A04_2_LVICC_Security_System_SOW.docx
DOCX document 1 MB Posted
- Attached to
- LVICC SECURITY SYSTEM Federal contract opportunity
- Solicitation number
- 140L3923Q0126
About this file
This statement of work outlines requirements for installing a security system at the Las Vegas Interagency Communication Center facility. Key details include installing approximately 15-20 window and door sensors, 4 motion sensors, 1 tilt sensor, 5 key fobs, and 2 control panels to monitor entry points such as doors and windows. The system will utilize wireless equipment where feasible and include 24/7 monitoring by a security company. The contractor must provide training and troubleshooting support prior to completion. Installation is to minimize impacts, with work hours restricted to weekdays from 8:30am to 3:30pm. The performance period is one base year with up to 5 option years. The related solicitation was issued by the Bureau of Land Management Nevada Region for the LVICC SECURITY SYSTEM opportunity.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L3923Q0126_Amd_0002.pdf | ||
| B09_Questions_and_answers_Version_2_0002.docx | DOCX document | |
| B09_Questions_and_answers_0001.docx | DOCX document | |
| Sol_140L3923Q0126_Amd_0001.pdf | ||
| B03_Wage_Determinations_Clark_County.pdf | ||
| A06_3_LVICC_Map.pdf | ||
| Sol_140L3923Q0126.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
BLM Nevada Las Vegas Interagency Communication Center
Security System center
Bureau of Land Management Southern Nevada District
1.0 Project Introduction
Project Name: Installation of Security Camera System at BLM Nevada
1.1 Location and Facilities
This project is located at:
a. Las Vegas Interagency Communication Center ( LVICC) 2980 N. Rancho Drive Las Vegas, NV 89130
1.2 Short Project Description
The project consists of installing a Security system at LVICC to secure the building through an armed system that is Monitoring Doors, Windows, motion sensors, facility entry points, 24 hour security system monitoring and the primary system is to be ran Internet based with a backup contingency plan.
See: Detailed Project Description 4.3
0. BLM Points of Contact Gary Moberly- POC Las Vegas NV 89502 Ph: 702-515-5305
Contracting Officers Representative/Project Manager To be determined at time of award.
1.4 Period of Performance
| Base Year |
| When Contract is awarded- 1 year |
| Option Year 1 |
| 1st year – 2nd Year |
| Option Year 2 |
| 2nd year – 3rd year |
| Options Year 3 |
| 3rd year -4th year |
| Option Year 4 |
| 4th year- 5th year |
| Option Year 5 |
| 5th year-end of 5th year |
2.0 PROJECT Requirements
2.1 Scope of Work and Project Summary/Requirements
The work of this project consists of supplying and installing a security system that monitors the dispatch center. Security Center will contact Emergency Services and the Dispatch Centers Point of Contact.
2.2 Minimize Installation Impacts
During installation, the doors and windows will not be left open and unsecured during this process. Security Company Personnel will have access to the building during business hours with LVICC staff.
2.3 Staging Areas
Staging is limited to in/near the working area. All staging areas shall be returned to pre-installation conditions once project is complete.
2.4 Installation Coordination at all sites.
The Contracting Officer (CO) will provide all necessary written notification and/or direction to the contractor.
2.5 Quality Control
The quality of all work shall be the responsibility of the Contractor.
2.6 Working Hour Restrictions
All work and deliveries shall be limited to the weekday hours of 8:30 am to 3:30 pm unless otherwise approved by the Contracting Officer. No work shall occur on Federal holidays or weekends without prior approval.
2.7 Hazard Control
Take all necessary precautions to prevent fire during installation. Do not store flammable or combustible liquids in existing structures. Provide adequate ventilation during use of volatile or noxious substances.
2.8 Smoking
Smoking within buildings or temporary storage sheds is prohibited at all locations.
