95332418Q0127_0_US_final_signed_by_CO.pdf

PDF 314 KB Posted

Attached to
Geospatial Information Services. Federal contract opportunity
Solicitation number
95332418Q0127
Issued by
Millennium Challenge Corporation

View the file

Other files for this federal contract opportunity

Other files attached to Geospatial Information Services., newest first.
File Type Posted
95332418Q01270005_US_signed_by_CO.pdf PDF
95332418Q01270004_US_signed_by_CO.pdf PDF
95332418Q01270003_US.pdf PDF
95332418Q01270002_US_final_signed_by_CO.pdf PDF
95332418Q01270001_US_signed_by_CO.pdf PDF
MCC's_Geospatial_Strategy_Highlights.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE 17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

RFQ IFB RFP

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF.

DATED . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print)

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

OFFER

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL

BUSINESS (WOSB)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

8 (A)

NAICS:

SIZE STANDARD:

STANDARD FORM 1449 (REV. 3/2005) BACK

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

95332418Q0127

TABLE OF CONTENTS:

Listing of Incorporated Purchase Requisitions Section B - Supplies or Services and Prices/Costs Section C - Description/Specifications/Work Statement Section D - Packaging and Marking Section E - Inspection and Acceptance Terms Section F - Delivery or Performance Section G - Contract Administration Data Section H - Special Contract Requirements Section I - Contract Clauses Section J - List of Documents, Exhibits, and other Attachments Section K - Representations, Certifications, and Other Statements of Offerors Section L - Instructions, Conditions and Notices to Offerors Section M - Evaluation Factors for Award

Listing of Incorporated Purchase Requisitions

Incorporated Purchase Requisition Numbers:

DCO-PR-18-0308

Section B - Supplies or Services and Prices/Costs

Item Number Base Item Number

Supplies/Services Quantity Unit

0001 Geospatial Information Services 1 Contract Type:Time and Materials

Unit Price Other Direct Costs

Extended Price

Description:

Purchase Requisitions DCO-PR-18-0308

IDC Type: Not Applicable NAICS Code: 541611 Administrative Management and General Management Co...

Supplies/Services Quantity Unit

0002 Base Year 1 Contract Type:Time and Materials

Unit Price Other Direct Costs

Extended Price

Description:

Purchase Requisitions DCO-PR-18-0308

Supplies/Services Quantity Unit

0003 Base Year 1 Contract Type:Time and Materials

Unit Price Other Direct Costs

Extended Price

Description:

Purchase Requisitions DCO-PR-18-0308

Supplies/Services Quantity Unit

0004 Base Year 1 Contract Type:Time and Materials

Unit Price Other Direct Costs

Extended Price

Description:

Purchase Requisitions DCO-PR-18-0308

Supplies/Services Quantity Unit

0005 Base Year 0 Contract Type:Time and Materials

Unit Price Other Direct Costs

Extended Price

Description:

Purchase Requisitions DCO-PR-18-0308

Supplies/Services Quantity Unit

1001 0001 Option Year 1 1 Contract Type:Time and Materials

Unit Price Other Direct Costs

Extended Price

Description:

Purchase Requisitions

Option: 1 Option Time Date: 9/24/19 Option Time Duration: 365 Option Time Units: Days

Supplies/Services Quantity Unit

2001 0001 Opion Year 2 1 Contract Type:Time and Materials

Unit Price Other Direct Costs

Extended Price

Description:

Purchase Requisitions

Option: 2 Option Time Date: 9/24/20

Option Time Duration: 364 Option Time Units: Days

Clauses incorporated by reference

None

Clauses incorporated by full text

SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS

SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS

B.1 PURPOSE

The purpose of the contract is procure services for the Infrastructure, Environment and Private Sector Division (IEPS) Geospatial Information Services.

NOTE: The following document has been automatically generated by an electronic system. Some errors in spacing, formatting and punctuation may have occurred throughout the document and are out of our control.

B.2 CONTRACT TYPE

This is a Time-and-Material(T&M) contract. For the consideration set forth in the contract, the Contractor shall provide the del iverables described in Section F and comply with all contract's requirements.

B.3 SCHEDULE OF SERVICES AND PAYMENT

The Total Estimated Price of this contract is $ TBD. The maximum dollar amount awarded to the contractor cannot exceed the Total NTE Price.

ITEM

NUMBER

DESCRIPTION OF

SUPPLIES/SERVICES

QUANTITY UNIT UNIT PRICE AMOUNT

0001 Geospatial Information Services

Contract Period: Base12 months

POP Begin: TBD

NTE $TBD

POP End: TBD

0001A Direct Labor Hours See Table of Labor Rates and Categories

Below

$TBD

0001B Other Direct Costs 1.00 Lot $TBD $TBD

1001 Geospatial Information Services

Contract Period: Option One, 12 months

POP Begin: TBD

POP End: TBD

NTE $TBD

1001A Direct Labor Hours See Table of Labor Rates and Categories

Below

$TBD

1001B Other Direct Costs 1.00 Lot $TBD $TBD

2001 Geospatial Information Services

Contract Period: Option Two, 12 months

POP Begin: TBD

POP End: TBD

NTE $TBD

2001A Direct Labor Hours See Table of Labor Rates and Categories

Below

$TBD

2001B Other Direct Costs 1.00 Lot $TBD $TBD

TOTAL NTE $TBD

The Contractor shall furnish all personnel, facilities, equipment, supplies, transportation, and other services required to provide services to the MCC in accordance with Section C, Statement of Work, and the terms and conditions contained herein. The Total Contract Price includes labor and other direct costs to perform all required services.

