This scope of work document outlines requirements for a federal contract to install insulation and perform asbestos abatement and rodent exclusion work at a housing unit at Walnut Canyon National Monument. The contract will remove old insulation and install new R-23 rock wool fiber insulation in the crawl space and attic. It will also mitigate and replace asbestos-containing insulation around water pipes under the house. Additionally, the contract will remediate HVAC ducting, seal all exterior attic access holes and window/door gaps, and trap rodents if needed to prevent further intrusion. The work must be completed within 45 days of award and is subject to quality standards including applicable EPA, OSHA and building codes. Bidders must provide a site-specific safety plan within 7 days of award. The solicitation number for this opportunity is 140P1524R0003 and it was issued by the Department of the Interior National Park Service Intermountain Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B09_-_Amendment_0001_140P1524R0003_0002.pdf | ||
| B09_-_Amendment_P00002_140P1524R0003_0002.pdf | ||
| Sol_140P1524R0003_Amd_0002.pdf | ||
| Sol_140P1524R0003_Amd_0001.pdf | ||
| A04_-_pinion_asbestos_report_0001.pdf | ||
| B08_-_RFQ_140P1524R0003_Install_Insulation-Asbestos_Abatement-Rodent_Exclusion.pdf | ||
| Sol_140P1524R0003.pdf | ||
| B03_-_DOL_wage_rates_AZ20240043.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U. S. Department of the Interior National Park Service
Walnut Canyon National Monument Install Insulation under Housing Unit
PMIS 247295
Scope of Work
General:
National Park Service (NPS), Walnut Canyon National Monument: Install Insulation/Asbestos Abatement/Rodent Exclusion
Location:
Walnut Canyon National Monument, 11 Ranger Cabin Rd, Flagstaff, AZ 86004
Project Overview:
This project removes old insulation and installs new insulation in the crawl space beneath and above the 1600 square-foot housing unit, and performs asbestos abatement on the insulation surrounding the water pipe underneath the house. Insulation covering the water line under the house has tested positive for asbestos.
Contractors will mitigate this material and replace with non-asbestos containing insulation. This project also includes remediation of HVAC ducting that has failed and allows entry to rodents. All perforations under this house will be sealed to further prevent rodent intrusion. Treatment will also include sealing all exterior attic access holes, trapping rodents if needed, closing off access holes, and sealing window and door gaps. The replacement insulation will be a minimum of R-23 and composed of rock wool fibers, not fiberglass. Insulation will be wired in place to keep it from falling from between the joists. The existing crawl space varies in ease of access – between 12” and 36” of clear space between the joists and the ground. A site visit is encouraged to fully assess the scope of work.
Place of Performance/Hours of Operation:
The normal hours of operation are Monday through Friday 8:00am to 4:30pm. All activities affecting NPS operations and/or visitor and staff safety must be arranged with NPS COR. Instillation will take place during normal business hours; exceptions may be authorized in order to better meet the project goals and incur fewer closures.
Period of Performance:
Performance will commence no less than 30 days after the award and completion within 45 days after award.
Quality Assurance:
All workmanship shall be done in a professional manner, in accordance with industry standards.
Specific codes and requirements include, but are not limited to:
• ANSI/BHMA
• ASHRAE 2018
• IECC 2015
• The International Building Code 2018
• NFPA 70: National Electrical Code (NEC) 2017
• United States Environmental Protection Agency (EPA), Title 40, Code of Federal Regulations, Part 61, National Emission Standards for Hazardous Air Pollutants (NESHAP), National Emission Standard for Asbestos (40 CFR, Part 61, Subpart A & M).
• EPA, Asbestos Hazard Emergency Response Act (AHERA), Title 40, Code of Federal Regulations, Part 763, including Appendices (40 CFR, Part 763).
• EPA, Resource Conservation & Recovery Act (RCRA).
• United States Department of Transportation (DOT), Hazardous Substances, Title 49, Code of Federal Regulations, Parts 171 through 180 (49 CFR Parts 171 and 180).
• United States Department of Labor, Division of Occupational Safety and Health (OSHA), Occupational Exposure to Asbestos, Tremolite, Anthophyllite, and Actinolite, Final Rules, Title 29, Code of Federal Regulations, Part 1910, Section 1001 and Part 1926, Section 1101.
• Respiratory Protection, 29 CFR Part 1910, Section 134 and 42 CFR Part 84. Los Angeles County Department Asbestos Abatement Specifications 15 of 36 Revised October 2018
• Asbestos in Construction Industry, 29 CFR Part 1926.
• Access of Employee Exposure/Medical Records, 29 CFR, Part 1910, Section 2.
• Hazard Communication, 29 CFR, Part 1910, Section 1200.
• Specifications for Accident Prevention Signs and Tags, 29 CFR, Park 1910, Section 145.
• Personal Protective Equipment, 29 CFR, Part 1910, Sections 132 -138.
• National Electric Cod
• The abatement of asbestos containing material(s) is to be performed by competent persons who are properly trained, knowledgeable and qualified in the techniques of asbestos abatement, handling and disposal of asbestos and/or asbestos contaminated materials and the subsequent cleaning of asbestos contaminated areas. Work shall be performed by Contractors who comply with all applicable federal, state and local regulations, are capable of, and willing to perform the work pursuant to these specifications.
Safety Plan:
The Contractor is responsible for the overall safety of this job. It is the Contractor's responsibility to know and comply with all applicable OSHA regulations as well as accepted industry standards for this project. The Contractor will provide proper safety equipment and training for workers on site and ensure that employees are physically capable to perform their assigned duties in a safe manner. Contractor shall provide a site specific safety plan within 7 days after receiving the Notice of Award. The safety plan shall include methods proposed to ensure property protection, safety of the public, NPS personnel, and Contractor's employees.
Accident Reporting: Reportable accidents, defined as death, occupational disease, traumatic injury to contractor’s personnel, NPS employees or the public, property damage of any accident in excess of $100 and fires, must be reported within seven days. Complete the CM-22 DSC Contractor Accident/Property Damage Report template, http://www.nps.gov/dscw/publicforms.htm#ct, and forward to the Contracting Officer (CO).
Quality Assurance: Ensure that all employees are physically qualified to perform their assigned duties in a safe manner. Do not allow employees to work if their abilities are impaired. Operators of all equipment shall be able to understand signs, signals and operating instructions, and be capable of operating such equipment.
http://www.nps.gov/dscw/publicforms.htm#ct
Special Conditions:
The contractor shall keep the project area neat, orderly, and in safe conditions at all time. The contractor is responsible for using barriers to protect and separate the public and employees from the work area. Moveable barriers may be necessary to prevent unauthorized use of the work area.
Inspection:
1. The government may inspect materials and workmanship during installation.
• Rejected materials and workmanship will be corrected by the contractor as soon as possible.
2. The contractor shall furnish a Product Data Sheet showing Specification Conformance.
3. The Contractor shall be responsible for inspection of his/her work to ensure that the services required under this purchase order are performed in accordance with the requirements of these specifications. The Contractor shall provide supervision at all times over the work which his/her employees are performing to assure complete and satisfactory performance.
Acceptance:
Acceptance check list will include:
• Completion of all work as described in SOW
• Workmanship
• Site Cleanliness
Attachments: (Next Page)