About this file

This document is a Draft Request for Proposal (DRFP) from NASA's Marshall Space Flight Center for the Consolidated Program Support Services (CPSS) Program Planning & Control (PP&C) II contract. NASA will conduct a total small business set-aside competitive acquisition resulting in an indefinite delivery, indefinite quantity (IDIQ) contract with cost-plus-fixed-fee task orders and a firm-fixed-price phase-in requirement. The contract will have a two-year base period and three one-year option periods, with an anticipated contract award date of March 2026 and a 90-day phase-in start date in June 2026.

The principal purpose is to provide personnel supporting NASA's current and future programs across multiple NASA centers, including program planning, earned value management, cost estimating and analysis, scheduling, resource data storage and retrieval, risk integration, and programmatic subject matter expert support. Key requirements include a Top Secret facilities clearance, submission of proposals through NASA's Enterprise File Sharing and Sync Box, and potential organizational conflict of interest considerations. Potential offerors are invited to review and comment on the draft solicitation, with comments due within 14 calendar days of the DRFP release. The North American Industry Classification System code is 541715, with a small business size standard of 1,300 employees.

View the file

Other files for this federal contract opportunity

Other files attached to Consolidated Program Support Services (CPSS), Program Planning & Control (PP&C) II, newest first.
File Type Posted
CPSS PPC II Virtual Industry Day Interested Parties.pdf PDF
CPSS PPC II Industry Day Briefing.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NASA FORM 1858 10/23 (2.4) Previous versions are obsolete.

National Aeronautics and Space Administration George C. Marshall Space Flight Center Marshall Space Flight Center, AL 35812

April 21, 2025

TO: All Potential Offerors

SUBJECT: Draft Request for Proposal (DRFP), Solicitation No. 80MSFC25R0011, for Consolidated Program Support Services (CPSS) Program Planning & Control

(PP&C) II

You are invited to review and comment on the National Aeronautics and Space Administration (NASA) Marshall Space Flight Center’s (MSFC) CPSS PP&C II solicitation. The principal purpose of this requirement is to provide personnel to support NASA’s current and future programs and projects to include PP&C Integration, Program Analysis, Earned Value Management (EVM), Cost Estimating, Cost Analysis, Scheduling, Scheduling Analysis, Resource Data Storage and Retrieval Analysis Center (REDSTAR), Risk Integration, Quantitative Risk Assessment, and Programmatic SME support.

Potential offerors are encouraged to comment on all aspects of the draft solicitation, including the requirements, schedules, proposal instructions, and evaluation approaches, any perceived safety, occupational health, security (including information technology security), environmental, export control, and/or other programmatic risk issues associated with performance of the work.

Potential offerors should identify any unnecessary or inefficient requirements and are also encouraged to comment on the Draft Request for Proposal (DRFP) Contract Line-Item Number (CLIN) structure, any unique terms and conditions, and the Section M Evaluation Criteria.

NASA will conduct this acquisition as a total small business set-aside. This competitive acquisition will result in an indefinite delivery, indefinite quantity (IDIQ) contract with the ability to issue cost-plus-fixed-fee (CPFF) task orders and a firm-fixed-price phase-in requirement. The contract will have a two-year Base Period and three one-year option periods.

The North American Industry Classification System code for this acquisition is 541715 and the small business size standard is 1,300.

Potential offerors should ensure its company is listed in the online database(s) for the following:

(1) System for award management: https://www.sam.gov/SAM/.

(2) U.S. Department of Labor Veterans’ Employment and Training Service, VETS-4212

Reports: https://vets4212.dol.gov/vets4212/.

https://www.sam.gov/SAM/ https://vets4212.dol.gov/vets4212/

(3) US Government’s unique entity identifier: https://www.gsa.gov/about-us/organization/federal-acquisition-service/technology-transformation-services/integrated-award-environment-iae/iae-systems-information-kit/unique-entity-identifier-update.

The current planned release date for the Final RFP is on or about June 6, 2025, with proposals being due approximately 30 calendar days later.

The anticipated contract award date is March 2026, with a June 2026, 90-day phase-in start date.

The contract may be performed onsite at NASA Ames Research Center, Armstrong Flight Research Center, Glenn Research Center, Goddard Space Flight Center, NASA Headquarters, Johnson Space Center, Kennedy Space Center, Langley Research Center, MSFC, and Stennis Space Center.

The following additional information is provided to assist in understanding this acquisition:

1. A Phase-in period will be conducted. The 90-day Phase-in period is a separate CLIN and will overlap the incumbent contract.

2. The Government will make available existing Installation-Accountable Government Property for onsite contract performance.

3. After release of the Draft RFP, a CPSS PP&C II Virtual Industry Day will be held on April 24, 2025. Please refer to Section L, MSFC 52.210-91, Virtual Industry Day Meeting, for additional details.

4. NASA has determined that this acquisition may give rise to a potential organizational conflict of interest (OCI). An OCI Plan is required for this acquisition.

5. Please note a Top Secret facilities clearance is required for this acquisition. A Top Secret facility security clearance is required at the time proposals are due because ongoing and/or new classified requirements may need to be performed upon contract commencement. For proposals submitted as joint ventures, the facility clearance must be granted either the joint venture itself or the individual partner(s) to the joint venture that will perform the necessary security work have a facility security clearance.

6. Proposals for this solicitation are required to be submitted through NASA’s Enterprise File Sharing and Sync Box (EFSS Box), a FedRAMP Moderate certified platform.

