A06_Specifications.pdf

PDF 329 KB Posted

Attached to
CURRY COULEE & PASTURE 4 PIPELINES Federal contract opportunity
Solicitation number
140L3421Q0025
Issued by
Department of the Interior Bureau of Land Management Montana-Dakotas

View the file

Other files for this federal contract opportunity

Other files attached to CURRY COULEE & PASTURE 4 PIPELINES, newest first.
File Type Posted
Sol_140L3421Q0025_Amd_0001.pdf PDF
QUESTION_AND_ANSWER_DOC_0001.docx DOCX document
A06_Schedule_of_Items.pdf PDF
Past_Performance_Questionnaire.doc DOC document
A06_Maps_and_Drawings.pdf PDF
Sol_140L3421Q0025.pdf PDF
B03_Davis_Bacon_Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Specifications for

CURRY COULEE & PASTURE 4 PIPELINES

BUREAU OF LAND MANAGEMENT

111 Garryowen Road

Miles City, Montana 59301

JULY 2021

PROJECT SPECIFICATIONS

TABLE OF CONTENTS

Specification Page No

TABLE OF CONTENTS

DIVISION 1 - GENERAL REQUIREMENTS

01009 General Information and Requirements ..............................................01009(1-5)

01019 Government Furnished Property .........................................................01019(1-2)

01505 Mobilization ........................................................................................01505(1-2)

DIVISION 2 - SITE WORK

02229 Trenching, Plowing, Backfilling, and Compacting ............................02229(1-3)

02665 Water Systems ....................................................................................02665(1-9)

Work Data Sheet .................................................................................................. WDS-1

GENERAL INFORMATION AND REQUIREMENTS

CURRY COULEE & PASTURE 4 PIPELINES 01009-1

SECTION 01009

PART 1: GENERAL

1.1 SUMMARY:

A. Description of Work: Furnishing labor, equipment, supplies, and materials, to construct two livestock pipelines. Work shall be based on the construction requirements for all scheduled items listed. *Note: The pipeline shall be ripped (pulled) to a 5 ft. depth. All pipeline appurtenances to be installed to 6 ft. frost free depth. (hydrants, valves, etc.)

B. Location: Work under this contract is located in Prairie County and Garfield County, Montana. The work locations are shown on the drawings.

C. Work Data Sheet: Designates the type, quantity and order of work required at each project location, and dimensions required for typical drawings.

1.2 REFERENCES:

A. Referenced Specifications/Standards with Abbreviations and/or Acronyms: Wherever the following acronyms are used in these specifications or on the drawings, they are to be construed the same as the respective expressions represented. Copies of the referenced specifications/standards referred to herein may be procured by the Contractor, from the following:

ASTM American Society for Testing and Materials

100 Barr Harbor Drive

West Conshohocken, PA 19428

AWPA American Wood Preservers' Association

P.O. Box 361784

Birmingham, AL 35236

NSF National Sanitation Foundation

P.O. Box 130140

789 N. Dixboro Road

Ann Arbor, MI 48105

NEC National Electric Code

National Fire Protection Association

1 Batterymarch Park

Quincy, MA 02169

OSHA Occupational Safety & Health Admin.

1244 Speer Blvd.

CURRY COULEE & PASTURE 4 PIPELINES 01009-2

Suite 551

Denver, Co. 80204

1.3 DEFINITIONS:

A. Approvals: Approval of the submittals is an indication that the Contractor's submittals have been reviewed and that there are no objections, except as noted. Approval of deviations shall apply only to those deviations or omissions from the requirements of the drawings and specifications brought to the Contracting Officer's attention in writing. After approval of an item, the Contractor may submit a substitute for approval when the approved item cannot be purchased or delivered in time to avoid delay in completion of the project.

1.4 SUBMITTALS:

A. Scope: Submittals include manufacturers' literature, samples, and maintenance manuals.

B. Requirements: Refer to specifications for submittals required. Allow at least 7 working days for review. Submittals shall be delivered to Contracting Officer at the Pre-work

Conference.

C. Identification of Submittals: Completely identify each submittal by showing at least the following information:

1. Name and address of submitter, plus name and telephone number of the individual to contact for further information.

2. Name of project as it appears in these specifications.

3. Contract number, drawing number, and specification section number to which the submittal applies.

4. Whether this is an original submittal or resubmittal.

5. Each item shall clearly note the manufacturer's name and address, trade name, product, lot, style, color, catalog designation or model number, and locations of use.

1.5 QUALITY ASSURANCE:

A. Codes and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This contract incorporates materials, applications, and tests by reference, with the same force and effect as when they were given in full text.

B. Conflict: Where a conflict occurs between reference documents and project specifications, the project specifications shall govern.

CURRY COULEE & PASTURE 4 PIPELINES 01009-3

1.6 DELIVERY, STORAGE, AND HANDLING:

A. Delivery: The Contractor shall protect products incorporated into the work, from damage while in transit to the site. Products must be delivered in original unopened containers with manufacturer's name and brand designation and contents legibly indicated.