LABOR RATES

CLINs Labor Category Labor Rates Base

Labor Rates

Labor Rates

Labor Rates

Labor Rates

9 months Option Year 1

Option Year 2

Option Year 3

Option Year 4

0001 Senior Geospatial Specialist

Mid-level Geospatial Specialist

Junior Geospatial Specialist

Administrative Support

TBD TBD TBD TBD TBD

1001 Senior Geospatial Specialist

Mid-level Geospatial Specialist

Junior Geospatial Specialist

Administrative Support

TBD TBD TBD TBD TBD

2001 Senior Geospatial Specialist

Mid-level Geospatial Specialist

Junior Geospatial Specialist

Administrative Support

TBD TBD TBD TBD TBD

TOTAL LABOR HOURS

Estimated LOE Hours Base Period 9/2018 - 9/2019

OY One 9 /2019 - 9

/2020

OY Two 9 /2020 - 9

/2021

TOTAL

Senior Geospatial Specialist

Mid-level Geospatial Specialist

Junior Geospatial Specialist

Administrative Support

TOTAL 1000 800 600 2400

The contractor should propose well-functioning team to successfully implement the SOW. The LOE hours in the table above are illustrative. The contractor may provide some variation in the LOE hours to achieve a better team composition and performance.

B.4 ADDITIONAL LABOR CATEGORIES AND COUNTRIES

During the performance of this contract, it may become desirable to add new labor categories to Section B. In such cases, the Government or the Contractor may identify additional labor categories and the Contractor may propose additional labor categories and rates.

In addition, during the performance of this contract, it may became necessary to add other MCC Compact-Eligible countries.

Section C - Description/Specifications/Work Statement

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

ACRONYMS AND ABBREVIATIONS

Acronym, Abbreviation Definition

COR Contracting Officer Representative

CPARS Contractor Performance Assessment Rating System

CT Country Team

MCA Millennium Challenge Account, the accountable entity

MCC Millennium Challenge Corporation

PM Project Monitor

QCP Quality Control Plan

RFQ Request for Quotations

SAM System for Award Management

TBD To Be Determined

C.1 INTRODUCTION

The Millennium Challenge Corporation (MCC) is a U.S. Government corporation formed to help low income and low middle income countries reduce poverty through the promotion of sustainable economic growth. MCC operates on the principle that aid is most effective when it strengthens good governance, economic freedom and investments in people. MCC awards multi-year grants known as "Compacts" to partner countries that meet its selection criteria and propose programs that address their constraints to economic growth. Once developed and agreed, MCC compacts must be implemented by those partner countries within terms of not more than five years.

Effective use of geospatial technologies and information can improve development, oversight and evaluation of MCC-funded programs. Increasingly, MCC staff across the Infrastructure, Environment and Private Sector Division (IEPS) are relying on geospatial information, technologies and analyses in their work. The agency's approach to date has been somewhat ad hoc, however. The division does not have a systematic, coordinated approach to employing appropriate geospatial technologies and techniques in the development and oversight of investments. Opportunities for more effective and efficient operations through better use of geospatial information and related technologies are being lost.

The successful firm will provide technical advice, support, and coordination for effective use of geospatial information and technology across the IEPS Division. And while reporting and providing direct support to IEPS, the firm will help IEPS coordinate our use of geospatial information with other key MCC offices, including the Department of Compact Operations Front Office and the Office of the Chief Information Officer.

C.2 CONTEXT

In February of 2015 MCC held an agency-wide call for ideas to improve effectiveness. MCC management selected the use of geospatial information as the highest priority and a consulting firm was hired through a competitive process to provide technical assistance in the development of a geospatial strategy. The first step was a needs assessment that engaged over 60 staff across MCC through key informant interviews, an agency-wide survey, a workshop to validate findings and prioritize recommendations, and the development of recommendations in collaboration with a steering committee represented by MCC' s Departments of Compact Operations, Administration and Finance, and Policy and Evaluation.

The product was a Geospatial Information Needs Assessment and Strategy (Strategy's summary is attached in Annex two) which was approved by MCC management on April 28, 2016. Key findings were:

1) Using geospatial technology is important in achieving MCC's goals.

2) MCC has implemented excellent examples of good practice within existing compacts, but the use of geospatial information is largely ad hoc and inconsistent across investments and organization units. This is primarily a result of low awareness of geospatial applications within MCC, few systems in place to support them, and varying capacity and data resources within MCAs and partner countries.

3) Data are being produced but not captured consistently for use across the investment cycle. Geospatial work products by consultants and contractors are inconsistent and are not systematically collected and stored to maximize their use and value.

