Amendment P00001_MOSSI II RFP 80MSFC21R0006.docx

DOCX document 2 MB Posted

Attached to
Marshall Operations Systems, Services and Integration (MOSSI II) Federal contract opportunity
Solicitation number
80MSFC21R0006
Issued by
National Aeronautics and Space Administration Marshall Space Flight Center

About this file

This solicitation requests proposals for the Marshall Operations Systems, Services and Integration II (MOSSI II) contract to support International Space Station ground systems infrastructure and operations at NASA's Marshall Space Flight Center, Johnson Space Center, and Kennedy Space Center. The cost-plus-award-fee contract has a potential period of performance of 98 months including a 90-day phase-in period and six 12-month option periods after a 23-month base period. The North American Industry Classification System code is 541715 with a small business size standard of 1,250 employees. Proposals are due no later than September 09, 2021 and the anticipated award date is July 22, 2022. The solicitation provides instructions for obtaining documents through SAM.gov and a point of contact for questions due by August 11, 2021.

View the file

Other files for this federal contract opportunity

Other files attached to Marshall Operations Systems, Services and Integration (MOSSI II), newest first.
File Type Posted
Amendment P00002_MOSSI II RFP 80MSFC21R0006.docx DOCX document
Attachment L-2 Electronic Pricing Model (I - L) revised MOSSI II 8 17 2021.xlsx XLSX spreadsheet
Attachment L-1 Electronic Pricing Model (A-H) revised 8 19 2021.xlsx XLSX spreadsheet
J-08 - B - List of IAGP.xlsx XLSX spreadsheet
Applicable Documents 3 of 6.zip ZIP file
Applicable Documents 2 of 6.zip ZIP file
Applicable Documents 1 of 6.zip ZIP file
Final Request for Proposal (RFP) Cover Letter.pdf PDF
Applicable Documents 4 of 6.zip ZIP file
J-08 - C - GFP.xlsx XLSX spreadsheet
MOSSI II - RFP.docx DOCX document
Attachment L-2 Electronic Pricing Model (I - L) revisedMOSSI II.xlsx XLSX spreadsheet
Attachment L-1 Electronic Pricing Model (A-H) revised.xlsx XLSX spreadsheet
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM 14, DESCRIPTION OF AMENDMENT (CONTINUATION SHEET)

1. Based upon the changes delineated in Attachment A entitled, “Responses to Final MOSSI II Request for Proposal (RFP) Questions,” the RFP 80MSFC21R0006 is hereby replaced in its entirety with updates as identified in the table below. A vertical line in the right margin of the RFP indicates the specific area(s) of change.

2. While the period for questions relative to this solicitation has closed, follow-up questions limited solely to Amendment 001's changes/responses by the Government are permitted. Submission of follow-up questions shall be submitted via email to the designated point of contact (see Provision MSFC 52.205-90, Designated Point of Contact) no later than 2:00 p.m. Central Time, August 26, 2021.

3. Summary of Section/Pages updated, is detailed in table below:

Amendment
Section / Pages Updated*
P00001
Section B / Page B-1
P00001
Section B / Page B-3
P00001
Section L / Pages L-4 – L-6
P00001
Section L / Pages L-26 – L-27
P00001
Section L / Page L-35
P00001
Section L / Page L-45
P00001
Section L / Page L-46
P00001
Section L / Page L-54
P00001
Section L / Page L-56
P00001
Section L / Pages L-7-1 – L-7-2
P00001
Section J / Pages J-10-1 – J-10-48

*Minor spelling corrections have been made throughout the solicitation, with no resulting changes in intent

4. All other terms and conditions of RFP 80MSFC21R0006 remain unchanged.

Amendment P00001 80MSFC21R0006

ATTACHMENT A – RESPONSES TO FINAL MOSSI II REQUEST FOR PROPOSAL (RFP) QUESTIONS

Index
Final RFP Page Number
Final RFP Reference
Background/RFP Text
Question
Response
RFP Revised
1
B-1
Section B and

Electronic Pricing Model (EPM) Attachment L-1

The RFP Section B, page B-1, Estimated Cost and Award Fee table shows CLIN 002 Base period having two contract years between Oct 2022 - Sep 2024. CLIN 003 Option Year 1 has a one year period of performance from Oct 2024- Sept 2025. Attachment L-1 EPM Tab A-1 has the Base Period as one contract year and Option 1 has two contract years. The subsequent tabs in Attachment L-1 EPM follow the same pattern. Should the pricing Form L-1 match the RFP Section B-1?
The clause entitled, “ESTIMATED COST AND AWARD FEE” is revised in its entirety.

The Electronic Pricing Model (EPM) Attachment L-1 is revised in its entirety.

Yes

2
L-45
Section L,

Attachment L-1 Instructions, Table L-4 “Estimated Other Direct Costs”

RFP page L-45, section (ii) (A) the directions state that the material and travel in "Table L-4" should be reflected in the IDIQ price. However, the material and travel values are currently reflected in row 30 Total Mission Contract (Core) price in rows 22 & 23 of Attachment L-1, Tab A-1. Travel and material are not included in the IDIQ price on row 32. Should row 32 Total IDIQ include travel and material?
Attachment L-1 Instructions (page L-45) paragraph (ii)(A) is revised in its entirety.

EPM Attachments L-1 and L-2 are revised in their entirety.

Yes

3
N/A
EPM Attachment L-1
In Attachment L-1, Tab B-1, column BO, the IDIQ PWS 11.0 is being included in the Total Mission Contract on Tab A-1, row 30 under the Core Total Mission Contract and also Tab A-1, row 32 the Total IDIQ. This is duplicating the IDIQ costs. This issues persists on Tab B-1 thru Tab B-8. Should PWS 11.0 be deleted from Tab B-1 thru Tab B-8 in Attachment L-1?
EPM Attachments L-1 and L-2 are revised in their entirety.
Yes
4
N/A
EPM Attachment L-1
Tab E
In Attachment L-1, Tab E, the contract year dates do not align with the dates in RFP Section B, Page B-1. Will you update the dates?
EPM Attachments L-1 and L-2 are revised in their entirety.
Yes
5
B-3 and

L-45 Section B and Section L, Table L-4 “Estimated Other Direct Costs”

The RFP states "The maximum potential not-to-exceed (NTE) value for the indefinite-delivery, indefinite-quantity (IDIQ) component of this contract including options, is $75,000,000. Does the $75M IDIQ Maximum Value include the $45.15M of IDIQ material and travel listed in Section L, page L-45?
Attachment L-1 Instructions (page L-45) paragraph (ii)(A) is revised in its entirety.

