About this file

This document contains questions and answers related to a solicitation for two cargo containers to temporarily store and process hardware. The solicitation is seeking bids for spray foam insulation, epoxy floor coating, exterior paint, and any necessary sealants. Bids must include safety data sheets for all materials and be compatible with hypergolic propellants. The period of performance is from January 22, 2024 through March 23, 2024, with delivery required by the end date. The containers will be bolted together but not permanently installed, and will later be moved and repurposed. Transportation to the site will be provided by the vendor, while on-site installation and placement on an existing concrete pad will be conducted by contractors. The National Aeronautics and Space Administration Shared Services Center is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Two cargo containers to temporarily store and process hardware, newest first.
File Type Posted
SATPC0033946 Tab 04 Questions and Answers.pdf PDF
SATPC0033946 Tab 04 4 SOW_Revised.pdf PDF
SATPC0033946 Tab 10 SAM RFQ.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

• WSTF personnel shall evaluate and approve all material for compa�bility with hypergolic propellant. Bids submited without SDS’s or that use noncompa�ble material will be rejected.

o Can you provide feedback on the amount of detail you are looking for in our bid vs.

awarded contract?

For example, we could provide safety data sheets for our spray foam insula�on, epoxy floor coa�ng, and exterior paint in our ini�al bid. But are you also looking for SDS for other items such as lights, EMT, galvanized Unistrut, light switches, screws, nuts, bolts, etc.?

Spray foam, insula�on, epoxy coa�ng, paint, and any sealants used. Don’t need SDS for lights, EMT, Unistrut, etc.

• Period of Performance - Jan 22, 2024 through March 23, 2024 o Is March 23 mandatory? Or are you somewhat flexible where we can state alterna�ve op�ons?

Product has to be delivered by March 23.

1. Containers need to be bolted together. This is not a permanent installa�on. Containers will moved and repurposed to support future projects.

2. As described in the SOW final assemble will be conduct by Onsite contractors. Containers will be placed on preexis�ng concrete pad.

3. SOW states the vendor needs to provide transporta�on to the site. Customer/WSTF will off load the containers and move them into their final loca�on

a. i.e. onsite support from the vender is not required.