A04 SOW Culvert Lining 160852.pdf

PDF 5 MB Posted

Attached to
Culvert Lining and Cleaning: Shenandoah NP, VA Federal contract opportunity
Solicitation number
140P4220R0038
Issued by
Department of the Interior National Park Service Northeast Region

About this file

This solicitation is for culvert lining and cleaning services at Shenandoah National Park in Virginia. The National Park Service is seeking a contractor to line existing culverts along Skyline Drive from milepost 64 to 73 using high density polyethylene pipe liner. The contractor will be required to clean, remove debris from, and pressure wash culverts prior to insertion of the liner. Additional requirements include providing new drop inlet covers for 50% of culverts, new marker stakes for 75% of culverts, and restoring all impacted areas. The contractor must maintain traffic on Skyline Drive throughout the project duration and coordinate any necessary traffic interruptions with the contracting officer. The solicitation includes bid line items for the base scope of work and optional additional culverts that may be awarded.

View the file

Other files for this federal contract opportunity

Other files attached to Culvert Lining and Cleaning: Shenandoah NP, VA, newest first.
File Type Posted
A06 Map Mp64-Mp73 SHEN Culvert Lining_0001.pdf PDF
Sol_140P4220R0038_Amd_0001.pdf PDF
B03 DOL Wage Determination Greene County va124.txt TXT text file
FORM A.pdf PDF
Sol_140P4220R0038.pdf PDF
Form B Past_Performance_Questionnaire.pdf PDF
B03 DOL Wage Determination Rockingham County va189.txt TXT text file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEN - Culvert Lining 160852 TOC-1

TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work

Shenandoah National Park Inlet Structure Top Slabs 1 & 2 drawing details

Shenandoah National Park Superintendents Compendium

01 27 00 Definition of Contract Line Items

Contract Price Schedule…………………………………………………………………...37

01 31 00 Project Management & Coordination

Request For Information Form

01 32 16 Construction Schedule

01 33 23 Submittal Procedures

01 35 23 Safety Requirements

Form CM-22

01 40 00 Quality Requirements

01 42 00 References

01 50 00 Temporary Facilities and Controls

01 57 19.12 Noise & Acoustics Management

01 67 00 Product Requirements

01 73 29 Cutting and Patching

01 73 40 Execution

01 74 19 Construction Waste Management

01 77 00 Closeout Procedures

01 78 23 Operation and Maintenance Data

DIVISION 01

01 89 00 Site Construction Performance Requirements

DIVISION 02 – EXISTING CONDITIONS

02 41 19 Selective Demolition

DIVISION 03 – CONCRETE

03 30 55 Cast-In-Place Concrete…………………………………………………………………..156

DIVISION 31 - EARTHWORK

31 10 00 Site Clearing

31 23 19 Dewatering

31 23 33 Excavation and Backfilling

31 25 00 Erosion and Sedimentation Controls

31 25 13 Rolled Erosion Control Products

31 30 00 Earthwork (Site)

DIVISION 32 – EXTERIOR IMPROVEMETNS

32 12 15 Trench Repair Asphalt Paving

32 17 23 Pavement Markings

SECTION 01 11 00 - SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Work covered by the Contract Documents.

2. Work phases.

3. Work under other contracts.

4. Government Furnished Materials.

5. Use of premises.

6. Government’s occupancy requirements.

7. Work Restrictions.

8. Soils Investigation Report.

9. Additional Reports.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Location: The project sites are located within the Central District/South District along the

Skyline Drive in Shenandoah National Park, Virginia. Asset numbers have been assigned to the various culverts to be lined by this project as the various locations of these assets are identified on a separate location drawing.

B. The Work consists of the following:

1. The work includes the cleaning and lining of existing culverts along the Skyline Drive as identified on the separate locations map. General goals of this portion of anticipated rehabilitation culvert work includes rehabilitating the interior of existing culvert pipes with high density polyethylene (HDPE) pipe liner system, Snap-Tite. Work consists of cleaning, debris removal, pressure washing, jetting of existing culverts and drain systems that the culvert piping would then serve as host pipes followed by inserting HDPE pipe liner system, sealing the culverts ends annular space for several feet, grout remaining annular space while displacing air & water from within the annular space, angling the inlets & outlets to promote storm & surface water passage/flow and restore impacted site grades and vegetation. Work shall be executed in compliance with the manufacturer’s recommendations and these contract documents. Culverts identified are at or beyond their expected lifespans. This project is to address some of the parks deferred maintenance, improve efficiency of operations, improve maintainability of assets, and be in compliance with applicable Federal, State, and local regulations.

2. Contractor to provide all labor, equipment, supplies, and materials & components necessary & needed for complete & functional systems at each of the designated locations.

3. Contractor to provide new drop inlet covers/tops for 50% of all this projects culverts systems. Therefore one-half of the total quantity of this projects culverts, contractor is to provide new Slab 1 and Slab 2 tops. Shop drawings details for Inlet Structure Top Slabs

1 & 2 follow this spec section. Surplus culvert tops are to be turned over to the park at the park Big Meadows maintenance bone yard east of the open meadow.