B. Storage: The Contractor shall provide temporary storage facilities for products complying with manufacturer's recommendations which will protect them from damage until installation on the project and final acceptance. The storage area shall permit access for inspection and handling.

C. Handling: The Contractor shall load and unload products in such a manner that protects them from damage until installation on the project.

1.7 PROJECT/SITE CONDITIONS:

A. Access to the Work: Public access roads damaged by the Contractor shall be restored, at the

Contractor's expense to the same condition they were in at the commencement of work.

Activity may be restricted during wet or frozen conditions. Mechanized equipment use will be avoided if the equipment causes rutting to a depth of 4 inches or greater. Survey monuments or markers disturbed or removed during construction shall be reset at the

Contractors expense. Any fences crossed during construction shall be repaired to condition prior to construction at the expense of the Contractor.

B. Environmental Considerations: Operations of the Contractor upon government premises including storage of materials, camping areas and equipment parking shall be confined to areas approved by the Contracting Officer. In the event the surrounding landscape is disturbed, the Contractor shall restore that area at the Contractor's expense. All equipment shall be pressure washed prior to entering project area.

1.8 SEQUENCING AND SCHEDULING:

A. Work Schedule: The schedule shall be submitted at the pre-work conference. When requested, the Contractor shall submit an updated schedule within 3 calendar days.

PART 2: PRODUCTS

(There are no applicable requirements.)

PART 3: EXECUTION

3.1 PROJECT MEETINGS:

A. Pre-Work Conference:

1. A pre-work conference will be held prior to the start of work. The Contractor will be

CURRY COULEE & PASTURE 4 PIPELINES 01009-4

notified in advance of meeting time, date, and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the contract.

2. The Contractor, subcontractors and the persons responsible for coordination of the work shall be present at the meeting.

3. The Contractor shall be prepared to summarize and explain procedures planned for the project and present the submittals requested in the specifications.

B. Progress Meetings:

1. Meetings shall be held at the project site, or as determined by the Contracting Officer.

2. Meetings may be called by either the Contracting Officer or the Contractor. Request shall state who should attend.

C. Final Inspection:

1. Meeting shall be held at the project site, or as determined by the Contracting Officer.

2. The Contractor shall notify the Contracting Officer in writing at least 3 working days before the completion date so the Government can schedule final inspection.

3.2 PROTECTION OF EXISTING PROPERTIES:

A. General

1. Take precautions to protect all adjoining private and public property and facilities, including underground and overhead utilities, structures, and fences. Restore or replace all disturbed or damaged facilities to its original condition at Contractor’s expense, taking necessary steps and precautions to protect buried utilities.

2. Contact utility owners using the Montana One Call System for utility locates before starting work. The Contractor is also responsible for ensuring that all private utilities are located within the work area. Protect the utilities exposed during the work and prevent damaging underground utilities adjacent to excavations. Immediately notify the utility owner of any construction damage. Repairs of damage to utilities are at the expense of the Contractor.

3.3 PREPARATION:

A. Work Layout: The Government will set stakes or steel fence posts to give the Contractor measurements, lines and grades necessary for the work executed under the contract.

Baseline monuments or benchmarks disturbed or removed during construction shall be reset by the Contractor at the Contractor's expense.

CURRY COULEE & PASTURE 4 PIPELINES 01009-5

B. Work Limits and Control Points: Will be established by the Contracting Officer.

3.4 SALVAGEABLE ITEMS:

A. Requirements: Salvageable items shall become the property of the Government. Remove and store items designated as salvage for the Government at the locations approved in writing by the Contracting Officer. Government property shall be left at the site. The

Contractor shall replace or reimburse the Government for items that are lost or destroyed during demolition work.

3.5 WARRANTY:

A. Requirements: Materials and equipment furnished under this Contract shall be covered by the most favorable commercial warranties the Contractor gives to any customer for such materials or equipment. The rights of remedies provided herein are in addition to and do not limit any rights afforded to the Government by any other clause of this Contract. With respect to all warranties expressed or implied, from manufacturers or suppliers for materials or equipment furnished under the Contract the contractor shall;

1. Obtain all warranties that would be given in normal commercial practices.

2. Require all warranties to be executed, in writing, for the benefit of the Government.

3. Submit all warranties to the Contracting officer prior to the final inspection.

B. Warranty Enforcement: Contracting Officer shall review and inspect any noted warranty deficiencies such as trench settlement, backfill, erosion within the one year warranty period after contract completion to determine required work. All required project warranty work shall be consolidated by the Contracting Officer and coordinated with the Contractor to be completed within the same time period. The Contractor shall have all deficiencies completed within a 30 day period of notification by the Contracting Officer.

PART 4: MEASUREMENT AND PAYMENT

4.1 METHOD OF MEASUREMENT:

A. Units: The work described in this section will not be measured for payment.

4.2 BASIS OF PAYMENT:

A. Payment: No direct payment for the work described under this section will be made. The

Contractor shall include consideration for this item in the Schedule of Items (SOI) for other items of the contract.