Potential offerors, especially those that have not previously submitted a proposal utilizing NASA’s EFSS Box, are encouraged to review the solicitation instruction entitled “Electronic Proposal Delivery - Proposal Marking and Delivery Through NASA’s EFSS Box” which provides instructions related to the submission of proposal via EFSS Box.

Offerors are encouraged to check with their corporate IT staff to determine if there are firewall restrictions that would need to be addressed prior to the submission of proposal files through NASA’s EFSS Box.

https://www.gsa.gov/about-us/organization/federal-acquisition-service/technology-transformation-services/integrated-award-environment-iae/iae-systems-information-kit/unique-entity-identifier-update https://www.gsa.gov/about-us/organization/federal-acquisition-service/technology-transformation-services/integrated-award-environment-iae/iae-systems-information-kit/unique-entity-identifier-update https://www.gsa.gov/about-us/organization/federal-acquisition-service/technology-transformation-services/integrated-award-environment-iae/iae-systems-information-kit/unique-entity-identifier-update https://www.gsa.gov/about-us/organization/federal-acquisition-service/technology-transformation-services/integrated-award-environment-iae/iae-systems-information-kit/unique-entity-identifier-update

7. Please note the DRFP contains numerous formatting inconsistencies (e.g., font size, margins) which are a function of the NASA contract writing system and cannot be corrected.

Documents related to this acquisition, including this letter, the solicitation, attachments, exhibits, any amendments, and links to online reference/technical/bidders’ library will be attainable electronically from the World Wide Web through the Government-wide point of entry website at www.SAM.gov. Potential Offerors are requested to periodically monitor the websites for updates.

NASA FAR Supplement (NFS) clause 1852.215-84, OMBUDSMAN, is applicable. The Ombudsman for this acquisition is Stephen Shinn at stephen.a.shinn@nasa.gov.

This DRFP is not a solicitation and NASA is not requesting proposals. This DRFP does not commit NASA MSFC to pay any proposal preparation costs, nor does it obligate NASA MSFC to procure or contract for this requirement. This request is not an authorization to proceed and does not authorize payment for any charges incurred by the offeror for performing any of the work called for in this solicitation.

Any comments regarding the DRFP should be submitted electronically in writing, to Charlene Booth, Contracting Officer, at charlene.c.booth@nasa.gov, within 14 calendar days after the release of this DRFP. If a respondent believes their comments contain confidential, proprietary, competition sensitive, or business information, those questions/comments shall be marked appropriately. However, questions that are marked as containing confidential, proprietary, competition sensitive or business information will not be provided a Government response. The Government will consider all comments received in preparation of the Final RFP. To the extent a comment leads the Government to revise the acquisition approach or requirements, the change will be reflected in the Final RFP. Some DRFP questions and comments may receive a posted response to the GPE if the Contracting Officer determines that a response would facilitate additional understanding of the solicitation. The Government may also respond via the GPE to comments and/or questions received following the issuance of the Final RFP.

Michael C. Eagan Division Director, Acting

Enclosure:

DRFP 80MSFC25R0011

DRFP Questions & Responses

National Aeronautics and Space Administration
Marshall Space Flight Center, AL 35812

SECTION

15A. NAME AND

ADDRESS

OF OFFEROR

SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.

RATING PAGE OF PAGES

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

CALL:

A. NAME B. TELEPHONE (NO COLLECT CALLS)

AREA CODE NUMBER EXTENSION

C. EMAIL ADDRESS

11. TABLE OF CONTENTS

(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION

A

B

C

D

E

F

G

H

I

J

K

L

M EVALUATION FACTORS FOR AWARD

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

LIST OF ATTACHMENTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

CONTRACT CLAUSESSOLICITATION/CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

PACKAGING AND MARKING

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

CONTRACT ADMINISTRATION DATA

SPECIAL CONTRACT REQUIREMENTS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause Number 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)

DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE

CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

15B. TELEPHONE NUMBER

AREA CODE NUMBER EXTENSION

15C. CHECK IF REMITTANCE ADDRESS IS

DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE

UNITED STATES CODE AT:

10 U.S.C. 3204(a) 41 U.S.C. 3304(a) ( )

24. ADMINISTERED BY (If other than Item 7)

26. NAME OF CONTRACTING OFFICER (Type or print)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

25. PAYMENT WILL BE MADE BY

27. UNITED STATES OF AMERICA (Signature of Contracting Officer) 28. AWARD DATE

CODE

ITEM

STANDARD FORM 33 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.214 (c)

SEALED BID (IFB) INVITATION FOR BID

NEGOTIATED (RFP) REQUEST FOR

PROPOSAL

(Hour) (Date)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

DRAFT

80MSFC25R0011

Section A - Solicitation/Contract Form

Section is intentionally left blank

Section B - Supplies or Services and Prices/Cost

Additional Information/Notes

Item Supplies/Service Dates Quantity Unit Unit Price Amount

Phase-in

Product Service Code: R408 Severability: Yes Firm Fixed Price

Period of Performance From

01 JUN

To

31 AUG

1.0

US

Dollar

Base Period

Cost Plus Fixed Fee

From

01 SEP

To

31 MAY

Option Period 1

From

01 JUN

To

Option Period 2

From

01 JUN

To

Option Period 3

From

01 JUN

To

MSFC 52.216-90 IDIQ Contract Value by Period of Performance Jan 2025

The maximum potential not-to-exceed (NTE) value of this contract including Options, is $458,000,000. This contract provides for performance of indefinite-delivery indefinite- quantity (IDIQ) task/delivery orders. The NTE value shall not be exceeded without the prior written approval of the Contracting Officer.