4. Contractor to provide new Carsonite Dual Sided Marker - White (ID: CIB307201 72in.)

with 3x9 RS Diamond Grade yellow reflective sheeting on both opposing stake sides-towards the top or approved equal stakes for 75% of all this projects culverts systems.

Therefore three-fourths of the total quantity of this projects culverts @ two Carsonite or approved equal stakes with yellow reflective sheeting per culvert, contractor is to provide new Carsonite or approved equal stakes similar to undamaged existing Carsonite stakes.

Carsonite stakes can be obtained from the following:

http://store.carsonite.com/products1.asp?catid=18&prodtype=37&type=1101

Surplus Carsonite or approved equal stakes are to be turned over to the park at the park

Big Meadows maintenance yard.

C. Project work scope as awarded will be constructed under a single prime contract.

1.3 CONTRACTOR USE OF SITE

A. General: Contractor may have significant use of the site within a designated limit of disturbance for construction operations during the construction period and is to be self-supportive of implementing & execution all traffic controls necessary for project execution. Contractor shall have limited use of the sites within a designated limit of disturbance for construction operations during the construction period. Contractor’s use of the site is limited by the Government’s righ t to perform work and maintain park operations or retain other contractors on portions of work under separate contract(s) for the Park. The Contractor’s access to the site may be affected by weather and/or road closures. These closures shall not impact the duration of the schedule. The Park is not responsible for plowing access to the sites. Call 540-999-3500 and press 8 at any time for administrative road status.

Skyline Drive status conditions are: Open to All Traffic, Administrative Use Only, and Closed to

All Traffic Except Law Enforcement.

1. Open to all Traffic: As implies. See Appendix 1 to specification: Shenandoah National

Park Superintendent’s Compendium of Designations, Closures, Permit Requirements and

Other Restrictions Imposed Under Discretionary Authority.

2. Administrative Use Only: Contractor may possibly acquire one park assigned key. Key is not to be duplicated, copied or destroyed and must be formally returned to the park prior to seeking final payment. Lost keys subject to all costs to replace park’s entire key and lock system.

3. Closed to All Traffic Except Law Enforcement, Emergency Use Vehicles, or NPS Snow

Plows: Contractor is not allowed on respective portions of Skyline Drive.

C.O. may review access and use of sites in conjunction with the pre-construction meeting.

B. The average annual adverse weather which would impact the schedule shall be built into the schedule.

http://store.carsonite.com/products1.asp?catid=18&prodtype=37&type=1101

a. The following "Closed to Public Vehicular Site Access" days were experienced in a recent winter for the Central District due to either hazardous driving conditions and/or the forecast/anticipation thereof with emphasis on public safety:

1) November: 5-days

2) December: 15-days plus 1-day of access only to/from one end of the District to Big

Meadows.

3) January: 22-days

4) February: 14-days plus 4-days of access only to/from one end of the District to Big

Meadows.

5) March: 11-days

C. Storage of Materials: Confine storage of materials to staging areas onsite as mutually agreed with the Contracting Officer’s Representative.

D. Preservation of Natural Features:

1. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

2. Provide temporary barriers to protect existing trees and plants and root zones.

3. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with Contracting Officer and remove agreed-on roots and branches that interfere with construction.

4. Do not fasten ropes, cables, or guys to existing trees.

5. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.

6. Identify NPS marked invasive plant species on access roads and within site limit of disturbance prior to construction.

7. Prevent spread of invasive plant species through the following methods:

a. All construction equipment and hand tools that will come into contact with park soil must be free of dirt, seeds and vegetation prior to entering the park.

b. Frames, tires, tracks, beds, buckets and other attachments must be pressure washed or steam cleaned. Any equipment leaving the park must be re-cleaned before re-entry to the park and project site.

c. All construction equipment and hand tools that are used in areas of the park infested with the invasive exotic plants such as, but not limited to, Japanese stilt grass (Microstegium vimineum), Oriental Lady's Thumb (Polygonum caespitosum), etc., must be free of dirt, seeds and vegetation prior to being moved to another work area within the park.

d. Invasive plant materials removed as part of construction operations must be legally disposed of outside of park.

8. Contractor shall provide any and all provisions and measures to mitigate potential impacts to and within the park in execution of the work. Contractor shall comply with the various items and provide measures as indicated in the separate “Mitigations List

Form” dated May 5, 2016, PEPC ID 63927 (3-pages under separate cover or following this spec section) and implement such to the satisfaction of the Contracting Officer’s

Representative at no additional time or cost to the government.

E. Driveways and Entrances: Keep driveways, access roads and entrances serving premises clear and available to Government, Government's employees, Concessionaire, Concessionaire’s staff and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

Maintain park and/or public access to all facilities including hiking trails.

1. Schedule deliveries to minimize use of driveways and entrances.

2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

SPECIFIC NOTE: The Skyline Drive is to remain in operation continually throughout th is project duration unless the Park implements closures as outlined in the Superintendents Compendium.