4) Awareness of the potential utility of geospatial data and applications is uneven across the organization. Current use at MCC exists in pockets and is driven by staff with prior experience in geospatial technology and information. While MCC staff do NOT need to be geospatial experts, they DO need to be competent consumers of geospatial data and services.

The Strategy offered four broad recommendations, two of which are relevant to this contract:

1) Facilitate more consistent and effective use of geospatial information. MCC should realize quick wins described in the Geospatial Strategy. These include creating the enabling conditions such as better guidelines, standards, contract templates, and information security protocols to capture and share geospatial information consistently throughout compacts and threshold programs. For information collected to be broadly useful, MCC should consistently capture geospatial metadata; this process can be quickly and easily improved by establishing standard contract requirements for geospatial deliverables. As part of the due diligence process, MCC should help extend the benefit of using geospatial information to MCA partners.

2) Make more informed investment and operational decisions. MCC should take full advantage of available geospatial tools and information to improve decision making. To that end, MCC should require location-based recording and reporting of MCC's work (at multiple geospatial scales – including national, sub-national, exact project location) and associated documents. This will facilitate transparency and improve the visibility and traceability of MCC's investments.

Two additional recommendations remain relevant but are largely outside the scope of this contract, as they are managed by other operational units at MCC. Nonetheless, the selected consultant should assist and guide IEPS to improve coordination with other relevant MCC units in these areas:

3) Support monitoring and evaluation. MCC should collect consistent aerial project imagery during the compact lifecycle (planning, design, implementation, and post-compact) to enable automated geospatial change detection.

This could complement costly field surveys, and when they are required, help scope them so they are well targeted. A key partner for IEPS in this regard will be MCC's Monitoring and Evaluation unit.

4) Communicate better with external audiences. MCC should develop an interactive public web map to communicate compact activities with increasing geographic specificity. This will expand on MCC's industry-leading transparency work and provide stakeholders with a better sense of what MCC is doing where. In the short term, this would involve mapping project information at a sub-national level. As more spatially explicit information becomes available, geographic project locations could be mapped. With this increased detail, project information could be mapped along with contextual data to illustrate decision logic and M&E reporting data to convey investment outcomes. Geospatial information and technology provide powerful and effective communication tools. A key partner for IEPS in this work will be the Agency's Congressional and Public Affairs Department.

Subsequent to the Geospatial Strategy, initial drafts of some guidance material were developed. This included administration guidance on geospatial data delivery and metadata creation, a metadata best practice document, and a geospatial resource guide including a comprehensive list of top GIS software vendors, most popular geospatial data sharing platforms, frequently used geospatial maps and services, and mobile data collection tools useful for MCC investments.

C.3 SCOPE OF WORK

The Geospatial Information Services contract for IEPS will provide support in two broad areas listed below. Both areas will be supported in the base contract as well as in the two options years.

A. SUPPORT IEPS DUE DILIGENCE OF COUNTRY PROGRAMS

Our objective is to provide geospatial technical assistance to IEPS management and staff responsible for scoping, designing, preparing and overseeing Compact and Threshold Programs. This would include, but not be limited to:

1) Providing technical assistance. Areas include (but are not limited to):

a. Opportunities to improve due diligence, decision-making, and oversight through the use of geospatial tools, technology, and information.

b. Assessing geospatial information needs and opportunities for an individual compact/threshold program, identifying appropriate geospatial tools and information to meet those needs, and supporting IEPS' oversight efforts involving their application.

c. At an IEPS Division level, assessing and selecting the appropriate technology and related software/IT platform(s) to be used for a given geospatial information objective, including the administrative requirements such as how to standup the system and coordinate responsibilities across MCC teams and contractors, MCAs and their contactors. This will include an appropriate mix of agency-approved cloud based applications (such as ESRI's ArcGIS Online, Collector, and Survey123 for ArcGIS and associated hardware, such as smartphones and GPS-enabled tablets) and desktop applications (such as ArcGIS).

d. Developing technical specifications and scopes of work for GIS-related work.

e. Day to day use of geospatial information and technology, providing authoritative guidance to IEPS staff.

2) Assisting implementation of geospatial work (data collection/generation, compilation and analyses) in support of IEPS involvement in program scoping, design, due diligence and oversight. Provision of related "on-the-job" training/mentoring for IEPS staff as appropriate.

3) Supporting IEPS interface with other MCC units and MCA staff, contractors, and other stakeholders or outside agencies regarding geospatial systems and opportunities in Compacts and Threshold Programs, as appropriate.

4) Travel to MCC countries to provide in country support for IEPS staff as appropriate, e.g. where the work will have relevance and applicability for multiple MCC country programs.

B. COORDINATION

IEPS's generation and use of geospatial information must be consistent with policies and systems developed by MCC.

Because agency policies and systems will inform IEPS use of geospatial information, the consultant may be called upon to:

1) Advise IEPS Management on key opportunities, constraints and recommended courses of action for using geospatial data and technology in the development and oversight of investments.