The values for each period of performance are set forth below:

PERIOD OF

PERFORMANCE

MINIMUM VALUE

MAXIMUM

VALUE

01 JUN 2026 - 31

AUG 2026

Not applicable $200,000

Base Contract

01 SEP 2026 - 31

MAY 2028

$200,000 (minimum for base and all options)

$170,215,634

Option 1

01 JUN 2028 - 31

MAY 2029

$91,260,504

Option 2

01 JUN 2029 - 31

MAY 2030

$95,786,030

Option 3 01 JUN 2030 - 31 May

$100,537,832

Maximum Potential NTE Value

$458,000,000

(End of clause)

MSFC 52.216-91 Supplies and/or Services to be Provided and Type of Contract Jan 2025

(a) The contractor shall provide all resources (except as expressly stated in the contract as furnished by the Government) necessary to perform and/or deliver the services in accordance with Attachment , J-1, Performance

.Work Statement

(b) This is a single-award indefinite-delivery, indefinite-quantity (IDIQ) contract with cost-plus-fixed-fee (CPFF) task orders (TOs). Clauses delineated in this contract are applicable as appropriate specific to the type of TO awarded. Center-specific clauses delineated elsewhere in this contract will apply to TO efforts performed at the specified center. Performance-based deductions apply to the contract in its entirety.

(c)IDIQ ordering shall be performed in accordance with Federal Acquisition Regulation (FAR) 52.216-18, Ordering, FAR 52.216-19, Order Limitations, and NASA FAR Supplement (NFS) 1852.216-80, Task Ordering Procedure, of this contract.

(d) IDIQ Labor Categories and Labor Rates: Labor categories and associated fully burdened labor rates to be used in development of work packages and resulting IDIQ task orders are included in Attachment J-4, Indefinite-Delivery, Indefinite-Quantity Rates.

(e) ODCs (e.g., travel, material, training): All ODCs required to support this contract shall be authorized and accounted for within IDIQ TOs. TO ODC burden rates shall not exceed those rates included in J-4, Indefinite- Delivery, Indefinite-Quantity Rates. Fee shall not be applied to ODCs. Travel shall be performed in compliance with the Federal Travel Regulations (FTR). The Government will not pay for expenses that exceed FTRs. ODCs shall be invoiced on separate line items in all invoices in which these costs are incurred. Travel shall also be invoiced to include complete backup documentation to support the invoiced travel amounts in all invoices in which these costs are incurred. The contractor shall obtain written approval from the contracting officer’s representative (COR) at least five (5) business days prior to the incurrence of any ODC or travel expenses.

(End of Clause)

MSFC 52.227-91 Data Requirements Jun 2017

(a) The contractor shall furnish all data identified and described in the data requirements list (DRL) of the data procurement document (DPD) which is attached to this contract. All expenses associated therewith are included in the estimated cost or firm fixed price of this contract, or any associated task orders if applicable.

(b) The Government reserves the right to delay the delivery of any or all data requirements descriptions (DRDs) specified in the DRL and such right may be exercised at no increase to the estimated cost or firm fixed price of this contract or any associated task orders.

(c) Nothing contained in this clause shall relieve the contractor from delivering data that is not identified and described in the DRL/DPD, but required under another section of this contract.

(d) To the extent that data required to be delivered under a DRD is also required to be delivered under another section of the contract, the requirements established by both the DRD and such other contract section shall apply. In the event of a conflict between the data requirements of the DPD and another contract section, the specific contract section will take precedence.

MSFC 52.216-92 Matrix Of Contract Line Items (CLINs) Oct 2017

The current total contract value is as specified below. To separately track the components of the value, separate CLINs have been established as follows:

CLIN DESCRIPTION VALUE OPTION STATUS

Phase-in-FFP

01 JUN 2026 - 31 AUG 2026

$TBP NA

Base Period - CPFF

01 SEP 2026 - 31 MAY 2028

$TBD NA

Option Period 1 - CPFF

01 JUN 2028 - 31 MAY

$TBD Not Exercised

Option Period 2 - CPFF

01 JUN 2029 - 31 MAY

Option Period 3 - CPFF

1 JUN 2030 - 31 MAY 2031

Total Value Phase-in, Base and All Exercised Options

$TBP

**If exercised, CLINS 0003-0005 values will be rolled up into CLIN 0002.

1852.216-74 Estimated Cost and Fixed Fee. DEC 1991

The estimated cost of this contract is $TBD, exclusive of the fixed fee of $TBD. The total estimated cost and fixed fee is $TBD.

1852.216-78 Firm Fixed Price. DEC 1988

The total firm fixed price of this contract is $ .TBP for the phase-in

1852.232-81 Contract Funding. JUNE 1990

(a) For purposes of payment of cost, exclusive of fee, in accordance with the Limitation of Funds clause, the total amount allotted by the Government to this contract is $TBD.

(b) An additional amount of $TBD is obligated under this contract for payment of fee.

Section C - Description/Specifications/Statement of Work

Requirements

Program Planning and Control (PP&C) and Programmatic Subject Matter Expert (SME) support services.