Skyline Drive traffic & access must be maintained at all times.

F. Construction Camp: Establishment of a camp within the park will not be permitted.

G. Hauling Restrictions: Refer to document at the end of this section: Shenandoah National Park

Superintendent’s Compendium.

1.4 PUBLIC USE OF SITE

A. The access road to the site is not open to public vehicles. Site is subject to public exposure and pedestrian traffic as well as impacts from wildlife.

1.5 OCCUPANCY REQUIRMENTS

A. Existing Buildings, Roads, Park Features & Assets

1. Full Government Occupancy: Government will able to occupy buildings, roads, and access all park features & assets, even if such will be under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with

Government's day-to-day operations. Maintain existing egress & access ways & roads and allow for continual seasonal operations unless otherwise indicated.

a. Maintain access to existing walkways, corridors, roads and other adjacent occupied or used facilities and amenities. Do not close or obstruct roads, walkways, corridors, or other occupied or used facilities and amenities without prior written permission from the CO.

b. Repair damage and impacts caused by construction operations. Protect park assets and its occupants during construction period.

1.6 WORK RESTRICTIONS

A. On-Site Work Hours: Work shall be generally performed during normal business working hours of

7:00 a.m. to 4:30 p.m., Monday through Friday, except when otherwise indicated or when elected by the Contractor to meet schedule and operational requirements – all of which is subject to CO approval.

1. Other Hours: Subject to approval by C.O. on a case by case basis as required to meet schedule and operational requirements.

2. Weekends and Federal Holidays: Work may not be undergone onsite during weekends or on Fridays and Mondays adjacent to a Federal Holiday weekend nor on a Federal

Holiday. Work may possibly be permitted on weekends or during Federal Holidays subject to approval by C.O. on a case by case basis as required to meet schedule and operational requirements.

B. Seasonal Work Restrictions: The existing park assets operate 24 hours a day and operate year-round. The infrastructure herein provides support to the roadways system that serves as egress/access & view-shed through the Park. However traffic volumes are significantly reduced during the “off-season” typically between December 1 and March 15.

C. Existing Infrastructure: Interruptions to the operations of these assets shall be of limited scope and limited duration. All work proposed within the scope of this project has the potential to impact

Parks operations and visitor services. Do not interrupt park traffic operations unless under the following conditions:

1. Notify Contracting Officer not less than 72 hours in advance of proposed interruption(s).

2. Do not proceed with interruptions without Contracting Officer’s written permission.

D. Existing Utilities

1. Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation.

2. Contractor shall be responsible for locating and preventing damage to known and unknown utilities. If damage occurs to a known or unknown, repair utility at no additional time or expense to the Government.

E. Existing traffic interruptions: Do not interrupt roadway traffic or others unless permitted under the following conditions and then only after arranging to provide & maintain all applicable traffic controls according to MUTC and the requirements of this project in addition to the items indicated below:

1. Notify Contracting Officer not less than 72 hours in advance of proposed interruptions.

2. Do not proceed with interruptions without Contracting Officer’s written permission.

3. Hours for traffic interruptions: Subject to approval by C.O. on a case by case basis and only considered for Tuesday through Thursday of a given week.

4. The maximum allowable duration of traffic delay is 15-minutes. The C.O. must be notified 72 hours in advance to coordinate park activities.

F. Nonsmoking Buildings: Smoking is not permitted within any Park building or within 25 feet of entrances, operable windows, or outdoor air intakes.

G. Existing Park Assets: Contractor shall provide any & all provisions for work execution to allow for continual park operation. Any and all impacts to existing to remain systems, hard surfaces, vegetation, drainage structures, utilities, etc., shall be repaired and/or replaced to match the adjacent at no additional time or cost to the government and be satisfaction of the CO.

1.7 SPECIAL CONSTRUCTION REQUIREMENTS

A. Contractor to obtain and pay for any required construction permits and coordinate the respective inspections, work, etc. to obtain Authority Having Jurisdiction approval and C.O. approval.

B. If conflict exists between codes, manufacturer’s recommendations or instructions, specifications, or drawings, etc., the most stringent prevails at the Contracting Officer's discretion .

1.8 SOILS INVESTIGATION REPORT

A. A soils investigation report has not been prepared for this project.

1.9 ADDITIONAL REPORTS

A. None.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 11 00

SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS

1.1 SUMMARY

A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut-off points where one item ends and another begins.

B. If no contract line item exists for a portion of the work, include the costs in a related item.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 LIST OF CONTRACT LINE ITEMS

A. Contract Line Item No.1: BASE BID Rehab culverts via furnish & install HDPE culvert liners per the manufacturer’s instructions & requirements and in compliance with the contract documents for all PMIS 160852 map identified existing culverts from & including mile post

64+1117 (Asset 193310) to & including mile post 64+1493 (Asset 193326), 64+4690 (Asset

196379), 65+413 (Asset 196511), 65+567 (Asset 196534), 65+1451 (Asset 196615), 65+2187

(Asset 196650), 65+3556 (Asset 197061), 65+3981 (Asset 197173), 66+4248 (Asset 197877), 66+5289 (Asset 197958), 67+439 (Asset 198284), 67+1749 (Asset 198417), 67+2197 (Asset

198466), 67+3085 (Asset 198460), 67+3500 (Asset198655), 73+0520 (Asset 208414).