2) Contribute to IEPS planning and coordination related to the use of geospatial information for due diligence and oversight. This may include geospatial standards, policy, programs and technology related to IEPS staff's core day to day tasks and objectives.

3) Help IEPS develop technical guidelines, standards, contract templates and other guidance essential for effective due diligence and oversight. One aim of IEPS is to adequately capture and share geospatial information consistently throughout Compacts and Threshold Programs. This may require coordination with management in other agency departments regarding relevant technical, legal and operational policies and procedures relevant to such guidelines and standards, including those related to data security and personally identifiable information

(PII).

4) Support IEPS coordination with relevant MCC offices (e.g. DCO Front Office and Office of the Chief Information Officer). This may include (but not be limited to) guidance on technical challenges such as integration, configuration and interfacing with data storage requirements for web-based enterprise architecture applications;

sharing data between MCC and overseas counterpart agencies (MCA's); advising IEPS on how to help the Agency meet relevant United States Government requirements on data collection, storage and sharing; and systems for retrieving data from contractors and consultants.

The contractor may be called on to perform other related duties.

C.5 REQUIRED RESOURCES

General Requirements for Personnel

MCC requests the Contractor propose a team of Contractors who can accomplish the contracts objectives, indicating key and non-key positions. At least three people should be identified as key personnel.The Team Leader duties shall be incorporated within one of the key personal positions the contractor proposes. The Contractor is encouraged to propose a team that will be best suited to complete the SOW.

MCC has estimated direct labor needs based on a team of three personnel. The Contractors should critically consider the experience, expertise and availability of the key personnel they can identify and propose the number needed to fulfill the qualifications/experience required for the tasks outlined above.

The Key Personnel are:

1. Senior Geospatial Specialist

2. Mid-level Geospatial Specialist

3. Junior Geospatial Specialist

C.6 MINIMUM PERSONNEL SKILLS REQUIREMENTS

1. Senior Geospatial Specialist

Education

§ A Master's degree in GIS, Geography, Earth Science, Engineering, Computer Science or a related field from an accredited college or university, or a Bachelor's degree with 6 years of relevant experience.

Experience

§ At least 15 years of experience (with the Master's degree) developing GIS management systems and applying geospatial analysis to major development projects is a requirement. Experience in infrastructure development projects is an asset, as is experience with remote sensing analysis.

§ Demonstrated training and/or experience with recent (at least 3 years) technologies and software such as cloud based systems, open-source, mobile mapping and surveying, drones, etc.

§ Familiarity with and demonstrated experience applying US Government geospatial policies, procedures and guidelines.

§ Demonstrated experience in advanced geospatial analysis (e.g. basic tools, spatial statistics, network analysis, etc.).

§ Demonstrated experience in a range of software and application platforms. These include, but are not limited to:

ArcGIS Desktop, ArcGIS Online, ArcGIS Collector, Survey123 and ENVI or IDRISI. Experience with open-source software and applications is also helpful (e.g. QGIS, R, mobile mapping and survey apps and open data sources (FAO GeoNetwork, NASA, USGS, OpenStreetMap, etc.). Experience in programing languages such as Python and R a plus.

§ Demonstrated experience with digital data collection and use in field settings, though the use of GPS-enabled tablets, devices and/or mobile phones.

§ Demonstrated experience as a geospatial coordinator, solution architect, or similar management position with experience in the design, implementation, and administration of geospatial information systems and applications in international development or similar environment.

§ Demonstrated experience using geographic information systems in support of development projects in developing countries in data-scarce environments.

§ Demonstrated experience in database management systems and developing and maintaining a web-based GIS management system.

§ Ability to take initiative, learn independently and quickly, and remain current in the geospatial field.

§ Work effectively in a multi-disciplinary and cross-cultural environment. Experience in developing countries is a plus.

2. Mid-level and Junior Geospatial Specialists

Education:

§ A Bachelor's degree (Masters preferred) in GIS, Geography, Earth Science, Engineering, Computer Science or a related field from an accredited college or university.

Experience

§ 5 years of experience for junior level specialist and 10 years of experience for mid-level specialist implementing GIS management systems and applying geospatial analysis to major development projects is a requirement.

Experience in infrastructure development projects is an asset, as is experience with remote sensing analysis.

§ Demonstrated experience in advanced geospatial analysis (e.g. basic tools, spatial statistics, network analysis, etc.).

§ Demonstrated experience in a range of software and application platforms. These include, but are not limited to:

ArcGIS Desktop, ArcGIS Online, ArcGIS Collector, Survey123 and ENVI or IDRISI. Experience with open-source software and applications is also helpful (e.g. QGIS, R, mobile mapping and survey apps and open data sources (FAO GeoNetwork, NASA, USGS, OpenStreetMap, etc.). Experience in programing languages such as Python and R a plus.

§ Demonstrated experience with digital data collection and use in field settings, though the use of GPS-enabled tablets, devices and/or mobile phones.

§ Using geographic information systems in support of development projects in developing countries in data-scarce environments.

§ Demonstrated experience in database management systems and developing and maintaining a web-based GIS management system.

§ Ability to respond quickly, work efficiently, and propose solutions to achieve task objectives.

