J_b_Attachment_3_CostPrice_Workbook.xlsx
XLSX spreadsheet 303 KB Posted
- Attached to
- Ames Consolidated Information Technology Services (ACITS)4 Federal contract opportunity
- Solicitation number
- 80ARC18R0010
About this file
This document summarizes a federal solicitation for consolidated information technology services. The National Aeronautics and Space Administration Ames Research Center plans to issue a request for proposal for the Ames Consolidated Information Technology Services 4 requirement. Services will include IT systems and facilities support, network and communication systems support, business systems support, scientific computing systems support, and outreach and informational systems support. The work is organized into technical areas including IT systems and governance support, cybersecurity, network and communications systems and support, applications management and support, scientific computing systems and support, and innovation and emerging technologies. The requirement will be set aside for 8(a) small businesses. The solicitation will result in a five-year hybrid cost-plus-fixed-fee and firm fixed price contract with a phase-in period, base year, and four option years. Key dates include an industry day in January 2018 and final proposal due date in April 2018. The incumbent contract is the Ames Consolidated Information Technology Services 3 contract held by ASRC Research and Technology Solutions.
Cost/Price Workbook
View the file
Other files for this federal contract opportunity
Show all 48
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit 1 Proposing Entity: _________________________________________
Summary of Proposed Price
| CLINS | Price (Cost and fee) | |
| 0002, 0003, 0004, 0005, 0006 | ACITS4 Contract Management (from Exhibit 2) | $4,882,939 |
| 0007, 0008, 0009, 0010, 0011 | ACITS4 Core Technical Services (from Exhibit 3) | $83,009,968 |
| 0012, 0013, 0014, 0015, 0016 | ACITS4 IDIQ Task Orders (from Exhibit 4) | $8,300,997 |
| Total Evaluation Price for Selection Purposes | $96,193,904 | |
| 0001 | Phase-in (from Exhibit 15) | $0 |
| Grand Total | $96,193,904 |
80ARC018R0010 &G J b., Attachment 3&K000000_x000D_Exhibit 1
Exhibit 2 Summary of Elements of Cost - ACITS4 Contract Management (Prime Offeror)
Proposing Entity: _________________________________________
Base Period Option Period 1 Option Period 2 Option Period 3 Option Period 4 Total
| Productive Labor Hours | ||||||
| Prime | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Subcontractor #1 | - 0 | |||||
| Subcontractor #2 | - 0 | |||||
| Total Productive Labor Hours | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Direct Labor Costs (Prime only) | $0 | $0 | $0 | $0 | $0 | $0 |
| Fringe Benefits on Prime Labor | - 0 | |||||
| Overhead on Prime Labor | - 0 | |||||
| Subcontractor Total Cost and Fee: | ||||||
| Subcontractor #1 | - 0 | |||||
| Subcontractor #2 | - 0 | |||||
| Other Direct Costs | 920,171 | 946,877 | 975,739 | 1,005,012 | 1,035,140 | 4,882,939 |
| Material and/or Subcontract Handling | - 0 | |||||
| Subtotal | 920,171 | 946,877 | 975,739 | 1,005,012 | 1,035,140 | 4,882,939 |
| G&A Expense | - 0 | |||||
| Total Cost | $920,171 | $946,877 | $975,739 | $1,005,012 | $1,035,140 | $4,882,939 |
| Fixed Fee | - 0 | |||||
| Facilities Capital Cost of Money | - 0 | |||||
| Total Cost Plus Fixed Fee | $920,171 | $946,877 | $975,739 | $1,005,012 | $1,035,140 | $4,882,939 |
80ARC018R0010 &G J b., Attachment 3_x000D_Exhibit 2_x000D_
Page &P of &N
Exhibit 2a Summary of Elements of Cost - ACITS4 Contract Management (Major Subcontractors)
Proposing Entity: _________________________________________
Base Period Option Period 1 Option Period 2 Option Period 3 Option Period 4 Total
Productive Labor Hours - 0 - 0 - 0 - 0 - 0 - 0
| Direct Labor Costs | $0 | $0 | $0 | $0 | $0 | $0 |
| Fringe Benefits | - 0 | |||||
| Overhead | - 0 | |||||
| Other Direct Costs | - 0 | |||||
| Material and/or Subcontract Handling | - 0 | |||||
| Subtotal | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| G&A Expense | - 0 | |||||
| Total Cost | $0 | $0 | $0 | $0 | $0 | $0 |
| Fee or Profit | - 0 | |||||
| Facilities Capital Cost of Money | - 0 | |||||
| Total Cost and Fee/Profit | $0 | $0 | $0 | $0 | $0 | $0 |
80ARC018R0010 &G J b., Attachment 3_x000D_Exhibit 2a_x000D__x000D_
Page &P of &N
