A005 2.6 Configuration Drawing Review CDRL.pdf

PDF 149 KB Posted

Attached to
N4 NEW ACQUISITION SUPPORT Federal contract opportunity
Solicitation number
N3220523Q0076
Issued by
Department of the Navy Military Sealift Command

About this file

This document contains a Contract Data Requirements List (CDRL) and related federal contract opportunity. The CDRL requires monthly configuration drawing reviews to ensure technical drawings match system configurations for new ship programs. The contractor must identify discrepancies, recommend corrective actions, and provide reports to the Contracting Officer Representative and subject matter experts within two days of each review. The federal contract opportunity is a solicitation from the Department of the Navy's Military Sealift Command to provide acquisition support for new ship classes delivered through 2023, including T-AO 205 fleet replenishment oilers, T-AGS 60 ocean surveillance ships, T-ATS towing, salvage, and rescue ships, and T-ARC research ships. The period of performance is 24 April 2023 through 19 December 2023.

View the file

Other files for this federal contract opportunity

Other files attached to N4 NEW ACQUISITION SUPPORT, newest first.
File Type Posted
N3320523Q0076 Amend 0002.pdf PDF
Q and A Responses.docx DOCX document
N3220523Q0076_A0001_CSS.pdf PDF
A004 2.5 Provisioning Review CDRL.pdf PDF
N3320523Q0076_CSS.pdf PDF
A003 2.4, 2.4.1, 2.4.2 ILS Package Review CDRL.pdf PDF
New Ships DD254Signed.pdf PDF
A001 2.2 Monthly Status Reports CDRL.pdf PDF
A002 2.3 DRL Review CDRL.pdf PDF
A006 2.7 Configuration Technical Manual Review CDRL.pdf PDF
New Acquisition QASP.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

1_DATA_ITEM_NO: A005
2_TITLE_OF_DATA_ITEM: Configuration Drawing Review
3_SUBTITLE:
4_AUTHORITY_Data_Acquisit:
5_CONTRACT_REFERENCE: See block 16
6_REQUIRING_OFFICE: N49
7_DID_250_REQ: NO
8_APP_CODE: N/A
DIST_STATEMENT:
10_FREQUENCY: Monthly
11_AS_OF_DATE:
12_DATE_OF_FIRST_SUBMISSI: See Block 16
13_DATE_OF_SUBSEQUENT_SUB: See Block 16
addressee1: COR
draft1:
reg1: 1
repro1:
addressee2: SME
draft2:
reg2: 1
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 0
16_REMARKS: (Block 5.) Applies to PARA 2.6

Configuration Drawing Review

The contractor shall review technical drawings against configuration baselines to ensure that all items contained in the configuration of a specified system are on the drawings and the items on the drawings are contained in the configuration including Valve Marks and Electric Symbol Number (VM-ESN). Systems are a series of pipes, wires or other connections between configurations worthy items that allow the items to work together from system origin to system termination. Provide report of all discrepancies identified including all recommended corrective actions.

Configuration Drawing Review: Approximately 1 System Drawing per month per post-delivery ship program.

Required Within 2 working days after the completion of each review.

The contractor shall provide one report to the COR and one report to each corresponding SME.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY: James Funaro
H_DATE: 4 JAN 2023
1_APPROVED_BY:
J_DATE: 9 FEB 2023
Page: 1
reg38t: 2
A_CONTRACT_LINE_ITEM_NO: 2.6
B_EXHIBIT:
TDP:
TM:
OTHER: Management
DSYSTEMITEM: MSC N4
E_CONTRACTPR_NO:
FCONTRACTOR:
of_pages: 1
Reset:
2023-02-09T15:06:54-0500
FUNARO.JAMES.F.1067519155

File details come from the government source that posted it. Updated .