This addendum to Quote No. 26-18-1 is issued by St. Tammany Parish Procurement Department in Louisiana for the Dockside Drive Drainage infrastructure project located in Slidell, LA. The addendum clarifies specifications for drainage construction work, specifically confirming that double-walled corrugated pipe (rather than concrete arched pipe) will be installed for the 15-inch diameter storm drainage system and confirming that the right-of-way extends through a resident's backyard. The original quote submission deadline is Tuesday, June 9, 2026, providing bidders with approximately two weeks from the addendum issuance date of June 4, 2026 to prepare their responses.
The addendum addresses specific technical questions submitted by prospective bidders regarding catch basin dimensions and pipe specifications, indicating an active bidding process with contractor engagement during the proposal period. No pricing information, set-aside programs, incumbent contractors, or specific contract award values are disclosed in this addendum document. The clarifications provided are essential for accurate bid preparation and ensure all contractors have uniform understanding of the project specifications before submission.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 923456-26-18-1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ST. TAMMANY PARISH
MICHAEL B. COOPER
PARISH PRESIDENT
PROCUREMENT DEPARTMENT
P.O. BOX 628 | COVINGTON, LOUISIANA | 70434 | PROCUREMENT@STPGOV.ORG | 985-898-2520
WWW.STPGOV.ORG
Version 2026.1
June 4, 2026
Please find the following addendum to the below-mentioned QUOTE.
Addendum No.: 1
Quote#: 26-18-1
Project Name: Dockside Dr Drainage
Quote Due Date: Tuesday, June 9, 2026
QUESTIONS & ANSWERS:
Question 1. Was hoping to get the exact catch basin sizes, anlso says 15” hp storm just ensuring that double walled corrugated is what is going in and not 15” concrete arched or something.
Answer 1. The double walled corrugated is correct.
Question 2. Also, what is the right of way going through the residents back yard?
Answer 2. The right of way goes through the residents back yard
End of Addendum # 1 http://www.stpgov.org/