Exhibit 3 Summary of Elements of Cost - ACITS4 Core Technical Services (Prime Offeror)
Proposing Entity: _________________________________________
Base Period Option Period 1 Option Period 2 Option Period 3 Option Period 4 Total
| Productive Labor Hours | ||||||
| Prime | 257,401 | 257,401 | 257,401 | 257,401 | 257,401 | 1,287,006 |
| Subcontractor #1 | - 0 | |||||
| Subcontractor #2 | - 0 | |||||
| Total Productive Labor Hours | 257,401 | 257,401 | 257,401 | 257,401 | 257,401 | 1,287,006 |
| Direct Labor Costs (Prime only) | $0 | $0 | $0 | $0 | $0 | $0 |
| Fringe Benefits on Prime Labor | - 0 | |||||
| Overhead on Prime Labor | - 0 | |||||
| Subcontractor Total Cost and Fee: | ||||||
| Subcontractor #1 | - 0 | |||||
| Subcontractor #2 | - 0 | |||||
| Other Direct Costs | 15,642,905 | 16,096,908 | 16,587,570 | 17,085,197 | 17,597,388 | 83,009,968 |
| Material and/or Subcontract Handling | - 0 | |||||
| Subtotal | 15,642,905 | 16,096,908 | 16,587,570 | 17,085,197 | 17,597,388 | 83,009,968 |
| G&A Expense | - 0 | |||||
| Total Cost | $15,642,905 | $16,096,908 | $16,587,570 | $17,085,197 | $17,597,388 | $83,009,968 |
| Fixed Fee | - 0 | |||||
| Facilities Capital Cost of Money | - 0 | |||||
| Total Cost Plus Fixed Fee | $15,642,905 | $16,096,908 | $16,587,570 | $17,085,197 | $17,597,388 | $83,009,968 |
80ARC018R0010 &G J b., Attachment 3_x000D_Exhibit 3_x000D_
Page &P of &N
Exhibit 3a Summary of Elements of Cost - ACITS4 Core Technical Services (Major Subcontractors)
Proposing Entity: _________________________________________
Base Period Option Period 1 Option Period 2 Option Period 3 Option Period 4 Total
Productive Labor Hours 257,401 257,401 257,401 257,401 257,401 1,287,006
| Direct Labor Costs | $0 | $0 | $0 | $0 | $0 | $0 |
| Fringe Benefits | - 0 | |||||
| Overhead | - 0 | |||||
| Other Direct Costs | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Material and/or Subcontract Handling | - 0 | |||||
| Subtotal | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| G&A Expense | - 0 | |||||
| Total Cost | $0 | $0 | $0 | $0 | $0 | $0 |
| Fee or Profit | - 0 | |||||
| Facilities Capital Cost of Money | - 0 | |||||
| Total Cost and Fee/Profit | $0 | $0 | $0 | $0 | $0 | $0 |
80ARC018R0010 &G J b., Attachment 3_x000D_Exhibit 3a_x000D__x000D_
Page &P of &N
Exhibit 4 Summary of Elements of Cost - ACITS4 IDIQ Task Orders (Prime Offeror)
Proposing Entity: _________________________________________
Base Period Option Period 1 Option Period 2 Option Period 3 Option Period 4 Total
| Productive Labor Hours | ||||||
| Prime | 36,186 | 36,186 | 36,186 | 36,186 | 36,186 | 180,929 |
| Subcontractor #1 | - 0 | |||||
| Subcontractor #2 | - 0 | |||||
| Total Productive Labor Hours | 36,186 | 36,186 | 36,186 | 36,186 | 36,186 | 180,929 |
| Direct Labor Costs (Prime only) | $0 | $0 | $0 | $0 | $0 | $0 |
| Fringe Benefits on Prime Labor | ||||||
| Overhead on Prime Labor | ||||||
| Subcontractor Total Cost and Fee: | ||||||
| Subcontractor #1 | ||||||
| Subcontractor #2 | ||||||
| Other Direct Costs | 1,564,290 | 1,609,691 | 1,658,757 | 1,708,520 | 1,759,739 | 8,300,997 |
| Material and/or Subcontract Handling | - 0 | |||||
| Subtotal | 1,564,290 | 1,609,691 | 1,658,757 | 1,708,520 | 1,759,739 | 8,300,997 |
| G&A Expense | ||||||
| Total Cost | $1,564,290 | $1,609,691 | $1,658,757 | $1,708,520 | $1,759,739 | $8,300,997 |
| Fixed Fee | - 0 | |||||
| Facilities Capital Cost of Money | - 0 | |||||
| Total Cost Plus Fixed Fee | $1,564,290 | $1,609,691 | $1,658,757 | $1,708,520 | $1,759,739 | $8,300,997 |
80ARC018R0010 &G J b., Attachment 3_x000D_Exhibit 4_x000D_
Page &P of &N
Exhibit 4a Summary of Elements of Cost - ACITS4 IDIQ Task Orders (Major Subcontractors)
Proposing Entity: _________________________________________
Base Period Option Period 1 Option Period 2 Option Period 3 Option Period 4 Total
Productive Labor Hours 36,186 36,186 36,186 36,186 36,186 180,929
| Direct Labor Costs | $0 | $0 | $0 | $0 | $0 | $0 |
| Fringe Benefits | - 0 | |||||
| Overhead | - 0 | |||||
| Other Direct Costs | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Material and/or Subcontract Handling | - 0 | |||||
| Subtotal | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| G&A Expense | ||||||
| Total Cost | $0 | $0 | $0 | $0 | $0 | $0 |
| Fee or Profit | - 0 | |||||
| Facilities Capital Cost of Money | - 0 | |||||