MSFC 52.216-90 “IDIQ CONTRACT VALUE BY PERIOD OF PERFORMANCE (MAY 2017)” is revised in its entirety.

Yes

6
B-3
Section B,

MSFC 52.216-90 “IDIQ CONTRACT VALUE BY PERIOD OF PERFORMANCE (MAY 2017)”

In RFP section B, B-2, 52.216-90 the table showing maximum value for each period of performance was unchanged from the draft RFP even though the Base Contract (CLIN 003) hours doubled. Will you increase the maximum base period NTE from $15.0M to $20.0M to reflect the increased hours?
MSFC 52.216-90 “IDIQ CONTRACT VALUE BY PERIOD OF PERFORMANCE (MAY 2017)” is revised in its entirety.

Yes

7
L-7-1 – L-7-2
Section L, Attachment L-7 “Innovation ROM Detailed Cost Template”
Attachment L-7 requires input of hourly rate information. Although the hours may be useful, cost information is typically excluded from Technical volumes to avoid potential bias. Did the Govt intend to require labor rates (cost data) as part of the Mission Suitability volume?
Attachment L-7 “Innovation ROM Detailed Cost Template” is revised in its entirety.
Yes
8
L-4
Section L
Font Size 12 pt for all text. Would the Government reconsider allowing Times New Roman 10 pt font in the headers and footers?
In accordance with NFS 1852.215-81, "PROPOSAL PAGE LIMITATIONS (APR 2015)” paragraph (b)(4), “Additionally, each volume page, with the exception of the contract volume, shall be identified with the offeror’s name (company logo may utilize other than Times New Roman 12-point font within existing margin restrictions), solicitation number, and date.”
No
9
L-8-1 – L-8-8
Section L, Attachments L-8 Total Hourly Compensation By Employee Category Form for MSFC, JSC and KSC
Attachment L-8 requires input of hourly labor rates on the TCP Tab. Cost information is typically excluded from Technical volumes to avoid potential bias. Did the Govt intend to require labor rates (cost data) as part of the Mission Suitability volume?
Attachment L-8, Total Hourly Compensation by Employee Category Form for MSFC, JSC and KSC, will remain as part of the Mission Suitability Volume. Salary rate information contained within Attachment L-8 is required to facilitate the evaluation of compensation for professional employees under Subfactor 1: Technical and Staffing Approach (TSA) in accordance with FAR 52.222-46, “Evaluation of Compensation for Professional Employees,” and NFS 1852.231-71, “Determination of Compensation Reasonableness.” Salary rate information alone is insufficient to extrapolate all aspects that comprise an offeror’s total proposed cost, such that evaluation of an offeror’s salary rate information as part of its Total Compensation Plan (TCP) will not create a bias in the evaluation of this volume.
No
10
L-11
Section L
The Notice of Potential OCI includes the Consolidated Program Support Services (CPSS) PP&C contract. Does the OCI requirement apply to only MOSSI II prime contractors, or also their subcontractors?
The Notice of Potential OCI applies to the offeror’s team as a whole.

No

11
L-4
Section L
1852.215.81 (3) states to “Submit each volume of the proposal as a separate sub-directory file on each electronic media.” However, the RFP page L-6 further instructs offerors to submit via the “NASA EFSS Box”. Does the separate sub-directory and electronic media still apply?
NFS 1852.215-81 “PROPOSAL PAGE LIMITATIONS (APR 2015)” paragraph (b)(3) is revised as follows:

“Submit the contents of each volume as a separate folder within the single .zip file. Offerors shall also ensure that each volume stands alone, provides complete coverage of the topic, and includes responses to each item described in the volume instructions.”

Yes

12
L-5
Section L
Justified margins in tables can result in readability issues. Will the Govt allow left justified or centered text in tables?
NFS 1852.215-81 “PROPOSAL PAGE LIMITATIONS (APR 2015)” paragraph (b)(6)(G) is revised as follows:

“Margins shall be justified with the exception of information contained within tables.”

Yes

13
L-28
Section L
Providing the Business System status of the offeror and proposed Subcontractors by Government approval status, the date of approval, the approval document, and the responsible Government agencies’ office takes up a considerable number of pages in Vol 1. Would the Govt consider changing the requirement from offeror and proposed subcontractors to offeror and major Subcontractors or moving the requirement to the Cost Volume?
The requirement for submission of this information is moved as follows:

FROM: Volume I – Mission Suitability

TO: Volume IV – CONTRACT INSTRUCTIONS (JUN 17 2021), Contract Volume, paragraph (d)(5) Yes

14
N/A
Section L,

EPM Attachment L-1,

Tab H Personnel and Fringe Benefit Form
Requires the form to be completed by Offeror and all subs. Is it the Government's intent to receive this information from all subs or only subs submitting cost volumes?
The instructions in the EPM Attachment L-1, Tab H “Personnel and Fringe Benefits Form” are revised to indicate “applicable” subcontractors in lieu of “all” subcontractors.
Yes
15
J-10-1– J-10-31
Section J, Attachment J-10 “Wage Determinations”
Wage Determinations 2015-4604 Rev 16 6/18/20 Alabama Counties of Limestone Madison (pages J-10-1 through J-10-15) and 2015-5234 Rev 14 6/27/20 Texas Counties of Austin Brazoria Chambers Fort Bend Galveston Harris Liberty Montgomery Waller (pages J-10-16 through J-10-31)
According to the DOL data, there has been a 2015-4603 Rev 17 7/21/21 for Madison County, Alabama and 2015-5233 Rev 18 7/21/21 for Texas. Are the revised Wage Determinations applicable to the procurement and if so should they be incorporated in an RFP Amendment?
Attachment J-10, “Wage Determinations,” is revised in its entirety.

FROM: even-numbered Wage Determinations

TO: odd-numbered Wage Determinations Yes

16
L-7-1 – L-7-2
Section L, Attachment L-7 “Innovation ROM Detailed Cost Template”
At the top of the form it states “Year 1”, but at the bottom states “Add tab for additional years as necessary.” Since this is no longer an Excel file, tabs cannot be added. If pages need to be added for multi-year innovation ROMs can this Attachment L-7 be excluded from the page count? (For example, 4 proposed innovations over a 6-year period would add a minimum of 24 pages.)
Attachment L-7 “Innovation ROM Detailed Cost Template” will remain as part of the Mission Suitability Volume. However, as noted in the solicitation (page L-35), this form is excluded from the Mission Suitability page count and is included after the last numbered page.