MSFC 52.211-93 Description/Specifications/Statement of Work May 2019

The Description/Specifications/Statement of Work/Performance Work Statement is located in Attachment J- .1, Performance Work Statement

Section D - Packaging and Marking

1852.245-74 Identification and Marking of Government Equipment JAN 2011

(a) The Contractor shall identify all equipment to be delivered to the Government using NASA Technical Handbook (NASA–HDBK) 6003, Application of Data Matrix Identification Symbols to Aerospace Parts Using Direct Part Marking Methods/Techniques, and NASA Standard (NASA–STD) 6002, Applying Data Matrix Identification Symbols on Aerospace Parts or through the use of commercial marking techniques that:

(1) are sufficiently durable to remain intact through the typical lifespan of the property: and, (2) contain the data and data format required by the standards. This requirement includes deliverable equipment listed in the schedule and other equipment when no longer required for contract performance and NASA directs physical transfer to NASA or a third party. The Contractor shall identify property in both machine and human readable form unless the use of a machine readable-only format is approved by the NASA Industrial Property Officer.

(b) Equipment shall be marked in a location that will be human readable, without disassembly or movement of the equipment, when the items are placed in service unless such placement would have a deleterious effect on safety or on the item's operation.

(c) Concurrent with equipment delivery or transfer, the Contractor shall provide the following data in an electronic spreadsheet format:

(1) Item Description.

(2) Unique Identification Number (License Tag).

(3) Unit Price.

(4) An explanation of the data used to make the unique identification number.

(d) For equipment no longer needed for contract performance and physically transferred under paragraph (a) of this clause, the following additional data is required:

(1) Date originally placed in service.

(2) Item condition.

(e) The data required in paragraphs (c) and (d) of this clause shall be delivered to the NASA center receiving activity listed below:

MSFC and other NASA Centers

(f) The contractor shall include the substance of this clause, including this paragraph (f), in all subcontracts that require delivery of equipment.

Section E - Inspection and Acceptance

FAR Clauses Incorporated by Reference

Number Title Effective Date 52.246-5 Inspection of Services-Cost-Reimbursement. Apr 1984

1852.246-71 Government Contract Quality Assurance Functions. OCT 1988

In accordance with the inspection clause of this contract, the Government intends to perform the following functions at the locations indicated:

Item Quality Assurance Function

Location

All Services

See MSFC 52.3237-91, Place of Performance

Inspection /Acceptance

Section F - Deliveries or Performance

Delivery Schedule

Period of Performance From

01 JUN 2026

To

31 AUG 2026

01 SEP 2026

31 MAY 2028

01 JUN 2028

31 MAY 2029

01 JUN 2029

31 MAY 2030

01 JUN 2030

31 MAY 2031

52.242-15 I Stop-Work Order. Apr 1984

MSFC 52.237-91 Place of Performance Jul 2018

The Contractor shall perform the work under this contract at Ames Research Center (ARC), Armstrong Flight Research Center (AFRC), Glenn Research Center (GRC), Johnson Space Center (JSC), Kennedy Space Center (KSC), Marshall Space Flight Center (MSFC), Stennis Space Center (SSC); Langley Research Center (LaRC)

, and (SME only), NASA Headquarters (HQ) (SME only) and Goddard Space Flight Center (GSFC) (SME only).

at such other locations as may be approved in writing by the Contracting Officer.

MSFC 52.211-94 Period of Performance May 2017

The period of performance for this contract is from through 01 JUN 2026 31 MAY 2031.

Section G - Contract Administration Data

Additional Regulation or Supplement Clauses Incorporated by Reference

1852.216-75 Payment of Fixed Fee. DEC 1988 1852.242-71 Travel Outside of the United States. DEC 1988 1852.242-73 NASA Contractor Financial Management Reporting. NOV 2004 1852.245-70 Contractor Requests for Government-Furnished Property. AUG 2015 1852.245-75 Property Management Changes. JAN 2011

JSC 52.204-92 NASA SECURITY PROGRAM AND IDENTIFICATION OF EMPLOYEES Jul 2022

(a) The contractor shall adhere to Center and Agency-wide program policy and guidance for security operations and the Contractor shall comply with the following:

• NPR 1600.1, NASA Security Program Procedural Requirements (current version)

• NPD 1600.9, NASA Insider Threat Program

• NPD 1600.3, Policy on Prevention of and Response to Workplace Violence

• NPR 1600.3, Personnel Security (current version)

• NPR 1600.4, Identity and Credential Management. (Current Version)

(b) For any contract requiring a Facility Clearance Level (FCL) for access to Classified National Security Information (CNSI), the contractor shall adhere to the Agency-wide program policy and guidance related to the protection of CNSI by complying with the following:

• NPR 1600.2, NASA Classified National Security Information (current version)

(c) For any contract requiring an FCL for access to CNSI and requiring access to Communications Security (COMSEC) equipment, the contractor shall adhere to the Agency-wide program policy and guidance related to the protection of COMSEC equipment by complying with the following:

• NPR 1600.6, Communications Security (COMSEC) (NPR 1600.6 is a protected document that can be obtained by contractors that have a need-to-know. The JSC point of contact is the JSC COMSEC Account Manager

(CAM)).

(d) At all times while on NASA property, the contractor, subcontractors, their employees, and agents shall wear NASA issued credentials. NASA credentials will be issued in accordance with NPR 1600.4, Identity and Credential Management. The employee’s Facility Security Officer (FSO) and/or Designated Official (DO) will submit an identity request for temporary (between 29 and 179 days) or permanent (greater than 180 days) credentials within the NASA Identity and Access Management (IdMAX) system.

(e) Credentials will be issued at the following locations:

• Johnson Space Center (JSC) Badging Office, Building 110, Monday through Friday excluding holidays.

