0
F a x
-2
-4 w w w .w h p a c ifi c .c o m
FINISH ABBREVIATIONS
ACT ACOUSTICAL CEILING TILE
EXP EXPOSED
EPXY EPOXY FLOOR
FRP FIBERGLASS REINFORCED PLASTIC PANELS
PT PAINTED GYPSUM BOARD
VINYL VINYL BASE
S. CONC SEAL CONCRETE
CT CERAMIC TILE
EPT EPOXY MOISTURE RESISTANT PAINT
CPT CARPET TILE
EM ENTRY MAT
ROOM FINISH SCHEDULE
ROOM NO ROOM NAME FLOOR BASE
WALLS CEILING
NOTESN S E W MATL
102A HALL
103 OFFICE
103A OFFICE
104A WOMEN CT CT CWT CWT CWT CWT EPT
104B MEN CT CT CWT CWT CWT CWT EPT
104C JANITOR EPXY FRP FRP FRP FRP FRP EXP
105 CLASSROOM CPT VINYL PT PT PT PT ACT
108 STORAGE
109 STORAGE VCT VINYL PT PT PT PT EXP
109A STORAGE VCT VINYL PT PT PT PT EXP
110 LECTURE HALL CPT VINYL PT PT PT PT ACT ACOUSTICAL WALL PANELS
110A MECHANICAL EPXY VINYL PT PT PT PT EXP
110B VESTIBULE VCT/EM VINYL PT PT PT PT PT
DOOR AND FRAME SCHEDULE
MARK
DOOR
DOOR
MATERIAL
FRAME FRAME FRAME FRAME FRAME
FIRE
RATING HARDWARE NOTESTYPE
SIZE SIZE SIZE
MATL TYPE
DETAIL DETAIL DETAIL
W HT THK JAMB HEAD SILL
D104A D1 3' - 0" 7' - 0" 0' - 1 3/4" HM HM F2 C3/A601 D3/A601 45 SEE SPEC
D104B D1 3' - 0" 7' - 0" 0' - 1 3/4" HM HM F2 C3/A601 D3/A601 45 SEE SPEC
D104C D1 3' - 0" 7' - 0" 0' - 1 3/4" HM HM F2 C3/A601 D3/A601 45 SEE SPEC
D109A D1 3' - 0" 7' - 0" 0' - 1 3/4" HM HM F1 C4/A601 D4/A601 SEE SPEC
D110 D2 3' - 0" 7' - 0" 0' - 1 3/4" HM HM F1 C4/A601 D4/A601 45 SEE SPEC SOUND SEAL
D110A D1-(2) 6' - 0" 7' - 0" 0' - 1 3/4" HM HM F3 C4/A601 D4/A601 SEE SPEC SOUND SEAL
D110B D3-(2) 6' - 0" 7' - 0" 0' - 1 3/4" AL AL F4 A1/A601 B3/A601 A3/A601 SEE SPEC SOUND SEAL
D110C D3-(2) 6' - 0" 7' - 0" 0' - 1 3/4" AL AL F4 A1/A601 B3/A601 A3/A601 SEE SPEC
FINISH MATERIALS AND COLORS
CEILINGS:
- CEILING GRID PAINT WHITE ENAMEL PAINT
- CEILING ACOUSTICAL TILES ARMSTRONG
RANDOM FISSURED TEXTURED
2'X4' PANEL
COLOR: WHITE
FLOORS:
- VINYL COMPOSITION TILE (VCT) ARMSTRONG T3513
- VINYL BASE JOHNSONITE
TRADITIONAL WALL BASE
COLOR: 129 SILK WB
- CARPET TILE BUILDING 112, ROOM 110
SHAW CONTRACT GROUP
WISDOM 60709
COLOR: 09900 MAJESTIC PURPLE
WALLS:
- INTERIOR PAINT SHERWIN- WILLIAMS
COLOR: NAVAJO WHITE SW 6126
- DECORATIVE ACOUSTICAL WALL PANEL BUILDING 112, ROOM 110
ACOUSTICAL SURFACES INC.
