A1_Attachment B_Contractor Performance Requirements.pdf
PDF 50 KB Posted
- Attached to
- Vertical Knee Milling Machines Federal contract opportunity
- Solicitation number
- M6700120Q1077
- Issued by
- United States Marine Corps
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| D_SF1449_M6700120Q1077.pdf | ||
| A1_Attachment A_FRC East Drawing PE-21893.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT PERFORMANCE REQUIREMENTS
1.0 Safety, Environmental, Quality, Security Requirements. All personnel who enter or work in assigned spaces of FRC East facility are required to comply with all federal, state, local, and site specific safety, environmental, quality and security requirements. FRC East has adopted and implemented additional safety programs to improve safety, quality, environmental, and security measures. Any individual found to not comply with this effort will be asked to immediately halt work. Supervisors, managers, and employees are to report issues of non-conformance through the proper chain of command. Any individual or entity not willing to comply will state such and shall not be authorized to enter the facility. FRC East may take actions that result in removal of individuals or entities from this facility due to issues of non-compliance with stated instructions.
1.1 Documented proof of all required certification training/licensing listed in the contract shall be available upon request by their Contracting Officer Representative or any auditor.
1.2 All personnel working on site at the FRC East under this contract shall document their receipt and review of the information listed in FRCEASTINST 5000.1B, Enclosure1, annually.
1.3 All contractors performing work on FRC East behalf and who have 10 employees at any time during the past calendar year, whose employees worked 1,000 or more hours in any quarter shall furnish FRC East their Total Case Incidence Rate for recordable nonfatal injuries and illnesses and their Days Away from Restricted work activity, and/or Job Transfer Rate for the past three years.
1.4 Foreign Object (FO) is defined as any article or substance alien to the aircraft or assembly which is allowed to invade the product. Foreign object damage (FOD) is the damage that occurs due to these FOs. All FRC East work sites shall be maintained in such a manner as to prevent FOD to aircraft and/or aircraft components. Work sites shall be kept clean at all times. All debris, scrap material, tools, and equipment will be cleared from the work site as work progresses. At no time shall hoses, power cords, materials, etc. be permitted to create tripping hazards in areas of the work site.
1.5 In those cases, where a contractor supervisor determines that solving a safety or health problem is beyond their control, but within the control of the FRC East, the contractor shall notify the appropriate point of contact identified in the contract.
1.6 All contractor employees performing work on site at FRC East shall immediately report any safety, security, or environmental violation to their contractor supervisor, as well as the cognizant FRC East Safety/Security/Environmental Office provided in FRCEASTINST 5000.1B, Enclosure 1. The initial FRC East notification can be made via phone or e-mail and should include as many applicable details as possible (date, time, identification numbers, tags, company, etc.). This initial notification shall be made as soon as possible. A safety incident will require the contractor to complete and submit an incident memo to the appropriate point of contact identified in the contract, with a copy to FRC East Safety Office within twenty-four hours of accident/incident). This incident memo will include the full name of the person involved in the incident, age, sex, job title, the name of the employing company and the contract number and title. In addition, this memo will include the severity of the illness or injury, indirect cause(s) or the accident and whether personal protective equipment was available and used.
1.7 All contractors and sub-contractors working within FRC East shall develop and operate effective safety and health programs. (CSS contracts only).
1.8 Contractors are required to wear personal protective equipment (PPE) consisting of hearing protection, eye protection, and safety shoes. PPE will not be provided by the facility. Contractor representatives without the appropriate PPE will not be allowed access to the facility.
1.9 Tools and hardware shall be controlled at all times to prevent migration out of the work site. Lost tools shall be reported to the tool control manager at 464-9741. Tools found unattended will be confiscated and reported to the contracting officer.
1.10 All pipe systems at Fleet Readiness Center (FRC) East shall be labeled per the American Society of Mechanical Engineers (ASME) A13.1, Scheme for the Identification of Piping Systems. Prior to construction, the contractor shall contact the FRC East Hazardous Program Manager for piping systems containing industrial waste and modifications to existing pipe systems. Surfaces exhibiting deteriorated paint or deteriorated insulation and surfaces exhibiting rust/corrosion should be properly repaired prior to placement of labels. Abandoned piping shall be labeled "Not in Use". The contractor shall contact FRC East Hazardous Material Program Manager at 464-8051 for any deviation from ASME
13.1 prior to construction and inspection of labeling by FRC East Hazardous Material Program Manager. This inspection is required prior to Government acceptance.
1.11 If work performed concerns installation of pipe, conduit, cables, or any wiring on or in the vicinity of any shop cranes, inside or around the building of FRC East, prior approval must be granted by either the Weight Handling Certifying Official or Chief Crane Engineer. To have permission granted, call the FRC East Maintenance Call desk at 252- 464-7654 and provide the required information for a work request submittal for the weight handling team.
1.12 Gasoline is prohibited for any purpose other than fueling motor vehicles. All gasoline-powered vehicles/equipment are prohibited inside the FRC East buildings. In addition, diesel or propane-powered equipment or vehicles used inside FRC East buildings shall have an approved Exposure Control Plan in place before work can begin. Approval of this Exposure Control Plan shall be accomplished through the contractors Accident Prevention Plan, reviewed by FRC East Industrial Hygiene, 464-7037.
1.13 Work causing airborne hazards shall be controlled as directed by EM 385-1-1, section 06.A.04b.
1.14 The contractor is responsible for collection, storage, and disposal of all hazardous waste generated. Additionally all hazardous waste shipped off site, requires a Hazardous Waste Manifest. This manifest must be signed by The Marine Corps Air Station Cherry Point's Environmental Affairs Department. The Marine Corps Air Station Cherry Point's Environmental Affairs Department's phone number is 466-3631. Contractor's requiring additional information regarding the proper collection, storage and disposal of hazardous waste can contact the FRC East Industrial Environmental Division (Code 6.3.5) at 464- 8042 or 464-8412.
1.15 Accident Prevention Clause.
1.15.1 The Contractor shall provide and maintain work environments and procedures which will (1) safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities;
(2) avoid interruptions of Government operations and delays in project completion dates; and (3) control costs in the performance of this contract.
1.15.2 For these purposes on contracts for construction or dismantling, demolition, or removal of improvements, the Contractor shall (1) Provide appropriate safety barricades, signs, and signal lights; (2) Comply with the standards issued by the Secretary of Labor at 29 CFR part 1926 and 29 CFR part 1910; and (3) Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for the purposes are taken.
1.15.3 If this contract is for construction or dismantling, demolition or removal of improvements with any Department of Defense agency or component, the Contractor shall comply with all pertinent provisions of the latest version of U.S.
Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in effect on the date of the solicitation.
1.15.4 Whenever the Contracting Officer becomes aware of any noncompliance with these requirements or any condition which poses a serious or imminent danger to the health or safety of the public or Government personnel, the Contracting Officer shall notify the Contractor orally, with written confirmation, and request immediate initiation of corrective action. This notice, when delivered to the Contractor or the Contractor’s representative at the work site, shall be deemed sufficient notice of the noncompliance and that corrective action is required. After receiving the notice, the Contractor shall immediately take corrective action. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause. (e) The Contractor shall insert this clause, including this paragraph (e), with appropriate changes in the designation of the parties, in subcontracts.
1.16 The contractor is to implement EM 385-1-1, provide an Accident Prevention Plan, and develop an Activity Hazard Analysis for each phase of work at least fifteen days prior to the scheduled pre- construction meeting. Additionally, as directed by EM 385-1-1, all contractors requiring Lock-out/Tag-out processes and entering a confined space are required to submit their Lock-out/Tag-out Program and Confined Space Program to the FRC East Program Managers for review. The FRC East Program managers will also share any required information of FRC East like programs as required. Contact numbers for these items is included on FRCEASTINST 5000.lB, enclosure (1).
1.17 Work areas utilized by contractors shall be provided an FRC East 5000/10, "Contract Work Notice," by their project manager. This work notice requires the contractor to notify a point of contact in the shop where they will be accomplishing work and document this notification on the appropriate portion of this notice. Once completed, notice shall be posted conspicuously in the area prior to performance of work. A copy of this notice will be available by the contractor upon request at all times. Contract Project Managers will address any issues regarding completion or duplication of this form.