923456-25-39-1-2.pdf
PDF 143 KB Posted
- Attached to
- Wilkinson St Drainage - Vendors Questions and Department Answers State and local contract opportunity
- Solicitation number
- 923456-25-39-1
- Issued by
- St. Tammany Parish, Louisiana
About this file
This document is an addendum (Addendum No. 2) issued by St. Tammany Parish Procurement Department for Quote #25-39-1, the Wilkinson St. Drainage project. The addendum, dated June 12, 2025, provides clarifications for the ongoing drainage infrastructure project, with the quote due on Wednesday, June 25, 2025. The addendum addresses two specific technical questions related to the project: first, confirming a 6" thick bedding using RPCC or stone for RCP and RCPA installations, and second, correcting a field note on sheet D10 Elmwood St. that mistakenly referenced a 24" RCPA, which should actually be a 36" RCPA.
The addendum does not introduce new pricing terms, set-asides, or funding details, but serves to provide critical technical clarification for potential bidders. By issuing this addendum, St. Tammany Parish ensures that contractors have accurate and precise information about the drainage infrastructure specifications, which is crucial for preparing accurate and compliant quotes for the Wilkinson St. Drainage project. The document maintains the parish's commitment to transparent and clear communication throughout the procurement process.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 923456-25-39-1.pdf | ||
| 923456-25-39-1-1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ST. TAMMANY PARISH
MICHAEL B. COOPER
PARISH PRESIDENT
PROCUREMENT DEPARTMENT
P.O. BOX 628 | COVINGTON, LOUISIANA | 70434 | PROCUREMENT@STPGOV.ORG | 985-898-2520
WWW.STPGOV.ORG
Version 2024 Q1
June 12, 2025
Please find the following addendum to the below-mentioned QUOTE.
Addendum No.: 2
Quote#: 25-39-1
Project Name: Wilkinson St. Drainage
Quote Due Date: Wednesday, June 25, 2025
QUESTIONS & ANSWERS:
Question 1: Can you provide details on the RCP and RCPA bedding and backfill? What is bedding thickness and type of materials to be used for bedding and backfill?
Answer 1: 6” Thick, RPCC or stone.
Question 2: On what appears to be field notes sheet D10 Elmwood St. there is a note “Remove and replace metal (?) with 42’ of 24” RCPA”. Is there any 24” RCPA Equivalent on this project?
Answer 2: The “24”RCPA” in the field notes should say “36” RCPA”.
End of Addendum # 2 http://www.stpgov.org/
File details come from the government source that posted it. Updated .