• White Sands Test Facility (WSTF), Protective Services Office Building (PSOB), Building 108, Monday through Friday excluding holidays. WSTF visitor credentials will be issued on a 7-day-a-week, 24-hour-a-day basis.

(f) The FSO/DO needing identity requester rights, must complete the following training in SATERN: Personal Identity Verification (PIV) – ICAM Overview “AG-PIV-ICAM-OVERVIEW” and Personal Identity Verification (PIV) – Requester Module “AG-PIV-IDENTITY-REQUESTER.” After completion of the training, the FSO/DO will request the following rights in NAMS: Agency ICAM Infrastructure; with the Identity Requester role. Lastly, submit a JSC Form (JF) 200, NASA JSC Agreement Maintenance Card to be added as a Requester for the contract/agreement of responsibility. This will allow the contractor to have identity requester privileges within IdMAX.

(g) For temporary credential requests, the FSO/DO will submit the credential request within IdMAX and instruct the employee to visit the JSC Badging Office to complete the enrollment process for the temporary credential. The employee will need to present two forms of matching I-9 identification documents to process a temporary credential. The list of acceptable I-9 documents can be found on the U.S. Citizenship and Immigration Services (USCIS) website located at www.uscis.gov.

(h) For permanent credential requests, the FSO/DO will submit the request within IdMAX. NASA Personnel Security will notify the employee via email to begin background investigation processing and will provide the employee the necessary forms to complete the eQIP process electronically. Once the background investigation process is complete, the employee will be notified to go to the JSC Badging Office or the NASA Facility nearest to the employee for enrollment. Employees will present two forms of matching I-9 identification documents to process for a permanent credential; and will receive a temporary 30-day credential or Interim Agency Smart Badge until the PIV credential is ready for pickup. When the PIV credential arrives, the employee will receive an email notification for credential pickup.

(i) The contractor shall be held accountable for issued credentials, keys, and other items. The contractor must assure credentials (returned to JSC Badging Office) and keys (returned to JSC Locksmith Office) are returned upon completion of work under the contract in accordance with the procedures listed on JF 760, JSC Termination/Retiree and Return for Future Use Checklist.

MSFC 52.204-91 Security and Badging Requirements Nov 2016

Performance of this contract will require access to facilities, information technology systems, and other resources at the Marshall Space Flight Center and/or the Michoud Assembly Facility. To obtain and maintain access, the Contractor shall comply with the applicable requirements from the latest revision of (1) NASA Procedural Requirements (NPR) 1600.1, “NASA Security Program Procedural Requirements,” (2) NPR 1600.4, “Identity and Credential Management,” (3) Marshall Procedural Requirements (MPR) 1600.1, “MSFC Security Program Procedural Requirements,” (4) MPR 1600.4, “MSFC Identity, Credential, and Access Management,” and (5) NASA Advisory Implementing Instruction (NAII) 1600.4, “Foreign National Access Management.”

1852.232-80 Submission of Vouchers/Invoices for Payment. APR 2018

(a) The designated payment office is the NASA Shared Services Center (NSSC) located at FMD Accounts Payable, Bldg. 1111, Jerry Hlass Road, Stennis Space Center, MS 39529.

(b) Except for classified vouchers, the Contractor shall submit all vouchers and invoices using the steps described at NSSC's Vendor Payment information Web site at: .https://www.nssc.nasa.gov/vendorpayment Please contact the NSSC Customer Contact Center at 1–877–NSSC123 (1–877–677–2123) with any additional questions or comments.

(c) Payment requests.

(1) The payment periods are stipulated in the payment clause(s) contained in this contract.

(2) Vouchers submitted under cost type contracts and invoices submitted under fixed-price contracts shall include the items delineated in FAR 32.905(b) supported by relevant back-up documentation. Back-up documentation shall include at a minimum, the following information:

(i) Vouchers.

(A) Breakdown of billed labor costs and associated contractor generated supporting documentation for billed direct labor costs to include rates used and number of hours incurred.

(B) Breakdown of billed other direct costs (ODCs) and associated contractor generated supporting documentation for billed ODCs.

(C) Indirect rate(s) used to calculate the amount of billed indirect expenses.

(D) Progress reports, as required.

(ii) Invoices.

(A) Description of goods and services delivered as part of the contract's terms and conditions, including the dates of delivery/performance.

(B) Progress reports, as required.

(C) Date goods and services were performed.

(iii) Fee vouchers.

(A) Listing of all provisionally-billed fee by period or date earned since contract award.

(B) A reconciliation of all billed and earned fee.

(C) A clear explanation of the fee calculations.

(d) The Contractor may submit a non-electronic voucher/invoice using the Non-electronic payment requests.

steps for non-electronic payment requests described at when any of ,https://www.nssc.nasa.gov/vendorpayment the following conditions are met:

(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor.

https://www.nssc.nasa.gov/vendorpayment https://www.nssc.nasa.gov/vendorpayment

(2) The contract includes provisions allowing the contractor to submit vouchers or invoices using the steps for non-electronic payment. In such instances the Contractor agrees to submit non-electronic payment requests using the method or methods specified in Section G of the contract.

(e) Improper vouchers/invoices. The NSSC Payment Office will notify the contractor of any apparent error, defect, or impropriety in a voucher/invoice within seven calendar days of receipt by the NSSC Payment Office.

Inquiries regarding requests for payment should be directed to the NSSC as specified in of this paragraph (b) section.