Excludes Bid Options; mile post 68+1709 (Asset199747), 69+358 (Asset199981), 72+3060

(Asset208255), 72+3656 (Asset 208266) Include concise description of what is included in this item. Do not describe items which are not covered by this item.

1. This item consists of:

a. Cleaning, debris removal, compliance with mitigations applicable to selected culverts as indicated.

b. Provide all, labor, materials, & equipment for complete & functional systems.

c. Provide and execute appropriate measures to maintain traffic on Skyline Drive.

d. Provide and execute appropriate measures and provisions for any and all water temporary diversion/storage until appropriate curing of materials is obtained.

e. Restore all impacted areas & surfaces to match adjacent un-impacted existing as a result of the construction of this project.

f. Provide 3 year warranty for contractor to eradicate (remove from site & dispose of legally outside the park) any non-native invasive exotic vegetation within the construction areas and establish stable vegetation.

g. All permitting and testing required by the respective system manufacturers, applicable regulations, codes and NPS.

h. Site & systems restoration as required.

2. Measurement for payment will be lump sum or percentage complete of line item per scheduled value.

3. Payment will be made at the contract lump sum price.

B. Contract Line Item No. 2: Bid Option A – Rehab culvert via furnish & install HDPE culvert liners per the manufacturer’s instructions & requirements and in compliance with the contract documents for PMIS 160852 map identified existing culvert @ mile post 68+1709 (Asset

199747).

1. This item consists of:

a. Cleaning, debris removal, compliance with mitigations applicable to selected culvert as indicated.

b. Provide all, labor, materials, & equipment for complete & functional systems.

c. Provide and execute appropriate measures to maintain traffic on Skyline Drive.

d. Provide and execute appropriate measures and provisions for any and all water temporary diversion/storage until appropriate curing of materials is obtained.

e. Restore all impacted areas & surfaces to match adjacent un-impacted existing as a result of the construction of this project.

f. Provide 3 year warranty for contractor to eradicate (remove from site & dispose of legally outside the park) any non-native invasive exotic vegetation within the construction areas and establish stable vegetation.

g. All permitting and testing required by the respective system manufacturers, applicable regulations, codes and NPS.

h. Site & systems restoration as required.

2. Measurement for payment will be lump sum or percentage complete of line item per scheduled value.

3. Payment will be made at the contract lump sum price.

C. Contract Line Item No. 3: Bid Option B – Rehab culvert via furnish & install HDPE culvert liners per the manufacturer’s instructions & requirements and in compliance with the contract documents for PMIS 160852 map identified existing culvert at mile post 69+358 (Asset

199981).

1. This item consists of:

a. Cleaning, debris removal, compliance with mitigations applicable to selected culvert as indicated.

a. Provide all, labor, materials, & equipment for complete & functional systems.

c. Provide and execute appropriate measures to maintain traffic on Skyline Drive.

d. Provide and execute appropriate measures and provisions for any and all water temporary diversion/storage until appropriate curing of materials is obtained.

e. Restore all impacted areas & surfaces to match adjacent un-impacted existing as a result of the construction of this project.

f. Provide 3 year warranty for contractor to eradicate (remove from site & dispose of legally outside the park) any non-native invasive exotic vegetation within the construction areas and establish stable vegetation.

g. All permitting and testing required by the respective system manufacturers, applicable regulations, codes and NPS.

h. Site & systems restoration as required.

2. Measurement for payment will be lump sum or percentage complete of line item per scheduled value.

3. Payment will be made at the contract lump sum price.

D. Contract Line Item No. 4: Bid Option C – Rehab culvert via furnish & install HDPE culvert liners per the manufacturer’s instructions & requirements and in compliance with the contract documents for PMIS 160852 map identified existing culvert at mile post 72+3060 (Asset

208255).

1. This item consists of:

a. Cleaning, debris removal, compliance with mitigations applicable to selected culvert as indicated.

b. Provide all, labor, materials, & equipment for complete & functional systems.

c. Provide and execute appropriate measures to maintain traffic on Skyline Drive.

d. Provide and execute appropriate measures and provisions for any and all water temporary diversion/storage until appropriate curing of materials is obtained.

e. Restore all impacted areas & surfaces to match adjacent un-impacted existing as a result of the construction of this project.

f. Provide 3 year warranty for contractor to eradicate (remove from site & dispose of legally outside the park) any non-native invasive exotic vegetation within the construction areas and establish stable vegetation.

g. All permitting and testing required by the respective system manufacturers, applicable regulations, codes and NPS.

h. Site & systems restoration as required.

2. Measurement for payment will be lump sum or percentage complete of line item per scheduled value.

3. Payment will be made at the contract lump sum price.

E. Contract Line Item No. 5: Bid Option D – Rehab culvert via furnish & install HDPE culvert liners per the manufacturer’s instructions & requirements and in compliance with the contract documents for PMIS 160852 map identified existing culvert at mile post 72+3656 (Asset

208266).

1. This item consists of:

a. Cleaning, debris removal, compliance with mitigations applicable to selected culvert as indicated.

b. Provide all, labor, materials, & equipment for complete & functional systems.

c. Provide and execute appropriate measures to maintain traffic on Skyline Drive.

d. Provide and execute appropriate measures and provisions for any and all water temporary diversion/storage until appropriate curing of materials is obtained.

e. Restore all impacted areas & surfaces to match adjacent un-impacted existing as a result of the construction of this project.

f. Provide 3 year warranty for contractor to eradicate (remove from site & dispose of legally outside the park) any non-native invasive exotic vegetation within the construction areas and establish stable vegetation.

g. All permitting and testing required by the respective system manufacturers, applicable regulations, codes and NPS.

h. Site & systems restoration as required.

2. Measurement for payment will be lump sum or percentage complete of line item per scheduled value.

3. Payment will be made at the contract lump sum price.

GENERAL NOTES:

The Skyline Drive, access roads, parking lots, site areas, inlet structures, outlet structures, headwalls, ditch lines, and surrounding grounds areas to, in, and around the sites must be maintained to the condition which existed prior to the commencement of work or better. Any damage that occurs to the surfaces, systems, structures, etc., including interfaces thereof, must be repaired or replaced to the satisfaction of the C.O. by the contractor at no additional time or expense to the government.

END OF SECTION 01 27 00

Culvert Lining

CONTRACT

LINE ITEM

NUMBER

(CLIN)

CONTRACT LINE ITEM (CLI) TITLE QUANTITY

UNIT OF

MEASURE

UNIT PRICE TOTAL PRICE

Rehab Existing Culverts via liners mile post 64+1117 to

73+520 minus bid options below 1 LS Lump Sum

Bid Option A: Rehab existing culvert via liner mile post

68+1709 1 LS Lump Sum

Bid Option B: Rehab existing culvert via liner mile post

69+358 1 LS Lump Sum

Bid Option C: Rehab existing culvert via liner mile post

72+3060 1 LS Lump Sum

Bid Option D: Rehab existing culvert via liner mile post

72+3656 1 LS Lump Sum

TOTAL PRICE FOR OPTIONS (Contract Line Item Number 2 through 5) ------------------------------------

TOTAL PROPOSED PRICE - BASE PLUS OPTIONS (Contract Line Item Number 1 through 5) -----------

CONTRACT PRICE SCHEDULE

SOLICITATION NUMBER:

PARK - PMIS: 160852

DEVELOPED AREA: Skyline Drive - Central District/South District

All measurement and payment information is included in the project specifications, Section 012700.

Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern.

Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the

Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.

TOTAL BASE PRICE (Contract Line Item Number 1) -------------------------------------------------------------

In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the

Government. Such proposals shall clearly identify why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the

Solicitation.

PROJECT TITLE: Culvert Linings Mile 64 to 73

SHEN 172852

CPS - 1

SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION

1.1 SUMMARY

A. This Section includes administrative provisions for coordinating construction operations on

Project including, but not limited to, the following:

1. Construction Coordination.

2. Requests for Information (RFIs).

3. Project meetings.

B. Related Requirements:

1. Section 01 3 216 “Construction Progress Documentation” for preparing and submitting

Contractor’s construction schedule.

2. Section 01 73 40 “Execution” for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.

3. Section 01 77 00 “Closeout Procedures” for coordinating closeout of the Contract.

1.2 CONSTRUCTION COORDINATION

A. Coordination: Coordinate construction operations included in different Sections of the

Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components with other Contractors to ensure maximum accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

4. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of all components, including mechanical and electrical.

B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's Construction Schedule.

2. Preparation of the Schedule of Values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Pre-installation conferences.

7. Project closeout activities.

8. Commissioning activities.

1.3 SUBMITTALS

A. Division 01 documents: four paper copies of the following items shall be submitted a minimum of one week prior to the Preconstruction Conference. Contracting Officer will notify Contractor of tentative date for the Pre-Construction Conference.

1. Letter designating Project Superintendent.

2. Construction Schedule.

3. A comprehensive breakdown of the Schedule of Values.

4. A list of Subcontractors for this project.

5. Satisfactory evidence of liability insurance coverage and workman’s compensation for the Contactor and all subcontractors.

B. All items listed must be provided to the Contracting Officer before the Pre-Construction

Conference is held. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to

Proceed will not be issued, and the Contracting Officer will consider other contractual remedies.

Work shall not commence until written Notice to Proceed.

1.4 REQUESTS FOR INFORMATION (RFIs)

A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall proceed as follows:

1. Bring issue to the attention of the Contractor’s on site representative to verify consensus on need for additional information or interpretation.