NFS 1852.215-81 “PROPOSAL PAGE LIMITATIONS (APR 2015)” paragraph (c), is revised as follows:

“(c) Identify any exclusions to the page limits that are excluded from the page counts specified in paragraph (a) of this provision (e.g., title pages, table of contents) as follows: Attachment L-3, Past Performance Interview/Questionnaire, is excluded from the Past Performance volume page limitation. Attachment L-6, Innovation ROM Template, Attachment L-7, Innovation ROM Detailed Cost Template, Attachment L-8, Total Hourly Compensation By Employee Category Form for MSFC, JSC and KSC, and copies of applicable salary surveys or other salary information are excluded from the Mission Suitability volume page limitation. There are no other exclusions from the page limitations established for the page limited volumes. In addition, the Cost section of your proposal is not page limited. However, this section is to be strictly limited to cost and price information. Information that can be construed as belonging in one of the other sections of the proposal will be so construed and counted against that section’s page limitation.”

Yes

17
L-6
Section L
ELECTRONIC SUBMISSION OF PROPOSALS – PROPOSAL MARKING AND DELIVERY THROUGH NASA’S EFSS BOX (JUL 2021) (c) The offeror shall submit all proposal files to: https://nasagov.app.box.com/f/0bcc26c8e3d84f07bf5011ebdbe46f63. The Offeror shall follow instructions regarding proposal submission found at https://www.hq.nasa.gov/office/procurement/other/EFSS-Box-Offeror-Proposal-Submission-Instructions.pdf

Could you provide additional instructions on obtaining access to the EFSS Box site for proposal submission or a direct link to the proposal submittal “drag and drop” location that does not require login access?

In accordance with “ELECTRONIC SUBMISSION OF PROPOSALS – PROPOSAL MARKING AND DELIVERY THROUGH NASA’S EFSS BOX (JUL 2021), “The Offeror shall follow instructions regarding proposal submission found at: https://www.hq.nasa.gov/office/procurement/other/EFSS-Box-Offeror-Proposal-Submission-Instructions.pdf ”

In addition, the EFSS Box link is revised from a shared link to a File Request link as follows:

https://nasagov.app.box.com/f/0bcc26c8e3d84f07bf5011ebdbe46f63

No

18
L-26
Section L
The text does not address the ability of the subcontractor to submit their compensation plan directly to the government. There is sensitive and proprietary company information included in the detailed compensation plan including the information required to complete of the Attachment L-8 and subcontractor should be allowed to submit directly to the government.
Please allow the subcontractor to submit their compensation plan directly to the government.
The Government considers the information contained in Attachment L-8 “Total Hourly Compensation by Employee Category Form for MSFC, JSC and KSC,” and EPM Attachment L-1, Tab H “Personnel and Fringe Benefits Form” to be proprietary and therefore subcontractors are encouraged to submit proprietary information directly to the Government. Similar to offerors, subcontractors should submit this information using the instruction provided in the provision entitled “Electronic Submission of Proposals – Proposal Marking and Delivery Through NASA’s EFSS Box.”

No

19
L-42
Section L
The text states the offeror will perform a cost and/or price analysis of the any respective subcontractor (which includes applicable subcontractors). Given the applicable subcontractor will be submitting their Cost volume directly to the government (given the sensitivity of the information), this cannot take place as written. The same reason the government allows the subcontractor’s Cost volume to be submitted directly to the government is the same reason why the Cost volume will not be provided to the offeror for review. The paragraph seems to be mixing two topics, the subcontractors’ cost proposal and their cost volume and they may not be the same.
Please clarify.
Offerors and applicable subcontractors having second tier subcontracts are required to submit the subcontract analysis required by RFP, Vol. II, paragraph (b)(2)(iii) as part of that firm’s Cost Volume submission. (See FAR 15.404-3(b))

No

20
L-8-1 – L-8-8
Section L Attachments L-8(A), L-8(B), and L-8(C)
What is the value to the government of the detailed requested by labor category? The fringe benefits may vary by three major groups, exempt, non-exempt, and SCA (Wage Determination). However, asking for the breakout of cost between an Software Engineer level I-VI is basically math (cost the benefit divided by labor). We can understand having this detail information for SCA/Wage Determination positions, but do not understand the usefulness for exempt positions by level as noted.
Please explain.
The information requested will be utilized to facilitate the Government’s evaluation of the offeror’s TCP, in accordance with FAR 52.222-46, “Evaluation of Compensation for Professional Employees,” and NFS 1852.231-71, “Determination of Compensation Reasonableness.”
No
21
L-7-1 – L-7-2
Section L
Attachment L-7
Header refers to Labor bid using IDIQ Rates from Attachment J-18; where is attachment J-18/ Not found in the RFP.
Attachment L-7 “Innovation ROM Detailed Cost Template” is revised in its entirety.

Yes

22
L-45
Section L
Attachment L-7
The Final RFP Word Document has Table L-4 Estimated IDIQ Other Direct Costs on page L-45. This table shows $2.9M each for CY1 and CY2 for Material and $325k each for Travel for CY1 and CY2. However, the Excel Attachment L-1 EPM (A-H) revised (1).xlsx, Tab A-1, Summary of Total Cost shows $5.8M each for CY1 and CY2 for Material and $650k each for Travel for CY1 and CY2. Which one is correct?
Attachment L-1 Instructions, paragraph (ii)(A) is revised in its entirety.

EPM Attachments L-1 and L-2 are revised in their entirety.

Yes

23
L-45
Section L
The Final RFP Word Document has a table entitled Table L-4 Estimated IDIQ Other Direct Costs on page L-45. Are the Other Direct Costs (Material and Travel) actually IDIQ or are they core (CPAF)?
Attachment L-1 Instructions, paragraph (ii)(A) is revised in their entirety.

Yes

Amendment P00001 80MSFC21R0006

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

ESTIMATED COST AND AWARD FEE

The estimated cost of this contract is $TBP. The maximum available award fee is $TBP. Total estimated cost and maximum award fee are $TBP.

