CMS_SOW_-_Final_10-31-18.pdf

PDF 14 KB Posted

Attached to
Composite Manufacturing Services Federal contract opportunity
Solicitation number
80JSC019R0041
Issued by
National Aeronautics and Space Administration Johnson Space Center

About this file

CMS Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Composite Manufacturing Services, newest first.
File Type Posted
80JSC019R0041P00003_-_SF1449.pdf PDF
CMS_Images.pdf PDF
80JSC019R0041P00002_-_T&CS.pdf PDF
CMS_TO1_SOW_-_A2_11-16-18.pdf PDF
CMS_QAs_11-16-18.pdf PDF
CMS_TO1_SOW_-_Final_10-31-18.pdf PDF
CMS_TO1_Reqts_-_Final_10-31-18.pdf PDF
80JSC019R0041_-_T&CS_Final_11-1-18.pdf PDF
80JSC019R0041_-_SF1449.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exploration Extra-Vehicular Mobility Unit (xEMU) Composite Manufacturing Services

Statement of Work

1. Purpose

The purpose of this statement of work (SOW) is to define the tasks and deliverables associated with the composite manufacturing support for the Exploration Extra-Vehicular Mobility Unit (xEMU) project.

2. Background:

The Crew and Thermal Systems Division’s Advanced Space Suit Team is developing a new Hard Upper Torso (HUT) and Hatch assembly that will be used in both micro-gravity and planetary EVA operations. The Space Suit Systems Branch is requesting support to fabricate a new composite Hard Upper Torso (HUT) and Hatch design.

NASA is investing in lightweight, damage tolerant composite material development, but this technology is not currently at a maturity level suitable for full component fabrication.

The intent of this contract is to provide composite manufacturing and fabrication services to support the xEMU project.

3. Period of Performance

The Period of Performance is from December 3, 2018 to December 2, 2023.

4. Scope of Work:

The contract shall provide all resources to complete the SOW requirements and deliverables below.

a. Development of manufacturing plan & manufacturing work instructions, including associated documentation thereof.

b. Design modifications, and documentation thereof, as required for manufacturability and/or structural integrity, including any data deliverables created in performance of this contract.

c. Composite hardware manufacturing/fabrication and associated data deliverables.

d. Composite hardware analysis, testing, and verification and associated documentation.

e. Status reporting.

1. Purpose
2. Background:
3. Period of Performance
The Period of Performance is from December 3, 2018 to December 2, 2023.