(f) In addition to the requirements of this clause, the Contractor shall meet the Other payment clauses.

requirements of the appropriate payment clauses in this contract when submitting payment requests.

(g) In the event that amounts are withheld from payment in accordance with provisions of this contract, a separate payment request for the amount withheld will be required before payment for that amount may be made.

1852.245-71 Installation-Accountable Government Property. JUN 2018

(a) The Government property described in paragraph (c) of this clause may be made available to the Contractor on a no-charge basis for use in performance of this contract. This property shall be utilized only within the physical confines of the NASA installation that provided the property unless authorized by the Contracting Officer under (b)(1)(iv). Under this clause, the Government retains accountability for, and title to, the property, and the Contractor shall comply with the following:

NASA Procedural Requirements (NPR) 4100.1, NASA Materials Inventory Management Manual;

NASA Procedural Requirements (NPR) 4200.1, NASA Equipment Management Procedural Requirements;

NASA Procedural Requirement (NPR) 4300.1, NASA Personal Property Disposal Procedural Requirements;

Property not recorded in NASA property systems must be managed in accordance with the requirements of the clause at FAR 52.245–1, as incorporated in this contract.

The Contractor shall establish and adhere to a system of written procedures to assure continued, effective management control and compliance with these user responsibilities. In accordance with FAR 52.245–1(h)(1) the contractor shall be liable for property lost, damaged, destroyed or stolen by the contractor or their employees when determined responsible by a NASA Property Survey Board, in accordance with the NASA guidance in this clause.

(b)

(1) The official accountable recordkeeping, financial control, and reporting of the property subject to this clause shall be retained by the Government and accomplished within NASA management information systems prescribed by the installation Supply and Equipment Management Officer (SEMO) and Financial Management Officer. If this contract provides for the Contractor to acquire property, title to which will vest in the Government, the following additional procedures apply:

(i) The Contractor's purchase order shall require the vendor to deliver the property to the installation central receiving area.

https://www.ecfr.gov/current/title-48/section-1852.232-80#p-1852.232-80(b)

(ii) The Contractor shall furnish a copy of each purchase order, prior to delivery by the vendor, to the installation central receiving area.

(iii) The Contractor shall establish a record for Government titled property as required by FAR 52.245–1, as incorporated in this contract, and shall maintain that record until accountability is accepted by the Government.

(iv) Contractor use of Government property at an off-site location and off-site subcontractor use requires advance approval of the Contracting Officer and notification of the Industrial Property Officer. The property shall be considered Government furnished and the Contractor shall assume accountability and financial reporting responsibility. The Contractor shall establish records and property control procedures and maintain the property in accordance with the requirements of FAR 52.245–1, Government Property (as incorporated in this contract), until its return to the installation. NASA Procedural Requirements related to property loans shall not apply to offsite use of property by contractors.

(2) After transfer of accountability to the Government, the Contractor shall continue to maintain such internal records as are necessary to execute the user responsibilities identified in paragraph (a) of this clause and document the acquisition, billing, and disposition of the property. These records and supporting documentation shall be made available, upon request, to the SEMO and any other authorized representatives of the Contracting Officer.

(c) The following property and services are provided if checked:

X (1) Office space, work area space, and utilities. Government telephones are available for official purposes only.

X (2) Office furniture.

X (3) Property listed in .Attachment J-6, Installation-Accountable Government Property and Services

(i) If the Contractor acquires property, title to which vests in the Government pursuant to other provisions of this contract, this property also shall become accountable to the Government upon its entry into Government records.

(ii) The Contractor shall not bring to the installation for use under this contract any property owned or leased by the Contractor, or other property that the Contractor is accountable for under any other Government contract, without the Contracting Officer's prior written approval.

(4) Supplies from stores stock.

(5) Publications and blank forms stocked by the installation.

X (6) Safety and fire protection for Contractor personnel and facilities.

(7) Installation service facilities: .none

X (8) Medical treatment of a first-aid nature for Contractor personnel injuries or illnesses sustained during on-site duty.

X (9) Cafeteria privileges for Contractor employees during normal operating hours.

X (10) Building maintenance for facilities occupied by Contractor personnel.

X (11) Moving and hauling for office moves, movement of large equipment, and delivery of supplies. Moving services may be provided on-site, as approved by the Contracting Officer.

1852.245-82 Occupancy Management Requirements. SEP 2017

(a) In addition to the requirements of the clause at FAR 52.245–1, Government Property, as included in this contract, the Contractor shall comply with the following in performance of work in and around Government real property:

(1) NPD 8800.14, Policy for Real Estate Management.

(2) NPD 8831.2, Facilities Maintenance and Operations Management.

(b) The Contractor shall obtain the written approval of the Contracting Officer before installing or removing Contractor-owned property onto or into any Government real property or when movement of Contractor-owned property may damage or destroy Government-owned property. The Contractor shall restore damaged property to its original condition at the Contractor's expense.

(c) The Contractor shall not acquire, construct or install any fixed improvement or structural alterations in Government buildings or other real property without the advance, written approval of the Contracting Officer.

Fixed improvement or structural alterations, as used herein, means any alteration or improvement in the nature of the building or other real property that, after completion, cannot be removed without substantial loss of value or damage to the premises. Title to such property shall vest in the Government.

(d) The Contractor shall report any real property or any portion thereof when it is no longer required for performance under the contract, as directed by the Contracting Officer.