END OF SPECIFICATION

GOVERNMNET-FURNISHED PROPERTY

CURRY COULEE & PASTURE 4 PIPELINES 01019-1

SECTION 01019

GOVERNMENT-FURNISHED PROPERTY

A. Section Includes: Materials to be furnished by the Government and their locations.

1.2 DELIVERY, STORAGE, AND HANDLING:

A. Location: The Government-furnished property will be provided by the Bureau of Land

Management at the District Office located at 111 Garryowen Road, Miles City, Montana.

B. Time: Storage tank will be available for pickup after October 11, 2021. Property will be available Monday through Friday, between the hours of 8:00 A.M. and 4:00 P.M., except on holidays. Notify the Contracting Officer Representative (COR) 3 working days prior to picking up the government furnished property to schedule pickup time.

C. Loading, Offloading and Transporting Property: The Contractor shall be responsible for providing the necessary material-handling equipment to load and offload materials. The

Contractor shall load and transport materials to worksites.

2.1 MATERIALS:

A. Materials to be furnished by the Government:

Specification

Section

Materials

Description

Estimated

Quantity Unit

02665 Water Quality Signs All Required Each

02665

10,000 gallon

Fiberglass Storage

Tank (approx.

10.5 ft x 18.5 ft)

1 Each

02665 Fiberglass Storage

Tank Saddles* 2 Each

*Note: Fiberglass Storage tank saddles are to be returned to BLM wareyard.

2.2 EQUIPMENT:

GOVERNMNET-FURNISHED PROPERTY

CURRY COULEE & PASTURE 4 PIPELINES 01019-2

A. Units: The work described in this section will not be measured for payment.

A. Payment: No direct payment for the work described under this section will be made. The

Contractor shall include consideration for this item in the Schedule of Items (SOI) for other items of the Contract.

MOBILIZATION

CURRY COULEE & PRAIRIE 4 PIPELINES 01505-1

SECTION 01505

A. Section Includes: Preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies and incidentals to the project site; and for other work and operations which must be performed or costs incurred prior to beginning work on the various items on the project site. This specification does not include moves between project sites.

A. Units: Progress payments will be made as follows:

1. When 5 percent of the original contract amount is earned from other bid items, 50 percent of the amount bid for mobilization or 5 percent of the original contract amount, whichever is lesser, will be paid.

2. When 10 percent of the original contract amount is earned from other bid items, 100 percent of the amount bid for mobilization or 10 percent of the original contract amount, whichever is lesser, will be paid.

3. Upon completion of work for the project, payment of the amount bid for mobilization in excess of 10 percent of the original contract amount, will be paid.

4. The total sum of all payments shall not exceed the original contract amount bid for mobilization, regardless of the fact that the Contractor may have shut down the work on the project or moved equipment away from the project and then back again.

A. Payment: No direct payment for moves between project sites will be made. The Contractor shall include consideration for moves between project sites in the Schedule of Items (SOI) for other items of the contract. Prices and payment will be full compensation for the work described in this section. No modification and adjustments shall be allowed for costs and changes to mobilization despite changes in fuel or transportation costs. Payment will be

CURRY COULEE & PRAIRIE 4 PIPELINES 01505-2

made under:

Pay Item Pay Unit

01505(1) Mobilization ..................................................................................................... Lump Sum

TRENCHING, PLOWING, BACKFILLING, AND COMPACTING

CURRY COULEE & PASTURE 4 PIPELINES 02229-1

SECTION 02229

A. Section Includes: Trenching, plowing, backfilling and compacting for the installation of utility lines.

1.2 QUALITY ASSURANCE:

A. Failure Criteria: Not limited to the following:

1. Settlement of backfill below natural ground surface.

2. Bury depth less than designated depth.

1.3 PROJECT/SITE CONDITIONS:

A. Borrow Sources: On Government land shall be as shown on the drawings or as approved prior to excavation.

B. Rock: Surface and subsurface rock is evident along the pipeline alignment.

(Plowing Only): Any rock that cannot be compressed or separated with 100 tons draw bar power by plowing or pulling shall be paid for under plowing (rock). All other material shall be paid for under plowing (common).

C. Water and Caving Soils: Subsurface water and caving soils may also exist along the alignment.

(Plowing Only): Pulling or plowing pipe through water or caving soils will be considered as plowing (common), except if conditions require the use of a backhoe or excavator to install pipe to the proper installation depth. This work will be paid for under plowing (rock). *

Note: Only HDPE pipe shall be acceptable for plowing.

2.1 MATERIALS:

A. General: Material excavated shall be considered unclassified.

B. Fill Material: Shall be approved before use. Material from excavations or plowing shall be used unless it contains material which might damage the utility or create voids.

CURRY COULEE & PASTURE 4 PIPELINES 02229-2

C. Bedding: Shall be round and be free of material that is sharp and angular.

3.1 PREPARATION:

A. Clearing: Provide minimum disturbance to existing grass and sod. Dispose of debris in the immediate vicinity of the pipeline.

B. Utilities: Before starting excavation or plowing, establish the location and extent of underground utilities in the work area. Protect active utility services uncovered by excavation or plowing. Damage to utilities shall be repaired or replaced at the Contractor's expense.