CLIN
Description
Period
Estimated

Cost

Award Fee
Total

Value

Potential
Earned
001
Phase-In (FFP)
07/22/2022 -

10/20/2022

$TBP

002
Base - Mission
10/21/2022 -

04/22/2023

$TBP
$TBP
$TBD
$TBP
003
Base - IDIQ
$TBD
$TBD
$TBD
$TBD
Award Fee Evaluation Period 1
$TBP
$TBP
$TBD
$TBP
002
Base - Mission
04/23/2023 -

09/30/2023

$TBP
$TBP
$TBD
$TBP
003
Base - IDIQ
$TBD
$TBD
$TBD
$TBD
Award Fee Evaluation Period 2
$TBP
$TBP
$TBD
$TBP
002
Base - Mission
10/01/2023 -

09/30/2024

$TBP
$TBP
$TBD
$TBP
003
Base - IDIQ
$TBD
$TBD
$TBD
$TBD
Award Fee Evaluation Period 3
$TBP
$TBP
$TBD
$TBP
004
Option 1 - Mission
10/01/2024 -

09/30/2025

$TBP
$TBP
$TBD
$TBP
005
Option 1 - IDIQ
$TBD
$TBD
$TBD
$TBD
Award Fee Evaluation Period 4
$TBP
$TBP
$TBD
$TBP
006
Option 2 - Mission
10/01/2025 -

09/30/2026

$TBP
$TBP
$TBD
$TBP
007
Option 2 - IDIQ
$TBD
$TBD
$TBD
$TBD
Award Fee Evaluation Period 5
$TBP
$TBP
$TBD
$TBP
008
Option 3 - Mission
10/01/2026 -

09/30/2027

$TBP
$TBP
$TBD
$TBP
009
Option 3 - IDIQ
$TBD
$TBD
$TBD
$TBD
Award Fee Evaluation Period 6
$TBP
$TBP
$TBD
$TBP
010
Option 4 - Mission
10/01/2027 -

09/30/2028

$TBP
$TBP
$TBD
$TBP
011
Option 4 - IDIQ
$TBD
$TBD
$TBD
$TBD
Award Fee Evaluation Period 7
$TBP
$TBP
$TBD
$TBP
012
Option 5 - Mission
10/01/2028 -

09/30/2029

$TBP
$TBP
$TBD
$TBP
013
Option 5 - IDIQ
$TBD
$TBD
$TBD
$TBD
Award Fee Evaluation Period 8
$TBP
$TBP
$TBD
$TBP
014
Option 6 - Mission
10/01/2029 -

09/30/2030

$TBP
$TBP
$TBD
$TBP
015
Option 6 - IDIQ
$TBD
$TBD
$TBD
$TBD
Award Fee Evaluation Period 9
$TBP
$TBP
$TBD
$TBP
Total Contract Value
$TBP
$TBP
$TBD
$TBP

(End of clause)

1852.216-78 FIRM FIXED PRICE (DEC 1988)

The total firm fixed price of this contract is $TBP.

(End of clause)

Note: This clause is applicable only to CLIN 001.

Amendment P00001 80MSFC21R0006

B-1

1852.232-81 CONTRACT FUNDING (JUN 1990)

(a) For purposes of payment of cost, exclusive of fee, in accordance with the Limitation of Funds clause, the total amount allotted by the Government to this contract is $TBD . This allotment is for CLINs TBD and covers the following estimated period of performance: TBD.

Previous
This Action
Total
Estimated Cost:
$TBD
$TBD
$TBD
Fee:
$TBD
$TBD
$TBD
Total Sum Allotted:
$TBD
$TBD
$TBD

(b) An additional amount of $TBD is obligated under this contract for payment of fee.

MSFC 52.216-90 IDIQ CONTRACT VALUE BY PERIOD OF PERFORMANCE (MAY 2017)

The maximum potential not-to-exceed (NTE) value for the indefinite-delivery, indefinite-quantity (IDIQ) component of this contract including options, is $80,000,000. This contract provides for performance of cost IDIQ task/delivery orders. The NTE value shall not be exceeded without the prior written approval of the Contracting Officer.

The values for each period of performance are set forth below:

PERIOD OF PERFORMANCE
MINIMUM VALUE
MAXIMUM VALUE
Base Contract (CLIN 003)
10/21/2022 – 09/30/2024
$0
$20,000,000
Option 1 (CLIN 005)
10/01/2024 – 09/30/2025
$0
$10,000,000
Option 2 (CLIN 007)
10/01/2025 – 09/30/2026
$0
$10,000,000
Option 3 (CLIN 009)
10/01/2026 – 09/30/2027
$0
$10,000,000
Option 4 (CLIN 011)
10/01/2027 – 09/30/2028
$0
$10,000,000
Option 5 (CLIN 013)
10/01/2028 – 09/30/2029
$0
$10,000,000
Option 6 (CLIN 015)
10/01/2029 – 09/30/2030
$0
$10,000,000

Note: Any unused IDIQ value for any period will roll over to the subsequent period.

MSFC 52.216-91 SUPPLIES AND/OR SERVICES TO BE PROVIDED AND TYPE OF CONTRACT (JUN 2017)

(a) The contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to perform and/or deliver the services in accordance with Attachment J-1, Performance Work Statement.

(b) The contract type will be firm-fixed-price (FFP) for the 90-day phase-in period, and cost-plus-award-fee (CPAF) for both the core mission work and indefinite-delivery, indefinite-quantity (IDIQ) components.

(c) Core Mission Work

Core mission work that has been identified in advance and for which the estimated cost and fee have been negotiated, shall comprise the negotiated contract value. The negotiated contract value, including the values negotiated for each option period, includes all direct and indirect costs and fee necessary for delivery of the services required of this contract effort.

(d) Indefinite-Delivery, Indefinite-Quantity Work

In addition to the core mission requirements delineated in Attachment J-1, PWS, IDIQ effort may be performed to support future program/project-specific mission services as such services are identified, under Attachment J-1, Section, 11.0, Indefinite- Delivery, Indefinite-Quantity (IDIQ) Projects. The Government may order IDIQ services at any time after contract start in accordance with the procedures set forth in NFS Clause 1852.216-80, “Task Ordering Procedures,” Clause 52.216-18, “Ordering,” and Clause 52.216-19, “Order Limitations,” of this contract. In performing these services, the contractor shall provide all required necessary labor, materials, travel, and ODCs as delineated in the individual Task Order proposals based on the rates delineated in Attachment J-12, Indefinite-Delivery, Indefinite-Quantity Fully Burdened Labor Rates.