2. Fully review and investigate Contract Documents and field conditions relating to item of issue.

3. Bring issue to the attention of the Contracting Officer informally.

4. If issue cannot be resolved through informal communication with the CO, prepare and submit an RFI in the form specified.

a. CO will return RFIs submitted by other entities controlled by Contractor with no response.

b. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

1. RFI number, numbered sequentially

2. Project name.

3. Contract number.

4. Date.

5. Name of Contractor.

6. RFI subject.

7. Specification Section number and title and related paragraphs, as appropriate.

8. Drawing number and detail references, as appropriate.

9. Field dimensions and conditions, as appropriate.

10. Contractor's suggested resolution. If Contractor's suggested resolution impacts the

Contract Time or the Contract Sum, Contractor shall state impact in the RFI.

11. Contractor's signature.

12. Requested date for response.

13. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop

Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.

C. RFI Forms: Utilize the RFI form that can be downloaded from the Workflows website at http://www.nps.gov/dscw/con_rfi217.htm or Software-generated form with substantially the same content as indicated above, approved by the CO. RFI form is also attached at the end of this section.

1. Attachments can be electronic files in Adobe Acrobat PDF format or hard copies can be submitted.

D. Contracting Officer’s Action: CO will review each RFI, determine action required, and respond. CO will determine the critical nature of each RFI and issue a response accordingly.

1. The following Contractor-generated RFIs will be returned without action:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for approval of Contractor's means and methods.

d. Requests for coordination information already indicated in the Contract

Documents.

e. Requests for adjustments in the Contract Time or the Contract Sum.

f. Requests for interpretation of Architect's actions on submittals.

g. Incomplete RFIs or inaccurately prepared RFIs.

2. CO's action may include a request for additional information, in which case time for response will date from time of receipt of additional information.

3. CO's action on RFIs may result in the need for a change to the Contract Time or the

Contract Sum. All contract changes will be processed following the terms and conditions of the contract.

1.5 PROJECT MEETINGS

A. Preconstruction Conference: Before start of construction, Contracting Officer will arrange an on-site meeting with Contractor. The meeting agenda will include the following as a minimum:

http://www.nps.gov/dscw/con_rfi217.htm

1. Roles & Responsibilities/ Lines of Authority.

2. Park rules and regulations.

3. Resolution of comments on required Division 01 documents.

4. Coordination of Subcontractors.

5. Modifications.

6. Payments to Contractor.

7. Payroll reports.

8. Contract time.

9. Liquidated damages.

10. Display of Hotline posters.

11. Notice to proceed.

12. Correspondence procedures.

13. Acceptance/rejection of work.

14. Progress meetings.

15. Submittal procedures.

16. As-constructed drawings/operation and maintenance (O&M) manuals.

17. Saturday, Sunday, holiday and night work.

18. Reference materials.

19. Value engineering.

B. Progress Meetings: The Contracting Officer will schedule weekly meetings with the

Contractor.

1. Attendees: In addition to Government Representatives, each Contractor, Subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings.

All participants at the meeting shall be familiar with the Project and authorized to conclude matters relating to the Work.

2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. The meeting agenda will include the following:

a. Approval of minutes of previous meetings.

b. Submittal status.

c. Review of off-site fabrication and delivery schedules.

d. Requests for information (RFI) and other issues.

e. Modifications.

f. Work in progress and projected.

g. Construction Schedule update (provide updated CPM).

h. Status of Project Record Drawings and O&M manuals.

i. Other business relating to work.

1.6 ENVIRONMENTAL COORDINATION

A. Contractor’s Environmental Manager: Designate an on-site party responsible for overseeing the

Contractor’s conformance to environmental goals for the project and implementing procedures for environmental protection.

1. Qualifications: Construction experience on projects of similar size and scope; with environmental procedures similar to those of this project; must be familiar with environmental regulations applicable to construction operations.

2. Responsibilities: Responsibilities shall include:

a. Compliance with applicable Federal, State, and local environmental regulations, including maintaining required documentation.

b. Training for Contractor personnel in accordance with their position requirements.

c. Monitoring and documentation.

B. Perform project quality control in accordance with requirements specified in Related Sections, including:

1. Quality Requirements.

2. Regulatory Requirements.

3. Noise & Acoustics Management.

4. Construction Waste Management.

C. Contractor’s Environmental Training Program: Contractor shall provide environmental training for workers performing work on the project site. Training shall include the following:

1. Overview of environmental issues related to the building industry.

2. Overview of environmental issues related to the Project.

3. Review of site specific procedures and management plans.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 31 00

Project: SHEN 160852 – Culvert Lining

Contract No.: Date:

To:

cc:

From:

Subject:

Please provide the following information or clarification:

Response required by ___\____\____

Date:

To:

From:

Subject: Response to RFI No___

REQUEST FOR INFORMATION # ____

[This page intentionally blank.]

SECTION 01 32 16 – CONSTRUCTION SCHEDULE

1.1 SUMMARY

A. This Section consists of Construction Schedule requirements including but not limited to the following:

1. Schedule of Values

2. Construction Schedule Requirements.

3. Construction Schedule Updates.

4. Time Impact Analysis.

B. Purpose: The purpose of the Construction Schedule is to ensure adequate planning, coordination, scheduling, and reporting during execution of the work by the Contractor. The

Construction Schedule will assist the Contractor and Contracting Officer in monitoring the progress of the work, evaluating proposed changes, and processing the Contractor's monthly progress payment.

1.2 DEFINITIONS

A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling the construction project. Activities included in a construction schedule consume time and resources.

1. Critical activities are activities on the critical path. They must start and finish on the planned early start and finish times.

2. Predecessor Activity: An activity that precedes another activity in the network.

3. Successor Activity: An activity that follows another activity in the network.

B. Cost Loading: The allocation of the Schedule of Values for the completion of an activity as scheduled. The sum of costs for all activities must equal the total Contract Sum, unless otherwise approved by the Contracting Officer.

C. CPM: Critical path method, which is a method of planning and scheduling a construction project where activities are arranged based on activity relationships. Network calculations determine when activities can be performed and the critical path of Project.

D. Critical Path: The longest connected chain of interdependent activities through the network schedule that establishes the minimum overall Project duration and contains no float.

E. Float: The measure of leeway in starting and completing an activity.

1. Float: Float is not for the exclusive use or benefit of either the Government or the

Contractor but is jointly owned.

2. Free float is the amount of time an activity can be delayed without adversely affecting the early start of the successor activity.

3. Total float is the measure of leeway in starting or completing an activity without adversely affecting the planned Project completion date.

F. Resource Loading: The allocation of manpower and equipment necessary for the completion of an activity as scheduled.

G. Fragnet: A partial or fragmentary network that breaks down activities into smaller activities for greater detail.

1.3 SUBMITTALS

A. Schedule of Values: After contract award and before the Pre-Construction conference submit a schedule of dollar values based on the Contract Price Schedule.

B. Construction Baseline Schedule: After contract award and before the Pre-Construction conference, submit two paper copies of baseline schedule, large enough to show entire schedule for entire construction period.

C. CPM Reports: Concurrent with CPM schedule, submit two paper copies of each of the following computer-generated reports. Format for each activity in reports shall contain activity number, activity description, [cost] and resource loading, original duration, remaining duration, early start date, early finish date, late start date, late finish date, and total float in calendar days.

1. Activity Report: List of all activities sorted by activity number and then early start date, or actual start date if known.

2. Logic Report: List of predecessor and successor tasks for all activities, sorted in ascending order by activity number and then early start date, or actual start date if known.

3. Total Float Report: List of all activities sorted in ascending order of total float.

D. Construction Schedule Updates: On or before the 7th day preceding the progress payment request date, submit estimates of the percent completion of each schedule activity and necessary supporting data. Provide two paper copies and one electronic copy.

E. Construction Schedule Revisions and Time Impact Analysis: For each Construction Schedule revision submit two paper copies of a Time Impact Analysis. Each Time Impact Analysis shall include a Fragmentary Network (Fragnet) demonstrating how the Contractor proposes to incorporate a modification, change, delay, or Contractor request into the Construction Schedule.

1.4 QUALITY ASSURANCE

A. The Contractor shall meet with the Contracting Officer on the day of the preconstruction conference to go over the following:

1. Verify availability of qualified personnel needed to develop and update schedule.

2. Discuss constraints, including phasing, work stages, and area separations.

3. Review schedule for work of separate Government contracts.

4. Review time required for review of submittals and re-submittals.

5. Review requirements for tests and inspections by independent testing and inspecting agencies.

6. Review time required for completion and startup procedures.

7. Review and finalize list of construction activities to be included in schedule.

8. Review initial schedule comments, resolve issues and progress on incorporating them.

9. Review procedures for updating schedule.

B. Contractor's Schedule Representative: Before or at the preconstruction conference, designate in writing and provide the qualifications of an authorized representative in the Contractor's organization who shall be responsible for coordinating with the Contracting Officer during the preparation and maintenance of the Construction Schedule.

1.5 COORDINATION

A. Coordinate preparation and processing of schedules and reports with performance of construction activities and with scheduling and reporting of separate Contractors.

B. Coordinate Construction Baseline Schedule with the list of subcontracts, Submittals Schedule, progress reports, payment requests, and other required schedules and reports.

1. In developing the Construction Baseline Schedule, ensure that the Subcontractor’s work at all tiers, as well as the prime Contractor’s work, is included and coordinated.

2. Secure time commitments for performing critical elements of the Work from parties involved.

3. Coordinate each construction activity in the network with other activities and schedule them in proper sequence.

PART 2 - PRODUCTS

2.1 SCHEDULE OF VALUES

A. Breakdown each lump-sum item into component parts of work for which progress payments may be requested. The total costs for the component parts of work shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values. Include mobilization, general condition costs, overhead and profit in the total dollar value of unit price items and in the component parts of work for each lump-sum item. Do not include mobilization, general condition costs, overhead or profit as a separate item.

B. Do not break down unit price items. Use only the contract price for unit price items.

C. The total cost of all items shall equal the contract price. The Schedule of Values will form the basis for progress payments.

D. An acceptable Schedule of Values shall be agreed upon by the Contractor and Contracting

Officer before the first progress payment is processed.

2.2 CONSTRUCTION SCHEDULE REQUIREMENTS

A. Construction Baseline Schedule: Prepare Construction Baseline Schedule using a computerized, cost and resource-loaded, time-scaled CPM network analysis diagram for the

Work.

1. Develop and finalize Construction Baseline Schedule so it can be accepted for use no later than 30 days after date established for the Notice of Award.

a. Failure to include any work item required for performance of this Contract shall not excuse Contractor from completing all work within applicable completion dates, regardless of Governments acceptance of the schedule.

2. Establish procedures for monitoring and updating Construction Baseline Schedule and for reporting progress. Coordinate procedures with progress meeting and payment request dates.

3. Use "one workday" as the unit of time. Incorporate nonworking days and government holidays into the schedule.

B. Construction Baseline Schedule Preparation: Prepare a list of all activities required to complete the Work. Using the preliminary CPM network diagram, prepare a skeleton network to identify probable critical paths.

1. Activities: Indicate the estimated duration, sequence requirements, and relationship of each activity in relation to other activities.

2. Critical Path Activities: Identify critical path activities, including those for interim completion dates. Scheduled start and completion dates shall be consistent with Contract milestone dates.

3. Processing: Process data to produce output data on a computer-drawn, time-scaled network. Revise data, reorganize activity sequences, and reproduce as often as necessary to produce the CPM schedule within the limitations of the Contract Time.

4. The Construction Baseline Schedule as developed shall show the sequence and interdependence of activities required for complete performance of the work. Ensure all work sequences are logical and the Construction Baseline Schedule shows a coordinated plan of the work.

5. Resource loading of each activity shall include all personnel by labor category and equipment type and capacity proposed to complete the activity in the duration shown.

6. Time Frame: Proposed duration assigned to each activity shall be the Contractor's best estimate of time required to complete the activity considering the scope and resources planned for the activity.

a. The late finish date shown on the schedule shall be the same date as the last day of the contract period.

b. Contract completion date shall not be changed by submission of a schedule that shows an early completion date.

c. The Contractor shall limit use of lead or lag duration’s between schedule activities.

d. Activity Duration: Define activities so no activity is longer than 15 days, except for non-construction activities including mobilization, shop drawings and submittals, fabrication and delivery of materials and equipment.

e. Procurement Activities: Include procurement process activities for the following long lead items and major items, requiring a cycle of more than 60 calendar days, as separate activities in the schedule. Procurement cycle activities include, but are not limited to, submittals, approvals, purchasing, fabrication, and delivery.

f. Submittal Review Time: Include review and re-submittal times indicated.

Coordinate submittal review times in Construction Baseline Schedule. Refer to

Division 01 Section 01 33 23 “Submittal Procedures” for submittal review times.

g. Substantial Completion: Allow time for Government administrative procedures necessary for certification of Substantial Completion.

7. Constraints: Include constraints and work restrictions indicated in the Contract

Documents and as follows in schedule, and show how the sequence of the Work is affected.

a. Phasing: Arrange list of activities on schedule by phase.

b. Work under More Than One Contract: Include a separate activity for each contract, sub-contract, or sub-sub-contract.

c. Work Restrictions: Show the effect of the following items on the schedule:

1) Coordination with existing construction.

2) Limitations of continued occupancies.

3) Uninterruptible services.

4) Partial occupancy before Substantial Completion.

5) Use of premises restrictions.

6) Provisions for future construction.

7) Seasonal variations.

8) Environmental control.

d. Work Stages: Indicate important stages of construction for each major portion of the Work.

8. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not limited to, the Notice to Proceed, switch over from old equipment to new equipment, Substantial Completion, and Final Completion.

C. Joint Review, Revision, and Acceptance:

1. Within seven calendar days of receipt of the Contractor's proposed Construction Baseline

Schedule, the Contracting Officer and Contractor shall meet for joint review, correction, or adjustment of the initial Construction Baseline Schedule. Any areas which, in the opinion of the Contracting Officer, conflict with timely completion of the project shall be subject to revision by the Contractor.

2. Within seven calendar days after the joint review between the Contractor and Contracting

Officer, the Contractor shall revise and resubmit the Construction Baseline Schedule in accordance with agreements reached during the joint review.

3. In the event the Contractor fails to define any element of work, activity, or logic, and the

Contracting Officer review does not detect this omission or error, such omission or error, when discovered by the Contractor or Contracting Officer, shall be corrected by the

Contractor within seven calendar days and shall not affect the contract period.

4.

This is the start of the file's text. The full file is on GovTribe.