SATPC0040040 Tab 04 4 SOW..pdf
PDF 179 KB Posted
- Attached to
- FY26 DDN Annual Maintenance Federal contract opportunity
- Solicitation number
- 80NSSC26920366Q
About this file
This Statement of Work (SOW) details the FY26 DDN Annual Maintenance requirements for NASA Langley Research Center (LaRC) in Hampton, VA. The procurement includes storage systems and support services, specifically two storage appliances (SFA400NVXE-HDR100 and SFA200NVXE-HDR100), 20 SSD drive modules, and associated hardware and software support. The contract includes basic parts support, customer self-maintenance, software support for GRIDScaler and RedHat Linux, and has a 1-year period of performance. Additionally, the SOW incorporates two new AI-related requirements mandating contractor disclosure of AI technology usage and compliance with OMB memo M-25-22 guidelines for AI systems and services acquisitions, effective September 2025.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0040040 Tab 04 4 SOW..pdf | ||
| SATPC0040040 Tab 10 RFQ Open Market Template.pdf | ||
| SATPC0040040 Tab 06 BNJ..pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
oSTATEMENT OF WORK
1. Objective/Requirements
The information listed below is required to complete the FY26 DDN Annual Maintenance at Langley Research Center (LaRC).
2. Characteristics, Scope, and Specs
PART NO. DESCRIPTION QTY.
Storage Systems
SFA400NVXE-HDR100 SFA400NVXE-HDR100 (S/N: F9001CTH120AN2B802M) Ready Appliance with SAS expansion ports and 24x NVMe slots, 8x HDR100 /100GbE ports, 2x power supplies and cables, rail kit; requires 4 node GRIDScaler and RHELsupport purchased separately
SFA200NVXE-HDR100 SFA200NVXE-HDR100 (S/N: F9001CTH120AN2B802N) Ready Appliance with 24x NVMe slots, 4x HDR100 / 100GbE ports, 2x power supplies and cables, rail kit;
requires 2 node GRIDScaler and RHEL support purchased separately
S0D10768N24NH36 7.68TB 1 DWPD NVMe G3 4K SSD drive module for 200NV system 20 SSDs > 8TB
SUP-SSD-BSPO-1 Basic Parts Only Support; SSD Drives; coverage through normal wear life; use only with BSPO offerings; price is per SSD; annual
Hardware Support SUP-BSPO-1 Basic Parts Only Support; Customer Self-Maintenance; storage systems, storage servers, disk drives and accessories; 7x24 remote support; no onsite labor; customer replace CRU and FRU; parts onsite NBD; SW support separate; annual
SUPPORT-SSDBH-DMR Non-returnable storage device option for SSDs; annual 1 Software Support
SUPSB-EGS-SCO-1 Basic Software Support for embedded GRIDScaler with customer-provided Spectrum Scale software licenses with current support; per NSD-hosting socket; annual pricing
SUPSP-RH1S1Y-1 Software Support, embedded RedHat Linux, single socket with one guest, for RH embedded into GRIDScaler or EXAScaler; does not include direct Red Hat support, all support provided by DDN; must be purchased annually
Support SUP-POP-INV Comment-only designation that support begins on the date of invoice 1
3. Place of Performance
NASA Langley Research Center
Hampton, VA 23681
4. Period of Performance
1-Year ARO
1) Use of Artificial Intelligence (AI) During Contract Performance (SEP 2025) which requires contractors to disclose the use of AI technologies at any time during the fulfillment of the contract. This requirement statement must be included in all contracts (including orders); and
2) Artificial Intelligence (AI) Acquisitions (SEP 2025) which provides additional contractor requirements when the contract is acquiring covered AI systems or services as defined by OMB memo M-25-22. This requirement statement must be included in all contracts (including orders) when acquiring covered AI systems or services. Covered AI systems or services and exceptions are listed below as defined OMB memo M-25-22).
File details come from the government source that posted it. Updated .