§ Work effectively in a multi-disciplinary and cross-cultural teams and environment. Experience in developing countries a plus.

C.7 CONFLICT OF INTEREST

In accordance with the principles of FAR Subpart 9.5 and MCC policy, the Contractor shall be ineligible to furnish, as a prime or subcontractor or otherwise, implementation services which result in response(s) to findings, proposals, or recommendations written by the Contractor, unless this provision is expressly waived by MCC.

The Contractor and its subcontractors would be precluded from bidding on work and services to be procured by the local Accountable Entity or using funds advanced under a Compact in the relevant country, unless the contractor submits a mitigation plan sufficient to ameliorate any conflict of interest pursuant to the rules applicable to the procurement process.

C.8 SUBCONTRACTS

Sub-contracts are allowed in order to complete the proposed work.

C.9 TRAVEL

The round trip travel is authorized from the company's headquarters or consultants' working locations to Washington DC and to MCC countries if needed. The contractor might be required to travel for work and meetings with MCC staff in Washington, and to MCC countries, and some other international travel is anticipated. The travel budgets will be finalized at the time of award.

Section D - Packaging and Marking

SECTION D - PACKAGING AND MARKING

SECTION D - PACKAGING AND MARKING

Reserved.

Section E - Inspection and Acceptance Terms

SECTION E - INSPECTION AND ACCEPTANCE

SECTION E - INSPECTION AND ACCEPTANCE

E.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE

The following contract clauses pertinent to this section are hereby incorporated by reference (by Citation Number, Title, and Date) in accordance with the clause at FAR "52.252-2 CLAUSES INCORPORATED BY REFERENCE" contained in this document. See FAR 52.252-2 for an internet address (if specified) for electronic access to the full text of a clause. Also, the full text of a clause may be accessed electronically at this address: http://www.acquisition.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR Chapter 1)

FAR Number Title Date

52.246-6 Inspection-Time-and-Material and Labor-Hour

APR 2015

E.2 GENERAL INSPECTION AND ACCEPTANCE

Inspection and acceptance of all items and services under this contract will be accomplished by the COR and/or PM. The COR and/or PM shall notify the contracting office promptly after the specified date of delivery of services not received, or not conforming to statement of work. Unless extenuating circumstances exist, the notification should be made not later than 30 days after the specified date of delivery. If the Contracting Officer determines that services, work or materials being furnished do not meet the required standards, the Government reserves the right to have the work performed elsewhere, charging the contractor with costs involved, subject to the provisions of FAR 52.246-4.

Quality Assurance

The contractor shall have in place and maintain a Quality Control Plan (QCP) that covers, as a minimum how the contractor intends to meet the requirements of all performance objectives, monitor and proactively manage contract's requirements.

Given the nature of the assignment, MCC may rely, in part, on the findings of the contractor in the event of an audit of its oversight of the program. Therefore documentation of the process, methodology and raw results, in addition to the stated deliverables, is critical. It shall also include the mechanism by which the Government will be notified of performance related incidents that are likely to affect quality of services or impact mission accomplishment. Any proposed changes to the QCP shall be provided to the Contracting Officer for review and comment no later than 10 working days prior to the effective date of the proposed changes.

E.3 DELIVERABLES ACCEPTANCE CRITERIA

Deliverables are associated with the tasks identified above. All reports, plans and analysis are to be submitted in English in electronic copy using WINDOWS based MS-Office products including WORD for text, data tables in EXCEL, appropriate MS-Office 2010 or later versions of programs for exhibits, and schedules using MS-Project. Files containing graphs, flowcharts or diagrams should be submitted in PDF printable version. Digital photo files should be submitted in JPG format.

GIS data should be submitted in PDF printable files. Presentations should be prepared with PowerPoint.

Acceptance Criteria:

The deliverables will be evaluated according to the following criteria:

• Thoroughness and timeliness in complying with all of the elements in the tasks specified.

• Quality and clarity of analyses and work produced.

• Timeliness and efficacy of communications with relevant counterparts at MCC, MCA, and other relevant organizations.

• All reports should be written in English, cleanly formatted and with no errors.English is the principle language for all reports and technical work under the contract. MCC does work in countries where the French or Spanish are the main language.

• MCC reserves the right to review draft reports, plans and analysis two weeks before the due date and provide comments before they are finalized.

• All reports are to be submitted in hard and electronic copy (in MS Word), with tables, data and calculations in MS Excel.

Section F - Delivery or Performance

Line Item: 0001 Period Of Performance Start Date Period Of Performance

End Date Period Of Performance Address

9/24/18 9/23/19 MCC Headquarters Millennium Challenge Corporation 1099 Fourteenth Street NW, Suite 700

WASHINGTON

US 20005

Line Item: 0002

End Date Period Of Performance Address

9/24/18 9/23/19 MCC Headquarters Millennium Challenge Corporation 1099 Fourteenth Street NW, Suite 700

Line Item: 0003

End Date Period Of Performance Address

9/24/18 9/23/19 MCC Headquarters Millennium Challenge Corporation 1099 Fourteenth Street NW, Suite 700

Line Item: 0004

End Date Period Of Performance Address

9/24/18 9/23/19 MCC Headquarters Millennium Challenge Corporation 1099 Fourteenth Street NW, Suite 700

Line Item: 0005

End Date Period Of Performance Address

MCC Headquarters Millennium Challenge Corporation 1099 Fourteenth Street NW, Suite 700

Line Item: 1001

End Date Period Of Performance Address

9/24/19 9/23/20 MCC Headquarters

Millennium Challenge Corporation 1099 Fourteenth Street NW, Suite 700

Line Item: 2001

End Date Period Of Performance Address

9/24/20 9/23/21 MCC Headquarters Millennium Challenge Corporation 1099 Fourteenth Street NW, Suite 700

SECTION F - DELIVERIES OR PERFORMANCE

SECTION F - DELIVERIES OR PERFORMANCE

F.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE

The following contract clauses pertinent to this section are hereby incorporated by reference (by Citation Number, Title, and Date) in accordance with the clause at FAR "52.252-2 CLAUSES INCORPORATED BY REFERENCE" contained in this document. See FAR 52.252-2 for an internet address (if specified) for electronic access to the full text of a clause.

FEDERAL ACQUISITION REGULATION (48 CFR Chapter 1)

FAR Number Title Date

52.242-15 STOP-WORK ORDER AUG 1989

52.242-17 GOVERNMENT DELAY OF WORK APR 1984

F.2 PERIOD OF PERFORMANCE

The period of performance for CLIN 0001 is twelve months; and all option year CLINs are one year periods.

F.3 TRAVEL REQUIREMENTS

The round trip travel is authorized from the company's headquarters or consultants working locations to Washington DC and to MCC countries if needed. The contractor might be required to travel for work and meetings with MCC staff in Washington, and to MCC countries, and some other international travel is anticipated. The travel budgets will be finalized at the time of award.

Please budget for imagery, licenses, equipment, etc. costs for the trips.

MCC estimates the following number for trips to MCC's countries. Please also budget additional trips from company's HQ and consultants' locations to Washington DC separately.

Base Year 4 trips two weeks each

OY1 3 trips two weeks each

OY2 1 trip two weeks each

F.4 PLACE OF PERFORMANCE

The principal place of performance for this contract will be Washington DC.

Physical presence of at least some key personnel in the Washington DC area is highly desirable.

F.5 DELIVERABLES

SUMMARY of DELIVERABLES

At a minimum, the following deliverables will be required:

Specific deliverables will be agreed upon as tasks are assigned through the issuance of Technical Directives. They may include (but not limited to):

• An updated Geospatial Strategy as it related to the work of the Infrastructure, Environment, and Private Sector division,

• A work plan that includes specific activities, methodologies, site visits, time frame, and estimated duration of each activity, prior to commencing work

• Quarterly reports

• Technical deliverables based on specific needs identified during the course of the contract.

• Presentations on key findings, issues for further examination, and recommendations

• Inputs to MCC documents

F.6 MCC TECHNICAL DIRECTION

(a) Performance of the work under this contract is subject to the written technical direction of the Contracting Officer Representative (COR), and any Government Project Monitors, (PM), who shall be specifically appointed, and responsibilities identified, by the Contracting Officer in writing in accordance with MCC policy. "Technical direction" means a directive to the Contractor that approves approaches, solutions, designs, or refinements; fills in details or otherwise completes the general description of work or documentation items; shifts emphasis among work areas or tasks; or furnishes similar instruction to the Contractor. Technical direction includes requiring studies and pursuit of certain lines of inquiry regarding matters within the general tasks and requirements in Section C of this contract, and any resulting Contract.

(b) The COR/Government PM does not have the authority to, and shall not, issue any instruction purporting to be technical direction that—

(1) Constitutes an assignment of additional work outside the statement of work;

(2) Constitutes a change as defined in the changes clause;

(3) Constitutes a basis for any increase or decrease in the total estimated contract cost, the fixed fee (if any), or the time required for contract performance;

(4) Changes any of the expressed terms, conditions, or specifications of the contract; or

(5) Interferes with the contractor's rights to perform the terms and conditions of the contract.

(c) Technical direction may be oral or in writing; however, the COR or government PM shall confirm oral direction in writing within five workdays.

(d) The Contractor shall proceed promptly with the performance of technical direction duly issued by the COTR or PM in the manner prescribed by this clause and within the COR's/PM's authority. If, in the Contractor's opinion, any instruction or direction by the COR/PM falls within any of the categories defined in paragraph (b) of this clause, the Contractor shall not proceed but shall notify the Contracting Officer in writing within 5 workdays after receiving it (either orally or in writing, whichever comes first) and shall request the Contracting Officer to take action as described in this clause. Upon receiving this notification, the Contracting Officer shall either issue an appropriate contract modification within a reasonable time or advise the Contractor in writing within 30 days that the instruction or direction is—

(1) Rescinded in its entirety; or

(2) Within the requirements of the contract and does not constitute a change under the changes clause of the contract, and that the Contractor should proceed promptly with its performance.

(e) A failure of the contractor and Contracting Officer to agree that the instruction or direction is both within the requirements of the contract and does not constitute a change under the changes clause, or a failure to agree upon the contract action to be taken with respect to the instruction or direction, shall be subject to the Disputes clause of this contract.

(f) Any action(s) taken by the contractor in response to any direction given by any person other than the Contracting Officer or the COR/PM shall be at the Contractor's risk.

F.7 LANGUAGE REQUIREMENTS

All deliverables shall be produced in English. There might be a need to review some reports and data in Spanish and French.

Section G - Contract Administration Data

SECTION G - CONTRACT ADMINISTRATION DATA

SECTION G - CONTRACT ADMINISTRATION DATA

G.1 MCC 52.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (COR) AND/OR PROJECT MONITOR

(PM) (JULY 2012)

(a) The Contracting Officer may designate a Government representative to act as the Contracting Officer's Representative (COR) or Project Monitor (PM) to perform functions under the contract such as review and/or inspection and acceptance of supplies, services, including construction, and other functions of a technical nature. The Contracting Officer will provide a written notice of such designation to the COR and/or PM and the Contractor. The designation letters will set forth the authorities and limitations of the COR and/or PM under the contract.

(b) Modifications to this contract are effective only if reduced to writing and executed by the Contracting Officer. The Contractor is specifically prohibited from performing any work that is outside the scope of this contract without the approval of the Contracting Officer. The Contracting Officer cannot authorize the COR or any other representative to sign documents (i.e., contracts, contract modifications, etc.) that require the signature of the Contracting Officer.

G.2 MCC 52.232-70 INVOICE INSTRUCTIONS (MAY 2017)

Invoices shall be paid in accordance with the Prompt Payment Act, thirty days (30) following receipt of a proper invoice. The Contractor shall submit each invoice electronically via email or fax to the following:

Fax: 303.969.5151/7281 ATTN: MCC Payments, or

Email: MCC_Accounting_IBCDENVER@ibc.doi.gov, or

As an alternative to electronic submission of invoices, one copy of each invoice may be submitted to the following address:

Interior Business Center

M/S D-2773

7301 West Mansfield Avenue

Lakewood, CO 80235-2230

If it is determined that the amount billed is incorrect, the invoice may be revised by the Government, or the contractor may be required to submit a revised invoice.

To constitute a proper invoice, each invoice must include the following information and/or attached documentation:

(1) Name, address and telephone of the Contractor

(2) Date of invoice and invoice number

(3) Contract number (including task order or call number and contract line item(s)) also modification number, if applicable

(4) Description (quantity, unit of measure, unit price, and extended price) of the supplies/services rendered (including hours incurred and billing rate, as applicable to the contract)

(5) A schedule depicting the following information:

Amount Invoiced

This Period

Cumulative Amount Invoiced Authorized Value of Contract Balance Remaining on Contract

If the contractor is billing for costs incurred over more than a single month, the costs for each month in which the costs were incurred and shall be segregated into the month they were actually incurred.

(6) Name of Contracting Officer's Representative (COR); and

(7) Signature of authorized representative of the firm with the following invoice certification:

"The undersigned hereby certifies to the best of my knowledge and belief that: the sum claimed under this contract is proper and due, and all the costs of contract performance have been paid, or to the extent allowed under the applicable payment clause, will be paid by the Contractor when due in the ordinary course of business; the work reflected by these costs has been performed, and amounts involved are consistent with the requirements of this Contract.

BY:______________________________________

TITLE:___________________________________

DATE:___________________________________

Inquiries regarding the status of invoices may be directed to NBC Accounting. The email address is:

MCC_Accounting_IBCDENVER@ibc.doi.gov.

G.3 ACCEPTANCE AND APPROVAL

The COR and PM must accept and approve all deliverables before payment may be made.

Section H - Special Contract Requirements

SECTION H - SPECIAL CONTRACT REQUIREMENTS

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H.1 KEY PERSONNEL

The following individual is identified as Key Personnel under this contract:

The Key Personnel are:

1. Senior Geospatial Specialist

2. Mid-level Geospatial Specialist

3. Junior Geospatial Specialist

The Contractor is encouraged to propose a team that will be best suited to complete the SOW. The Contractor may propose more than one person per position to enhance the team's expertise.

The Contractor must provide and maintain all Key Personnel as specified in the Statement of Work. Any changes are subject to prior approvals by MCC in accordance with the appropriate U.S. Government regulations.

Before changing an individual identified as Key, the Contractor shall notify the Contracting Officer in no less than 15 business days and will submit written justification as to the reason for substitution. Substitution within the first 90 days will only be considered for reasons of illness, death, or termination of employment. The Justification must include the name and qualifications of the proposed substitute(s). The proposed substitute(s) will possess qualifications equal to or superior to those of the Key person being replaced. The Contractor shall not substitute Key personnel without written consent from the Contracting Officer. No change in fixed unit prices may occur as a result of key personnel substitution. The key personnel may, with the consent of the contracting parties, be amended from time to time during the course of this contract to either add or delete personnel, as appropriate, provided that the contracting officer may ratify, in writing, such diversion and such ratification shall constitute the consent of the contracting officer. Substitutions of Key Personnel shall be equal to or have greater qualifications than the personnel being replaced.

H.2 MCC 52.203-70 CONTRACTOR NON-DISCLOSURE AGREEMENT (MAY 2017)

All contractor employees or independent contractors engaged in this contract shall provide a non-disclosure agreement as follows signed by the individual contractor/consultant and, if a contractor employee, by the contractor's contract administrator:

NON-DISCLOSURE AGREEMENT

I, _(contractor employee's name) do solemnly swear (or affirm) that I will not divulge any information, whether obtained orally or in writing from, or data maintained by the Millennium Challenge Corporation (MCC) to any unauthorized person for any purpose. I will not directly or indirectly use, or allow the use of Confidential Information for any other purpose other than that directly associated with my officially assigned duties for MCC.

Further, I will not directly or indirectly reveal or cause to be revealed the nature or content of any (Confidential Information), except to authorized personnel.

I am aware that the unauthorized use of information may be a violation of law and this Agreement.

Company or Subcontractor

Understand that authorized persons refer only to persons assigned to a project requiring access to Confidential Information or directly in the line of management over the project requiring access to the data.

[signatory]

Contract Administrator Date

I am aware that the unauthorized use of information may be a violation of law and this Agreement.

H.3 MCC 52.232-73 TRAVEL REIMBURSEMENT (MAY 2017)

Policy. When authorized as part of the Scope of Work on this contract/order and within the contract/order ceiling and as approved by the Contracting Officer's Representative (COR) and/or other MCC officials as described below, travel expenses incurred in performance of technical directives issued under this contractor/order may be reimbursed as allowed by the Federal Travel Regulations (FTR) in effect at the time of travel. MCC's supplemental policy interpretations are derived from the FTR and cannot grant additional benefits or adjust processes defined in the FTR. Supplemental policies of MCC set forth below:

a) Traveler Responsibilities. All contractor travelers must:

1) Exercise the same care in incurring expenses that a prudent person would exercise if traveling on personal business;

2) Travel in accordance with the FTR and the MCC policies included in this document; and

3) Pay any charges or fees associated with non-compliance of FTR or any MCC policies included in this document, and any expenses incurred for personal convenience. For example, the traveler may become personally responsible for travel costs associated with unauthorized use of other than coach class accommodations, failing to follow the Fly American Act requirements, exceeding per diem rates, changing departure or return flights, purchasing unapproved items, etc. regardless of the fact that travel arrangements may have been booked by others (e.g., Travel Agency).

b) Cabin Class Standards

1) The standard cabin class for contractor air-travel is coach class, regardless of destination or travel time.

2) Coach "premium" class may be authorized for destinations which have a travel time of more than 14 hours, consistent with the Federal Travel Regulations and the approval standards outlined in paragraph (f) of this document.

3) Business class travel accommodations will NOT be authorized except as determined through the approval process outlined in paragraph (f) of this document. This approval process is considered to be exceptional, to be part of a trip by trip analysis, and at the discretion of the government regardless of the destination or travel time.

c) Airlines and Flights. In accordance with the Fly America Act, contractors must use a U.S. flag air carrier service for all travel funded by the government beginning or ending in the U.S. unless a specific exemption to the "Fly America" rule applies.

Flights on U.S. air carrier pairings with foreign carriers (i.e., code share flights) are regarded as meeting Fly America requirements if the ticket is issued on the American carrier and there is an American carrier flight number.

d) Limitations. Travel reimbursement, which is part of ODC, shall not exceed the authorized ODC amount on the contract. To be reimbursable, the travel expenses must be:

1) Allowable under the FTR and the provisions of this contract/order and associated technical directives;

2) Approved prior to travel expenditure by the COR; and

3) Allocable and necessary for performance of this contract/order and associated technical directives.

e) Reimbursement Requests. Travel reimbursement requests must be submitted in sufficient time for the COR to give prior approval, and must identify:

1) The name of the traveler.

2) Destination (s) including itinerary.

3) Purpose of the travel; and

4) Cost breakdown.

5) To be reimbursed, invoices including travel expenses must provide a detailed breakdown of the actual expenditures invoiced. Contractor shall maintain the original or legible copy of receipts for all travel expenses invoiced when the expenditure is $75.00 or more. MCC reserves the right to request evidence of any travel expense paid.

f) Approvals. All travel expenses, including rental cars, must be approved by the MCC COR in writing in advance of booking any travel and incurring travel expenses. The following expense types require additional MCC pre-approvals beyond that of the COR. These additional approvals and associated justifications will be documented in writing:

1) Business class - Business class travel is considered to be exceptional, to be determined as part of a trip by trip analysis, and at the discretion of the government regardless of the destination or travel time. To reflect the exceptional nature of this approval, the justification for use of business class must be prepared by the COR and approved in writing by the relevant Managing Director or Deputy Vice President of the organization requesting the contractor to travel. The single exception to requiring this justification and approval for every trip in question is when a State Department approved medical accommodation has been granted.