Section H - Special Contract Requirements

52.234-4 Earned Value Management System. Nov 2016

1852.208-81 Restrictions on Printing and Duplicating. NOV 2004 1852.223-70 Safety and Health Measures and Mishap Reporting. DEC 2015 1852.223-72 Safety and Health (Short Form). JUL 2015 1852.223-75 Major Breach of Safety or Security. FEB 2002 1852.242-72 Denied Access to NASA Facilities. OCT 2015

GRC 52.237-91 Contractors' Duties and Responsibilities On-Site Dec 2016

(a) BADGES AND PASSES

(i) Badge and Pass Issuance

Support Service Contractor personnel having a need to enter areas of the Glenn Research Center Lewis Field or Plum Brook Station shall have an identification badge or pass. This badge or pass shall be obtained at the Badge Control Office or Visitor Control Office located at the Main Gate of either Lewis Field or Plum Brook Station.

(1) Permanent Badge (Personal Identify Verification (PIV) Credential) Requirements

a. It is recommended that the contractor complete the new employee hiring process at least 10 work days prior to the employee’s start date.

b. Upon the selection of a new employee, the contractor’s Human Resource (HR) representative shall create an identity in the Identity and Access Management Tool (IdMAX).

c. The contractor’s HR representative shall also complete NASA Form 1760, Position Risk Designation for Non-NASA Employee and GRC 1760, Position Risk Designation Cover sheet. Once completed, both forms shall be signed by the NASA COTR and sent to the Office of Protective Services POC for Non-Government Investigations.

d. At the time of the Center visit or the Entry-on-Duty appointment, the new employee shall complete the Enroll for PIV credential process at the Main Gate Badge Control Office.

e. During this activity the new employee shall provide verification of their identity by providing two forms of I-9 documentation and fingerprints.

f. Upon Entry-on-Duty, the employee shall be issued a temporary credential (badge) for access to the Center until a Permanent Credential (badge) is created.

Please reference the GRC Office of Protective Services web site for the Permanent Support Service Contractor (SSC) New Hire Identity Creation Process ( ), and https://security.grc.nasa.gov/im_ssc_new_hire.cfm for additional information.

(2) Temporary Pass Requirements

Short Term Visitors (1-29 days) shall receive a Visitor Pass. Please reference the GRC Office of Protective Services web site ( ) to complete the on-line visitor https://security.grc.nasa.gov/form_visit_information.cfm request form.

NASA GRC Service and Vendor Personnel shall receive a Service / Vendor Personnel Pass which will allow only physical access to NASA GRC. Please reference the GRC Office of Protective Services web site (

) for complete information.https://security.grc.nasa.gov/crm_grc_serv_vend_pers.cfm

The contractor shall ensure that, for badging purposes, each contractor employee is in possession of GRC 9975 (Construction Contractor Registration & ID Badge), prior to reporting to work. Contractor employees not in possession of the above mentioned form will be delayed at the gate until the contractor supervisor/foreman or that individual’s representative reports to the Main Gate with the appropriate paperwork for badging

Temporary workers are defined as those employees that are on Center for more than 29 days and less than 180 days. Please reference the GRC Office of Protective Services web site (https://security.grc.nasa.gov

) for complete information./crm_temporary_worker.cfm

All lost or stolen badges or passes shall be reported immediately to the GRC Office of Protective Services.

(ii) Employee Separation

(1) When an employee terminates and/or resigns employment, the contractor shall issue to the employee GRC 10087, Non-NASA Separation Clearance Record. The contractor shall be responsible for making an inquiry of all offices listed on the form to see if the employee has any outstanding Government items. The employee shall then take this form to all offices that list he/she as having outstanding items. The employee's last stop is for the return of their Government issued I.D. badge. The contractor is also required to send a notice to the Grc-Ssc- Separations@Lists.Nasa.Gov within 1 day of employees' separation.

(2) The contractor shall ensure that the terminated and/or resigned employee has returned his/her badge to the Main Gate Badge Clerk. Final clearance of a contractor upon completion of a contract will depend in part upon accounting for all badges issued to employees during the performance of the contract. Security badges are Government property and any alteration or misuse of these badges may be prosecuted as a violation of Section 499, Title 18, U.S. Code.

(3) The contractor's on-site manager shall comply with the Badge and Property Regulations a copy of which will be given to the contractor's supervisors at the time of the Construction Site Showing.

(4) Upon termination of duties, each employee's badge will be collected and returned to the Main Gate by the contractor. Final clearance of a contractor upon completion of a contract will depend in part upon the accounting for all badges issued to employees during the performance of the contract. Security badges are Government property and any alteration or misuse of these badges may be prosecuted as a violation of Section 499, Title 18, U.S. Code.

(b) PERSONNEL LOCATION AND IDENTIFICATION

The contractor shall:

https://security.grc.nasa.gov/im_ssc_new_hire.cfm https://security.grc.nasa.gov/form_visit_information.cfm https://security.grc.nasa.gov/crm_grc_serv_vend_pers.cfm https://security.grc.nasa.gov/crm_temporary_worker.cfm https://security.grc.nasa.gov/crm_temporary_worker.cfm

(1) Ensure that office space occupied by its personnel is clearly labeled with the name of the company.

(2) Ensure, to the extent practicable, that external correspondence signed by its personnel is on company letterhead. Internal correspondence, including e-mail and memoranda, must include the name of the company in the signature line or in another clearly identifiable location.

(3) Ensure that its onsite personnel, when receiving or placing telephone calls, identify their employer, in addition to whatever other appropriate greeting is used.