C. Trenches: Follow OSHA regulation Part 1926, subpart p., Excavations.

3.2 INSTALLATION:

A. Trenches: Excavated trenches shall be a minimum of 6 inches in width. The bury depth shall be measured from the top of the pipe to the natural ground surface as stated on the

Work Data Sheet. Plowed lines shall be a maximum of 6 inches wide except for areas where rock excavation may occur.

B. Pipe Bedding: The pipe shall be bedded in the bedding zone with approved bedding material. If rock is encountered, over excavate as directed by the Contracting Officer and then backfill with 2 inches of bedding material under the pipe.

C. Center-loading: Prior to testing, the pipe may be center-loaded with approved material.

Leave 2 feet of pipe uncovered at all joints and connections for trenched lines and any excavated assemblies for plowed lines.

D. Trench Backfill: After testing and approval of the pipeline, trench or plow backfilling may be completed. Mound excess material over the trenched or plowed backfill in an inverted

U-shape as directed by the Contracting Officer. All backfill may be un-compacted except within roadways, which shall be compacted to the same density as the original roadway.

Place compacted backfill in 8 inch lifts.

E. Borrow: Furnish borrow materials required for backfill, bedding, and water bars.

F. Water Bars: Water bars shall be constructed at locations designated by the Contracting

Officer.

3.3 FIELD QUALITY CONTROL:

A. Testing of Pipelines: Shall be done according to Specification 02665 - Water Systems.

CURRY COULEE & PASTURE 4 PIPELINES 02229-3

B. Bury Depth: Depth of excavated and plowed lines shall be checked or verified by visually checking and measuring excavated trenches and assemblies, observing the location of the natural ground surface in relation to the trencher stinger or plowing mechanism when at the proper depth and angle or by probing covered or backfilled lines. Lines not at the designated depth shall be required to be excavated or plowed to the proper depth, re-routed or additional cover added from an approved borrow source as directed by the Contracting

Officer. Responsibility and expenses shall be determined by the Contracting Officer. Plowed and trenched lines using HDPE pipe shall be allowed to be installed at the designated bury depth of the Work Data Sheet. Trenched lines using PVC pipe shall be installed at a 6 foot minimum bury depth.

A. Units: The work described in this section will be measured and paid for by the linear foot as measured along the ground surface over the completed utility.

A. Payment: Prices and payment will be full compensation for the work described in this section. Payment will be made and based on the following pay items:

02229(3B) Plowing (5 Ft. Common), Backfilling and Compacting ............................... Linear Foot

02229(4B) Plowing (5 Ft. Rock), Backfilling and Compacting ..................................... Linear Foot

WATER SYSTEMS

CURRY COULEE & PASTURE 4 PIPELINES 02665-1

SPECIFICATION 02665

A. Section Includes: Furnishing and Installing with Contractor-furnished property and

Government-furnished property, livestock water systems with Poly Vinyl Chloride (PVC) or High Density Polyethylene (HDPE) pipe.

1.2 REFERENCES:

A. American Society for Testing and Materials:

ASTM A 53 Pipe, Steel, Black and Hot-Dipped Zinc-Coated Welded and

Seamless

ASTM D 1784 Rigid Poly (Vinyl Chloride) (PVC) Compounds and

Chlorinated Poly (Vinyl Chloride) (CPVC) Compounds

ASTM D 2241 Poly (Vinyl Chloride) (PVC) Pressure-Rated Pipe (SDR

Series)

ASTM D 2466 Poly (Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule

ASTM D 2564 Solvent Cements for Poly (Vinyl Chloride) (PVC) Plastic

Piping Systems

ASTM D 2672 Joints for IPS PVC Pipe Using Solvent Cement

ASTM D 2774 Underground Installation of Thermoplastic Pressure Piping

ASTM D 2855 Two Step (Primer and Solvent Cement) Method of Joining

Poly (Vinyl Chloride) (PVC) or Chlorinated Poly (Vinyl

Chloride) (CPVC) Pipe and Piping Components w/ Tapered

Sockets

ASTM F 656 Primers for Use in Solvent Cement Joints of Poly (Vinyl

Chloride) (PVC) Plastic Pipe and Fittings

ASTM D 1248 Polyethylene Plastics Extrusion Materials for Wire and

Cable

ASTM D 1599 Resistance to Short-Time Hydraulic Pressure of Plastic

Pipe, Tubing, & Fittings.