NOISE S.T.O.P. FIBRISORB
COLOR: DEEP BURGANDY
- PORCELAIN TILE: BUILDING 112, RESTROOMS
- FIELD TILE (WALLS & FLOORS) COLOR: DAL TILE PERSIAN GOLD CS54
- ACCENT TILE 1 COLOR: DAL TILE INDIAN RED CS51
- ACCENT TILE 2 COLOR: DAL TILE TUSCAN BLUE CS56
EXTERIOR:
- EXTERIOR PAINT SHERWIN- WILLIAMS
EXTERIOR ENAMEL
COLOR: IZMIR PURPLE SW 6825
(4 ACCESSIBLE TABLES)
DOMESTIC COLD WATER PIPING (CW)
DOMESTIC HOT WATER PIPING (HW)
HOT WATER CIRCULATING PIPING (HWR)
G GAS PIPING
DS DOMESTIC SOFT WATER
RO REVERSE OSMOSS WATER PIPING
C CONDENSATE PIPING
S SANITARY WASTE PIPING
SANITARY VENT PIPING
RD ROOF DRAIN PIPING
V
SD STORM DRAIN PIPING
AW ACID WASTE PIPING
AV ACID VENT PIPING
FP FIRE PROTECTION PIPING
PLUMBING PIPING TO BE REMOVED
POINT OF CONNECTION/DISCONNECT
NOTE; NOT ALL SYMBOLS ARE USED
(E) EXISTING PIPING/EQUIPMENT
PIPING DROP
A. THESE DRAWINGS ARE SCHEMATIC IN NATURE AND ARE
NOT INTENDED TO SHOW ALL POSSIBLE CONDITIONS. IT
IS INTENDED THAT A COMPLETE PLUMBING SYSTEM BE
PROVIDED WITH ALL NECESSARY EQUIPMENT,
APPURTENANCES, AND CONTROLS COMPLETELY
COORDINATED WITH ALL DISCIPLINES. ALL PARAMETERS
GIVEN IN THESE DOCUMENTS SHALL BE STRICTLY
CONFORMED TO ANY ITEMS AND LABOR REQUIRED FOR
A COMPLETE PLUMBING SYSTEM IN ACCORDANCE WITH
ALL APPLICABLE CODES, STANDARDS, LOCAL
AUTHORITIES, AND THESE CONTRACT DOCUMENTS
SHALL BE FURNISHED WITHOUT INCURRING ANY
ADDITIONAL COST TO THE OWNER. CAREFULLY REVIEW
ALL CONTRACT DOCUMENTS AND THE DESIGN OF OTHER
TRADES.
B. COORDINATE ALL WORK WITH ARCHITECTURAL,
STRUCTURAL, FIRE PROTECTION, MECHANICAL AND
ELECTRICAL TRADES. PIPE ROUTING SHOWN IS
DIAGRAMMATIC. PROVIDE ALL OFFSETS, ETC., TO AVOID
INTERFERENCE WITH EQUIPMENT, PIPING, DUCTWORK,
LIGHTS, CONDUIT, ETC.
C. COORDINATE ALL FLOOR PENETRATIONS WITH
STRUCTURAL DRAWINGS, SET SLEEVES IN FLOORS AND
WALLS AND ATTACHMENTS FOR HANGERS AS
CONSTRUCTION PROGRESSES. ALL PENETRATIONS
MUST BE SEALED AND HELD AS TIGHT TO COLUMNS OR
WALLS AS POSSIBLE.
D. PROVIDE 24x24 OR 18x18 ACCESS PANELS (AS
REQUIRED) FOR WATER HAMMER ARRESTORS, ALL
VALVES LOCATED ABOVE NON-ACCESSIBLE CEILINGS
AND INSIDE PIPE CHASES. EXACT LOCATION MUST BE
COORDINATED WITH ARCHITECTURAL DRAWINGS AND
APPROVED BY ARCHITECT PRIOR TO INSTALLATION.
E. ALL DRAINAGE PIPING SHALL BE CONCEALED INSIDE
WALLS AND PIPE CHASES OR ABOVE CEILINGS. INSTALL
ALL PIPING ABOVE CEILING AS HIGH AS POSSIBLE.
F. WALL HYDRANTS AND HOSE BIBBS SHALL BE MOUNTED
24" ABOVE GRADE OR ABOVE FINISH FLOOR.
G. COORDINATE ALL UNDERGROUND PIPING WITH GRADE
BEAMS, WALL FOOTINGS AND OTHER STRUCTURAL
CONDITIONS.
H. REFER TO ARCHITECTURAL PLANS AND ELEVATIONS
FOR LOCATION OF ALL PLUMBING FIXTURES. EXACT
LOCATION OF ALL PLUMBING FIXTURES MUST BE
VERIFIED IN FIELD PRIOR TO INSTALLATION. FINAL
LOCATION SHALL BE AS DIRECTED BY ARCHITECT.
I. DO NOT RUN PLUMBING, PIPING OR FIRE PROTECTION
PIPING THROUGH TRANSFORMER VAULTS, ELECTRICAL
CLOSETS, ELECTRICAL SWITCHGEAR ROOMS, OR
TELEPHONE ROOMS.
J. PROVIDE BASE CLEANOUT AT LOWEST FLOOR LEVEL OF
ALL SANITARY STACKS, WASTE STACKS, AND ROOF
DRAIN LEADERS. EXACT LOCATION OF WALL CLEANOUT
MUST BE COORDINATED AND ACCEPTED BY ARCHITECT
PRIOR TO INSTALLATION.