3.0 PERFORMANCE REQUIREMENTS
3.1 Protection
Protect any areas adjacent to the project site from installation debris. Keep dust and dirt to a minimum. Use suitable methods to limit dust and dirt from rising and scattering in air to lowest practical level. Comply with governing regulations pertaining to environmental protection. Ensure safety of persons in the work area. Provide temporary barricades as required to protect personnel and general public from injury due to installation work. Provide adequate fire protection. Keep area clear of hazardous substances and debris. Project site will be cleaned and secured on a daily basis to ensure the safety of the general public and personnel. All project debris will be cleaned up/removed at the end of the workday.
Project areas will be flagged/cordoned off to ensure the safety of the general public and personnel.
3.2 Contractor Support
Contractor will provide training and troubleshooting prior to project completion.
4.0 PROJECT DESCRIPTION
4.1 Existing Building and Site Description
At 2980 North Rancho Building. There are two programs that reside here.
Total Square Footage= 4,940 Square footage
1) Las Vegas Interagency Communication Center that is year-round, during the summer hours of operation are 24 hours and folks will be in the facility on a 24 hour staffing pattern.
The Federal Government employs 9 full time employees, during the summer months the staffing could be up to 15 dispatchers per shift.
2) Las Vegas Helitack program has between 8-12 Helicopter Crew members that are employed by the Federal Government.
This program will have personnel rotating in and out of the Helitack side of the building when rotating staffing. ( Outlined on the facility map)
It is important to have these two programs separated on the security system lay out. This way each program will be able to arm and disarm the security system as needed.
The zones will be reflected on the map as 1) LVICC 2) Helitack
| Features to include in the Security System through a Cellular service. |
| Count |
| Description |
| 15-20 |
| Window and Door sensors |
| 4 |
| Motion Sensors |
| 1 |
| Tilt Sensors |
| 5 |
| Key Fobs |
| 1 |
| Main Key Control panel, located at Dispatch Center |
| 1 |
| Generic keypad, located on Helitack side of the building |
| 1 |
| Interactive service and monitored by security company 24/7 year-round. |
Doors and windows that will need to be monitored.
· Garage Entry Doorway
· 5 exterior to interior entry door ways
· Windows that have the ability to Open
Map below lines out the area the boundary areas and doors /windows that need to have security equipment installed.
4.2 Existing Project Condition
The existing project sites are located in an interior area of a building which is a climate-controlled environment.
4.3 Detailed Project Description
4.3.1 Specific Work Tasks:
The Contractor shall provide Security Equipment that will monitor entry points to the building, control panels that will arm and disarm the system.
The Contractor shall provide personnel that monitor the facility 24 hours a day on a year round basis and aware of when the alarm is activated/triggered. The contractor shall contact the person of contact (POC) and the appropriate emergency services at the facility when there are emergencies at the facility.
If software is approved by the BLM. The Ability for BLM employees to monitor the system from remote software or an APP when not at the facility to arm or disarm the monitoring system.
All of the Systems equipment will be maintained by the security provider under the scope of this contract.
Motion detectors at entry points in the building.
Control panel is controlled by wireless internet., 2 Keypad control systems ( 1 in dispatch, 1 in Helitack), audible sirens. Will need to have the option to arm and disarm specific zones within the building and have a “stay” mode when arming.
4.3.2 Installation:
Preferred the Security system to utilize wireless equipment in the facility whenever feasible.
4.3.3 Warranty:
Provide and onsite product and replacement warranty. This does not include abuse, mishandling, or acts of nature.
4.4 Inspection and Acceptance
The Government shall inspect and approve all work prior to final completion and acceptance and completion of the Contract responsibilities.
The Government reserves the right to reject any work based on defects with respect to completeness, correctness and consistencies. In the event of a rejection of any task, the Contracting Officer shall notify the Contractor in writing within a reasonable time of any deficiencies to be corrected. The Contractor shall have five (5) business days after receipt to correct noted deficiencies or respond with corrective action plan accordingly.