(4) When participating in meetings with Government and/or other contractor personnel, ensure that its personnel properly identify themselves as contractor employees so that their actions will not be construed as acts of Government officials.

(c) EMERGENCY PREPAREDNESS

(1) Emergencies are defined as incidents involving serious personal injury or damage, incidents that cause possible hazardous conditions, or incidents that require immediate attention of the Plant Protection Department or Security. The contractor shall ensure that its employees are informed that Emergency, Fire, Medical, Safety, and Security assistance can be summoned by dialing 911 from a NASA phone, or 216-433-8888 from a cell phone.

(2) For incidents not classified as an emergency, contractor personnel shall be instructed to immediately notify the Contracting Officer's Representative (COR) (rather than dialing 911 from a NASA phone, or 216-433- 8888 from a cell phone).

(3) In the event of any accident investigation activity, the contactor shall cooperate fully with the Government Accident Investigator and the Center Accident Investigation Board. This cooperation shall include interviews at the accident site and/or at a Board meeting.

(4) The contractor shall provide written guidance to its employees in the event of an emergency, an incident other than an emergency, a Center closure, a building closure, a fire alarm, or tornado alarm. The contractor is encouraged to include in this guidance pre-established instructions, when feasible, to employees such that unnecessary delays and confusion may be avoided by employees who may otherwise be awaiting management instructions. For example, the contractor is encouraged to address what actions employees should immediately take in the event of fire, building closure, Center closure (i.e. late Center opening or early center dismissal) for snow or other causes.

(d) TRAFFIC

The contractor agrees to comply, and agrees to require that all of its personnel will comply with all posted traffic signs, signals and instructions of personnel assigned for traffic control and parking purposes and with the provisions of the NASA Glenn Research Center Safety Manual (GLM-QS-1700.1), Chapter 19, Vehicle & Pedestrian Safety, incorporated herein by reference and made a part hereof.

(e) PROHIBITION OF FIREARMS

Firearms or weapons of any kind are strictly prohibited at the Glenn Research Center.

(f) SECURITY INCIDENTS

Theft of Property, Bomb threats, malicious damage and any other threat or violent situations shall be immediately reported to the GRC Office of Protective Services.

(g) AFTER-HOUR ACCESS

During normal working hours, 6:00 a.m. to 6:00 p.m. Monday through Friday, the guards at the gates will permit contractor entrance and departure. At any other time, advance clearance is required. Advance clearance may be obtained through the Glenn/Plum Brook COR, who will make the request to the Main Gate Officer ( 3- 2204 at Glenn and 3-3221 at Plum Brook). After-hour clearances, as approved by the COR, are certification to the guards as authority for admittance of a contractor during off hours, including Saturdays, Sundays, and Holidays. This procedure ONLY applies to temporary contractors who are on-site at Glenn for 1 - 179 days within 365 day timeframe and are issued temporary badges(non-smartcard credentials) NOTE: Per Plum Brook management ALL Plum Brook Station employees are required to follow the after-hour access procedures.

(h) GOVERNMENT PROPERTY ACCOUNTABILITY

(1) Government property and material is subject to the requirements of Federal Acquisition Regulation (FAR) Part 45 and NASA FAR Supplement (NFS) Part 1845. All NASA contractors are required to follow all applicable FAR and NFS regulations as well as applicable NASA Directives. Removal of NASA property from GRC and Plum Brook Station without prior authorization is strictly prohibited and is subject to denial of Center access and criminal prosecution. Contractors shall ensure that their employees are familiar with the requirements of the contract with regard to Government Property, including the disposal and removal of scrap and residual materials. The removal of scrap and residual job materials from GRC requires written approval from the NASA COR or authorized representative. The appropriate documentation must be completed and signed by the COR or authorized representative before exiting the Center. Each driver is required to surrender the completed documentation to the security officer at the security control point upon departure. Each vehicle is then subject to inspection prior to departure from the Center to check the contents of the respective vehicle against the information listed on the documentation authorizing removal of the property.

(2) In addition to the above, Municipal Waste, Recyclables, and Hazardous Materials must also be properly disposed of utilizing the appropriate containers and collection points for each type of scrap and residual material. Failure to adhere to the proper disposal of these materials or unauthorized use of municipal waste or recycling containers may result in the denial of Center access and possible civil or criminal prosecution for the offender.

(3) Property movement and disposal shall be coordinated through the Logistic and Technical Information Division’s (LTID) Supply and Equipment Management Officer/Property Disposal Officer in accordance with the requirements in NASA Policy Document (NPD) 4200.1, Equipment Management, NPD 4300.1, NASA Personal Property Disposal Policy, NPR 4200.1, NASA Equipment Management Procedural Requirements, and NPR 4300.1, NASA Personal Property Disposal.

(4) Questions concerning the proper removal and disposal of property, scrap, waste or other residual job materials should be forwarded to the NASA COR, or the GRC Supply and Equipment Management Officer

(SEMO).

GRC 52.204-96 Personal Identity Verification (PIV) Card Issuance Procedures Apr 2021

PIV Card issuance information is posted on the World Wide Web at https://www.grc.nasa.gov/security ./services/piv-badges

HQ 52.204-98 Onsite Contractor Personnel - Identification, Reporting, and Checkout Procedures. Nov 2021 https://www.grc.nasa.gov/security/services/piv-badges https://www.grc.nasa.gov/security/services/piv-badges

(a) The Contractor’s designated representative for the purposes of this clause is the Contractor’s Project Manager.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .