Attachments.pdf
PDF 1 MB Posted
- Attached to
- Site Remdiation Federal contract opportunity
- Solicitation number
- A15PS00180
About this file
Attachments
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_A15PS00180_Amd_000001.pdf | ||
| Sections_B_-_M.rtf | RTF text file | |
| Sol_A15PS00180.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1
Figures
Approximate Site Location
Sources: Esri, DeLorme, NAVTEQ, TomTom, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), and the GIS User Community
Site Location
Figure 1 Irrigation Operation and Maintenance Facility
Bureau of Indian Affairs Poston, Arizona
Site Location Map
DATUM:
WGS84
PROJECTION:
Mercator (A/S)
DATE 07/31/13
DWN. N.A.P.
SCALE 1" = 1 mi
APPRVD. S.R.
SHEET
of
Phone (907)563-0013 Fax (907)563-6713 µ 0 0.5 1
Miles Project No.:
34140023Do cu me nt Pa th : G
:\J ob s\3
3_
BI
A_
CR
IT
\M
AP
S\
FI
GU
RE
-1
.m xd
!A
!A
!A
!A
!A !AAir S parge M anifold
S B-1
S B-3S B-4
S B-7 S B-6
S B-5S B-2
Source: Esri, i-cubed, USDA, USGS, AEX, GeoEye, Getmapping, Aerogrid, IGN, IGP, and the GIS User Community
!A S oil Boring Approximate Extent of S oil Contamination Exceeding RS Ls µ
Figure 2 Irrigation Operation and M aintenance Facility
Bureau of Indian Affairs Poston, Arizona
Select Soil Analytical Results
DAT U M :
WGS 84
PROJECT ION:
M ercator (A/S )
DAT E 07/31/13
DWN. N.A.P.
S CALE 1" = 50'
APPRVD. S .R.
S HEET
of
Phone (907)563-0013 Fax (907)563-6713 Project No.:
34140023Do cu me nt Pa th : G
:\J ob s\3
3_
BI
A_
CR
IT
\M
AP
S\
RP
-F igu re
2v 1.
m xd
0 50
Feet
AOC
Legend
Overlay Sources:
M ACTEC, Figure 2-2, 10/2010 Ninyo & M oore, Figure 3, 12/2010
Notes:
Dashed lines indicated underground piping.
Bolded non-detects have RLs that exceed RS L.
All depths in feet bgs.
Benzene and Ethylbenzene results in µ g/kg.
TPHG results in mg/kg.
† = indicates field duplicate µ g/kg = micrograms per kilogram mg/kg = milligrams per kilogram bgs = below the ground surface ND = not detected above RL in parentheses NE = not established RL = reporting limit RS L = regional screening level TPHG = total petroleum hydrocarbons as gasoline
DEPT H T PHG BENZ ENE ET HY LBENZ ENE
10 52 ND (79) 360
12 790 ND (66) 450
14 700 ND (74) ND (150)
DEPT H T PHG BENZ ENE ET HY LBENZ ENE
12 ND (28) ND (8,400) ND (17,000)
14 9,700 ND (54) ND (110)
14† 7,200 1,200 19,000
DEPT H T PHG BENZ ENE ET HY LBENZ ENE
12.5 170 ND (54) ND (110)
14 5,200 130,000 600,000
DEPT H T PHG BENZ ENE ET HY LBENZ ENE
12 ND (24) ND (63) ND (130)
14 5,500 ND (55) ND (110)
DEPT H T PHG BENZ ENE ET HY LBENZ ENE
12 160 ND (65) ND (130)
12† 44 ND (63) 390
14 9,000 ND (2,700) 41,000
DEPT H T PHG BENZ ENE ET HY LBENZ ENE
12 2,100 200 4,900 14 7,700 1,100 36,000
DEPT H T PHG BENZ ENE ET HY LBENZ ENE
12 ND (24) ND (64) ND (130)
14 2,500 ND (54) 400
ANALY T E RS L
T PHG NE
BENZ ENE 1,100
ET HY LBENZ ENE 5,400
Source: Esri, i-cubed, USDA, USGS, AEX, GeoEye, Getmapping, Aerogrid, IGN, IGP, and the GIS User Community
Approxim ate Extent of Groundwa ter Contam ina tion Exceeding MCL s µ Figure 3
Irrigation Operation and Maintenance Facility Bureau of Indian Affairs
Poston, Arizona Select Groundwater Analytical Results, September 2013
DAT U M:
WGS84
PROJECT ION :
Merca tor (A/S)
DAT E 07/31/13
DWN . N .A.P.
SCAL E 1" = 50'
APPRV D. S.R.
SHEET
of
Phone (907)563-0013 Fax (907)563-6713 Project N o.:
34140023Do cu me nt Pa th : G
:\J ob s\3
3_
BI
A_
CR
IT
\M
AP
S\
RP
-F igu re
3v 1.
m xd
0 50
Feet
AOC
Legend
Overlay Source:
MACT EC, Figure 2-2, 10/2010
SAMPL E BEN Z EN E T PHG
MW-4 11 2.7
SAMPL E BEN Z EN E T PHG
MW-11 2,000 14
SAMPL E BEN Z EN E T PHG
MW-23 69 0.76
SAMPLE BEN Z EN E T PHG
MW-24 48 0.61
MW-30† 29 0.62
AN AL YT E MCL
BEN Z EN E 5
T PHG N E
Notes:
Bolded results exceed MCL s All benzene results in µg/L All T PHG results in m g/L † = indicates field duplicate µg/L = m icrogram s per liter m g/L = m illigram s per liter MCL = m axim um contam inant level N E = not established T PHG = total petroleum hydrocarbons as gasoline
S B
S B
S B
1.5
D e p t h i n
F e e t
Distance in Feet
0 10
4.5
7.5
10.5
20 30 40 50 60
ND (28)
ND (8,400)
A A'
13.5
70 80 90 100 110 120
2,100
ND (54)
9,700
1,200
7,700
1.100
5,200
130,000
D r a w i n g
O
J O
B S
B I A
C R I T A C A D
E N
V I R O
D
W G
S F I G
U R E R P A P P D
W G
L a y o u t
X
U s e r
N
P E A C O
C K
S e p p m
X r e f s
I m a g e s
C R O
S S S E C T I O
N T I F F
Legend
10 200
Horizontal Scale: Feet
PROJECTION:
DATUM:
APPRVD.
DWN.
SCALE
DATE
SHOWN
JSR
02/05/2014
NAP
FIGURE 4
Irrigation Operation and Maintenance Facility
Bureau of Indian Affairs
Poston, Arizona
Cross Section A-A'
NA
Phone (907) 563-0013 Fax (907) 563-6713
ENVIRONMENTAL
REMEDIATION SERVICES, LLC
NA
PROJECT NO.
34140023
1.5 30
Vertical Scale: Feet
Silt
Sand
Sandy Silt
BOH
Soil Sample
TPHG
Benzene
Boring Diagram
W a t e
T a b l e
Extent of Soil
Contamination
Notes:
TPHG soil results in milligrams per kilogram.
Benzene soil results in micrograms per kilogram.
ND = not detected above RL in parentheses
RL = reporting limit
S B
M W
S B
S B
1.5
D e p t h i n
F e e t
Distance in Feet
0 10
4.5
7.5
10.5
20 30 40 50 60 70 80
ND (24)
ND (65)
2,500
ND (54)
2,100
7,700
1,100
ND (79)
ND (66)
ND (74)
B B'
13.5
D r a w i n g
O
J O
B S
B I A
C R I T A C A D
E N
V I R O
D
W G
S F I G
U R E R P A P P D a y o u t
X
U s e r
N
P E A C O
C K
S e p e f m a g e s
C R O
S S S E C T I O
N T I F F
Legend
10 200
Horizontal Scale: Feet
PROJECTION:
DATUM:
APPRVD.
DWN.
SCALE
DATE
SHOWN
JSR
02/05/2014
NAP
FIGURE 5
Irrigation Operation and Maintenance Facility
Bureau of Indian Affairs
Poston, Arizona
Cross Section B-B'
NA
PROJECT NO.
34140023
1.5 30
Vertical Scale: Feet Silty Sand
Sandy Gravel
Silt
Silty Clay
Sand
Sandy Silt
BOH
Soil Sample
TPHG
Benzene
Boring Diagram
W a t e
T a b l e
Extent of Soil
Contamination
Notes:
TPHG soil results in milligrams per kilogram.
Benzene soil results in micrograms per kilogram.
ND = not detected above RL in parentheses
RL = reporting limit
!A
!A !A
!A !A
B B'
A
A'
SB-3SB-4
SB-7 SB-6
SB-5
SB-1
SB-2
!A Soil Boring Location Cross Section A-A'
Cross Section B-B' µ Figure 6
Irrigation Operation and Maintenance Facility Bureau of Indian Affairs
Poston, Arizona Site Map
DATUM:
WGS84
PROJECTION:
Mercator (A/S)
DATE 07/31/13
DWN. N.A.P.
SCALE 1" = 125'
APPRVD. S.R.
SHEET
of
Phone (907)563-0013 Fax (907)563-6713 Project No.:
34140023Do cu me nt Pa th : G
:\J ob s\3
3_
BI
A_
CR
IT
\M
AP
S\
FI
GU
RE
-6
-R P-
AP
P.m xd
0 125
Feet
AOC
Legend
Source:
MACTEC, Figure 2-2, 10/2010
ATTACHMENT 2
AS/SVE Design
INSTALLATION
Contractor will be required to supply/perform the following:
• Soil vapor extraction blower mechanical and control equipment and housing unit for year round operation.
• Blower capable of delivering 500 scfm at 60 inches of water vacuum.
• Thermal/catalytic oxidizer system for treatment of collected vapors from the SVE system.
• Ancillary equipment associated with operation of SVE blower system. This includes flowmeters, temperature gauges, vacuum gauges, valves, vacuum relief valve, water knockout, etc.
• SVE system interconnected to the AS system such that the AS system will automatically shut down if the SVE system stops operating. SVE system will automatically shut down in the case of high liquid level in the knockout tank, excessive vacuum, excessive blower temperature.
• Connection from the existing SVE manifold to the blower.
• Connection to the local electric power company. Three-phase power is available on site.
• Installation of 15 air sparge wells. Figure 1 presents the locations of the new air sparge wells as well as proposed lateral airline locations. Figure 2 presents the air sparge wellhead detail.
• Air sparging compressor capable of delivering 300 scfm of air at 30 psi. Air sparge system will have an after cooler and appropriate flowmeters, pressure gauges, and temperature gauges.
• AS system will automatically shut down in the case of excessive pressure, excessive blower temperature.
• The AS/SVE system will have a telemetry system that at a minimum will notify the operator if the system has shutdown.
• Air sparge manifold will be 1-inch diameter steel piping and will contain 16 legs.
Each leg will supply an individual air sparge well. Each leg will contain a control valve to regulate flow to the air sparge well, a pressure gauge, and a flowmeter.
The flowmeter must be capable of measuring a flowrate of between 0 and 20 scfm.
• Air sparge lateral piping will be buried 12-inches below grade.
• Disposal of all waste.
SYSTEM OPERATIONS AND MAINTENANCE
12 months of AS/SVE system monitoring.
Monthly monitoring of SVE and off-gas treatment system.
!A
!A
!A
!A !A
AU
AU
AU
AU
AU
AU
AU
AU
AU
AU
AU
AU
AU
AU
AU
AS-01
SB-3SB-4
SB-7
SB-6
SB-5
Shop #636
Fuel Island
Office Trailer Office Trailer
Conc. Slab
O & M Building #635
Conex
Co nc
. W alk
Ta nk
C on ta in
Wa ll
Ta nk
C on ta in
Wa ll
Canopy Covered Concrete Slab
Co nc
. W alk
Contain Wall
SB-1
SB-2
MW-14
MW-10
MW-27
MW-13
AS-03
MW-30
MW-04 AS-04
MW-24
MW-23
MW-06MW-25
MW-05
MW-26
MW-11
AS-02
MW-29
MW-28
Source: Esri, i-cubed, USDA, USGS, AEX, GeoEye, Getmapping, Aerogrid, IGN, IGP, and the GIS User Community
> Existing Air Sparge Well Location
> New Air Sparge Well
AU Monitoring Well
!A Soil Boring
# Valve Box Pressure Indicator
Fence Overhead Power Line SVE Pipe 'A' SVE Pipe 'B' SVE Pipe 'C' SVE Pipe 'D'
SVE Pipe 'E North' SVE Pipe 'E South' SVE Pipe 'F' SVE Horizontal Well 4" Blank Piping SVE Horizontal Well 4" - 0.010-inch Slotted Piping
Approximate Extent of Soil Contamination Exceeding RSLs SVE Manifold µ
Figure 1 Irrigation Operation and Maintenance Facility
Bureau of Indian Affairs Poston, Arizona
Air Sparge Well Locations
DATUM:
WGS84
PROJECTION:
Mercator (A/S)
DATE 07/31/13
DWN. N.A.P.
SCALE 1" = 50'
APPRVD. S.R.
SHEET
of
Phone (907)563-0013 Fax (907)563-6713 Project No.:
34140023Do cu me nt Pa th : G
:\J ob s\3
3_
BI
A_
CR
IT
\M
AP
S\
RP
-F igu re
1v 1.
m xd
0 15 30
Feet
Legend
Overlay Sources:
MACTEC, Figure 2-2, 10/2010 Ninyo & Moore, Figure 3, 12/2010
Notes:
SVE Piping Screened Where Dashed
18" Traffic Rated Iron Well Cover
Cement Slurry Mix
0' BGS
1'
As Required
Concrete
D r a w i n g
O
J O
B S
B I A
C R I T A C A D
E N
V I R O
D
W G
S R P F I G
U R E W
D a y o u t
L A Y O
U T
U s e r
N
P E A C O
C K
J u l e f m a g e s
PROJECTION:
DATUM:
APPRVD.
DWN.
SCALE
DATE
1/4" = 1"
BA
07/23/14
NAP
FIGURE 2
IRRIGATION OPERATION AND MAINTENANCE FACILITY
BUREAU OF INDIAN AFFAIRS
POSTON, ARIZONA
AIR SPARGE WELL-HEAD
NA
PROJECT NO.
34140023
Keyed Notes:
1. Plug, 2" PVC SCH. 40 (T)
2. Tee, 2" PVC SCH 40 (SXSXT)
3. Air Sparge Well, 2" PVC SCH 40
4. 2" x 3/4" PVC SCH 40 Bushing (SXT)
5. 3/4" Hose Barb
6. Hose Clamp
7. Flexible Air Hose
8. 3/4" x 3/4" Male Adapter
9. 3/4" Duratec Air-Line
ATTACHMENT 3
Project Work Plan Outline
• Introduction
• Background
• Prior Contamination
• Current Contamination
• Project Work Plan Objectives
• Project Team, Organization, Responsibilities, and Subcontractors
• Logistics, Sequencing and Coordination
• Regulatory Requirements / RSLs
• Sampling and Analytical Methods
• AS/SVE Design and Installation
• AS/SVE Operations and Maintenance
• AS/SVE Performance Standards
• Groundwater Monitoring Program
• Monitoring Well Abandonment/Installation
• Project Reporting
• Project Completion Schedule
• Attachments
• HASP
• Optional Services
ATTACHMENT 4
Remedial Progress Report Outline
• Introduction
• Background
• Prior Contamination
• Project Team, Organization, Responsibilities, and Subcontractors
• Regulatory Requirements / RSLs
• Groundwater Monitoring
• Sampling and Analytical Methods
• AS/SVE Operations and Maintenance
• Discussion of Results
• Current Contamination
• Conclusions and Recommendations
• Attachments
ATTACHMENT 5
AS-SVE System Operation Schedule
ID Task Name Duration Start Finish
1 AS‐SVE System Operation 640 days Mon 6/1/15 Thu 3/2/17 2 Contract Award/NTP 1 day Mon 6/1/15 Tue 6/2/15 3 Task 1 Project Planning 89 days Tue 6/2/15 Sun 8/30/15 4 Initial Site Visit 1 day Fri 6/12/15 Sat 6/13/15 5 Draft Work Plan 45 days Tue 6/2/15 Fri 7/17/15 6 Draft Work Plan Review 30 days Fri 7/17/15 Sun 8/16/15 7 Final Work Plan 14 days Sun 8/16/15 Sun 8/30/15 8 Task 2 Air Sparge Well Installation 14 days Sun 8/30/15 Sun 9/13/15 9 Air Sparge Well Installation 14 days Sun 8/30/15 Sun 9/13/15 10 Task 3 SVE System Maintenance 372 days Sun 9/13/15 Mon 9/19/16 11 Soil Vapor Extraction System Installatio 14 days Sun 9/13/15 Sun 9/27/15 12 SVE System Operation 365 days Sun 9/20/15 Mon 9/19/16 13 Task 4 Air Sparge System Installation and
Maintenance 372 days Sun 9/13/15 Mon 9/19/16
14 Air Sparge System Installation 7 days Sun 9/13/15 Sun 9/20/15 15 Air Sparge System Operation 365 days Sun 9/20/15 Mon 9/19/16 16 Task 5 Groundwater Monitoring 455 days Sun 9/20/15 Sun 12/18/16 17 1st Quarter Groundwater Monitoring 90 days Sun 9/20/15 Sat 12/19/15 18 2nd Quarter Groundwater Monitoring 90 days Sat 12/19/15 Fri 3/18/16 19 3rd Quarter Groundwater Monitoring 90 days Fri 3/18/16 Thu 6/16/16 20 4th Quarter Groundwater Monitoring 90 days Thu 6/16/16 Wed 9/14/16 21 5th Quarter Groundwater Monitoring 90 days Mon 9/19/16 Sun 12/18/16 22 Task 6 Monitoring Well Abandonment 1 day Tue 6/2/15 Wed 6/3/15 23 Monitoring Well Abandonment (to be determined) 1 day Tue 6/2/15 Wed 6/3/15
24 Task 7 Remedial Progress Reporting 639 days Tue 6/2/15 Thu 3/2/17 25 Task 7a Monthly Progress Report 595 days Tue 6/2/15 Tue 1/17/17 26 Month 1 Progress Report 30 days Tue 6/2/15 Thu 7/2/15 27 Month 2 Progress Report 30 days Thu 7/2/15 Sat 8/1/15 28 Month 3 Progress Report 30 days Sat 8/1/15 Mon 8/31/15 29 Month 4 Progress Report 30 days Mon 8/31/15 Wed 9/30/15 30 Month 5 Progress Report 30 days Wed 9/30/15 Fri 10/30/15 31 Month 6 Progress Report 30 days Fri 10/30/15 Sun 11/29/15 32 Month 7 Progress Report 30 days Sun 11/29/15 Tue 12/29/15 33 Month 8 Progress Report 30 days Tue 12/29/15 Thu 1/28/16 34 Month 9 Progress Report 30 days Thu 1/28/16 Sat 2/27/16 35 Month 10 Progress Report 30 days Sat 2/27/16 Mon 3/28/16 36 Month 11 Progress Report 30 days Mon 3/28/16 Wed 4/27/16 37 Month 12 Progress Report 30 days Wed 4/27/16 Fri 5/27/16 38 Month 13 Progress Report 30 days Fri 5/27/16 Sun 6/26/16 39 Month 14 Progress Report 30 days Sun 6/26/16 Tue 7/26/16 40 Month 15 Progress Report 30 days Tue 7/26/16 Thu 8/25/16 41 Month 16 Progress Report 30 days Thu 8/25/16 Sat 9/24/16 42 Month 17 Progress Report 30 days Sat 9/24/16 Mon 10/24/16 43 Month 18 Progress Report 30 days Sun 12/18/16 Tue 1/17/17 44 Task 7b Remedial Progress Report 74 days Sun 12/18/16 Thu 3/2/17 45 Draft Remedial Progress Report 30 days Sun 12/18/16 Tue 1/17/17 46 Draft Remedial Progress Report Revi 30 days Tue 1/17/17 Thu 2/16/17 47 Final Remedial Progress Report 14 days Thu 2/16/17 Thu 3/2/17 48 Task 8 (Optional Monitoring Well
Installation 1 day Tue 6/2/15 Wed 6/3/15
49 Monitoring Well Installation (to be determined)
1 day Tue 6/2/15 Wed 6/3/15
B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B June July August September October November December January February March April
Task
Split
Milestone
Summary
Project Summary
External Tasks
External Milestone
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration‐only
Manual Summary Rollup
Manual Summary
Start‐only
Finish‐only
Deadline
Progress
Project: Project1 Date: Mon 9/22/14
ID Task Name Duration Start
1 AS‐SVE System Operation 640 days Mon 6/1/15 2 Contract Award/NTP 1 day Mon 6/1/15 3 Task 1 Project Planning 89 days Tue 6/2/15 4 Initial Site Visit 1 day Fri 6/12/15 5 Draft Work Plan 45 days Tue 6/2/15 6 Draft Work Plan Review 30 days Fri 7/17/15 7 Final Work Plan 14 days Sun 8/16/15 8 Task 2 Air Sparge Well Installation 14 days Sun 8/30/15 9 Air Sparge Well Installation 14 days Sun 8/30/15 10 Task 3 SVE System Maintenance 372 days Sun 9/13/15 11 Soil Vapor Extraction System Installatio 14 days Sun 9/13/15 12 SVE System Operation 365 days Sun 9/20/15 13 Task 4 Air Sparge System Installation and
Maintenance 372 days Sun 9/13/15
14 Air Sparge System Installation 7 days Sun 9/13/15 15 Air Sparge System Operation 365 days Sun 9/20/15 16 Task 5 Groundwater Monitoring 455 days Sun 9/20/15 17 1st Quarter Groundwater Monitoring 90 days Sun 9/20/15 18 2nd Quarter Groundwater Monitoring 90 days Sat 12/19/15 19 3rd Quarter Groundwater Monitoring 90 days Fri 3/18/16 20 4th Quarter Groundwater Monitoring 90 days Thu 6/16/16 21 5th Quarter Groundwater Monitoring 90 days Mon 9/19/16 22 Task 6 Monitoring Well Abandonment 1 day Tue 6/2/15 23 Monitoring Well Abandonment (to be determined) 1 day Tue 6/2/15
24 Task 7 Remedial Progress Reporting 639 days Tue 6/2/15 25 Task 7a Monthly Progress Report 595 days Tue 6/2/15 26 Month 1 Progress Report 30 days Tue 6/2/15 27 Month 2 Progress Report 30 days Thu 7/2/15 28 Month 3 Progress Report 30 days Sat 8/1/15 29 Month 4 Progress Report 30 days Mon 8/31/15 30 Month 5 Progress Report 30 days Wed 9/30/15 31 Month 6 Progress Report 30 days Fri 10/30/15 32 Month 7 Progress Report 30 days Sun 11/29/15 33 Month 8 Progress Report 30 days Tue 12/29/15 34 Month 9 Progress Report 30 days Thu 1/28/16 35 Month 10 Progress Report 30 days Sat 2/27/16 36 Month 11 Progress Report 30 days Mon 3/28/16 37 Month 12 Progress Report 30 days Wed 4/27/16 38 Month 13 Progress Report 30 days Fri 5/27/16 39 Month 14 Progress Report 30 days Sun 6/26/16 40 Month 15 Progress Report 30 days Tue 7/26/16 41 Month 16 Progress Report 30 days Thu 8/25/16 42 Month 17 Progress Report 30 days Sat 9/24/16 43 Month 18 Progress Report 30 days Sun 12/18/16 44 Task 7b Remedial Progress Report 74 days Sun 12/18/16 45 Draft Remedial Progress Report 30 days Sun 12/18/16 46 Draft Remedial Progress Report Revi 30 days Tue 1/17/17 47 Final Remedial Progress Report 14 days Thu 2/16/17 48 Task 8 (Optional Monitoring Well
Installation 1 day Tue 6/2/15
49 Monitoring Well Installation (to be determined)
1 day Tue 6/2/15
M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B M E B May June July August September October November December January February March
Task
Split
Milestone
Summary
Project Summary
External Tasks
External Milestone
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration‐only
Manual Summary Rollup
Manual Summary
Start‐only
Finish‐only
Deadline
Progress
Project: Project1 Date: Mon 9/22/14
File details come from the government source that posted it. Updated .