A06_-_140L1721Q0055-Section_02525.pdf
PDF 55 KB Posted
- Attached to
- KING MOUNTAIN WELL ABANDONMENT Federal contract opportunity
- Solicitation number
- 140L1721Q0055
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B13_-_140L1721Q0055_-Past_Performance_Questionnaire.doc | DOC document | |
| A06_-_140L1721Q0055-Well_Construction_and_Test_Report.pdf | ||
| A06_-_140L1721Q0055-Title_Sheet.pdf | ||
| A06_-_140L1721Q0055-Section_01009.pdf | ||
| B13_-_140L1721Q0055-_Fillable_889_Form.pdf | ||
| Sol_140L1721Q0055.pdf | ||
| B03_-_140L1721Q0055-_Wage_Rate.pdf | ||
| A04_-_140L1721Q0055-Schedule_of_Items.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Well Abandonment King Mountain Well Abandonment [06/21]
02525 - 1
SECTION 02525
WATER SUPPLY WELLS
PART 1: GENERAL
1.1 SUMMARY
A. Section Includes: Requirements for the abandonment of one existing water well. Information regarding the well can be found under the Colorado Division of Water Resources Well Permit Number 241418.
1.2 SUBMITTALS
A. General: Submittals shall be according to Section 01009 - General Information and Requirements.
B. Driller Requirements: The driller must have a current License for well construction/pump installation in the state of Colorado. Submit drillers license information.
PART 2: PRODUCTS
2.1 MATERIALS
A. General: Materials required for the plugging and abandonment of the water well shall be as stated in the Colorado Division of Water Resources, Water Well Construction Rules, 2 CCR 402-2.
PART 3: EXECUTION
3.1 PREPARATION
A. Site Preparation: Minimize surface disturbance at sites. Level construction sites only as necessary for drilling/abandonment operations.
3.2 EXISTING WATER WELL
A. General: For information regarding the construction of the water well, see attachment “Well Construction and Test Report”, for Well Permit Number 241418.
3.3 ABANDONMENT OF THE WELL
A. Abandoning Existing Well: Remove drop pipe, wiring, pump, and all items associated with the well prior to abandonment. Cut and remove the surface casing a minimum of 3 feet from the ground surface or as required by the State of Colorado. Abandon and seal existing well in accordance with the Colorado Division of Water Resources, Water Well Construction Rules, 2 CCR 402-2, Rule 16, Standards for Plugging, Sealing, and Abandoning Wells and Boreholes. Complete “Well Abandonment Report” and submit according to Section 01009.
Well Abandonment King Mountain Well Abandonment [06/21]
02525 - 2
3.4 CLEANUP
A. Requirements: Upon completion of the well abandonment, remove the debris and surplus materials resulting from the work from the jobsite.
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. Units: The work described in this section will not be measured and paid for on a lump sum basis.
4.2 BASIS OF PAYMENT
A. Payment: Payment will be made under:
Pay Item Pay Unit
02525(1) Well Abandonment Lump Sum
END OF SECTION