A05_QUALITY_ASSURANCE_SURVEILLANCE_PLAN.docx
DOCX document 23 KB Posted
- Attached to
- HAVO REPL AUDITORIUM CARPET SEATS Federal contract opportunity
- Solicitation number
- 140P8221Q0027
About this file
This Quality Assurance Surveillance Plan outlines performance monitoring for the renovation of theater seating and flooring at Kilauea Visitor Center in Hawai'i Volcanoes National Park. Key responsibilities include the Contracting Officer overseeing overall performance and resolving disputes. The Contracting Officer's Representative will monitor compliance with contract terms and conditions, inspect completed tasks, and record inspection results. Performance objectives include removing carpeting and seating, installing new carpet and aisle lights, removing and installing baseboard, submitting a proposed seating layout, and installing new fixed seating. Inspections will be conducted after task completion using the performance assessment table, with non-compliance remedied within required timeframes. The COR will conduct regular performance assessments documented in CPARS for annual reporting, with contractor input. Revisions to the plan are joint responsibilities of the Contracting Officer and COR.
The related federal contract opportunity is for renovating the auditorium carpet, seats, and flooring at Hawai'i Volcanoes National Park, solicited by the National Park Service under number 140P8221Q0027.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8221Q0027_Amd_0001.pdf | ||
| Past_Performance_Questionnaire.doc | DOC document | |
| A06_Revised_Drawing.pdf | ||
| B03_SCA_2015_5691_Rev_12.pdf | ||
| A05_Revised_Statement_of_Work.docx | DOCX document | |
| Sol_140P8221Q0027.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
Renovation of Theater Seating and Flooring Kilauea Visitor Center Hawai’i Volcanoes National Park
1. OBJECTIVE
This Quality Assurance Surveillance Plan (QASP) is developed in accordance with FAR 46.401. The QASP will assist in evaluating the contractor’s performance as required by the Performance Work Statement (PWS). The plan prescribes the objectives of the QASP, goals and responsibilities of the Contracting Officer (CO) and Contracting Officer’s Representative (COR), and the process for performance assessment throughout the contract.
In addition to the services described in the PWS, the contractor is expected to be a partner with the NPS in continuously improving the quality and services offered. This QASP is designed to provide the COR with an effective and systematic method of monitoring contractor performance for each listed objective in the PWS. The QASP is based on the premise that the contractor, and not the Government, is responsible for management and quality control actions to meet the terms of the contract.
2. MULTI-FUNCTIONAL TEAM (MFT) ROLES & RESPONSIBILITIES
The following Government personnel will participate in performance management of the contractor. Their roles and responsibilities are described as follows:
2.1. Contracting Officer (CO).
The CO is responsible for monitoring the contractor’s overall performance, including the areas of contract compliance, contract administration, cost control, reviewing the COR’s assessment of the contractor’s performance and resolving all discrepancies between the COR and the contractor. The CO is the only person with the authority to direct the contractor in the performance of duties under the contract and to make interpretations of and/or changes to the contract. The CO will facilitate MFT meetings.
2.2. Contracting Officer’s Representative (COR).
Responsible for monitoring, assessing, recording, and reporting on contractor compliance with the terms and conditions of the contract. A primary and/or alternate COR will be appointed for this contract. The Contracting Officer is the designating authority. The COR has primary responsibility for quality assurance monitoring and evaluation of the contractor’s performance
3. PERFORMANCE ASSESSMENT
3.1. The following table will be utilized for performance evaluations.
| Performance Objective |
| PWS Paragraph |
| Method of Assessment |
| Remove and Dispose of carpeting and theater seating |
| D |
| Direct Observation |
| Install New Carpet |
| D.2 |
| Direct Observation |
| Install new LED Aisle Lights and associated Controls |
| D.3 |
| Direct Observation |
| Remove and Install New Baseboard |
| D.4 |
| Direct Observation |
| Submit Proposed Layout and Install New Fixed Seating |
| D.6 |
| Direct Observation |
| Contractor Personnel |
| 1.4 |
| Direct Observation |
3.2. Inspections. The COR will perform 100% inspections to ensure contractor compliance with the appropriate paragraphs of the PWS and will record the date and results of the inspection.
3.3. Procedures. The COR shall inspect each task immediately after completion of the task, and record the results on Appendix A.
3.4 Remedies for Non-Conformance. If inspections indicate unacceptable performance, the COR will notify the contractor of the deficiencies for correction. The contractor will be given an appropriate time frame (depending on the discrepancy identified) after notification to correct the unacceptable performance. If deficiencies are not corrected within the required time frame, the COR should notify the CO for action. If the contractor disagrees with the noted discrepancy and an agreement cannot be reached, the CO shall make a final decision. When re-performance is not possible, the contract price may be reduced to reflect the reduced value of the services performed.
4. PERFORMANCE MANAGEMENT
4.1. Contract Performance Assessment Reporting System (CPARS). The COR shall conduct, document, track, and analyze contractor performance via regularly scheduled assessments. The assessment results shall be maintained as Past Performance Information and utilized to prepare and support annual CPARS reporting. More frequent updates may be made as required to document a significant improvement or degradation of the level of contract performance. The Assessing Official Representative (AOR) will be the COR who will also prepare the CPAR document for the CO’s review. The contractor will have input prior to the CPAR being finalized.
5. REVISIONS TO THIS QUALITY ASSURANCE SERVEILLANCE PLAN
Revisions to this QASP are the joint responsibility of the CO and COR. The COR reviews the PWS and QASP annually and will provide proposed changes, if necessary. This is a living document that can be changed at any time as needed.
Appendix A COR Inspection Record
COR Inspection Record
DATE/TIME
NATURE OF COMPLAINT/CONTRACT PERFORMANCE OBJECTIVE REFERENCE
CORRECTIVE ACTION TAKEN BY CONTRACTOR
CONTRACTING OFFICER’S REPRESENTATIVE REVIEW/APPROVAL
CONTRACTING OFFICER’S REPRESENTATIVE REVIEW/APPROVAL