ASTM D 2122 Standard Test Method for Determining Dimensions of

Thermoplastic Pipe and Fittings

ASTM D 2239 Polyethylene (PE) Plastic Pipe (SIDR-PR) Based on

Controlled Inside Diameter

ASTM D 2290 Apparent Hoop Tensile Strength of Plastic or Reinforced

Plastic Pipe

ASTM D 2321 Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications

ASTM D 2657 Standard Practice for Heat Fusion Joining of Polyolefin

Pipe and Fittings

CURRY COULEE & PASTURE 4 PIPELINES 02665-2

ASTM D 2737 Standard for Polyethylene (PE) Plastic Tubing

ASTM D 2837 Obtaining Hydrostatic Design Basis for Thermoplastic Pipe

Materials or Pressure Design Basis for Thermoplastic Pipe

ASTM F 714 Standard Specification for Polyethylene (PE) Plastic Pipe

(DR-PR) Based on Outside Diameter

ASTM D 3035 Polyethylene (PE) Plastic Pipe (DR-PR) Based on

Controlled Outside Diameter

ASTM D 3261 Butt Heat Fusion Polyethylene (PE) Plastic Fittings for

Polyethylene (PE) Plastic Pipe and Tubing

ASTM D 3350 Polyethylene Plastic Pipe and Fittings Materials

B. American Wood Preservers' Association (AWPA)

AWPA U1-20 User Specifications for Treated Wood

AWPA T1-20 Processing and Treatment Standards

AWPA P23-14 Standard for Chromated Copper Arsenate Type C (CCA-C)

AWPA P36-16 Standard for Copper Naphthenate (CuN)

AWPA P35-16 Standard for Pentachlorophenol (PCP)

AWPA P48-15 Standard for Copper Azole Type C (CA-C)

C. National Sanitation Foundation (NSF)

1.3 SUBMITTALS:

A. Materials List: Prior to beginning work, Contractor shall submit for approval a complete list of proposed Contractor furnished materials showing brand, model, type, size or class designation as applicable, and intended location of use. When requested, Contractor shall also submit manufacturer's literature fully describing materials including manufacturer's recommended methods of sizing, installing and adjusting.

B. Product Data, Manuals, and Warranties: Contractor shall deliver to Contracting Officer before final inspection all installation instructions, manuals, product data, parts lists, and warranties packaged with products by manufacturer.

C. Plastic Pipe Certification: Pipe shall be marked with the appropriate ASTM designation, pipe diameter, type of plastic pipe material (designation code number), manufacturer's name and code, schedule number or SDR (or pressure rating) and National Sanitation Foundation

(NSF) designation.

1.4 QUALITY ASSURANCE:

A. Failure Criteria: Not limited to the following:

1. Evidence of leakage

2. Evidence of breakage of pipe

CURRY COULEE & PASTURE 4 PIPELINES 02665-3

3. Malfunctioning valves

4. Blockage of piping

5. Pressure drop

1.5 DELIVERY, STORAGE, AND HANDLING:

A. Storage: Store materials and equipment according to the manufacturer's recommendations.

Store all plastic piping under a cover, and out of direct sunlight.

2.1 CONTRACTOR-FURNISHED MATERIALS:

A. Plastic Pipe & Fittings: Pipe and fittings shall be manufactured of material approved by

NSF for potable water systems. Fittings shall be the same size as the adjoining pipeline except where otherwise specified, or where reducers are required to enter a valve body.

Pressure rating of fittings shall be equal to or greater than the adjoining pipeline.

1. PVC Pipe: PVC 1120 solvent weld type pipe conforming to applicable ASTM

Standards D 1784, D 2241, and D 2672.

2. PVC Pipe Fittings: Fittings conform to applicable ASTM Standard D 2466.

3. HDPE Pipe: HDPE (DR) high density manufactured from PE4710 resin polyethylene manufactured in accordance with ASTM D 2239, D 2837 and D 3350.

4. HDPE Pipe Fittings: Fittings shall be PE4710 HDPE to conform to applicable ASTM

Standards D 3035, D 3261, or D 3350.

5. Transition Fittings: Fittings shall be brass, stainless steel, fabricated or molded fittings pressure rated to at least adjacent pipe or greater to adapt HDPE pipe to steel/PVC connections.

B. PVC Solvents: Certified by manufacturer for use on type I PVC pipe under conditions existing at worksite at time of application. Certified by NSF for potable water systems.

Primer and cement conform to ASTM F 656 and D 2564 respectively.

C. Brass Pipe and Fittings: Threaded, schedule 40. All fittings shall be either PVC, Brass, or stainless steel. Fitting size shall be the same as the adjoining pipeline except where otherwise specified, or where reducers are required to enter a valve body.

D. Air Relief Valve: Automatic continuous air bleed and vacuum relief type, 2 to 230 psi minimum working pressure range, free floating foam float system. Minimum vent

CURRY COULEE & PASTURE 4 PIPELINES 02665-4

discharge rate 0.01 cu ft/sec at 50 psi. Bermad Model A30 or equal.

E. High Pressure Air Relief Valve: Automatic float operated valve type, up to 300 psi maximum working pressure range, simple lever stainless steel float system. Val-Matic

Model 22.9 or equal.

F. Curb Stop Valve: 1 inch O-ring type valve, 1 inch I.P. threaded inlet and outlet, 3 turn check, 300 psi minimum working pressure, Minneapolis top threads, brass or bronze body, tee-head, and stem. No drain port.

G. Riser & Cap for Curb Stop Valves: For use on 1 inch curb stop valves: 1-1/2 inch PVC pipe

Class 160, 1-1/2 inch female adapter slip to flip, 1-1/2 inch PVC Cap Class 160, stationary shut off rod 63 inches long, compatible with curb stop valves. Extends 4 inches above ground surface when attached to valve buried at pipeline depth shown in the Work Data

Sheet.

H. Curb Stop Rod: Shall be a standard manufactured extension steel rod which can attach to the top of the curb stop valve with a tee head which is compatible with a tee handle curb stop key or shall be a fabricated steel extension rod which can attach to the curb stop valve and extend to the top of the PVC riser & cap to allow it to be turned with a wrench or pliers rather than a curb stop key.

I. Curb Stop Key: Tee handle type, without a pentagon head for operating stationary shut-off rod. One end of tee handle shall be pointed for digging. Compatible with a stationary rod.

Furnish at least 1 key for each pipeline as listed on the Work Data Sheet.

J. Riser and Cap for Air Relief and Pressure Reducing Valves: Shall be Plastic Sewer or PVC risers and caps. Risers for air relief/pressure reducing valve assemblies shall be 4 inch diameter minimum. Furnished risers and caps shall be large enough to accommodate furnished valves and appurtenances.

K. Pipe Wrap: 10 mil minimum thickness, 2 inch minimum width, 14,000 volts minimum dielectric strength, 1,000,000 megohms minimum insulation resistance. Polyethylene backing with butyl rubber resin adhesive.

L. Sump Gravel: Well graded 1/2 inch minus gravel. Less than 2 percent by weight smaller than No. 200 sieve size.

M. Polyethylene Sheeting: 6 mil minimum thickness.

N. Strapping and Nails for Hydrant: 3/4 inch x 22 gauge minimum galvanized steel strapping, with 16d minimum galvanized nails.

O. Nails for Water Quality signs: 16d galvanized nail minimum or as approved by the

Contracting Officer.

CURRY COULEE & PASTURE 4 PIPELINES 02665-5

P. Wood Fence Post: 6-1/2 ft. long, 4 inch diameter, entire post pressure-treated with a waterborne preservation in accordance with AWPA C5 standards. Post shall be straight, single-stem, and sound.

Q. Steel Fence Post: 5-1/2 ft. long, Type "T", with anchor plate. Post shall have white reflective top.

R. Urethane Coating: Black polyurethane spray or brush on truck liner protective coating.

S. Hydrant: Frost free or a Frost-Proof, automatic drain-back type, adjustable flow, 1 inch galvanized riser pipe, brass or bronze valve body with 1 inch NPT inlet, cast iron head, 3/4 inch brass hose adaptor on nozzle, valve body drain port tapped 1/8 inch NPT. Hydrant length shall be that required to provide between 26 and 28 inches of clearance between outlet and ground surface when hydrant is buried to pipeline depth shown in the Work Data

Sheet.

T. Pressure Reducing Valve: Valve shall be capable of 200 psi or equal. Maximum Working

Pressure: 200 psi, adjustable reduced pressure range 25 to 50 psi, Watts u5 or equal. The

Work Data Sheet and maps shall indicate the locations on the pipeline. Set the outlet pressure to 50 psi.

U. Galvanized Pipe: Schedule 40 grade B, conforming to ASTM A 53 standards, and wrapped with pipe wrap.

V. Float valve: compatible with 2 in stand pipe and government storage tank . Minimum working pressure 4 psi or less and velocity of 5 gpm.

W. Flapper Check valve: 1 ½” in line valve with threaded ends, brass casing.

2.2 GOVERNMENT-FURNISHED PROPERTY:

A. Water Quality Signs: Water Quality signs shall be government furnished to match the number of hydrants installed. The contractor shall transport the signs from the BLM Eastern

Montana Dakotas District Office to the project site. The signs shall be contractor installed as directed by the Contracting Officer. See Part 3-3.2.-G.-3. for installation requirements.

B. Storage Tank Assembly: Storage tank shall be government furnished. The contractor shall transport the tank to the project site. Tank will be available for the contractor to pickup after

October 11th, 2021 at the BLM Miles City Field Office Wareyard. Tank shall be contractor installed as directed by the Contracting Officer. See Part 3-3.2. G-5 for installation requirements.

2.3 EXISTING EQUIPMENT AT SITE:

A. Pasture 4 Pipeline is an extension of existing pipeline on BLM managed land. New storage tank shall be installed in designated location.

CURRY COULEE & PASTURE 4 PIPELINES 02665-6

B. Curry Coulee Pipeline will tie into an existing well on BLM managed land.

3.1 PREPARATION:

A. General: Clearing, grubbing, excavation, backfill, and bedding shall be performed in accordance with Specification 02229 - Trenching, Plowing, Backfilling, and Compacting.

3.2 INSTALLATION:

A. PVC Pipe, Joints, and Fittings: PVC pipe, joints, and fittings shall be assembled and installed in accordance with the pipe and cement manufacturer's instructions and ASTM specifications D 2774 and D 2855. The ends of the pipe shall be covered during progress of the work to preclude intrusion of undesirable material. Pipe shall be at operating temperature when backfilling. *Note: PVC pipe shall not be plowed and shall be installed at a 6 foot bury depth.

B. HDPE Pipe, Joint, and Fittings: PE pipe, joints and fittings shall be assembled and installed in accordance with the pipe manufacturer’s instructions and ASTM specifications D 2737 and D 3350. The ends of the pipe shall be covered during progress of the work to preclude intrusion of undesirable material. HDPE pipe, joints and fittings shall be heat fusion welded unless otherwise specified or approved. *Note: HDPE Pipe is acceptable for plowing/trenching to a 5 foot bury depth.

C. Steel Pipe & Fittings: Except where otherwise specified, steel pipe and fittings shall not be used where they will be in contact with the soil. Only brass, PVC pipe, HDPE pipe, and fittings or steel wrapped fittings shall be used in such locations.

D. Pipe Wrap: All buried exposed steel pipe and fittings shall be wrapped with pipe wrap.

Wraps shall be tight and moisture-proof, with each wrap overlapping one-half the previous lap. All uncoated and exposed HDPE steel transition fittings and other HDPE steel fittings shall be wrapped with pipe wrap as described above and the wrap sprayed or brush coated with an adequate layer of black urethane protective bed liner.

E. Thread Lubrication: Thread lubricant shall be used on all threaded fittings.

F. Connections: Connection of a new pipeline to other facilities shall be made in accordance with the drawings.

G. Assemblies: Refer to the drawings "Pipeline Details" and "Overview and Profile”.

1. Air Relief Valve Assembly (Detail A): Install air relief valve, PVC or HDPE transition tee, reducer, slip-to-thread adaptor, riser and cap (do not glue), steel fence post. Drill six evenly spaced 1/4 inch diameter vent holes in riser just below cap. Wrap and

CURRY COULEE & PASTURE 4 PIPELINES 02665-7

urethane coat any exposed HDPE steel fittings.

2. Curb Stop Valve Assembly (Detail D): Install curb stop valve, PVC or HDPE transition tee, 1-1/2 inch or 3 inch PVC pipe riser, three slip-to-thread adapters, steel fence post, and PVC cap (do not glue). *Note change from drawing. Wrap and urethane coat any exposed HDPE steel fittings.

3. Hydrant Assembly (Detail G): Install hydrant, 90 degree stainless steel elbow, reducer, slip-to-thread adaptor, PVC or HDPE transition tee, wood fence post, sump gravel, and polyethylene sheeting. Attach hydrant solidly to post with two steel straps. Wrap each strap twice around post. Nail the first strap just below the hydrant head and the second strap 12 inches below the first. Provide 26 to 28 inches of clearance between hydrant outlet and original ground surface. Install flow control valve on hydrant outlet when required in Work Data Sheet. Wrap buried galvanized riser pipe and fittings with pipe wrap. Urethane coat any exposed wrapped HDPE steel fittings. Attach water quality sign by wrapping around post and securing each corner with a roofing nail or at least three wraps with approved tape (1 inch).

4. Pressure Reducing Valve Assembly (Detail C): Install valve, reducer, slip-to-thread adapter, PVC riser and cap, steel fence post, and PVC cap (do not glue). Wrap or urethane coat any exposed metal fittings. PVC pipe does not need to be insulated.

5. Storage Tank Assembly: Shall include loading, transporting, unloading, site preparation, setting the tank, installing, plumbing, and partially backfilling the government furnished 10,000 gallon fiberglass storage tank from the Miles City BLM wareyard to and at the pipeline site. The tank shall be approximately 10.5 ft. in diameter and approximately 18.5 ft. in length, with an access port, port for an overflow, secondary drain, inlet/outlet, and daylight drain. Storage tank is mounted on removable saddles for transporting, storing, and installing the tank. The saddles shall be returned to the BLM once the storage tank is properly installed to allow for the return to the fiberglass manufacture. Excavate the horizontal storage tank foundation to a depth of 5 ft below original ground. The tank excavation limits shall be 14. 5 ft. wide and 22.5 ft long. The excavation directly under the storage tank shall be a cradle for the tank at a depth of 5.5 ft. Line the excavated area with a gravel apron made of pit run gravel to the depth of 6 inches (approximately 6 cubic yards), see storage tank detail. Place the storage tank atop the gravel apron, within the natural support, 5 ft. below original ground. The tank inset shall be oriented to newly installed spur and connection, see drawings. The Contractor shall be responsible for supplying and installing an inlet/outlet with check and float valves, air vent, overflow, secondary drain with curb stop and riser (include wood post), and a daylight drain with screen as designated and shown on the storage tank detail. The storage tank shall be back filled and compacted at a 2:1 slope from the gravel apron to total bury depth of 8 ft. minimum, 3 ft above original ground. The backfill and gravel material shall be approved by the Contacting

Officer prior to installation.

6. Daylight Drain Assembly (Detail H): Tee into a curb stop valve assembly (Detail D).

CURRY COULEE & PASTURE 4 PIPELINES 02665-8

Install curb stop valve, PVC or HDPE transition tee, 1-1/2 inch or 3 inch PVC pipe riser, three slip-to-thread adapters, steel fence post, and PVC cap (do not glue). *Note change from drawing. Wrap and urethane coat any exposed HDPE steel fittings.

Transition into PVC pipe that slopes downhill with a minimum 2% slope and finished with a flow through cap screen to prevent the entrance of wildlife.

3.3 FIELD QUALITY CONTROL:

A. General: The pipeline may be tested in whole or in segments as work progresses. If the pipeline is connected to an existing system, the test shall apply to both systems. A 24 hour notice is required for conducting second and final tests.

B. Testing Procedure: Test pressure shall be the maximum operating pressure as listed in the

Drawings. Fill pipeline with water and conduct test as follows:

1. First Test: The presence of the Contracting Officer is not required at the first test.

Pressurize to test pressure and inspect for failure criteria. Correct all defects and repeat the test until no further defects are observed.

2. Second Test: Once the first test has been conducted and all defects corrected, a second test shall be conducted in the Contracting Officer's presence. Pressurize to test pressure.

Hold this pressure for a minimum of 4 hours and then inspect for failure criteria.

Correct all defects and repeat the test until no further defects are observed and until test is approved. Backfilling may be completed after approval of second test.

3. Final Test: Once backfilling is complete a final test shall be conducted in the

Contracting Officer's presence. Pressurize to test pressure. Hold this pressure for a minimum of 24 hours and then inspect for failure criteria. Correct all defects and repeat the test until no further defects are observed and until test is approved.

A. Units: Measurement for pipe shall be the number of linear ft. provided measured on the ground surface along the completed pipeline centerline. Pay items of the Schedule of Items

(SOI) shall include the cost per foot of only PVC or only HDPE pipe to be used for trenching pipe, the cost per foot of HDPE pipe only to be used for plowing pipe since PVC pipe shall not be plowed. Measurement for assemblies shall be the number of each type assembly provided and installed. PVC or HDPE pipe within or between parts of an assembly shall be included for payment under pipe when payment is provided in the

Schedule of Items (SOI) for that respective pipe type, size, and rating. Daylight drains from curb stops shall be paid for by the linear foot as measured along the ground surface over the completed utility. The cost of excavating, cutting into and "teeing" off of a pipeline will not be paid for separately, but will be considered to be a subsidiary obligation of the Contractor under other contract items or assemblies. Installation and hookup of storage tank shall be a

CURRY COULEE & PASTURE 4 PIPELINES 02665-9

lump sum.

A. Payment: Prices and payment will be full compensation for the work described in this section. Payment will be based on the following pay items:

(Plowing with HDPE SDR 4710 Pipe)

02665(4) HDPE 4710, SDR 7.3, 320 psi pipe, 1.5” diameter ........................................ Linear Foot

02665(5) HDPE 4710, SDR 9, 250 psi pipe, 1.5” diameter ........................................... Linear Foot

02665(30) Curb Stop Valve Assembly 1 inch ...........................................................................Each

02665(40) Air Relief Valve Assembly ......................................................................................Each

02665(42) High Pressure Air Relief Valve Assembly ...............................................................Each

02665(70) Hydrant Assembly ....................................................................................................Each

02665(90) Storage Tank Assembly (Gov’t Furnished) ................................................... Lump Sum

Project Name Project No. Project Location

Plowing, (5 ft common)

Backfilling and

Compacting

Storage Tank

Assembly

Installation

Plowing, (5 ft

Rock)

Backfilling and

Compacting

HDPE Pipe, PE

4710, DR 7.3,

320 psi, 1.5" diam.

HDPE Pipe, PE

4710, DR 11,

200 psi, 1.5" diam.

Hydrant

Assembly

(Each)*

Curb Stop

Valve

Assembly, 1.5" (each)*

Air Relief

Valve

Assembly

(Each)*

High

Pressure Air

Relief Valve

Assembly

(Each)*

Curry Coulee Pipeline 21988 T 19 N, R 31 E, Sec

10,14,15 & 23 9,179 0 383 7,400 2,162 1 1 5 1

Pasture 4 Pipeline 419797 T 11N, R 55 E, Sec

5,341 1 223 0 5,564 1 2 1 0

CONTRACT TOTAL 14,520 1 606 7,400 7,726 2 3 6 1

*All pipeline appurtenances (hydrants, valve assembly, etc) shall be installed at a 5 foot bury depth.

CURRY COULEE & PASTURE 4 PIPELINES

WORK DATA SHEET

No Construction between April 15 to July 15 for migratory birds.

Curry Coulee: Tie new pipeline system into existing well on site. Provide 1 curb stop key.

Pasture 4: Extension for exisiting pipeline and installation of storage tank. Storage tank will be avaliable for pick up at BLM office after October 11th. No construction from December 1st to March 31 for mule deer.

Specificiations Cover sheet.pdf
TABLE OF CONTENTS.pdf
Specification 01009 - General Information and Requirements (Pipeline).pdf
Specification 01019 - Government Furnished Property.pdf
Specification 01505 - Mobilization (Pipeline).pdf
Specification 02229 - Trenching, Plowing, Backfilling, and Compacting.pdf
Specification 02665 - Water Systems.pdf