76077-Purchase Description (PD).pdf
PDF 166 KB Posted
- Attached to
- VDATS Virginia Panel F35 Order #3 Federal contract opportunity
- Solicitation number
- FA857124Q0102
About this file
This document is a Purchase Description for the procurement of VDATS parts by the 402d 569 Maintenance Group (EMXG) at Robins Air Force Base, Georgia. The Contractor shall provide the listed receiver modules, with no installation required. The contractor shall deliver all items within 10 weeks after receipt of order, shipped to the designated government representatives at Robins AFB. The contract includes standard commercial warranty terms. No government furnished equipment or services are required. The document outlines security requirements the contractor must comply with, including supply chain risk management procedures. The procurement is a sole source award to Virginia Panel Corporation, a small business.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 76077-Drawing_DWG_ 200626093_Double Tier Receiver.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PURCHASE DESCRIPTION
VDATS- Virginia Panel F35 Order #3
21 June 2024
1.0 DESCRIPTION.
The Contractor shall provide to the 402d 569 Maintenance Group (EMXG), Robins Air Force Base, GA, all materials, parts, tools, and shipping necessary to provide VDATS parts listed in 1.1. No contractor installation is required.
1.1 The contractor shall provide the following:
Description Qty. Serial # Part # Receiver, 9050, 50 Module, VXI and Discrete Wiring, Double Tier (Without Silkscreen)
9 N/A 310104272
2.0 Service Support. N/A
2.1 Delivery.
2.1.1 Government Representatives. The following individuals will serve as the Primary and Alternate Government Representatives as the points of contact through which all contractor-provided services will be requested and accomplished for EMXG.
Government Representatives will not supervise the Contractor, and they are not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The following individuals will serve as Government Representatives for EMXG.
2.2 Shipping/Delivery/Period of Performance. The contractor shall deliver all items listed in paragraph 1.1 no later than 10 weeks after receipt of order (ARO) utilizing FOB Destination to the address listed below.
Primary Government Representative Alternate Government Representative
Name: Donald Watson Name: Michael Griger Unit: 402 EMXG/569 EMXS/MXDXA Unit: 402 EMXG/569 EMXS/MXDXA Phone: (478) 327-4955 Phone: (478) 327-4953 Email: donald.watson.7@us.af.mil Email: michael.griger@us.af.mil
2.3 Ship To Address.
FOB Destination
2.4 Incidental Services. None
2.5 Warranty. Contractor shall provide the manufacturer’s standard commercial warranty beginning on the date of acceptance of all items.
2.6 Options. None
3.0 Government Furnished Equipment and Services or Government Furnished Property
(GFP) and services. None
4.0 General Information.
4.1 Security Requirements.
4.1.1 Government Security Regulations. The Contractor shall ensure personnel, information, system, facility, and international security requirements are met in accordance with 32 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM), Air Force Instruction (AFI) 31-101, Integrated Defense.
4.1.2 Communications Security (COMSEC). The Contractor shall use only secure communications methods and/or equipment to transmit or otherwise transfer classified and/or sensitive, but unclassified, information in accordance with 2 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM).
4.2 Operations Security (OPSEC). The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall comply with DoDD 5205.02E “DoD Operations Security”, DoD Manual 5205.02-M and AFI 10-701 “Operations Security” to protect United States (U.S. Government interest. The Contractor shall ensure compliance with OPSEC requirements including procedures to protect classified and/or sensitive, but unclassified, Government projects and/or programs. The Contractor shall ensure Contractor personnel who perform work at Robins AFB or another Government facility comply with the OPSEC procedures of the facility.
DoDAAC: FY2072 Attn.: Donald Watson
569 EMXS/MXDPBS
635 Tech Rd., Bldg. 639 Robins AFB, GA 31098
(478) 327-4955 donald.watson.7@us.af.mil
4.3 Security Incident or Violation. The Contractor shall immediately notify the Government Security Office of any potential or actual security incidents or violations including potential or actual unauthorized disclosure or compromise of classified and/or sensitive, but unclassified, information.
4.4 Supply Chain Risk Management. The Contractor shall implement risk management procedures to ensure that system, equipment, components, software, maintenance equipment, and supplies do not incorporate counterfeit parts, malicious code, or other elements that would allow adversaries to gain access to data and critical program information and disrupt operations. Contractor risk management procedures shall comply with:
Air Force Pamphlet (AFPAM) 63-113, Program Protection Planning for Life Cycle Management, SAE Aerospace Standard AS5553C, Counterfeit Electrical, Electronic, and Electromechanical (EEE) Parts; Avoidance, Detection, Mitigation and Disposition, National Institute of Standards and Technology (NIST) Special Publication 800-53 Rev 5, Security and Privacy Controls for Information Systems and Organizations.
4.5 Agency Affirmative Procurement Program. In accordance with FAR 23.404(b)(1), 100% of purchases of Environmental Protection Agency (EPA)-designated products included in the Comprehensive Procurement Guidelines (CPG) list [https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program] and/or United States Department of Agriculture (USDA)-designated products included in the bio based product listings [http://www.biopreferred.gov] shall, at a minimum, meet the EPA or USDA standards for recovered materials or bio based content, respectively, unless an item cannot be acquired competitively within a realistic timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price.
4.5.1 In accordance with FAR 23.404(a)(3)(iii), the Contractor shall provide estimates and verification of recovered material for EPA-designated CPG products and certification for both EPA-designated CPG products and USDA-designated bio based products. In accordance with the Robins Air Force Base, Georgia / Affirmative Procurement Program (formerly Green Procurement Program (GPP)) Plan, the Contractor shall provide estimates and certifications to the Government for completion of the applicable attachment(s) to be included in the Purchase Request (PR) package.
4.6 Inspection of Services/Inspection of Supply: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.
4.7 Invoice/Payment and Receipt/Acceptance: In accordance with DFARS clause 252.232-7003, Electronic submission of Payment Requests and Receiving Reports, the Contractor shall submit/process payment requests (invoices, Receiving Reports or combos) and receipt/acceptance documents via Procurement Integrated Enterprise Environment (PIEE) through module Wide Area Workflow (WAWF). Access at the following site:
https://piee.eb.mil/
5.0 Appendices -
Appendix A- Drawing-VICD 200626093 Double Tier Receiver
File details come from the government source that posted it. Updated .