K. ALL MATERIALS IN AREAS EXPOSED TO WEATHER ARE
TO BE PAINTED WITH TWO COATS OF ZINC CHROMATE
PRIMER OR HOT DIP GALVANIZED.
L. ALL TRAPS TO FLOOR DRAINS AND FLOOR SINKS TO
HAVE APPROVED TRAP PRIMERS.
M. PRODUCTS, MANUFACTURERS AND MODEL NO.S FOR
EQUIPMENT INDICATE A BASIS FOR DESIGN BUT ARE NOT
LIMITED TO THE PRODUCTS SPECIFIED. SUBSTITUTION
OF PRODUCTS MUST COMPLY OR EXCEED THE
REQUIREMENTS DESIGNATED IN THE SPECIFICATIONS
AND DRAWINGS.
N. CLEANOUTS TO BE PROVDED AS INDICATED ON PLANS
AND AS REQUIRED BY CODE.
O. PLUMBING DESIGN AND INSTALLATION SHALL COMPLY
WITH UPC 2012.
SHEET NUMBER
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
D
A T
E R
E M
A R
K S
IS
S
U E
D A
T E
S U
B M
IT
T
A L
D R
A W
IN
G
S C
A L E
D R
A W
IN
G
F
IL
E N
A M
E P
R O
JE
C
T N
U M
B E
R
M A
N A
G E
M E
N T
R E
V
IS
IO
N
S
A D
D E
N D
U M
S
C
U s e rs
\P u b li c \D o c u m e n ts \H
A S
K E
L L
P
L U
M C
E N
T R
A L c a rn tz e n
.r v t
/5
/2
:2
:4
P
M
/8
'-0
P-001
P L
U M
B
IN
G N
O T
E S
A N
D L
E G
E N
D S
H A
S K
E L
L
IN
D
IA
N N
A T
IO
N
S U
N
IV
E R
S
IT
Y
B U
IL
D
IN
G
R
O O
M
L
E C
T U
R E
H A
L L
P
7W
M T
B
C G
A
M T
B
P
7W P
-0
PLUMBING SYMBOL LEGENDGENERAL PLUMBING NOTES
A m e ri c a s P k w y N
E S u it e
A lb q u e rq u e N
M
-2 -0
F a x
-2
-4 w w w .w h p a c ifi c .c o m
/0
/2
STORAGE
CLASSROOM
HALL
102A
LECTURE HALL
STORAGE
(E)WC
(E)UR
(E)LAV
(E)FD
222222
33 CAP
FURNACEFURNACE
(E)G(E)G(E)G
(E )G
(E)G
A. SEE SHEET P-001 FOR PLUMBING NOTES AND LEGEND.
GENERAL NOTES
SHEET NUMBER
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
D
A T
E R
E M
A R
K S
IS
S
U E
D A
T E
S U
B M
IT
T
A L
D R
A W
IN
G
S C
A L E
D R
A W
IN
G
F
IL
E N
A M
E P
R O
JE
C
T N
U M
B E
R
M A
N A
G E
M E
N T
R E
V
IS
IO
N
S
A D
D E
N D
U M
S
C
U s e rs
\P u b li c \D o c u m e n ts \H
A S
K E
L L
P
L U
M C
E N
T R
A L c a rn tz e n
.r v t
/5
/2
:2
:4
P
M
A s in d ic at ed
PD101
B L
D G
P
L U
M B
IN
G
D E
M O
L
IT
IO
N
P L
A N
H A
S K
E L
L
IN
D
IA
N N
A T
IO
N
S U
N
IV
E R
S
IT
Y
B U
IL
D
IN
G
R
O O
M
L
E C
T U
R E
H A
L L
P
7W
M T
B
C G
A
M T
B
P
7W P
D
1/4" = 1'-0" A1
BLDG 112 - PLUMBING DEMOLITION PLAN
A m e ri c a s P k w y N
E S u it e
A lb q u e rq u e N
M
-2 -0
F a x
-2
-4 w w w .w h p a c ifi c .c o m
N
SCALE : 1/4" = 1'-0"
0' 2' 4' 8' 16'
KEYED NOTES
1 REMOVE EXISTING PLUMBING FIXTURES AND
ASSOCIATED CW, HW, WASTE AND VENT PIPING. CAP
PIPING AT MAINS.
2 DEMO EXISTING PIPING AS REQUIRED TO
ACCOMODATE NEW PLUMBING FIXTURE PIPING IN
NEW LOCATIONS. SEE SHEET P-101. FIELD
VERIFICATION OF EXISTING PIPING SIZES AND
LOCATION WILL BE REQUIRED.
3 EXISTING GAS LINE IN CRAWL SPACE TO REMAIN.
4 REMOVE EXISTING GAS LINE SERVING FURNACES
AND CAP GAS LINE AT MAIN.
5 FLOOR DRAIN TO REMAIN IN PLACE FOR REUSE.
6 REMOVE EXISTING CONDENSATE PIPING SERVING
FURNACE.
7 FIELD VERIFY AND REMOVE INACTIVE OR
ABANDONED PIPING OR APPURTENANCES IN THIS
ROOM. CAP INACTIVE/ABANDONED PIPING ABOVE
CEILING, BEHIND WALL OR BELOW FLOOR AND PATCH
SURFACES PER ARCHITECTURAL DIRECTION.
A5
KEY PLAN
/0
/2
WOMEN
104A
JANITOR
104C
CLASSROOM
LECTURE HALL
MEN
104B
HALL
102A
(E)FD
FD1
TYP.
11 TYP.
WCWC1
WC1
MB
U1
L1 L1
NOTE: SEE ISOMETRICS THIS
SHEET FOR PIPE SIZES AND
ADDITIONAL INFORMATION.
A. SEE SHEET P-001 FOR PLUMBING NOTES AND LEGEND.
B. SEE SHEET M-101 FOR LOCATION OF AIR HANDLER AHU-
1 AND FOR NOTING REGARDING THE AIR HANDLER'S
ASSOCIATED CONDENSATE DRAIN.
GENERAL NOTES
FD1
(E)FD
1 1/2"ø
2"ø
U1
MB
L1
L1
WC1
WC
1 1/2"ø 2"ø
2"ø
2"ø
2"ø
2"ø
3"ø
WOMEN
104A
MEN
104B
JANITOR
104C
1 1/2"ø
2"ø
3"ø
3"ø
3"ø
TYP.
2"ø
2"ø
2"ø
2"ø
2"ø
1"ø
1"ø
3/4"ø
3/4"ø
1"ø
3/4"ø
1/2"ø
1/2"ø
WC
WC1
MB
U1
WC1
L1
L1
WOMEN
104A
MEN
104B
JANITOR
104C
SHEET NUMBER
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
D
A T
E R
E M
A R
K S
IS
S
U E
D A
T E
S U
B M
IT
T
A L
D R
A W
IN
G
S C
A L E
D R
A W
IN
G
F
IL
E N
A M
E P
R O
JE
C
T N
U M
B E
R
M A
N A
G E
M E
N T
R E
V
IS
IO
N
S
A D
D E
N D
U M
S
C
U s e rs
\P u b li c \D o c u m e n ts \H
A S
K E
L L
P
L U
M C
E N
T R
A L c a rn tz e n
.r v t
/5
/2
:2
:4
P
M
A s in d ic at ed
P-101
B L
D G
P
L U
M B
IN
G
P L
A N
H A
S K
E L
L
IN
D
IA
N N
A T
IO
N
S U
N
IV
E R
S
IT
Y
B U
IL
D
IN
G
R
O O
M
L
E C
T U
R E
H A
L L
P
7W
M T
B
C G
A
M T
B
P
7W P
-1
1/4" = 1'-0" C2
BLDG 112 - PLUMBING PLAN
KEYED NOTES
1 ROUTE NEW PLUMBING PIPING TO CONNECT TO EXISTING.
VERIFY EXISTING SIZE IS ADEQUATE PER CODE. FIELD
VERIFICATION OF EXISTING PIPING SIZES AND LOCATION
WILL BE REQUIRED.
2 ROUTE NEW PLUMBING PIPING TO CONNECT TO EXISTING.
VERIFY EXISTING SIZE IS ADEQUATE PER CODE. FIELD
VERIFICATION OF EXISTING PIPING SIZES AND LOCATION
WILL BE REQUIRED.
3 EXISTING FLOOR DRAIN AND ASSOCIATED WASTE AND
VENT TO REMAIN. MODIFY PIPING AS NEEDED TO MEET
CODE. IF P-TRAP AT EXISTING FLOOR DRAIN IS NOT
PRIMED, INSTALL NEW TRAP GUARD, TG.
4 ROUTE NEW 3" VENT TO CONNECT TO EXISTING VENT.
VERIFY EXISTING SIZE IS ADEQUATE PER CODE. FIELD
VERIFICATION OF EXISTING VENT PIPING SIZE AND
LOCATION WILL BE REQUIRED. IF A NEW VENT THROUGH
ROOF IS INSTALLED, SEE DETAIL B1/P-501.
5 EXTEND EXISTING HWR PIPE AND CONNECT TO 3/4" HW
LINE SERVING LAVATORIES IN PLUMBING CHASE. PROVIDE
BALANCING COCK IN HWR LINE IN CHASE AND PROVIDE
ACCESS PANEL IN WALL FOR ACCESS TO BALANCING
COCK. FIELD VERIFICATION OF EXISTING HWR PIPING
SIZES AND LOCATION WILL BE REQUIRED.