| Total Cost and Fee/Profit | $0 | $0 | $0 | $0 | $0 | $0 |
80ARC018R0010 &G J b., Attachment 3_x000D_Exhibit 4a_x000D_
Page &P of &N
Exhibit 5 Summary of Proposed Direct Labor Rates
| [ ] Prime Contractor: |
| [ ] Major Subcontractor: |
Year 1 Base Period Proposed Labor Rate
| LABOR CATEGORY | ||||||||
| Proposed Direct Labor Rates | ||||||||
| NASA Standard Labor Category | Offeror's Category | Yr2 | Yr3 | Yr4 | Yr5 | Source | Staffing | |
| Example: | ||||||||
| Proposed Escalation Percentage (%) | 3.2% | 3.0% | 3.0% | 3.0% | Actual | Incumbent | ||
| Salary Survey | Offeror's employee | |||||||
| Engineer IV | Senior Aerospace Engineer | $52.00 | $53.66 | $55.27 | $56.93 | $58.64 | DOL2005-2516 | New hire |
Proposed Escalation Percentage (%)
| Contract Management | ||||
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| No input required in this space. | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 |
| ARC Core Technical Services & IDIQ | $0.00 | $0.00 | $0.00 | $0.00 |
| Aerospace Systems Subject Matter Expert 2 | $0.00 | $0.00 | $0.00 | $0.00 |
| Aerospace Systems Subject Matter Expert 3 | $0.00 | $0.00 | $0.00 | $0.00 |
| Aerospace Systems Subject Matter Expert 4 | $0.00 | $0.00 | $0.00 | $0.00 |
| Application Integrator | $0.00 | $0.00 | $0.00 | $0.00 |
| Application/Software Developer | $0.00 | $0.00 | $0.00 | $0.00 |
| Applications Subject Matter Expert 1 | $0.00 | $0.00 | $0.00 | $0.00 |
| Applications Subject Matter Expert 2 | $0.00 | $0.00 | $0.00 | $0.00 |
| Applications Subject Matter Expert 3 | $0.00 | $0.00 | $0.00 | $0.00 |
| Applications Subject Matter Expert 4 | $0.00 | $0.00 | $0.00 | $0.00 |
| Business Process IT Analyst | $0.00 | $0.00 | $0.00 | $0.00 |
| Data Center Subject Matter Expert 1 | $0.00 | $0.00 | $0.00 | $0.00 |
| Data Center Subject Matter Expert 2 | $0.00 | $0.00 | $0.00 | $0.00 |
| Data Center Subject Matter Expert 3 | $0.00 | $0.00 | $0.00 | $0.00 |
| Data Center Subject Matter Expert 4 | $0.00 | $0.00 | $0.00 | $0.00 |
| Database Administrator | $0.00 | $0.00 | $0.00 | $0.00 |
| Engineering Technician Level 3 | $0.00 | $0.00 | $0.00 | $0.00 |
| Engineering Technician Level 4 | $0.00 | $0.00 | $0.00 | $0.00 |
| IT Customer Liason | $0.00 | $0.00 | $0.00 | $0.00 |
| IT Engineer | $0.00 | $0.00 | $0.00 | $0.00 |
| IT Engineer, Manager | $0.00 | $0.00 | $0.00 | $0.00 |
| IT Security Analyst | $0.00 | $0.00 | $0.00 | $0.00 |
| IT Security Analyst, Intern | $0.00 | $0.00 | $0.00 | $0.00 |
| IT Security Subject Matter Expert 1 | $0.00 | $0.00 | $0.00 | $0.00 |
| IT Security Subject Matter Expert 2 | $0.00 | $0.00 | $0.00 | $0.00 |
| IT Security Subject Matter Expert 3 | $0.00 | $0.00 | $0.00 | $0.00 |
| IT Security Subject Matter Expert 4 | $0.00 | $0.00 | $0.00 | $0.00 |
| IT Support Technician, Level 1 | $0.00 | $0.00 | $0.00 | $0.00 |
| IT Support Technician, Level 2 | $0.00 | $0.00 | $0.00 | $0.00 |
| IT Systems Administrator 1 | $0.00 | $0.00 | $0.00 | $0.00 |
| IT Systems Administrator 2 | $0.00 | $0.00 | $0.00 | $0.00 |
| IT Systems Administrator 3 | $0.00 | $0.00 | $0.00 | $0.00 |
| IT Systems Engineer | $0.00 | $0.00 | $0.00 | $0.00 |
| IT Technical Writer | $0.00 | $0.00 | $0.00 | $0.00 |
| Network Subject Matter Expert 1 | $0.00 | $0.00 | $0.00 | $0.00 |
| Network Subject Matter Expert 2 | $0.00 | $0.00 | $0.00 | $0.00 |
| Network Subject Matter Expert 3 | $0.00 | $0.00 | $0.00 | $0.00 |
| Network Subject Matter Expert 4 | $0.00 | $0.00 | $0.00 | $0.00 |
| RF/Video Subject Matter Expert 1 | $0.00 | $0.00 | $0.00 | $0.00 |
| RF/Video Subject Matter Expert 2 | $0.00 | $0.00 | $0.00 | $0.00 |
| RF/Video Subject Matter Expert 3 | $0.00 | $0.00 | $0.00 | $0.00 |
| RF/Video Subject Matter Expert 4 | $0.00 | $0.00 | $0.00 | $0.00 |
| Web Developer | $0.00 | $0.00 | $0.00 | $0.00 |
| Offeror shall remove examples when submitting its proposal. | ||||
| The example is provided to demonstrate formatting and how the data is to be submitted. The data in the example is not real and should not be interpreted as such. |
80ARC018R0010 &G J b., Attachment 3_x000D_Exhibit 5
Page &P of &N
Exhibit 6 Summary of Key Personnel Direct Labor Rates
| [ ] Prime Contractor: |
| [ ] Major Subcontractor: |
| Actual Rates Projected | ||||||||
| Labor Category | Names of Key Personnel | Current Rates* | Phase-in Period | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 |
