B09_Questions_and_answers_Version_2_0002.docx
DOCX document 20 KB Posted
- Attached to
- LVICC SECURITY SYSTEM Federal contract opportunity
- Solicitation number
- 140L3923Q0126
About this file
This document contains questions and answers regarding security system requirements for a Bureau of Land Management facility in North Las Vegas, Nevada. The solicitation seeks an alarm and monitoring system for the building, which currently lacks security infrastructure. No existing equipment will be reused. The facility has a stable electric power supply with backup generator support. No fiber optic, cabling, trenching or existing equipment testing will be required. The building features solid ceilings between floors. A map with dimensions of the facility is available. The system must meet specifications in the statement of work and monitor the site continuously. The solicitation closing date has been extended to the 30th.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L3923Q0126_Amd_0002.pdf | ||
| B09_Questions_and_answers_0001.docx | DOCX document | |
| Sol_140L3923Q0126_Amd_0001.pdf | ||
| A06_3_LVICC_Map.pdf | ||
| A04_2_LVICC_Security_System_SOW.docx | DOCX document | |
| Sol_140L3923Q0126.pdf | ||
| B03_Wage_Determinations_Clark_County.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers Number 2
1. Do they need access control and new intrusion?
Yes, this facility does not have an existing alarm. This will be a new alarm system.
2. Who would they like monitoring?
This is for the building. Monitoring break-ins and building security.
3. For access control, do they require a platform to read the PIV credentials?
There is nothing set up for FOBs system. This is for the alarm system not for entry to the door system.
4. What is the existing power infrastructure?
Electric, in North Las Vegas
a. Is the power supply stable?
Yes, and there is a Generator when there is power failure.
b. Will UPS(s) be required? No, the Facility is tied to a Back up Generator. There would be lag time 30-45 seconds before power is fully back up at the facility.
i. If so, what is the power requirement? N/A
ii. How many UPS? N/A
5. Are there existing fiber optic access points? No- prefer wireless.
c. Will new fiber optic cables be required? No
i. If so, what type?N/A
d. What are the lengths of the fiber optic cables from point of origin to end destination? N/A
e. How many fiber optic runs? N/A
f. What termination types will be required? N/A
6. Will trenching be required? No
g. If so, are the utility locations marked on the ground and/or properly documented? N/A
h. Will dig permits be required? N/A
i. Who will be required to obtain the digging permits? N/A
7. Will lead and asbestos abatement be required? No
j. Have the buildings been tested for lead and asbestos? N/A
i. If so, will the government provide the results of the testing? N/A
k. Are there any other health hazards associated with the applicable installation and maintenance? NO
8. Are any of the buildings listed as historic buildings? NO
l. If so, who will determine the locations approved for possible drilling and camera placement? N/A
9. Is the existing camera system analog or IP? Camera system not requested.
m. Are the cameras connected by ethernet or coax cable? N/A
10. Is Cat6 plenum indoor and outdoor cable required? No
n. Are there existing cable raceways or paths to route the new ethernet through? N/A
o. Will conduit be required? N/A
i. If so, what type and how many feet? N/A
11. Will existing equipment need to be tested? No
p. If so, what type of equipment? N/A
q. Number of each? N/A
12. Will existing cameras need to be replaced? N/A
r. If so, how many cameras need to be replaced? N/A
s. What type and/or brand of cameras are they to be replaced with? N/A
13. Camera locations: N/A
t. How many cameras are/will be mounted above 12' on the buildings/poles? N/A
u. How many cameras are/will be roof top mounted? N/A
v. How many cameras are/will require a lift? N/A
14. Do the buildings have drop ceilings, or are they solid ceilings between floors? Solid between floors
15. Are “To Scale” drawings available for publication? Only Drawing is the map of the building that is available.
w. If not, what is the length, width, and height of the building(s). provided with in the map
16. What are the “testing requirements” for the new or upgraded system(s)? The system is required to meet the specified requirements provided in the statement of work. The system is required to monitor the facility 24/7 year round.
17. Is the government able to extend the solicitation’s due date?
The solicitation will be extended to the 30th.