6 VERIFY IF NEW FLOOR CLEANOUTS ARE REQUIRED FOR
WASTE PIPING SERVING ROOMS 104A, 104B AND 104C. IF
REQUIRED, INSTALL PER DETAIL C1/P-501.
7 INSTALL WALL CLEANOUT AT URINAL AND LAVATORIES
AND AS REQUIRED BY CODE.
8 NEW FLOOR DRAIN, SEE DETAIL C4/P-501 AND INSTALL
WITH TRAP GUARD, TG.
9 WATER HAMMER ARRESTOR IN PLUMBING CHASE, SIZED
FOR NUMBER OF FIXTURES SERVED BY CW LINE. SEE
DETAIL B2/P-501.
A1
PLUMBING ISOMETRIC - WASTE & VENT
A m e ri c a s P k w y N
E S u it e
A lb q u e rq u e N
M
-2 -0
F a x
-2
-4 w w w .w h p a c ifi c .c o m
N
SCALE : 1/4" = 1'-0"
0' 2' 4' 8' 16'
A5
KEY PLANA3
PLUMBING ISOMETRIC - WATER
/0
/2
WYE FITTING
LENGTH TO SUIT
FLOW
EXISTING FINISHED FLOOR
CAULK AS REQUIRED
TOP OF CLEANOUT TO BE FLUSH
WITH FINISHED FLOOR
ADJUSTABLE FLOOR CLEANOUT
WITH INTERNAL BRONZE THREADED
PLUG AND SCORIATED COVER
SECURED TO PLUG WITH
COUNTERSUNK SCREW
BALANCE OF PIPING SAME AS
CLEANOUT TO GRADE
GROUTED PLUG IN WYE
FITTING OR 1/8 BEND IF
CLEANOUT OCCURS AT END
OF LINE
NOTES:
BLOWTHRU: DIMENSION A = GREATER OF 4" OR 1/2"
PLUS AC TOTAL PRESSURE IN INCHES WATER
COLUMN (WC)
DRAIN LINE SHALL BE INSULATED.
ROOF TOP UNIT DRAIN PAN
DRAIN LINE SHALL BE AT LEAST THE SAME
SIZE AS THE NIPPLE ON THE DRAIN PAN
CLEAN
OUT PLUG
DEPTH FOR SEAL,
SEE NOTE 1
SEE FLOOR PLANS
PITCH DOWN
TOWARD DRAIN
CLEAN
OUT PLUG
OPEN TO
ATMOSPHERE
UNION
CL
A
B
DRAWTHRU: DIMENSION B = GREATER OF 2" OR 1/2"
PLUS AC TOTAL PRESSURE IN INCHES WATER
COLUMN (WC)
OR
1.
2.
CLAMP TO 24"x24" 4# LEAD SHEET
AND WATERPROOFING
MEMBRANE (NOT REQUIRED FOR
SINGLE POUR CONSTRUCTION)
COATED CAST IRON FLOOR DRAIN
WITH ADJUSTABLE STRAINER,
DOUBLE DRAINAGE FLANGE AND
WEEP HOLES
EXISTING FINISHED FLOOR
CAULK AS REQUIRED
SUPPORT AT
THIS POINTCONCRETE FLOOR
OF TWO POUR
CONSTRUCTION
DEEP
SEAL "P"
TRAP
STAINLESS
STEEL CLAMP
ROOFING (SEE ARCH
FOR ROOF TYPE)
FASTEN & SEAL FULL
WIDTH OF FLANGE
OFFSET IN
CEILING WHERE
REQUIRED
PIPE SLEEVE
VENT PIPE
ESCUTCHEON
FOR EXPOSED
RISER
24" MIN. FROM ANY
WALL OR VERTICAL
SURFACE
24" MINIMUM
FOR SNOW LOAD
NEOPRENE
PIPE BOOT
SEALANT
UNION
BALL VALVE
HAMMER ARRESTOR
SEE PLAN FOR SIZE
FRAMED STAINLESS STEEL ACCESS
DOOR WITH CYLINDER LOCK AND
"HAMMER ARRESTOR" LABEL
12-32
1-11
FIXTURE UNITSMARK P.D.I. UNITS
WHA1
WHA
B
A
33-60WHA2 C
REMARKS
PROVIDE
ACCESS
DOOR5010
JR SMITH MODEL No.
1. WATER HAMMER ARRESTORS TO BE SIZED BASED ON QUANTITY OF
FIXTURE UNITS SERVED WITHIN A FIXTURE GROUP, AND TO HAVE
THREADED CONNECTION, STAINLESS STEEL 304 CASING AND BELLOWS.