* Date of current rates is payroll of:
80ARC018R0010 &G J b., Attachment 3_x000D_Exhibit 6_x000D_
Exhibit 7
| [ ] Prime Contractor: |
| [ ] Major Subcontractor: |
Direct Labor Cost Summary - ACITS4 Contract Management
| Labor Category | Base Period (12 months) | Option Period 1 | Option Period 2 | ||||||
| Total Labor Hours | Labor Rate | Total Labor Cost | Total Labor Hours | Labor Rate | Total Labor Cost | Total Labor Hours | Labor Rate | Total Labor Cost | |
| 0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |||
| 0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |||
| 0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |||
| 0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |||
| 0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |||
| 0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |||
| 0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |||
| 0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |||
| 0 | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |||
| Total Labor Hours and Costs | - 0 | $0 | - 0 | $0 | - 0 | $0 |
| [ ] Prime Contractor: |
| [ ] Major Subcontractor: |
DIRECT LABOR COST SUMMARY - ACITS4 CORE CONTRACT MANAGEMENT
| Labor Category | Option Period 3 | Option Period 4 | ||||
| Total Labor Hours | Labor Rate | Total Labor Cost | Total Labor Hours | Labor Rate | Total Labor Cost | |
| 0 | $ - 0 | $0 | $ - 0 | $0 | ||
| 0 | $ - 0 | $0 | $ - 0 | $0 | ||
| 0 | $ - 0 | $0 | $ - 0 | $0 | ||
| 0 | $ - 0 | $0 | $ - 0 | $0 | ||
| 0 | $ - 0 | $0 | $ - 0 | $0 | ||
| 0 | $ - 0 | $0 | $ - 0 | $0 | ||
| 0 | $ - 0 | $0 | $ - 0 | $0 | ||
| 0 | $ - 0 | $0 | $ - 0 | $0 | ||
| 0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Total Labor Hours and Costs | - 0 | $0 | - 0 | $0 |
80ARC018R0010 &G J b., Attachment 3_x000D_Exhibit 7
Page &P of &N
Exhibit 8
| [ ] Prime Contractor: |
| [ ] Major Subcontractor: |
Direct Labor Cost Summary - ACITS4 Core Technical Services
| NASA Standard Labor Category | Base Period (12 months) | Option Period 1 | Option Period 2 | ||||||
| Total Labor Hours | Labor Rate | Total Labor Cost | Total Labor Hours | Labor Rate | Total Labor Cost | Total Labor Hours | Labor Rate | Total Labor Cost | |
| Aerospace Systems Subject Matter Expert 3 | 5,684 | $0.00 | $0 | 5,684 | $0.00 | $0 | 5,684 | $0.00 | $0 |
| Aerospace Systems Subject Matter Expert 4 | 2,387 | $0.00 | $0 | 2,387 | $0.00 | $0 | 2,387 | $0.00 | $0 |
| Application/Software Developer | 43,745 | $0.00 | $0 | 43,745 | $0.00 | $0 | 43,745 | $0.00 | $0 |
| Applications Subject Matter Expert 1 | 1,034 | $0.00 | $0 | 1,034 | $0.00 | $0 | 1,034 | $0.00 | $0 |
| Applications Subject Matter Expert 2 | 2,047 | $0.00 | $0 | 2,047 | $0.00 | $0 | 2,047 | $0.00 | $0 |
| Applications Subject Matter Expert 3 | 10,918 | $0.00 | $0 | 10,918 | $0.00 | $0 | 10,918 | $0.00 | $0 |
| Applications Subject Matter Expert 4 | 2,161 | $0.00 | $0 | 2,161 | $0.00 | $0 | 2,161 | $0.00 | $0 |
| Business Process IT Analyst | 1,555 | $0.00 | $0 | 1,555 | $0.00 | $0 | 1,555 | $0.00 | $0 |
| Data Center Subject Matter Expert 1 | 1,268 | $0.00 | $0 | 1,268 | $0.00 | $0 | 1,268 | $0.00 | $0 |
| Data Center Subject Matter Expert 2 | 4,592 | $0.00 | $0 | 4,592 | $0.00 | $0 | 4,592 | $0.00 | $0 |
| Data Center Subject Matter Expert 3 | 1,103 | $0.00 | $0 | 1,103 | $0.00 | $0 | 1,103 | $0.00 | $0 |
| Data Center Subject Matter Expert 4 | 188 | $0.00 | $0 | 188 | $0.00 | $0 | 188 | $0.00 | $0 |
| Database Administrator | 4,979 | $0.00 | $0 | 4,979 | $0.00 | $0 | 4,979 | $0.00 | $0 |
| Engineering Technician Level 3 | 5,651 | $0.00 | $0 | 5,651 | $0.00 | $0 | 5,651 | $0.00 | $0 |
| Engineering Technician Level 4 | 3,866 | $0.00 | $0 | 3,866 | $0.00 | $0 | 3,866 | $0.00 | $0 |
| IT Customer Liason | 6,013 | $0.00 | $0 | 6,013 | $0.00 | $0 | 6,013 | $0.00 | $0 |
| IT Security Analyst | 26,132 | $0.00 | $0 | 26,132 | $0.00 | $0 | 26,132 | $0.00 | $0 |
| IT Security Analyst, Intern | 13,281 | $0.00 | $0 | 13,281 | $0.00 | $0 | 13,281 | $0.00 | $0 |
| IT Security Subject Matter Expert 1 | 9,417 | $0.00 | $0 | 9,417 | $0.00 | $0 | 9,417 | $0.00 | $0 |
| IT Security Subject Matter Expert 2 | 10,490 | $0.00 | $0 | 10,490 | $0.00 | $0 | 10,490 | $0.00 | $0 |
| IT Security Subject Matter Expert 3 | 8,458 | $0.00 | $0 | 8,458 | $0.00 | $0 | 8,458 | $0.00 | $0 |
