This is an addendum to a Request for Proposal issued by St. Tammany Parish Government in Louisiana for comprehensive HVAC maintenance services at the Justice Center complex located at 701 N. Columbia Street and 601 N. Jefferson Avenue in Covington, Louisiana. The addendum clarifies the scope of work for maintenance and repair services on HVAC equipment, ventilation ductwork, chilled water piping, boiler/hot water piping, and water treatment systems. The revised Project Specifications Appendix C provides a detailed equipment list including two 600-ton York centrifugal chillers, a 1,200-ton Baltimore Air Coil cooling tower, ten Aurora centrifugal pumps ranging from 10 to 40 horsepower, two Cleaver-Brooks gas boilers rated at 3,500,000 BTU each, multiple York air handlers, 312 variable air volume boxes, and additional auxiliary equipment such as exhaust fans, water heaters, and motor starters. The parking garage equipment list includes a 35-ton air-cooled chiller, York air handler, variable air volume boxes, and elevator air conditioning package units. Written inquiries were due December 1, 2025, at 2:00 PM, with responses provided by December 5, 2025, at 2:00 PM. Proposals are due December 10, 2025, at 2:00 PM CST. The initial contract term runs from Notice to Proceed through December 31, 2026, with options for two additional one-year renewals.
The addendum addresses key clarifications regarding contractor responsibilities and preexisting conditions. The Parish confirmed that an evaluation period will be provided to the awarded vendor to identify and document preexisting equipment damage or disrepair, protecting the contractor from liability for conditions not caused by their work. The scope includes full maintenance contracts for all ductwork and piping systems, with the understanding that major capital replacements such as boiler and cooling tower replacements planned for 2026 at the Justice Center are excluded from contractor responsibility. Equipment replacement for obsolete parts must match existing specifications at no additional cost to the Parish. The contractor is responsible for supplying all equipment, chemicals, and materials at 100 percent, including thorough cleaning of all equipment with wet washing of fans, blades, and fan coil units, with debris removal and proper equipment preparation before systems are placed online.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 923456-25-11-3.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ST. TAMMANY PARISH
MICHAEL B. COOPER
PARISH PRESIDENT
PROCUREMENT DEPARTMENT
P.O. BOX 628 | COVINGTON, LOUISIANA | 70434 | PROCUREMENT@STPGOV.ORG | 985-898-2520
WWW.STPGOV.ORG
Version 2025.1
December 1, 2025
Please find the following addendum to the below-mentioned RFP.
Addendum No.: 1
RFP#: 25-11-3
Project Name: HVAC Maintenance
RFP Due Date: Wednesday, December 10, 2025
GENERAL INFORMATION:
1. Please remove Attachment A – Project Specifications Appendix C and replace it with Attachment A – Project Specifications Appendix C – Revised (attached).
QUESTIONS & ANSWERS:
Question 1. We would like clarification on section 2.1, scope of work/services. The RFP states “ Additionally, all associated ventilation ductwork, chilled water piping, boiler/hot water piping, and water treatment equipment are not excluded and remain a part of this contract.” What is the scope of maintenance and repair you would like us to include on the duct work and piping?
Answer 1. The scope involves a full maintenance contract, meaning that any maintenance or repairs needed on the ductwork and piping should be included. Should any of these items be determined to be in disrepair during the initial equipment evaluation period, those repairs would not fall on the awarded contractor.
Question 2. Will there be an evaluation period to the vendor that is awarded the project. Meaning will the contractor have the opportunity to identify preexisting conditions, so they are not liable for work done, not done, misdiagnosed, or unidentified by the previous contractor?
Answer 2. Yes. Please refer to the second-to-last sentence in Section 2.1.
Question 3. We would like clarification on section 2.1, scope of work/services. The RFP states, “If a part is obsolete, the Provider shall replace the equipment to match the existing specifications http://www.stpgov.org/
ST. TAMMANY PARISH
MICHAEL B. COOPER
PARISH PRESIDENT
PROCUREMENT DEPARTMENT
P.O. BOX 628 | COVINGTON, LOUISIANA | 70434 | PROCUREMENT@STPGOV.ORG | 985-898-2520
WWW.STPGOV.ORG
Version 2025.1 of the failed unit, and at no additional cost to the Parish.” For example: If one of the boilers at the justice center has a leak that can not be repaired, are we responsible for changing out that boiler?
Answer 3. We are working on replacing the Justice Center boilers in 2026, in addition to the cooling towers. Please refer to the first paragraph in section 2.1 regarding proactive replacements.
ATTACHMENTS:
1. Attachment A – Project Specifications Appendix C – Revised.pdf
End of Addendum # 1 http://www.stpgov.org/
Appendix “C” Justice Center Equipment List
701 N. Columbia St., Covington, LA 70433 (Building) 601 N. Jefferson Ave., Covington, LA 70433 (Parking Garage)
Equipment Included in the Justice Center Scope of Work:
Heating System- Boilers, pumps, heating coils, steam traps, water strainers, unit heaters, duct heaters, heat exchangers, tube bundles, cabinetry, humidifiers and all components contributing to proper building heating.
Cooling System– Air conditioning compressors, evaporators, evaporative condensers, air-cooled condensers, cooling towers, cooling tower fans, pumps, water chillers, cooling coils and all components contributing to proper building cooling.
Air Handling System – Fans, motors, sheaves, shafts, dampers, induction units, VAV mixing box pneumatic controllers, VAV mixing boxes and fan coil units, VFDs and all components contributing to moving/circulating air for the building.
Miscellaneous Equipment– Exhaust fans, float valves, direct expansion valves, thermometers, gauges, magnetic starters, manual motor starters, pump and fan motor drives, belts, and electrical wiring from motor disconnect to their respective motor.
Chemical Water Treatment - Open loop condenser water system, closed loop chilled water system, closed loop heating water system. Supply all equipment and chemicals 100%.
The Proposer should be responsible to clean all the equipment listed, wet wash fans and blades with soap and water, and wet wash entire fan coil unit. All cleaned units are NOT to be put online until water, dirt and debris are properly vacuumed out so that it never enters the ductwork and flex lines. All drain pans are to be cleaned so that ALL DEBRIS is removed at least once a year.
St. Tammany Parish Justice Center Equipment:
York – 600 ton Centrifugal chiller. Chiller model #YT Series (2 ea) Chiller associated isolation valves & makeup/aerator systems Baltimore Air Coil - Cooling tower 1200 ton/ 2 cell & bypass valves Aurora - Centrifugal pumps 10 thru 40 hp (10 ea) & associated motors Grundfos - 1/6 hp Circulating pump (hot water) (4 ea) Cleaver-Brooks - (2 ea) Gas boilers 3,500,000 BTU & makeup water system Central Plant Exhaust fans (7 ea) Central Plant Supply fans (2 ea) Air compressors/dryers & associated controls (2 ea)
Revised
Trane 2 stage DX 5 ton unit (1 ea) Ruud - 120 gallon water heaters (2 ea) Smoke evac fans up to 50 hp (12 ea) Smoke evac fans 50 to 75 hp (6 ea) Chill water valves (18 ea) Motor starters (57 ea) York- 35thru 50 ton air handlers (5 ea) York-20 h.p electric motors (5 ea) York - 50 thru 55 ton air handlers (3 ea) York - 25 hp electric motors (3 ea) York - 60 thru 65 ton air handlers (5 ea) York - 30 hp electric motors (5 ea) York - 65 thru 85 ton air handlers (5 ea) York - 40 hp electric motors (5 ea) Variable Frequency drives (15 ea) Variable Air Volume boxes w/hot water heating coil (312 ea) Hot water by-pass valves (2 ea) Chill water by-pass valves (2 ea) Refrigerant monitor {l ea} South Elevator A/C package units (2 ea} LG mini split unit ( 1 ea}
Air Handlers Units (AHU) and Make up Air handler Units (MAU):
AHU
B-1, Qty 21
AHU
B-2, Qty 21
AHU
Revised
B-3, Qty 21
AHU
G-1, Qty 20
AHU
G-2, Qty 14
AHU
G-3, Qty 22
AHU
G-4, Qty 17
AHU
2-1, Qty 30 AHU 2-2, Qty 15 AHU 2-3, Qty 32 AHU 2-4, Qty 18 AHU 3-1, Qty 25 AHU 3-2, Qty 17 AHU 3-3, Qty 25 AHU 3-4, Qty 14
St. Tammany Parish Parking Garage Equipment:
Chiller - 35 ton air cooled (1 ea) Variable Frequency drive (1 ea) York Air Handler 15hp (I ea) Variable Air Volume boxes w/electric heating coil (13 ea) Exhaust fans (2 ea) Elevator NC package units (2 ea) LG mini split units (3 ea)
Revised
MAU 3-1
MAU 4-1
MAU 4-2
VAV boxes with controllers and hot water heating coils:
• Total VAVs at the JC:312