This document outlines the requirements for a Supervisory Control and Data Acquisition (SCADA) System for the Entiat National Fish Hatchery.

The statement of work details the monitoring points required for the SCADA system, including wells, water structures, temperature sensors, flow meters, water level sensors, and cameras. Specific monitoring needs are identified for infiltration galleries, settling basins, headboxes, fish ponds, springs, incubation facilities, intake structures, and outfall locations. The document notes existing devices to reuse as well as locations where new devices will need to be installed.

The related federal contract opportunity provides additional context, with the solicitation seeking proposals for a SCADA system for the Entiat NFH. The opportunity is being issued by the Department of the Interior Fish and Wildlife Service.

View the file

Other files for this federal contract opportunity

Other files attached to SCADA System for Entiat NFH, newest first.
File Type Posted
Sol_140F0520R0014_Amd_0003.pdf PDF
Question and Answer Document_0003.pdf PDF
Sol_140F0520R0014_Amd_0002.pdf PDF
Sol_140F0520R0014_Amd_0001.pdf PDF
A04 0040477446 SOW.pdf PDF
A04 0040477446 Statement of Work Pictures 2.pdf PDF
B03 140F0520R0014 Wage Rates.pdf PDF
Sol_140F0520R0014.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Entiat NFH combined photos of Wells and Water Structures for SCADA

Location

Te m pe ra tu re

Fl ow ra te

W at er L ev el

O N

/O

FF

C am er a

Other Requirements

Well #1 N E N N Keep Existing Flowmeter is a Sierra 203 at North Culvert Box Aeration Chamber

Well #2 N N N N Current flowmeter is located at South Culvert Box near Aeration Chamber. New to be installed here or at the Well.

Well #3 N N N N Current flowmeter is located at South Culvert Box near Aeration Chamber. New to be installed here or at the Well.

Well #4 N N N N Current flowmeter is located at South Culvert Box near Aeration Chamber. New to be installed here or at the Well.

Well #5 N N N N Current flowmeter is located at the Well.

Well #6 N N N N Current flowmeter is located at the Well.

Infiltration Gallery N E E N Existing flowmeter is a Sierra 203.

Sand Settling Basin N Screen Chamber N N

A-Bank Headbox N N May be possible to combine A/B/C headbox PLC if monitoring and alarms are kept independent.

B-Bank Headbox N N May be possible to combine A/B/C headbox PLC if monitoring and alarms are kept independent.

C-Bank Headbox N N May be possible to combine A/B/C headbox PLC if monitoring and alarms are kept independent.

A/B/C Bank(s) & Adult Holding Facility Ponds

N Single Camera to cover all Fish Pond Bank(s) A/B/C Raceways and the Adult Pond Holding Facility. Mount on Hatchery Building or provide pole.

Fresh Water Spring N N Current flowmeter is located at North Culvert Box near Aeration Chamber. New to be installed here or at Spring.

Egg Incubation N N Aeration Chamber N N

Entiat River Intake N N N

Existing flowmeter is inside the 36" concrete pipe, which required confined space. Contractor may install new meter in same location or use other location. Device shall also measure the Entiat River water elevation.

River Intake into Vault N Measure temperature difference after mixing.

Above Hatchery Outfall N Measure temperature difference from Intake temperature.

Adult Holding Facility Pond East Side

N N Camera monitoring is included in A/B/C Bank above.

Adult Holding Facility Pond West Side

N N Camera monitoring is included in A/B/C Bank above.

Note: "E" = Existing Device to Reuse, "N" = New Device

Well 1

Well 2

Well 3

Well 4

Well 5

Well 6

River Intake

River Intake

River Screen Chamber

River Sand Basin

Well Water Mixing Building adjacent to sand basin

80 x 80 rearing units; 3 banks of 10 individual reading units. Each bank has 1 common headbox two adult holding ponds

Infiltration Gallery

Egg Incubation