| IT Security Subject Matter Expert 4 | 188 | $0.00 | $0 | 188 | $0.00 | $0 | 188 | $0.00 | $0 |
| IT Support Technician, Level 1 | 1,879 | $0.00 | $0 | 1,879 | $0.00 | $0 | 1,879 | $0.00 | $0 |
| IT Support Technician, Level 2 | 5,637 | $0.00 | $0 | 5,637 | $0.00 | $0 | 5,637 | $0.00 | $0 |
| IT Systems Administrator 1 | 3,534 | $0.00 | $0 | 3,534 | $0.00 | $0 | 3,534 | $0.00 | $0 |
| IT Systems Administrator 2 | 33,175 | $0.00 | $0 | 33,175 | $0.00 | $0 | 33,175 | $0.00 | $0 |
| IT Systems Administrator 3 | 16,052 | $0.00 | $0 | 16,052 | $0.00 | $0 | 16,052 | $0.00 | $0 |
| IT Systems Engineer | 21,570 | $0.00 | $0 | 21,570 | $0.00 | $0 | 21,570 | $0.00 | $0 |
| IT Technical Writer | 1,503 | $0.00 | $0 | 1,503 | $0.00 | $0 | 1,503 | $0.00 | $0 |
| Network Subject Matter Expert 2 | 2,107 | $0.00 | $0 | 2,107 | $0.00 | $0 | 2,107 | $0.00 | $0 |
| Network Subject Matter Expert 3 | 38 | $0.00 | $0 | 38 | $0.00 | $0 | 38 | $0.00 | $0 |
| Network Subject Matter Expert 4 | 188 | $0.00 | $0 | 188 | $0.00 | $0 | 188 | $0.00 | $0 |
| RF/Video Subject Matter Expert 2 | 4,362 | $0.00 | $0 | 4,362 | $0.00 | $0 | 4,362 | $0.00 | $0 |
| RF/Video Subject Matter Expert 3 | 133 | $0.00 | $0 | 133 | $0.00 | $0 | 133 | $0.00 | $0 |
| RF/Video Subject Matter Expert 4 | 188 | $0.00 | $0 | 188 | $0.00 | $0 | 188 | $0.00 | $0 |
| Web Developer | 1,879 | $0.00 | $0 | 1,879 | $0.00 | $0 | 1,879 | $0.00 | $0 |
| Total Labor Hours and Costs | 257,401 | $0 | 257,401 | $0 | 257,401 | $0 |
| [ ] Prime Contractor: |
| [ ] Major Subcontractor: |
DIRECT LABOR COST SUMMARY - ACITS4 CORE TECHNICAL SERVICES
| NASA Standard Labor Category | Option Period 3 | Option Period 4 | ||||
| Total Labor Hours | Labor Rate | Total Labor Cost | Total Labor Hours | Labor Rate | Total Labor Cost | |
| Aerospace Systems Subject Matter Expert 3 | 5,684 | $0.00 | $0 | 5,684 | $0.00 | $0 |
| Aerospace Systems Subject Matter Expert 4 | 2,387 | $0.00 | $0 | 2,387 | $0.00 | $0 |
| Application/Software Developer | 43,745 | $0.00 | $0 | 43,745 | $0.00 | $0 |
| Applications Subject Matter Expert 1 | 1,034 | $0.00 | $0 | 1,034 | $0.00 | $0 |
| Applications Subject Matter Expert 2 | 2,047 | $0.00 | $0 | 2,047 | $0.00 | $0 |
| Applications Subject Matter Expert 3 | 10,918 | $0.00 | $0 | 10,918 | $0.00 | $0 |
| Applications Subject Matter Expert 4 | 2,161 | $0.00 | $0 | 2,161 | $0.00 | $0 |
| Business Process IT Analyst | 1,555 | $0.00 | $0 | 1,555 | $0.00 | $0 |
| Data Center Subject Matter Expert 1 | 1,268 | $0.00 | $0 | 1,268 | $0.00 | $0 |
| Data Center Subject Matter Expert 2 | 4,592 | $0.00 | $0 | 4,592 | $0.00 | $0 |
| Data Center Subject Matter Expert 3 | 1,103 | $0.00 | $0 | 1,103 | $0.00 | $0 |
| Data Center Subject Matter Expert 4 | 188 | $0.00 | $0 | 188 | $0.00 | $0 |
| Database Administrator | 4,979 | $0.00 | $0 | 4,979 | $0.00 | $0 |
| Engineering Technician Level 3 | 5,651 | $0.00 | $0 | 5,651 | $0.00 | $0 |
| Engineering Technician Level 4 | 3,866 | $0.00 | $0 | 3,866 | $0.00 | $0 |
| IT Customer Liason | 6,013 | $0.00 | $0 | 6,013 | $0.00 | $0 |
| IT Security Analyst | 26,132 | $0.00 | $0 | 26,132 | $0.00 | $0 |
| IT Security Analyst, Intern | 13,281 | $0.00 | $0 | 13,281 | $0.00 | $0 |
| IT Security Subject Matter Expert 1 | 9,417 | $0.00 | $0 | 9,417 | $0.00 | $0 |
| IT Security Subject Matter Expert 2 | 10,490 | $0.00 | $0 | 10,490 | $0.00 | $0 |
| IT Security Subject Matter Expert 3 | 8,458 | $0.00 | $0 | 8,458 | $0.00 | $0 |
| IT Security Subject Matter Expert 4 | 188 | $0.00 | $0 | 188 | $0.00 | $0 |
| IT Support Technician, Level 1 | 1,879 | $0.00 | $0 | 1,879 | $0.00 | $0 |
| IT Support Technician, Level 2 | 5,637 | $0.00 | $0 | 5,637 | $0.00 | $0 |
| IT Systems Administrator 1 | 3,534 | $0.00 | $0 | 3,534 | $0.00 | $0 |
| IT Systems Administrator 2 | 33,175 | $0.00 | $0 | 33,175 | $0.00 | $0 |
| IT Systems Administrator 3 | 16,052 | $0.00 | $0 | 16,052 | $0.00 | $0 |
| IT Systems Engineer | 21,570 | $0.00 | $0 | 21,570 | $0.00 | $0 |
| IT Technical Writer | 1,503 | $0.00 | $0 | 1,503 | $0.00 | $0 |
| Network Subject Matter Expert 2 | 2,107 | $0.00 | $0 | 2,107 | $0.00 | $0 |
| Network Subject Matter Expert 3 | 38 | $0.00 | $0 | 38 | $0.00 | $0 |
| Network Subject Matter Expert 4 | 188 | $0.00 | $0 | 188 | $0.00 | $0 |
| RF/Video Subject Matter Expert 2 | 4,362 | $0.00 | $0 | 4,362 | $0.00 | $0 |
| RF/Video Subject Matter Expert 3 | 133 | $0.00 | $0 | 133 | $0.00 | $0 |
| RF/Video Subject Matter Expert 4 | 188 | $0.00 | $0 | 188 | $0.00 | $0 |
| Web Developer | 1,879 | $0.00 | $0 | 1,879 | $0.00 | $0 |
| Total Labor Hours and Costs | 257,401 | $0 | 257,401 | $0 |
80ARC018R0010 &G J b., Attachment 3_x000D_Exhibit 8
Page &P of &N
Exhibit 9
| [ ] Prime Contractor: |
| [ ] Major Subcontractor: |
Direct Labor Cost Summary - ACITS4 IDIQ Task Orders
| NASA Standard Labor Category | Base Period (12 months) | Option Period 1 | Option Period 2 | ||||||
| Total Labor Hours | Labor Rate | Total Labor Cost | Total Labor Hours | Labor Rate | Total Labor Cost | Total Labor Hours | Labor Rate | Total Labor Cost | |
| Application/Software Developer | 14,013 | $0.00 | $0 | 14,013 | $0.00 | $0 | 14,013 | $0.00 | $0 |
| Applications Subject Matter Expert 2 | 2,030 | $0.00 | $0 | 2,030 | $0.00 | $0 | 2,030 | $0.00 | $0 |
| Applications Subject Matter Expert 3 | 349 | $0.00 | $0 | 349 | $0.00 | $0 | 349 | $0.00 | $0 |
| Data Center Subject Matter Expert 1 | 423 | $0.00 | $0 | 423 | $0.00 | $0 | 423 | $0.00 | $0 |
| Data Center Subject Matter Expert 2 | 905 | $0.00 | $0 | 905 | $0.00 | $0 | 905 | $0.00 | $0 |
| Data Center Subject Matter Expert 3 | 516 | $0.00 | $0 | 516 | $0.00 | $0 | 516 | $0.00 | $0 |
| Database Administrator | 846 | $0.00 | $0 | 846 | $0.00 | $0 | 846 | $0.00 | $0 |
| IT Engineer, Manager | 1,893 | $0.00 | $0 | 1,893 | $0.00 | $0 | 1,893 | $0.00 | $0 |
| IT Security Analyst | 4,384 | $0.00 | $0 | 4,384 | $0.00 | $0 | 4,384 | $0.00 | $0 |
| IT Security Analyst, Intern | 1,706 | $0.00 | $0 | 1,706 | $0.00 | $0 | 1,706 | $0.00 | $0 |
| IT Security Subject Matter Expert 1 | 292 | $0.00 | $0 | 292 | $0.00 | $0 | 292 | $0.00 | $0 |
| IT Security Subject Matter Expert 2 | 626 | $0.00 | $0 | 626 | $0.00 | $0 | 626 | $0.00 | $0 |
| IT Security Subject Matter Expert 3 | 2,888 | $0.00 | $0 | 2,888 | $0.00 | $0 | 2,888 | $0.00 | $0 |
| IT Security Subject Matter Expert 4 | 94 | $0.00 | $0 | 94 | $0.00 | $0 | 94 | $0.00 | $0 |
| IT Systems Administrator 2 | 1,042 | $0.00 | $0 | 1,042 | $0.00 | $0 | 1,042 | $0.00 | $0 |
| IT Systems Administrator 3 | 738 | $0.00 | $0 | 738 | $0.00 | $0 | 738 | $0.00 | $0 |
| IT Systems Engineer | 3,008 | $0.00 | $0 | 3,008 | $0.00 | $0 | 3,008 | $0.00 | $0 |
| Network Subject Matter Expert 2 | 57 | $0.00 | $0 | 57 | $0.00 | $0 | 57 | $0.00 | $0 |
| Network Subject Matter Expert 3 | 161 | $0.00 | $0 | 161 | $0.00 | $0 | 161 | $0.00 | $0 |
| RF/Video Subject Matter Expert 2 | 57 | $0.00 | $0 | 57 | $0.00 | $0 | 57 | $0.00 | $0 |
| RF/Video Subject Matter Expert 3 | 161 | $0.00 | $0 | 161 | $0.00 | $0 | 161 | $0.00 | $0 |
| Total Labor Hours and Costs | 36,186 | $0 | 36,186 | $0 | 36,186 | $0 |
| [ ] Prime Contractor: |
| [ ] Major Subcontractor: |
DIRECT LABOR COST SUMMARY - ACITS4 IDIQ TASK ORDERS
| NASA Standard Labor Category | Option Period 3 | Option Period 4 | ||||
| Total Labor Hours | Labor Rate | Total Labor Cost | Total Labor Hours | Labor Rate | Total Labor Cost | |
| Application/Software Developer | 14,013 | $0.00 | $0 | 14,013 | $0.00 | $0 |
| Applications Subject Matter Expert 2 | 2,030 | $0.00 | $0 | 2,030 | $0.00 | $0 |
| Applications Subject Matter Expert 3 | 349 | $0.00 | $0 | 349 | $0.00 | $0 |
| Data Center Subject Matter Expert 1 | 423 | $0.00 | $0 | 423 | $0.00 | $0 |
| Data Center Subject Matter Expert 2 | 905 | $0.00 | $0 | 905 | $0.00 | $0 |
| Data Center Subject Matter Expert 3 | 516 | $0.00 | $0 | 516 | $0.00 | $0 |
| Database Administrator | 846 | $0.00 | $0 | 846 | $0.00 | $0 |
| IT Engineer, Manager | 1,893 | $0.00 | $0 | 1,893 | $0.00 | $0 |
| IT Security Analyst | 4,384 | $0.00 | $0 | 4,384 | $0.00 | $0 |
| IT Security Analyst, Intern | 1,706 | $0.00 | $0 | 1,706 | $0.00 | $0 |
| IT Security Subject Matter Expert 1 | 292 | $0.00 | $0 | 292 | $0.00 | $0 |
| IT Security Subject Matter Expert 2 | 626 | $0.00 | $0 | 626 | $0.00 | $0 |
| IT Security Subject Matter Expert 3 | 2,888 | $0.00 | $0 | 2,888 | $0.00 | $0 |
| IT Security Subject Matter Expert 4 | 94 | $0.00 | $0 | 94 | $0.00 | $0 |
| IT Systems Administrator 2 | 1,042 | $0.00 | $0 | 1,042 | $0.00 | $0 |
| IT Systems Administrator 3 | 738 | $0.00 | $0 | 738 | $0.00 | $0 |
| IT Systems Engineer | 3,008 | $0.00 | $0 | 3,008 | $0.00 | $0 |
| Network Subject Matter Expert 2 | 57 | $0.00 | $0 | 57 | $0.00 | $0 |