(End of clause)

MSFC 52.216-92 MATRIX OF CONTRACT LINE ITEMS (CLINs) (OCT 2017)

The current total contract value is as specified below. To separately track the components of the value, separate CLINs have been established as follows:

CLIN
DESCRIPTION
VALUE
STATUS
001
Phase-In
See NFS 1852.216-78, “Firm Fixed Price”
Awarded
002
Base – Mission
See “Estimated Cost and Award Fee”
Awarded
003
Base – IDIQ
See “Estimated Cost and Award Fee”
Awarded
004
Option 1 – Mission
See “Estimated Cost and Award Fee”
Not Exercised
005
Option 1 – IDIQ
See “Estimated Cost and Award Fee”
Not Exercised
006
Option 2 – Mission
See “Estimated Cost and Award Fee”
Not Exercised
007
Option 2 – IDIQ
See “Estimated Cost and Award Fee”
Not Exercised
008
Option 3 – Mission
See “Estimated Cost and Award Fee”
Not Exercised
009
Option 3 – IDIQ
See “Estimated Cost and Award Fee”
Not Exercised
010
Option 4 – Mission
See “Estimated Cost and Award Fee”
Not Exercised
011
Option 4 – IDIQ
See “Estimated Cost and Award Fee”
Not Exercised
012
Option 5 – Mission
See “Estimated Cost and Award Fee”
Not Exercised
013
Option 5 – IDIQ
See “Estimated Cost and Award Fee”
Not Exercised
014
Option 6 – Mission
See “Estimated Cost and Award Fee”
Not Exercised
015
Option 6 – IDIQ
See “Estimated Cost and Award Fee”
Not Exercised
Total Value of Base and All Exercised Options
See NFS 1852.216-85, Estimated Cost and Award Fee
N/A

MSFC 52.227-91 DATA REQUIREMENTS (JUN 2017)

(a) The contractor shall furnish all data identified and described in the data requirements list (DRL) of the data procurement document (DPD) which is attached to this contract. All expenses associated therewith are included in the estimated cost or firm fixed price of this contract, or any associated task orders if applicable.

(b) The Government reserves the right to delay the delivery of any or all data requirements descriptions (DRDs) specified in the DRL and such right may be exercised at no increase to the estimated cost or firm fixed price of this contract or any associated task orders.

(c) Nothing contained in this clause shall relieve the contractor from delivering data that is not identified and described in the DRL/DPD, but required under another section of this contract.

(d) To the extent that data required to be delivered under a DRD is also required to be delivered under another section of the contract, the requirements established by both the DRD and such other contract section shall apply. In the event of a conflict between the data requirements of the DPD and another contract section, the specific contract section will take precedence.

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

MSFC 52.211-93 DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK/PERFORMANCE WORK STATEMENT (MAY 2019)

The Description/Specifications/Statement of Work/Performance Work Statement is located at Attachment J-1.

C-1

SECTION D - PACKAGING AND MARKING

1852.211-70 PACKAGING, HANDLING, AND TRANSPORTATION (SEP 2005)

(a) The Contractor shall comply with NASA Procedural Requirements (NPR) 6000.1, “Requirements for Packaging, Handling, and Transportation for Aeronautical and Space Systems, Equipment, and Associated Components”, as may be supplemented by the statement of work or specifications of this contract, for all items designated as Class I, II, or III.

(b) The Contractor’s packaging, handling, and transportation procedures may be used, in whole or in part, subject to the written approval of the Contracting Officer, provided (1) the Contractor’s procedures are not in conflict with any requirements of this contract, and (2) the requirements of this contract shall take precedence in the event of any conflict with the Contractor’s procedures.

(c) The Contractor must place the requirements of this clause in all subcontracts for items that will become components of deliverable Class I, II, or III items.

(End of clause)

1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT EQUIPMENT (JAN 2011)

(a) The Contractor shall identify all equipment to be delivered to the Government using NASA Technical Handbook (NASA-HDBK) 6003, Application of Data Matrix Identification Symbols to Aerospace Parts Using Direct Part Marking Methods/Techniques, and NASA Standard (NASA-STD) 6002, Applying Data Matrix Identification Symbols on Aerospace Parts or through the use of commercial marking techniques that: (1) are sufficiently durable to remain intact through the typical lifespan of the property: and, (2) contain the data and data format required by the standards. This requirement includes deliverable equipment listed in the schedule and other equipment when no longer required for contract performance and NASA directs physical transfer to NASA or a third party. The Contractor shall identify property in both machine and human readable form unless the use of a machine readable-only format is approved by the NASA Industrial Property Officer.

(b) Equipment shall be marked in a location that will be human readable, without disassembly or movement of the equipment, when the items are placed in service unless such placement would have a deleterious effect on safety or on the item’s operation.

(c) Concurrent with equipment delivery or transfer, the Contractor shall provide the following data in an electronic spreadsheet format:

(1) Item Description.

(2) Unique Identification Number (License Tag).

(3) Unit Price.

(4) An explanation of the data used to make the unique identification number.

(d) For equipment no longer needed for contract performance and physically transferred under paragraph (a) of this clause, the following additional data is required:

(1) Date originally placed in service.

(2) Item condition.

(e) The data required in paragraphs (c) and (d) of this clause shall be delivered to the NASA center receiving activity listed below:

NASA/Marshall Space Flight Center Attn: AS41/Cynthia Thomas-Davis Industrial Property Officer

MSFC, AL 35812

(f) The contractor shall include the substance of this clause, including this paragraph (f), in all subcontracts that require delivery of equipment.

D-2

SECTION E - INSPECTION AND ACCEPTANCE

52.246-3 INSPECTION OF SUPPLIES--COST-REIMBURSEMENT (MAY 2001)

52.246-5 INSPECTION OF SERVICES--COST-REIMBURSEMENT (APR 1984)

1852.246-71 GOVERNMENT CONTRACT QUALITY ASSURANCE FUNCTIONS (OCT 1988)

In accordance with the inspection clause of this contract, the Government intends to perform the following functions at the locations indicated:

ALL MOSSI II Performance Evaluation Plan Marshall Space Flight Center (MSFC), Johnson Space Center (JSC), and Kennedy Space Center (KSC)

E-1

SECTION F - DELIVERIES OR PERFORMANCE

52.242-15 STOP-WORK ORDER (AUG 1989) ALTERNATE I (APR 1984)

MSFC 52.211-94 PERIOD OF PERFORMANCE (MAY 2017)

The period of performance for this contract is from 07/22/2022 through 09/30/2024. This includes a firm-fixed-price (FFP) 90-day phase-in period.

(End of clause)

MSFC 52.237-91 PLACE OF PERFORMANCE (JUL 2018)

The Contractor shall perform the work under this contract at Marshall Space Flight Center, Johnson Space Center, Kennedy Space Center, and at such other locations as may be approved in writing by the Contracting Officer.

(End of clause)

MSFC 52.247-90 SECTION 10721 RATES (FEB 2001)

The Contractor shall use carriers that offer acceptable service at reduced rates (Section 10721 rates), if available.

F-1

SECTION G - CONTRACT ADMINISTRATION DATA

52.227-11 PATENT RIGHTS-OWNERSHIP BY THE CONTRACTOR (MAY 2014) (AS MODIFIED BY NFS 1852.227-11)

1852.223-71 AUTHORIZATION FOR RADIO FREQUENCY USE (APR 2015)

1852.227-70 NEW TECHNOLOGY—OTHER THAN A SMALL BUSINESS FIRM OR NONPROFIT ORGANIZATION (APR 2015)

1852.227-72 DESIGNATION OF NEW TECHNOLOGY REPRESENTATIVE AND PATENT REPRESENTATIVE (APR 2015)

1852.227-84 PATENT RIGHTS CLAUSES (APR 2015)

1852.227-86 COMMERCIAL COMPUTER SOFTWARE LICENSE (APR 2015)

1852.242-71 TRAVEL OUTSIDE OF THE UNITED STATES (DEC 1988)

1852.242-73 NASA CONTRACTOR FINANCIAL MANAGEMENT REPORTING (NOV 2004)

1852.245-70 CONTRACTOR REQUESTS FOR GOVERNMENT-FURNISHED PROPERTY (AUG 2015)

1852.245-75 PROPERTY MANAGEMENT CHANGES (JAN 2011)

1852.245-78 PHYSICAL INVENTORY OF CAPITAL PERSONAL PROPERTY (AUG 2015)

1852.216-76 AWARD FEE FOR SERVICE CONTRACTS (JUN 2018)

(a) The contractor can earn award fee from a minimum of zero dollars to the maximum stated in NASA FAR Supplement clause 1852.216-85, “Estimated Cost and Award Fee” in this contract.

(b) Beginning six months after the effective date of this contract, the Government shall evaluate the Contractor’s performance every six months to determine the amount of award fee earned by the contractor during the period. The Contractor may submit a self-evaluation of performance for each evaluation period under consideration. These self-evaluations will be considered by the Government in its evaluation. The Government’s Fee Determination Official (FDO) will determine the award fee amounts based on the Contractor’s performance in accordance with the MOSSI II Performance Evaluation Plan. The plan may be revised unilaterally by the Government prior to the beginning of any rating period to redirect emphasis.

(c) The Government will advise the Contractor in writing of the evaluation results. The NASA Shared Services Center Financial Management Division (FMD) Accounts Payable will make payment based on the receipt of a fee voucher submitted by the contractor in accordance with 1852.232-80.

(d) The Contracting Officer may direct the withholding of earned award fee payments until a reserve is set aside in an amount that the Contracting Officer considers necessary to protect the Government’s interest relative to an orderly and timely closeout of the contract. This reserve shall not exceed 15 percent of the contract’s total potential award fee or $100,000, whichever is less.

(e) The amount of award fee which can be awarded in each evaluation period is limited to the amounts set forth at Section B, NFS 1852.216-85, “Estimated Cost and Award Fee”. Award fee which is not earned in an evaluation period cannot be reallocated to future evaluation periods.

(f)(1) Provisional award fee payments will be made under this contract pending the determination of the amount of fee earned for an evaluation period. If applicable, provisional award fee payments will be made to the Contractor on a monthly basis. The total amount of award fee available in an evaluation period that will be provisionally paid is the lesser of 75 percent of the prior period’s evaluation score.

(2) Provisional award fee payments will be superseded by the final award fee evaluation for that period. If provisional payments exceed the final evaluation score, the Contractor will either credit the next payment voucher for the amount of such overpayment or refund the difference to the Government, as directed by the Contracting Officer.

(3) If the Contracting Officer determines that the Contractor will not achieve a level of performance commensurate with the provisional rate, payment of provisional award fee will be discontinued or reduced in such amounts as the Contracting Officer deems appropriate. The Contracting Officer will notify the Contractor in writing if it is determined that such discontinuance or reduction is appropriate.

(4) Provisional award fee payments will not be made prior to the first award fee determination by the Government.

(g) Award fee determinations are unilateral decisions made solely at the discretion of the Government.

(End of clause)

1852.232-80 SUBMISSION OF VOUCHERS/INVOICES FOR PAYMENT (APR 2018)

(a) The designated payment office is the NASA Shared Services Center (NSSC) located at FMD Accounts Payable, Bldg. 1111, Jerry Hlass Road, Stennis Space Center, MS 39529.

(b) Except for classified vouchers, the Contractor shall submit all vouchers and invoices using the steps described at NSSC’s Vendor Payment information web site at: https://www.nssc.nasa.gov/vendorpayment. Please contact the NSSC Customer Contact Center at 1-877-NSSC123 (1-877-677-2123) with any additional questions or comments.

(c) Payment requests.

(1) The payment periods are stipulated in the payment clause(s) contained in this contract.

(2) Vouchers submitted under cost type contracts and invoices submitted under fixed-price contracts shall include the items delineated in FAR 32.905(b) supported by relevant back-up documentation. Back-up documentation shall include at a minimum, the following information:

(i) Vouchers.

(A) Breakdown of billed labor costs and associated contractor generated supporting documentation for billed direct labor costs to include rates used and number of hours incurred.

(B) Breakdown of billed other direct costs (ODCs) and associated contractor generated supporting documentation for billed ODCs.

(C) Indirect rate(s) used to calculate the amount of billed indirect expenses.

(D) Progress reports, as required.

(ii) Invoices.

(A) Description of goods and services delivered as part of the contract’s terms and conditions, including the dates of delivery/performance.

(B) Progress reports, as required.

(C) Date goods and services were performed.

(iii) Fee vouchers.

(A) Listing of all provisionally-billed fee by period or date earned since contract award.

(B) A reconciliation of all billed and earned fee.

(C) A clear explanation of the fee calculations.

(d) Non-electronic payment requests. The Contractor may submit a non-electronic voucher/invoice using the steps for non-electronic payment requests described at https://www.nssc.nasa.gov/vendorpayment, when any of the following conditions are met:

(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor.

(2) The contract includes provisions allowing the contractor to submit vouchers or invoices using the steps for non-electronic payment. In such instances the Contractor agrees to submit non-electronic payment requests using the method or methods specified in Section G of the contract.

(e) Improper vouchers/invoices. The NSSC Payment Office will notify the contractor of any apparent error, defect, or impropriety in a voucher/invoice within seven calendar days of receipt by the NSSC Payment Office. Inquiries regarding requests for payment should be directed to the NSSC as specified in paragraph (b) of this section.

(f) Other payment clauses. In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.

(g) In the event that amounts are withheld from payment in accordance with provisions of this contract, a separate payment request for the amount withheld will be required before payment for that amount may be made.

(End of clause)

1852.245-71 INSTALLATION—ACCOUNTABLE GOVERNMENT PROPERTY (JUN 2018)

(a) The Government property described in paragraph (c) of this clause may be made available to the Contractor on a no-charge basis for use in performance of this contract. This property shall be utilized only within the physical confines of the NASA installation that provided the property unless authorized by the Contracting Officer under (b)(1)(iv). Under this clause, the Government retains accountability for, and title to, the property, and the Contractor shall comply with the following:

NASA Procedural Requirements (NPR) 4100.1, NASA Materials Inventory Management Manual;

NASA Procedural Requirements (NPR) 4200.1, NASA Equipment Management Procedural Requirements;

NASA Procedural Requirement (NPR) 4300.1, NASA Personal Property Disposal Procedural Requirements;

Property not recorded in NASA property systems must be managed in accordance with the requirements of the clause at FAR 52.245-1, as incorporated in this contract.

The Contractor shall establish and adhere to a system of written procedures to assure continued, effective management control and compliance with these user responsibilities. In accordance with FAR 52.245-1(h)(1) the contractor shall be liable for property lost, damaged, destroyed or stolen by the contractor or their employees when determined responsible by a NASA Property Survey Board, in accordance with the NASA guidance in this clause.

(b)(1) The official accountable recordkeeping, financial control, and reporting of the property subject to this clause shall be retained by the Government and accomplished within NASA management information systems prescribed by the installation Supply and Equipment Management Officer (SEMO) and Financial Management Officer. If this contract provides for the Contractor to acquire property, title to which will vest in the Government, the following additional procedures apply:

(i) The Contractor’s purchase order shall require the vendor to deliver the property to the installation central receiving area.

(ii) The Contractor shall furnish a copy of each purchase order, prior to delivery by the vendor, to the installation central receiving area.

(iii) The Contractor shall establish a record for Government titled property as required by FAR 52.245-1, as incorporated in this contract, and shall maintain that record until accountability is accepted by the Government.

(iv) Contractor use of Government property at an off-site location and off-site subcontractor use requires advance approval of the Contracting Officer and notification of the Industrial Property Officer. The property shall be considered Government furnished and the Contractor shall assume accountability and financial reporting responsibility. The Contractor shall establish records and property control procedures and maintain the property in accordance with the requirements of FAR 52.245-1, Government Property (as incorporated in this contract), until its return to the installation. NASA Procedural Requirements related to property loans shall not apply to offsite use of property by contractors.

(2) After transfer of accountability to the Government, the Contractor shall continue to maintain such internal records as are necessary to execute the user responsibilities identified in paragraph (a) of this clause and document the acquisition, billing, and disposition of the property. These records and supporting documentation shall be made available, upon request, to the SEMO and any other authorized representatives of the Contracting Officer.

(c) The following property and services are provided if checked:

[X]
(1) Office space, work area space, and utilities. Government telephones are available for official purposes only.
[X]
(2) Office furniture.
[X]
(3) Property listed in Attachment J-8-B, List of Installation-Accountable Government Property.

(i) If the Contractor acquires property, title to which vests in the Government pursuant to other provisions of this contract, this property also shall become accountable to the Government upon its entry into Government records.

(ii) The Contractor shall not bring to the installation for use under this contract any property owned or leased by the Contractor, or other property that the Contractor is accountable for under any other Government contract, without the Contracting Officer’s prior written approval.

[]
(5) Publications and blank forms stocked by the installation.
[X]
(6) Safety and fire protection for Contractor personnel and facilities.
[X]
(7) Installation service facilities: Attachment J-8-A, Installation Services and Facilities.
[X]
(8) Medical treatment of a first-aid nature for Contractor personnel injuries or illnesses sustained during on-site duty.
[X]
(9) Cafeteria privileges for Contractor employees during normal operating hours.
[X]
(10) Building maintenance for facilities occupied by Contractor personnel.
[X]
(11) Moving and hauling for office moves, movement of large equipment, and delivery of supplies. Moving services may be provided on-site, as approved by the Contracting Officer.

1852.245-73 FINANCIAL REPORTING OF NASA PROPERTY IN THE CUSTODY OF CONTRACTORS (JAN 2017)

(a) The Contractor shall submit annually a NASA Form (NF) 1018, NASA Property in the Custody of Contractors, in accordance with this clause, the instructions on the form and NFS subpart 1845.71, and any supplemental instructions for the current reporting period issued by NASA.

(b)(1) Subcontractor use of NF 1018 is not required by this clause; however, the Contractor shall include data on property in the possession of subcontractors in the annual NF 1018.

(2) The Contractor shall mail the original signed NF 1018 directly to the cognizant NASA Center Industrial Property Officer and a copy to the cognizant NASA Center Deputy Chief Financial Officer, Finance, unless the Contractor uses the NF 1018 Electronic Submission System (NESS) for report preparation and submission.

(3) One copy shall be submitted (through the Department of Defense (DOD) Property Administrator if contract administration has been delegated to DOD) to the following address: File electronically, . Mail back up to MSFC: - MSFC IPO, and - MSFC Property Accountant, unless the Contractor uses the NF 1018 Electronic Submission System (NESS) for report preparation and submission.

(c)(1) The annual reporting period shall be from October 1 of each year through September 30 of the following year. The report shall be submitted in time to be received by October 31st. The information contained in these reports is entered into the NASA accounting system to reflect current asset values for agency financial statement purposes. Therefore, it is essential that required reports be received no later than October 31st.

(2) Some activity may be estimated for the month in which the report is submitted, if necessary, to ensure the NF 1018 is received when due. However, contractors’ procedures must document the process for developing these estimates based on planned activity such as planned purchases or NASA Form 533 (NF 533) Contractor Financial Management Report) cost estimates. It should be supported and documented by historical experience or other corroborating evidence, and be retained in accordance with FAR Subpart 4.7, Contractor Records Retention. Contractors shall validate the reasonableness of the estimates and associated methodology by comparing them to the actual activity once that data is available, and adjust them accordingly. In addition, differences between the estimated cost and actual cost must be adjusted during the next reporting period. Contractors shall have formal policies and procedures, which address the validation of NF 1018 data, including data from subcontractors, and the identification and timely reporting of errors. The objective of this validation is to ensure that information reported is accurate and in compliance with the NASA FAR Supplement. If errors are discovered on NF 1018 after submission, the contractor shall contact the cognizant NASA Center Industrial Property Officer (IPO) within 30 days after discovery of the error to discuss corrective action.

(3) In addition to an annual report, if at any time during performance of the contract, NASA-owned property in the custody of the Contractor has a value of $10 million or more, the Contractor shall also submit a report no later than the 21st of each month in accordance with the requirements of paragraph (c)(2) of this clause.

(4) The Contracting Officer may, in NASA’s interest, withhold payment until a reserve not exceeding $25,000 or 5 percent of the amount of the contract, whichever is less, has been set aside, if the Contractor fails to submit annual NF 1018 reports in accordance with NFS subpart 1845.71, any monthly report in accordance with (c)(3) of this clause, and any supplemental instructions for the current reporting period issued by NASA. Such reserve shall be withheld until the Contracting Officer has determined that NASA has received the required reports. The withholding of any amount or the subsequent payment thereof shall not be construed as a waiver of any Government right.

(d) A final report shall be submitted within 30 days after disposition of all property subject to reporting when the contract performance period is complete in accordance with paragraph (b)(1) through (3) of this clause.

(End of clause)

1852.245-76 LIST OF GOVERNMENT PROPERTY FURNISHED PURSUANT TO FAR 52.245-1 (JAN 2011)

For performance of work under this contract, the Government will make available Government property identified below or in Attachment J-8-A of this contract on a no charge-for-use basis pursuant to the clause at FAR 52.245-1, Government Property, as incorporated in this contract. The Contractor shall use this property in the performance of this contract at MSFC and at other location(s) as may be approved by the Contracting Officer. Under FAR 52.245-1, the Contractor is accountable for the identified property.

(End of clause)

1852.245-82 OCCUPANCY MANAGEMENT REQUIREMENTS (SEP 2017)

(a) In addition to the requirements of the clause at FAR 52.245-1, Government Property, as included in this contract, the Contractor shall comply with the following in performance of work in and around Government real property:

(1) NPD 8800.14, Policy for Real Estate Management.

(2) NPR 8831.2, Facilities Maintenance and Operations Management.

(b) The Contractor shall obtain the written approval of the Contracting Officer before installing or removing Contractor-owned property onto or into any Government real property or when movement of Contractor-owned property may damage or destroy Government-owned property. The Contractor shall restore damaged property to its original condition at the Contractor’s expense.

(c) The Contractor shall not acquire, construct or install any fixed improvement or structural alterations in Government buildings or other real property without the advance, written approval of the Contracting Officer. Fixed improvement or structural alterations, as used herein, means any alteration or improvement in the nature of the building or other real property that, after completion, cannot be removed without substantial loss of value or damage to the premises. Title to such property shall vest in the Government.

(d) The Contractor shall report any real property or any portion thereof when it is no longer required for performance under the contract, as directed by the Contracting Officer.

(End of clause)

MSFC 52.204-91 SECURITY AND BADGING REQUIREMENTS (NOV 2016)

Performance of this contract will require access to facilities, information technology systems, and other resources at the Marshall Space Flight Center and/or the Michoud Assembly Facility. To obtain and maintain access, the Contractor shall comply with the applicable requirements from the latest revision of (1) NASA Procedural Requirements (NPR) 1600.1, “NASA Security Program Procedural Requirements,” (2) NPR 1600.4, “Identity and Credential Management,” (3) Marshall Procedural Requirements (MPR) 1600.1, “MSFC Security Program Procedural Requirements,” (4) MPR 1600.4, “MSFC Identity, Credential, and Access Management,” and (5) NASA Advisory Implementing Instruction (NAII) 1600.4, “Foreign National Access Management.”

(End of clause)

MSFC 52.245-90 CAPITAL ASSET TRACKING (MAY 2017)

In accordance with NASA Procedural Requirements (NPR) 9250.1, “Property, Plant, and Equipment (PPE) and Operating Materials and Supplies”, and NASA Policy Directive (NPD) 9250.1, “Capital Asset Identification and Treatment”, the contractor shall track, report, and separately identify capital assets as separate Work Breakdown Structure elements on the Contractor’s NASA Form 533M reports.

If PP&E greater than $500,000 ($1,000,000 for internal use software) is purchased, the Contractor shall provide a copy of supporting invoices (to include third party invoices to substantiate capitalized asset costs) to the Contracting Officer. PP&E is defined as tangible assets, including land, that meets the following criteria: (1) has an estimated useful life of 2 years or more, (2) is not intended for sale in the ordinary course of operations, and (3) has been acquired or constructed with the intention of being used or being available for use by the entity.

(End of clause) G-8

SECTION H - SPECIAL CONTRACT REQUIREMENTS

1852.208-81 RESTRICTIONS ON PRINTING AND DUPLICATING (NOV 2004)

1852.223-70 SAFETY AND HEALTH MEASURES AND MISHAP REPORTING (DEC 2015)

1852.223-72 SAFETY AND HEALTH (SHORT FORM) (JUL 2015)

1852.242-72 DENIED ACCESS TO NASA FACILITIES (OCT 2015)

1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY (FEB 2002)

1852.228-76 CROSS-WAIVER OF LIABILITY FOR INTERNATIONAL SPACE STATION ACTIVITIES (OCT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .