About this file

This document is an Amendment (A0002) to Solicitation 75H70125Q00023 for the Pine Ridge Air Handler 10 Fan Array Replacement project. The amendment provides updated questions and answers dated May 29, 2025, addressing technical details about the project. Key technical questions addressed include motor requirements for the fan array (VFD or ECM motors are acceptable if controllable through the BAS system), redundancy needs for the fan array, potential chilled water piping modifications, and Test and Balance (TAB) requirements. The amendment clarifies that the contractor must include any necessary modifications to install the new fan array, and TAB will be required specifically for measuring the air handler's differential pressure and CFM after installation to ensure proper operation.

The solicitation is a 100% Indian Small Business Economic Enterprise (ISBEE) set-aside under NAICS code 238220 for Plumbing, Heating, and Air-Conditioning Contractors, with a size standard of $19 million. The project involves replacing the supply fan in Air Handler 10 at Pine Ridge Hospital with a new 4-fan array to address existing vibration and mounting issues. The contract will be a Firm Fixed Price (FFP) construction contract with a 120-calendar day performance period. The project magnitude is estimated between $25,000 and $100,000, and the Indian Health Service (IHS) Division of Engineering Services is the issuing agency.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A0002

Andrew Hart, Contracting Officer

The purpose of this amendment is to provide an updated Q&As as of May 29, 2025.

All other terms and conditions of this solicitation remain unchanged.

Indian Health Service - DES Seattle 701 5th Avenue, Suite 1600 Seattle, WA 98104

75H70125Q00023

1 2

05/29/2025

05/02/2025

Amend No.

Item

Date Submitted

Question Type

(Technical or Admin)

Question Response Date Response Responded By

EXAMPLE 0 11/23/2020 Technical Please provide drawings or plans for ??? 11/23/2020 IHS Response IHS POC

A0001 1 5/19/2025 Technical

Does the motors on the proposed fan array have to be VFD driven or can we use ECM motors?

05/20/2025

As long as the motors can be controlled and varied through the BAS system individually, the method of motor control and power does not matter. Again, the motors must be able to be varied in speed independentaly and, through BAS, must be adjustable. IHS COR

A0001 2 5/19/2025 Technical

Does the owner want redundancy built into the fan array? Info given in SOW is the CFM, Static pressure, power rating, etc per the original schedule.

05/20/2025

Yes, that is one of the reasons we want to go with a fan array system.

Enough redundancy in the system so that if 1 fan were to go down we could maintain cfm and static pressure for the as designed system would be preffered. IHS COR

A0001 3 5/19/2025 Technical

Does the proposal need to include removing the chilled water piping in front of the AHU back to the mains to give clearance to remove the existing fan section? The isolation valves are at the pipe drops and not at the mains, this could require partial draining of the chilled water loop. 05/20/2025

If, in the contractors assessment, the chilled water piping will have to be moved or any other work needing to be done to the AHU to install the fan array or remove the old fan array, then that work shall be part of this project and included in the proposal. IHS COR

A0002 4 5/28/2025 Technical

Will TAB be required? If so will only the cfm need to be read at the unit to setup new fan array or will the entire duct and register system from AHU 10 need to be balanced?

05/29/2025

TAB will be required. It will not be required for a full AH10 downstream system to be TAB'd but for the Air handler itself to have differential pressure and CFM measured and reported after installation so that we know it is running as designed and as the air handler was meant to operate.

IHS COR