| Network Subject Matter Expert 3 | 161 | $0.00 | $0 | 161 | $0.00 | $0 |
| RF/Video Subject Matter Expert 2 | 57 | $0.00 | $0 | 57 | $0.00 | $0 |
| RF/Video Subject Matter Expert 3 | 161 | $0.00 | $0 | 161 | $0.00 | $0 |
| Total Labor Hours and Costs | 36,186 | $0 | 36,186 | $0 |
80ARC018R0010 &G J b., Attachment 3_x000D_Exhibit 9_x000D_
Page &P of &N
Exhibit 10 Summary of Indirect Cost Rates
| [ ] Prime Contractor: __________________________________ |
| [ ] Major Subcontractor: __________________________________ |
| Fringe Benefits* | Overhead | G&A | |
| Example: | |||
| Portion of Contractor FY 13 From: _11/1/12_ to _4/30/13_ | 46.00% | 4.50% | 7.00% |
| Portion of Contractor FY 14 From: _5/1/13_ to _10/31/13 | 44.00% | 3.50% | 5.00% |
| Base Period Weighted Average | 45.00% | 4.00% | 6.00% |
| Phase-in Period: |
| Contractor FY Ending: ____________ |
| Base Period: |
| Portion of Contractor FY __ From: ________ to ________ |
| Portion of Contractor FY __ From: ________ to ________ |
| Base Period Average |
| Option Period 1 |
| Portion of Contractor FY __ From: ________ to ________ |
| Portion of Contractor FY __ From: ________ to ________ |
| Option Period 1 Average |
| Option Period 2 |
| Portion of Contractor FY __ From: ________ to ________ |
| Portion of Contractor FY __ From: ________ to ________ |
| Option Period 2 Average |
| Option Period 3 |
| Portion of Contractor FY __ From: ________ to ________ |
| Portion of Contractor FY __ From: ________ to ________ |
| Option Period 3 Average |
| Option Period 4 |
| Portion of Contractor FY __ From: ________ to ________ |
| Portion of Contractor FY __ From: ________ to ________ |
| Option Period 4 Average |
| * Disregard if it is your normal accounting practice to |
| include fringe benefits with overhead. |
| Offeror shall remove examples when submitting its proposal. |
| The example is provided to demonstrate formatting and how the data is to be submitted. The data in the example is not real and should not be interpreted as such. |
80ARC018R0010 J b., Attachment 3_x000D_Exhibit 10_x000D__x000D_
&G_x000D_Page &P of &N
Exhibit 11 Overhead and/or Fringe Benefits (Composition of Burden Pool)
| [ ] Prime Contractor: __________________________________ | |
| [ ] Major Subcontractor: _________________________________ | Overhead or Service Center Pool* = ___________________ |
| Base of Application = __________________________ |
* Specify Type of Overhead Burden: Fringe Benefits, Labor, Onsite, Offsite, Engineering, Procurement, Service Center(s), etc.
OFFEROR'S FISCAL YEAR BEGINS ____________ AND ENDS ____________.
| Actual | Forecast | |||||||
| Prior Yr 3 | Prior Year 2 | Prior Yr 1 | ||||||
| Cost Elements within | Contractor | Contractor | Contractor | Contractor | Contractor | Contractor | Contractor | Contractor |
| the Overhead Burden Pool | Fiscal Year | Fiscal Year | Fiscal Year | Fiscal Year | Fiscal Year | Fiscal Year | Fiscal Year | Fiscal Year |
| 20xx | 20xx | 20xx | 20xx | 20xx | 20xx | 20xx | 20xx |
| Payroll Taxes |
| FICA (Social Security) |
| HIT (Medicare) |
| FUI (Federal Unemployment) |
| SUI (State Unemployment) |
| WC (Workers Comp) |
| Fringes: |
| Retirement |
| Health/Life Insurance |
| Paid Leave |
| Other |
| Other (Identify) |
| Facilities |
| Depreciation |
| Total Overhead Expenses | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Application Base ($) | ||||||||
| Contractor FY Rate (%) | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
80ARC018R0010 &G J b., Attachment 3_x000D_Exhibit 11_x000D_
Page &P of &N
Exhibit 12 General and Administrative Expense (G&A)
| [ ] Prime Contractor: __________________________________ | |
| [ ] Major Subcontractor: _________________________________ | Base of Application = __________________________ |
OFFEROR'S FISCAL YEAR BEGINS ____________ AND ENDS ____________.
| Actual | Forecast | |||||||
| Prior Yr 3 | Prior Year 2 | Prior Yr 1 | ||||||
| Cost Elements within | Contractor | Contractor | Contractor | Contractor | Contractor | Contractor | Contractor | Contractor |
| the Overhead Burden Pool | Fiscal Year | Fiscal Year | Fiscal Year | Fiscal Year | Fiscal Year | Fiscal Year | Fiscal Year | Fiscal Year |
| 20xx | 20xx | 20xx | 20xx | 20xx | 20xx | 20xx | 20xx |
Labor: (Identify)
Labor Related Cost: (Taxes & Fringes Etc.)
| B&P |
| IR&D |
| Corporate Allocations: |
| Other (Specify): |
| Facilities |
| Depreciation |
| Total G&A Expenses | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Distribution Base Dollars: | ||||||||
| Existing Business Base | ||||||||
| This Contract Base | ||||||||
| Forecasted Business Base | ||||||||
| Total Distribution Base $ | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Calculated G&A Rates (%) | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
80ARC018R0010 &G J b., Attachment 3_x000D_Exhibit 12_x000D_
Page &P of &N
Exhibit 13 Prime Contractor:
Minor Subcontractors
| Minor Subcontractor | NASA Standard Labor Category | |||||||||||||||
| Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | ||||||||||||
| Hours | SFBR | Total | Hours | SFBR | Total | Hours | SFBR | Total | Hours | SFBR | Total | Hours | SFBR | Total | ||
| Examples: | ||||||||||||||||
| XYZ Company | Engineer 3 | 1,395 | $85.00 | $118,575 | 1,395 | $87.55 | $120,947 | 1,395 | $90.18 | $123,365 | 1,395 | $92.89 | $125,833 | 1,395 | $95.68 | $128,349 |
| Technician 2 | 1,395 | $56.00 | $78,120 | 1,395 | $57.68 | $79,682 | 1,395 | $59.41 | $81,276 | 1,395 | $61.19 | $82,902 | 1,395 | $63.03 | $84,560 | |
| Safety Manager | 930 | $79.00 | $73,470 | 450 | $81.37 | $36,261 | - 0 | $83.81 | $0 | - 0 | $86.32 | $0 | - 0 | $88.91 | $0 | |
| Technician 3 | 3,720 | $58.00 | $215,760 | 1,500 | $59.74 | $88,740 | - 0 | $61.53 | $0 | - 0 | $63.38 | $0 | - 0 | $65.28 | $212,909 | |
| Total XYZ: | 7,440 | $485,925 | 4,740 | $325,630 | 2,790 | $204,641 | 2,790 | $208,734 | 2,790 | $425,818 |
| ABC Tool & Die | Engineer 1 | 1,860 | $44.00 | $81,840 | 1,860 | $45.32 | $84,295 | 1,860 | $46.68 | $86,825 | 1,860 | $48.08 | $89,429 | 1,860 | $49.52 | $92,107 |
| Technician 3 | 3,720 | $62.00 | $230,640 | 1,395 | $63.86 | $89,085 | - 0 | $65.78 | $0 | - 0 | $67.75 | $0 | - 0 | $69.78 | $0 | |
| Safety Manager | 930 | $71.00 | $66,030 | 450 | $73.13 | $32,909 | - 0 | $75.32 | $0 | - 0 | $77.58 | $0 | - 0 | $79.91 | $0 | |
| Total ABC: | 6,510 | $378,510 | 3,705 | $206,289 | 1,860 | $86,825 | 1,860 | $89,429 | 1,860 | $92,107 |
| Offeror shall remove examples when submitting its proposal. |
| The example is provided to demonstrate formatting and how the data is to be submitted. The data in the example is not real and should not be interpreted as such. |
80ARC018R0010 &G J b., Attachment 3_x000D_Exhibit 13_x000D__x000D_
Page &P of &N
Exhibit 14 Incumbency Assumptions
| [ ] Prime Contractor: ________________________ |
| [ ] Major Subcontractor: _______________________ |
| This exhibit provides the Government visibility into the Offeror's intentions regarding the hiring of |
| incumbent contractor employees. |
State the percentage of incumbents intended/expected to be retained: ________
| Labor Rates | The Government understands that a non-incumbent Offeror may only be able to estimate the salary cost of current incumbents; however, the Government must evaluate the Offeror’s intentions regarding pay for these employees if retained. |
| Notwithstanding the rates estimated and proposed by the Offeror, upon receiving contract award, do you intend to pay retained incumbents at their current salaries/wages? Offerors shall select only one of the options below. | |
| [ ] Yes. No further response required. | |
| [ ] No. If you check this box, explain (in the space below) what salaries/wages you intend to offer to incumbents and how this will allow you to achieve the intended/expected incumbent retention percentage stated above. |
| Length of Service | Do you intend to recognize incumbent employees' service time under predecessor contracts, in the performance of similar work, for purposes of fringe benefits computations (such as the amount of paid-time-off received)? Offerors shall select only one of the options below. |
| [ ] Yes. No further response required. | |
| [ ] No. If you check this box, explain (in the space below) your policy regarding length of service of incumbents, as it relates to fringe benefits computations (such as the amount of paid-time-off received), and how this will allow you to achieve the intended/expected incumbent retention percentage stated above. |
80ARC018R0010 &G J b., Attachment 3_x000D_Exhibit 14_x000D_
&G_x000D_Page 1 of 1
Exhibit 15
| Phase-in |
| Company Name: |
| Cost Element | Hours | Rate | Cost |
| Prime Offeror Direct Labor (DL): | |||
| Skill mix: (identify labor category) | |||
| *Example: Technician 1 | 100 | $ 10.00 | $1,000 |
| 1. | $0 | ||
| 2. | |||
| 3. | |||
| 4. | |||
| Total Prime Offeror Direct Labor Cost | - 0 | $0 |
| Prime Offeror Fringe and/or Overhead on Labor: | ||
| *Example: Overhead | 10% | $100 |
| 1. | ||
| 2. | ||
| Total Fringe/Overhead | $0 |
| Major Subcontractor Total Cost (list) | |
| 1. | |
| 2. | |
| 3. | |
| 4. | |
| Total Major Subcontractor Cost | $0 |
| Minor Subcontractor Total Cost | |
| 1. | |
| 2. | |
| 3. | |
| Total Minor Subcontractor Costs | $0 |
| Prime Offeror Non-Labor Resources (NLR): | |
| Material/Supplies/Equipment | |
| Travel/Training | |
| Service Agreements, Outsourcing & Consultant Fees | |
| Other | |
| Total Non-Labor Cost | $0 |
| Subtotal DL$, Major & Minor Subs$, OH$ & NLR$ | $0 |
| Prime Offeror Total G&A Cost | |
| Subtotal Estimated Cost | $0 |
| Prime Offeror Award Fee |
| Prime Offeror Facilities Capital Cost of Money |
Total Phase-in Firm Fixed Price $0
| *Remove example from official submission, it is provided to demonstrate formatting and how the |
| data is to be submitted. The data in the example is not real and should not be interpreted as such. |
80ARC018R0010 &G J b., Attachment 3_x000D_Exhibit 15_x000D_
Page &P of &N
Exhibit 16 Schedule of Subcontracts
[ ] Prime Contractor: ______________________________________
Description of Work:
| Number of quotes solicted/received | ||||
| Subcontractor selected: | Subcontract (1) Name and Address | Subcontract (2) Name and Address | Subcontract (3) Name and Address | Subcontract (4) Name and Address |
Basis of Selection:*
Type of Subcontract:**
| Cost | ||||
| Fee/Profit | ||||
| Total Amount Proposed | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Affiliation with Prime:*** |
Cost/Price Analysis Performed by Prime:****
| * Lowest price, teaming partner, technical qualifications, etc. |
| ** FFP, CPAF, CPFF, T&M, etc. |
| *** Subcontractor, subsidiary, interdivisional, etc. |
| **** FAR 15.404-3(b) requires that contractors conduct appropriate cost or price analyses to establish the reasonableness of proposed subcontract prices |
| and include the results of these analyses in the price proposal. If response above is "No", explain why cost or price analyis was not |
| performed and how the Offeror determined that the proposed subcontract price was reasonable. |
80ARC018R0010 &G J b., Attachment 3_x000D_Exhibit 16