SHEET NUMBER
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
D
A T
E R
E M
A R
K S
IS
S
U E
D A
T E
S U
B M
IT
T
A L
D R
A W
IN
G
S C
A L E
D R
A W
IN
G
F
IL
E N
A M
E P
R O
JE
C
T N
U M
B E
R
M A
N A
G E
M E
N T
R E
V
IS
IO
N
S
A D
D E
N D
U M
S
C
U s e rs
\P u b li c \D o c u m e n ts \H
A S
K E
L L
P
L U
M C
E N
T R
A L c a rn tz e n
.r v t
/5
/2
:2
:4
P
M
A s in d ic at ed
P-501
B L
D G
P
L U
M B
IN
G
D E
T A
IL
S
H A
S K
E L
L
IN
D
IA
N N
A T
IO
N
S U
N
IV
E R
S
IT
Y
B U
IL
D
IN
G
R
O O
M
L
E C
T U
R E
H A
L L
P
7W
M T
B
C G
A
M T
B
P
7W P
-5
C1
FLOOR CLEANOUT DETAIL
C2
CONDENSATE DRAIN DETAIL
C4
FLOOR DRAIN DETAIL
B1
VENT THROUGH ROOF DETAIL
B2
WATER HAMMER ARRESTOR DETAIL
A m e ri c a s P k w y N
E S u it e
A lb q u e rq u e N
M
-2 -0
F a x
-2
-4 w w w .w h p a c ifi c .c o m
/0
/2
FD1
FLOOR DRAIN: ZURN Z-415, 6" ASSEMBLY WITH TYPE B STRAINER,
CAST IRON. PROVIDE WITH TRAP GUARD TG.
TG
TRAP GUARD BY J.R. SMITH MODEL No. 2692. SIZE TO MATCH DRAIN
SIZE. INSTALL PER MFG. REQUIREMENTS.
FCO
FLOOR CLEANOUT: SMITH 4223 CAST IRON BODY WITH GAS AND
WATERTIGHT BRONZE PLUG.
WCO:
WALL CLEANOUT: SMITH 4472 ROUND STAINLESS STEEL COVER
WITH BRONZE PLUG.
WC-WATER CLOSET:
AMERICAN STANDARD AFWALL "MILLENIUM" FLOWISE 1.28 GPF,
FLUSHOMETER TOILET SYSTEM, WALL-HUNG VITREOUS CHINA
WATER CLOSET WITH ELONGATED SIPHON JET ACTION BOWL
AND 1-1/2" TOP SPUD INLET AND MANUAL HIGH EFFICIENCY
FLUSH VALVE, MODEL 2856.128. PROVIDE WITH CHURCH
295CT WHITE OPEN FRONT ELONGATED SEAT LESS COVER,
J.R. SMITH CARRIER: FLOOR SUPPORTED, CONCEALED IN
WALL.
MFG: SMITH, WADE, JOSAM OR ZURN.
SUPPLY: MCGUIRE H166 STOP AND SUPPLY.
MOUNTING HEIGHT: HEIGHT AS INDICATED ON
ARCHITECTURAL DRAWINGS, OR AS SPECIFIED BY THE
ARCHITECT.
SERVICE REQUIREMENTS: 3" WASTE, 1" CW
WC1-WATER CLOSET (ADA COMPLIANT):
AMERICAN STANDARD AFWALL "MILLENIUM" FLOWISE 1.28 GPF,
FLUSHOMETER TOILET SYSTEM, WALL-HUNG VITREOUS CHINA
WATER CLOSET WITH ELONGATED SIPHON JET ACTION BOWL
AND 1-1/2" TOP SPUD INLET AND MANUAL HIGH EFFICIENCY
FLUSH VALVE, MODEL No. 2856.128. PROVIDE WITH CHURCH
295CT WHITE OPEN FRONT ELONGATED SEAT LESS COVER,
J.R. CARRIER: FLOOR SUPPORTED, CONCEALED IN WALL.
MFG: SMITH, WADE, JOSAM OR ZURN.
SUPPLY: MCGUIRE H166 STOP AND SUPPLY.
BARRIER FREE TOILET: MOUNTING HEIGHT: HEIGHT AS
INDICATED ON ARCHITECTURAL DRAWINGS, OR AS SPECIFIED
BY THE ARCHITECT.
SERVICE REQUIREMENTS: 3" WASTE, 1" CW
U1, URINAL (ADA COMPLIANT):
AMERICAN STANDARD WASHBROOK FLOWISE 0.125 GPF
ULTRA HIGH EFFICIENCY URINAL SYSTEM, WALL HUNG,
VITREOUS CHINA, WASHOUT FLUSH ACTION, SENSOR-
OPERATED FLUSHOMETER VALVE AND URINAL SYSTEM,
MODEL No. 6590.525 WITH FACTORY-INSTALLED 6V LITHIUM
BATTERY AND LOW BATTERY INDICATOR.
CARRIER: FLOOR SUPPORTED, CONCEALED IN WALL.
MFG: SMITH, WADE, JOSAM OR ZURN.
MOUNTING HEIGHT: HEIGHT AS INDICATED ON
ARCHITECTURAL DRAWINGS, OR AS SPECIFIED BY THE
ARCHITECT.
SERVICE REQUIREMENTS: 2" WASTE, 3/4" CW
L1, LAVATORY (ADA COMPLIANT):
TYPE: WALL-HUNG, VITREOUS CHINA
MFG: AMERICAN STANDARD MODEL 0356.012 "LUCERNE"
FAUCET: DELTA FAUCET MODEL No. 2529LF-LGHGMHDF WITH
SOLID BRASS BODY, 4" CENTERSET, WITH WRISTBLADE
HANDLES, VANDAL RESISTANT 0.5 GPM SPRAY OUTLET AND
METAL GRID STRAINER.
SUPPLIES: 1/2" COMPRESSION ANGLE BALL VALVE STOPS
WITH 16" BRAIDED STAINLESS STEEL RISERS. CHROME
PLATED.
TAILPIECE: 1-1/4" IN X 1-1/2" OUT, 17 GA, CHROME PLATED,
ADJUSTABLE.
CARRIER: FLOOR SUPPORTED, CONCEALED IN WALL WITH
CONCEALED ARMS.
MFG: SMITH, WADE, JOSAM OR ZURN.
MOUNTING HEIGHT: HEIGHT AS INDICATED ON
ARCHITECTURAL DRAWINGS, OR AS SPECIFIED BY THE
ARCHITECT.
NOTE: HOT WATER SUPPLY LINE AND WASTE SHALL BE
INSULATED WITH TRUEBRO T101W KIT. SEE ARCHITECTURAL
FOR MOUNTING HEIGHT.
SERVICE REQUIREMENTS: 1-1/2" WASTE, 1-1/2" VENT, 1/2" CW
AND 1/2" HW.
MB, MOP BASIN
TYPE: FLOOR MOUNT, MOLDED STONE BY FIAT MODEL No.
TSBC1611, 32"x32"x12" DEEP, WITH STAINLESS STEEL CAP ON
THRESHOLD ONLY. DRAIN BODY IS STAINLESS STEEL CAST
INTEGRALLY AND A WITH A STAINLESS STEEL STRAINER.
PROVIDE WITH No. 832AA HOSE AND HOSE BRACKET, No.
833AA SILICONE SEALANT AND No. MSG STAINLESS STEEL
WALL GUARDS (TWO PANELS).
FAUCET: CHICAGO FAUCET MODEL No. 897-CCP WALL-MOUNT, 8" BODY, ADJUSTABLE ARMS, VANDAL PROOF LEVER
HANDLES, WITH ATMOSPHERIC VACUUM BREAKER SPOUT,
PAIL HOOK AND WALL BRACE.
SERVICE REQUIREMENTS: 3" WASTE, 2" VENT, 1/2" CW AND
1/2" HW.
MARK
WC & WC1
U1
L1 LAVATORY
URINAL, FLUSHVALVE
WATER CLOSET, FLUSHVALVE
DESCRIPTION
MINIMUM INDIVIDUAL CONNECTIONS (IN)
WASTE
VENT
CW HW
2 2 3/4 -
1/21/21-1/21-1/2
REMARKS
FD1 FLOOR DRAIN -2 -1-1/2
MB MOP BASIN 1/21/223
SHEET NUMBER
D E
S
IG
N E
D
D R
A W
N
C H
E C
K E
D
D
A T
E R
E M
A R
K S
IS
S
U E
D A
T E
S U
B M
IT
T
A L
D R
A W
IN
G
S C
A L E
D R
A W
IN
G
F
IL
E N
A M
E P
R O
JE
C
T N
U M
B E
R
M A
N A
G E
M E
N T
R E
V
IS
IO
N
S
A D
D E
N D
U M
S
C
U s e rs
\P u b li c \D o c u m e n ts \H
A S
K E
L L
P
L U
M C
E N
T R
A L c a rn tz e n
.r v t
/5
/2
:2
:4
P
M
2"
'-0
P-601
B L
D G
P
L U
M B
IN
G
S C
H E
D U
L E
S
H A
S K
E L
L
IN
D
IA
N N
A T
IO
N
S U
N
IV
E R
S
IT
Y
B U
IL
D
IN
G
R
O O
M
L
E C
T U
R E
H A
L L
P
7W
M T
B
C G
A
M T
B
P
7W P
-6
WASTE DEVICES
FIXTURE SCHEDULE
PLUMBING FIXTURE PIPE CONNECTION SCHEDULE
A m e ri c a s P k w y N
E S u it e
A lb q u e rq u e N
M
-2 -0
F a x
-2
-4 w w w .w h p a c ifi c .c o m
/0
/2
GENERAL HVAC DUCTWORK NOTES
(APPLICABLE TO ALL DUCTWORK DRAWINGS)
A. PRODUCTS, MANUFACTURERS, AND MODEL NUMBERS FOR
EQUIPMENT INDICATE A BASIS FOR DESIGN AND ARE NOT LIMITED
TO THE PRODUCTS SPECIFIED. SUBSTITUTION OF PRODUCTS MUST
COMPLY OR EXCEED THE REQUIREMENTS DESIGNATED IN THE
SPECIFICATIONS AND DRAWINGS.
B. CONCRETE HOUSEKEEPING PADS AT MECHANICAL EQUIPMENT
SHALL BE A MINIMUM OF 6" THICK AND A MINIMUM OF 6" LARGER
THAN THE MECHANICAL EQUIPMENT.
C. ALL DUCT SIZES SHOWN ON THE DRAWINGS ARE CLEAR INSIDE
DIMENSIONS.
D. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT SIZE, LOCATION,
AND MOUNTING HEIGHT OF ALL LOUVERS.
E. MOUNT ROOM THERMOSTATS AND TEMPERATURE SENSORS
WHERE INDICATED ON PLANS, AT 48 IN. A.F.F. UNLESS NOTED
OTHERWISE.
F. PROVIDE MANUAL BALANCING DAMPERS ON BRANCH DUCT FOR
ALL AIR OUTLETS, INLETS AND DEVICES.
G. PLANS SHOW AIR DEVICES IN COORDINATION WITH REFLECTED
CEILING PLANS. VERIFY CEILING TYPES BEFORE ORDERING AIR
DEVICES.
H. REFER TO REFLECTED CEILING PLANS FOR EXACT LOCATION OF AIR
DEVICES.
I. WHERE CEILING SPACE IS USED AS A RETURN AIR PLENUM AND
WALLS EXTEND TO DECK, PLANS SHOW SIZE OF OPENINGS.
J. USE NO MORE THAN 5 FT OF FLEXIBLE DUCT LENGTHS AT
CONNECTION TO AIR TERMINALS. ALL OTHER DUCTWORK SHALL BE
PER SPECIFICATIONS.
K. SEE DUCT SPECIFICATIONS FOR SPECIFIC AND GENERAL
MATERIALS AND REQUIREMENTS.
L. ALL RECTANGULAR SQUARE ELBOWS SHALL BE PROVIDED WITH
INTERNAL TURNING VANES.
M. VERIFY ACTUAL CONDITIONS ON SITE BEFORE BID.
N. IN HARD CEILINGS AND WALLS, PROVIDE 30"x30" ACCESS PANELS
FOR ALL ISOLATION VALVES, FIRE/SMOKE DAMPERS, BALANCING
DAMPERS, CONTROL DEVICES, AND ALL OTHER DEVICES THAT
REQUIRE MAINTENANCE.
O. ALL MATERIALS ON PLANS ARE NEW, UNLESS INDICATED
OTHERWISE.
P. INSTALL FLEXIBLE DUCT CONNECTIONS BETWEEN DUCTWORK AND
ANY EQUIPMENT CONTAINING A MOTOR (NO EXCEPTIONS).
Q. WITHOUT EXCEPTION, ELIMINATION OF ANY PIPING INSULATION FOR
HANGERS IS NOT ACCEPTABLE. PROVIDE INSERTS, AS SPECIFIED,
FOR THE PLACEMENT OF PIPING SUPPORT. CRUSHING OF
INSULATION IS NOT ACCEPTABLE. SEE SPECIFICATIONS.
R. FOR ALL PIPING LOCATED OUTSIDE BUILDING, PROVIDE ALUMINUM
JACKET OVER WATERPROOFED INSULATION.
S. WHERE CONFLICTS OCCUR BETWEEN THE CONTRACT DRAWINGS,
SPECIFICATIONS, FIELD CONDITIONS AND/OR THE BUILDING CODE,
THE MOST STRINGENT REQUIREMENTS SHALL APPLY, IN THE SOLE
JUDGMENT OF THE ARCHITECT/ENGINEER.
T. DRAWINGS ARE CONSIDERED SCHEMATIC IN NATURE. PROVIDE
REQUIRED FITTINGS AND OFFSETS FOR A COMPLETELY
OPERATIONAL SYSTEM.
U. FIRE/SMOKE DAMPERS SHALL BE 120V WITH DUCT INTEGRAL
SMOKE DETECTORS, WIRED AND MONITORED BY DIV. 26.
V. PROVIDE INSULATED BASE OF THERMOSTATS LOCATED ON
EXT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .