A04_Rosebud_Warehouse_SOW_edited_vlm.pdf

PDF 54 KB Posted

Attached to
BLM-UT Rosebud Warehouse Federal contract opportunity
Solicitation number
140L5721R0006
Issued by
Department of the Interior Bureau of Land Management Utah Region

About this file

This document provides a statement of work for the construction of a 1,600 square foot warehouse building at the Rosebud Field Station in Box Elder County, Utah. The contractor will be responsible for designing and constructing the prefabricated steel building, including footings and foundations, interior finishes, mechanical, electrical systems, and any necessary site work. Specific requirements include delivery and installation of the prefabricated steel building, design and construction of foundations, building construction and electrical/lighting installation, installation of a compressed air system, relocation of fuel tanks and a small shed, trenching and installation of new electrical from the power pole to the new building and fuel tank, and site grading immediately around the building. The period of performance is 180 days from notice to proceed. Work hours are Monday through Friday from 7:00 am to 7:00 pm unless otherwise approved. The related federal contract opportunity is solicitation number 140L5721R0006 for the BLM-UT Rosebud Warehouse construction project through the Department of the Interior Bureau of Land Management Utah Region.

View the file

Other files for this federal contract opportunity

Other files attached to BLM-UT Rosebud Warehouse, newest first.
File Type Posted
B09_Rosebud_Warehouse_Pre-Sol_Site_Visit_Roster_0001.pdf PDF
Sol_140L5721R0006_Amd_0001.pdf PDF
B09_Questions_and_Answers_0001.pdf PDF
B03_Wage_Determinations_UT202100081.pdf PDF
A06_Rosebud_Geotechnical_Final_Rpt.pdf PDF
A06_Rosebud_Warehouse_Drawing_Packet.pdf PDF
A06_Rosebud_Warehouse_Specifications_v_4_mao.pdf PDF
Sol_140L5721R0006.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rosebud Warehouse Statement of Work June 2021 1

Statement of Work:

The contract includes construction of a 1,600 sq ft shop with 25 ft of covered parking. The warehouse will be a slab-on-grade prefabricated steel building. Contractor will be responsible for the design and construction of the building and associated footings, interior finishes, mechanical, electrical, and any site work necessary to install the structure and provide services to

it. This work includes the following:

• Delivery of a prefabricated steel building

• Design and construction of footings and foundations for the building

• Construction of the building including electrical and lighting

• Installation of a compressed air system

• Relocation of fuel tanks and a small shed

• Trenching and installing new electrical from the power pole to the new building and the relocated fuel tank

• Site grading immediately around the building as required to install the building (overall site work and grading is not part of this contract)

A Geotech report for the site is attached.

The Contractor shall minimize disturbance to the site to the greatest extent possible unless otherwise directed. All waste, trash, and debris generated from this effort shall be disposed of in a manner consistent with local and State regulations. During and after construction activities, the site shall be inspected and cleaned of any trash that has accumulated.

Locations:

Work under this contract is located in Box Elder County, Utah at the Rosebud Field Station (Lat

41.6176995, Long -113.6072257), approximately 18 miles southwest of Rosette, UT, on

Highway 30. Access to the work site is on State, County, and BLM paved and gravel roads. The work locations are shown on the attached site maps.

Period of Performance:

The period of performance on this contract will be 180 days from the date the Notice to Proceed is signed.

Work Schedule:

Work hours shall be Monday through Friday, 7:00 am to 7:00 pm, unless otherwise approved by the Contracting Officer