J03 Construction Documents - Crow Agency Pumps_100 submittal_18 August.pdf
PDF 15 MB Posted
- Attached to
- Pump Replacement at Crow Agency, MT Federal contract opportunity
- Solicitation number
- 75H701-20-R-00050
About this file
This document provides details for a federal contract solicitation to replace pumps at the Crow Service Unit in Crow Agency, Montana. The Indian Health Service is seeking proposals under solicitation number 75H701-20-R-00050 for pump replacement projects at three locations. The magnitude of construction is estimated between $250,000 and $500,000. NAICS code 238220 for plumbing, heating, and air conditioning contractors applies, with a small business size standard of $16.5 million. This solicitation is set aside 100% for small businesses. Proposals are due by August 18, 2020. The selected contractor will replace pumps to improve infrastructure and services at the Crow Agency health facility operated by the Department of Health and Human Services Indian Health Service.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 00003 RFP 75H701-20-R-00050.pdf | ||
| Amendment 00002_75H701-20-R-00050.pdf | ||
| Amendment 00001_75H701-20-R-00050.pdf | ||
| J01 Crow Pumps Schedule of Items.pdf | ||
| J04 Self-Performed Calculation Sheet.docx | DOCX document | |
| B01 Solicitation - 75H701-20-R-00050.pdf | ||
| J06 General Decision Number MT20200056 06_26_2020.pdf | ||
| J02 Construction Documents Section 011000 Summary.doc | DOC document | |
| J05 Past Performance Questionnaire (PPQ) Form PPQ-0.docx | DOCX document | |
| J03 Construction Documents Drawings and Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CROW PUMPS REPLACEMENT
CROW/NORTHERN CHEYENNE HOSPITAL
CROW RESERVATION
CROW AGENCY, MONTANA
26/03/2020 VARIES
MICHAEL JENSEN, P.E. BC 13
VA
RI
ES
CR
O W
P U
M
PS
R
EP
LA
CE
M
EN
T
CR
O W
/N O
RT
HE
RN
C
HE
YE
N N
E
HO
SP
IT
AL
CR
O
W /N
O
RT
HE
RN
C
HE
YE
N
N E
HO
SP
IT
AL
CR
O
W R
ES
ER
VA
TI
O N
CR
O
W A
GE
N
CY
, M
O N
TA
N
A
MONTANA
CROW RESERVATION
MONTANA
WYOMING
HARDIN
CROW AGENCY
ST. XAVIER
LODGE GRASS
PRYOR
WYOLA
RANCHESTER
LOVELL
EDGAR
BILLINGS
FT. SMITH
CROW/NORTHERN
CHEYENNE
HOSPITAL
STATE MAP RESERVATION MAP
VICINITY MAP
ENGINEER:
DEPARTMENT OF HEALTH
AND
HUMAN SERVICES
TITLE SHEET
SH
DRAWN BY:
DATE: PROJECT NUMBER:
DEPARTMENT OF HEALTH & HUMAN SERVICES
U.S.PUBLIC HEALTH SERVICE
BILLINGS AREA INDIAN HEALTH SERVICE
P.O. BOX 36600
2900 4TH AVE. NORTH
BILLINGS, MT 59107
OF
REVISIONS
# DESCRIPTIONDATE BYDESCRIPTION#
DRAWING INDEX
1 TITLE PAGE
2 NOTES
3 NOTES
4 FLOOR PLAN OVERVIEW
5 FLOW DIAGRAM ALL SYSTEMS
6 ISOLATION PLAN- HOT WATER CIRCULATION
7 NEW FACILITIES- HOT WATER CIRCULATION SYSTEM
8 ISOLATION PLAN DOMESTIC BOOSTER PUMPS
9 NEW FACILITIES- DOMESTIC BOOSTER PUMPS
10 ISOLATION AND REPLACEMENT PLAN- SOFT COLD WATER
11 ISOLATION PLAN- FIRE PUMP
12 NEW FACILITIES- FIRE PUMP
13 PRODUCT INFORMATION
SH
EE
T
PR
O
JE
CT
TI
TL
E
PA
GE
N
CROW AGENCY PUMPS REPLACEMENT PROJECT
CROW/NORTHERN CHEYENNE HOSPITAL
CROW RESERVATION
CROW AGENCY, MONTANA
PROJECTS BI18CR202H6, BI19CR200H6, BI20CR201H6
AutoCAD SHX Text Date
AutoCAD SHX Text 16505
AutoCAD SHX Text 04/14/2020
AutoCAD SHX Text
AutoCAD SHX Text o
AutoCAD SHX Text o
AutoCAD SHX Text o
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text o
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text o
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text U
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text V
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text H
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text H
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text A
CROW RESERVATION
CROW AGENCY, MONTANA
26/03/2020 VARIES
MICHAEL JENSEN, P.E. BC 13
VA
RI
ES
CR
O W
P U
M
PS
R
EP
LA
CE
M
EN
T
CR
O W
/N O
RT
HE
RN
C
HE
YE
N N
E
HO
SP
IT
AL
CR
O
W /N
O
RT
HE
RN
C
HE
YE
N
N E
HO
SP
IT
AL
CR
O
W R
ES
ER
VA
TI
O N
CR
O
W A
GE
N
CY
, M
O N
TA
N
A
ENGINEER:
NOTES
SH
DRAWN BY:
DATE: PROJECT NUMBER:
DEPARTMENT OF HEALTH & HUMAN SERVICES
U.S.PUBLIC HEALTH SERVICE
BILLINGS AREA INDIAN HEALTH SERVICE
P.O. BOX 36600
2900 4TH AVE. NORTH
BILLINGS, MT 59107
OF
REVISIONS
# DESCRIPTIONDATE BY
SH
EE
T
PR
O
JE
CT
GE
N
ER
AL
N
O
TE
S
GENERAL NOTES
1.THIS WORK WILL TAKE PLACE IN AN OPERATING FACILITY THAT IS FULLY BUILT
OUT, WITH MINIMAL FREE FLOOR SPACE OR OVERHEAD SPACE. THUS, THE
DIMENSIONS OF THE EXISTING EQUIPMENT/INSTALLATIONS SHALL BE NOMINALLY
ADHERED TO REGARDING THE SELECTION OF NEW EQUIPMENT.
2.PUMP SUCTION AND DISCHARGE NOZZLES LOCATIONS/ORIENTATIONS SHALL BE
NOMINALLY THE SAME IN ORDER TO MINIMIZE UNNECESSARY PIPING REWORK.
3.THE CONTRACTOR SHALL PROVIDE REDLINES TO THE PLANS AS RECORD DRAWINGS.
4.ALL MATERIALS AND WORKMANSHIP SHALL BE WARRANTIED FOR A PERIOD OF ONE
YEAR. MANUFACTURER'S WARRANTY CERTIFICATES SHALL BE PROVIDED TO THE
OWNER, WHERE APPLICABLE.
5. ALL MATERIAL REQUIREMENTS, UNLESS OTHERWISE NOTED, WITH REFERENCE TO
SPECIFIC MANUFACTURERS OR BRANDS ARE INTENDED TO SPECIFIED AS "OR EQUAL
BASIS".
6.THE EXISTING BUILDING AUTOMATION SYSTEM IS AUTOMATED LOGIC. THE SYSTEM
IS CURRENTLY MAINTAINED AND SUPPORTED BY:
STANDARD PLUMBING AND HEATING
JASON MICHAEL
HELENA, MT (406) 422-3966
DOMESTIC WATER BOOSTER PUMPS
1.DOMESTIC WATER BOOSTER PUMPS SHALL BE REPLACED WITH A SKID ASSEMBLY
ACCORDING TO THE BELOW SPECIFICATIONS OR THEIR APPROVED EQUALS:
1.1.TWO ARMSTRONG SERIES 6800 MODEL N250322 WITH A 10HP 460V / 3PH /
60HZ HIGH EFFICIENCY MOTOR, SEE PRODUCT INFO PAGE FOR MORE DETAILS
2.ISOLATION AND BYPASS VALVES SHALL BE 4" MILWAUKEE HP1LSS BUTTERFLY VALVE
WITH LEVER HANDLE OR APPROVED EQUAL.
3.WATER SOFTENER SYSTEM VALVE SHALL BE 2" APOLLO 70LF-200 SERIES LEAD FREE
BALL VALVE OR APPROVED EQUAL.
4.PUMP CONTROL SYSTEMS SHALL BE TIED INTO FACILITY'S EXISTING AUTOMATED
LOGIC BUILDING AUTOMATION SYSTEM (BAS), WHICH SHALL BE ABLE TO MONITOR
AND ADJUST THE PUMPS' OPERATIONS REMOTELY. THE PANEL SHALL PROVIDE AN
HOA SWITCH. THE AUTOMATIC CONTROLS SHALL PROVIDE FOR A CONSTANT
PRESSURE SYSTEM INCLUDING PRESSURE SENSOR WITH A 4-20 MA OUTPUT ON
THE SKID AND ANOTHER REMOTELY LOCATED AT THE NURSES' STATION. THIS
PRESSURE SENSOR SHALL PROVIDE INPUT TO THE BUILDING AUTOMATION SYSTEM,
WHICH SHALL PROVIDE THE LOGIC TO THE VARIABLE FREQUENCY DRIVE.
THEREFORE, THE VFD MUST BE BACNET COMPATIBLE TO THE BAS.
5.DUE TO THE CRITICAL NATURE OF THE BOOSTER PUMPS SERVICE TO THE OVERALL
FACILITY, THE INSTALLATION CONTRACTOR MUST HAVE A PLAN THAT LIMITS
SERVICE DOWNTIME TO NOT EXCEED TWO (2) HOURS, WITHOUT AN APPROVED
MITIGATION PLAN. THE DOWNTIME MUST BE COORDINATED WITH THE FACILITY
MANAGER AND MAY BE REQUIRED TO HAPPEN DURING EVENINGS, NIGHTS, OR
WEEKENDS.IF SERVICE DOWNTIME IS EXPECTED TO EXCEED TWO (2) HOURS, THE
TEMPORARY SYSTEM MUST BE OPERATIONAL WITHIN TWO HOURS OF TAKING THE
EXISTING SYSTEM OFF-LINE. THE EXISTING SYSTEM CAN BE SCAVENGED FOR USE IN
THE TEMPORARY SYSTEM. THE OWNER DOES NOT GUARANTEE THE OPERATION OF
THE EXISTING EQUIPMENT IN USE AS A TEMPORARY SYSTEM.
6.CONTROLS FOR PUMPING SYSTEMS WILL INCLUDE THE FOLLOWING:
6.1.NEW CONTROLLERS COMPATIBLE WITH AUTOMATED LOGIC MOUNTED IN A
NEW CONTROL PANEL, 10 UNIVERSAL INPUTS, 6 DIGITAL OUTPUTS AND 4
ANALOG OUTPUTS.
6.2.NEW BACNET ROUTER
6.3.RELAYS AND CURRENT SENSORS AS NEEDED FOR EQUIPMENT CONTROL AND
MONITORING
6.4.POWER SUPPLY FOR NEW AUTOMATED LOGIC CORPORATION COMPATIBLE
CONTROLLERS
6.5.COMPLETE INSTALLATION
6.6.PROGRAMMING AND EQUIPMENT GRAPHICS
6.7.BACnet TO THE DRIVES IF BACnet COMPATIBLE.
7. BASIS OF PAYMENT -
7.1.BOOSTER PUMP SKID ASSEMBLY (EQUIPMENT ONLY): THE CONTRACT LUMP
SUM PRICE SHALL CONSTITUTE FULL COMPENSATION FOR PURCHASING AND
DELIVERING ALL MATERIALS ASSOCIATED WITH SKID ASSEMBLY INCLUDING, PUMPS,
MOTORS, ELECTRICAL EQUIPMENT AND ENCLOSURES, INSTRUMENTATION, PIPING,
AND FITTINGS. THIS INCLUDES ANY TAXES, FEES, AND MARK-UPS TO DELIVER
FREIGHT TO THE CLIENT'S FACILITY WHERE THE ASSEMBLY WILL BE INSTALLED AND
WARRANTIED.
7.2.DEMOLITION, INSTALLATION, AND COMMISSIONING SERVICES: THE CONTRACT
LUMP SUM PRICE SHALL CONSTITUTE FULL COMPENSATION FOR REMOVING AND
PROPERLY DISPOSING OF SYSTEM COMPONENTS IDENTIFIED ON THE PLANS. THESE
COMPONENTS INCLUDE BUT NOT LIMITED TO THE EXISTING PUMP SKID AND ITS
INTEGRAL COMPONENTS SUCH AS PUMPS, MOTORS, PIPE, FITTINGS, POWER SUPPLY
AND CONTROL AND ALL OTHER ITEMS DEMO'ED TO ALLOW INSTALLATION OF THE
PROPOSED BOOSTER PUMP SYSTEM. THIS ITEM MAY ALSO INCLUDE PROVIDING A
TEMPORARY SYSTEM TO PRESSURIZE THE DOMESTIC WATER SYSTEM FOR THE
PERIOD BETWEEN DEMO OF THE EXISTING SYSTEM AND COMMISSIONING OF THE
NEW SYSTEM.
IN ADDITION, INCLUDED IN THE CONTRACT PRICE, IS FULL COMPENSATION FOR THE
INSTALLATION AND COMMISSIONING OF THE COMPLETE AND FULLY OPERATIONAL
DOMESTIC BOOSTER PUMP SYSTEM. THIS INCLUDES THE INSTALLATION OF ALL
MATERIALS PURCHASED IN ORDER TO MAKE THE SYSTEM OPERATIONAL, INCLUDING
ISOLATION AND BYPASS VALVES, AS WELL AS A SINGLE VALVE LOCATED ON THE
WATER SOFTENING SYSTEM. THIS ITEM ALSO INCLUDES MAKING REPAIRS TO ITEMS
THAT ARE DAMAGED/MODIFIED DURING CONSTRUCTION ACTIVITIES, SUCH AS
INSULATION REMOVAL. THIS INCLUDES LABOR COST TO PERFORM WORK ON NIGHTS
OR WEEKEND HOURS IF NECESSARY.
THIS EXCLUDES ANY SERVICES REQUIRED TO INTEGRATE PUMP CONTROLS INTO THE
AUTOMATED LOGIC BUILDING CONTROL SYSTEM, WHICH CAN BE FOUND IN SECTION
7.4.
7.3. ANCILLARY MATERIALS: THE CONTRACT LUMP SUM PRICE SHALL CONSTITUTE
FULL COMPENSATION FOR PURCHASING AND DELIVERING ALL MATERIALS NOT
PROVIDED WITH THE SKID ASSEMBLY BUT REQUIRED IN ORDER TO PROVIDE CLIENT
WITH A COMPLETE AND FULLY OPERATIONAL SYSTEM. THIS SHALL INCLUDE, BUT
MAY NOT BE LIMITED TO, ISOLATION AND BYPASS VALVES, WATER SOFTENER
VALVE, PIPE SPOOLS AND FITTINGS TO TIE THE SKID INTO THE EXISTING SYSTEM,
CONSTRUCTION CONSUMABLES, INSULATION, ETC. THE CONTRACT PRICE SHALL
INCLUDE ALL TAXES, FEES, AND MARK-UPS REQUIRED TO DELIVER TO THE CLIENT'S
FACILITY WHERE THE MATERIAL WILL BE INSTALLED AND WARRANTIED.
THIS EXCLUDES ANY MATERIALS REQUIRED TO INTEGRATE PUMP CONTROLS INTO
THE AUTOMATED LOGIC BUILDING CONTROL SYSTEM, WHICH CAN BE FOUND IN
SECTION 7.4.
7.4. CONTROLS INTEGRATION INTO AUTOMATED LOGIC: THE CONTRACT LUMP SUM
PRICE SHALL INCLUDE INTEGRATION OF THE PUMP CONTROLS TO THE EXISTING
BUILDING AUTOMATION SYSTEM (AUTOMATED LOGIC). THE ITEM SHALL CONSTITUTE
FULL COMPENSATION FOR FURNISHING AND INSTALLING ALL MATERIALS AND
WORKMANSHIP INCLUDING CONTROL MODULES, CONDUIT, WIRING, PROGRAMMING,
AND THE GRAPHICAL INTERFACE TO PROVIDE A COMPLETE AND OPERATIONAL
INTEGRATION TO THE EXISTING BUILDING AUTOMATION SYSTEM.
PROVIDING AND INSTALLING INPUT DEVICES, SUCH AS PRESSURE SENSORS, OR
OUTPUT DEVICES, SUCH AS MOTORIZED VALVES, SHALL BE INCLUDED IN OTHER BID
ITEMS.
FIRE WATER SYSTEM
1.FIRE PUMP SHALL BE REPLACED ACCORDING TO THE BELOW SPECIFICATIONS OR
THEIR APPROVED EQUALS:
1.1.PENTAIR AURORA MODEL 3-483-10, WITH A 30HP 460V/3PH/60HZ MOTOR. SEE
PRODUCT INFO PAGE FOR MORE DETAILS.
2. FIRE PUMP CONTROL PANELS SHALL BE REPLACED ACCORDING TO THE BELOW
SPECIFICATIONS OR THEIR APPROVED EQUALS:
2.1 FIRETROL FTA-1000-BM30B-TSA, ACROSS-THE-LINE STARTER WITH AUTOMATIC
TRANSFER SWITCH.
2.2 FIRETROL FTA-200-A-Q REMOTE ALARM PANEL. THE CONTRACTOR SHALL
REPLACE THREE EXISTING FIRE PUMP ALARM PANELS LOCATED IN THE BOILER
ROOM, THE EMERGENCY DEPARTMENT, AND THE MEDICAL-SURGICAL INPATIENT
DEPARTMENT. THE EXISTING PANEL IN THE SURGICAL DEPARTMENT SHALL BE
REMOVED AND NOT REPLACED. THE CONTRACTOR SHALL VERIFY THE
CONNECTION TO THE FIRE ALARM PANEL AND MAINTAIN THE EXISTING
ARRANGEMENT FOR THE PROPOSED REPLACEMENT REMOTE ALARM PANELS.
3. ISOLATION VALVES SHALL BE VICTAULIC 4" SERIES 765 WITH WEATHERPROOF
ACTUATOR OR APPROVED EQUAL.
4. PUMP CONTROL SYSTEMS SHALL BE TIED INTO THE FACILITY'S EXISTING
AUTOMATED LOGIC BUILDING CONTROL SYSTEM, WHICH SHALL BE ABLE TO
MONITOR PUMP OPERATIONS REMOTELY. THE BUILDING AUTOMATION SYSTEM
SHALL RECORD THE START AND STOP TIMES AND DATES TO DOCUMENT THE
LENGTH OF THE FIRE PUMP RUN TIMES.
5. UPON COMPLETION OF INSTALLATION OF THE FIRE PUMP, CONTRACTOR SHALL
PERFORM TESTING OF THE PUMP AND SPRINKLER SYSTEM IN ACCORDANCE WITH
NFPA's ANNUAL TESTING REQUIREMENT BEFORE TURNING CUSTODY OF THE
SYSTEM BACK OVER TO THE FACILITY MANAGER. THIS TESTING MAY BE
SUBCONTRACTED OUT TO AN APPROVED CONTRACTOR OR PERFORMED BY
INSTALLATION CONTRACTOR IF APPROVED AND CERTIFIED TO CONDUCT THE
TESTING.
6. DUE TO THE CRITICAL NATURE OF THE FIRE PUMPS SERVICE TO THE OVERALL
FACILITY, THE INSTALLATION CONTRACTOR MUST HAVE PLANS THAT LIMIT SERVICE
DOWNTIME TO NOT EXCEED FOUR (4) HOURS. THE DOWNTIME MUST BE
COORDINATED WITH THE FACILITY MANAGER AND MAY BE REQUIRED TO HAPPEN
DURING EVENINGS, NIGHTS, OR WEEKENDS. IF SERVICE DOWN TIME IS EXPECTED
TO EXCEED FOUR (4) HOURS, THE CONTRACTOR MUST SUBMIT A PLAN FOR
MITIGATION OF EXTENDED DOWN TIME TO THE FACILITY MANAGER FOR
APPROVAL BEFORE COMMENCING THE WORK. THE TEMPORARY SYSTEM MUST BE
OPERATIONAL WITHIN FOUR HOURS OF TAKING THE EXISTING SYSTEM OFF-LINE.
THE MEANS AND METHODS FOR THIS WILL BE LEFT TO THE CONTRACTOR. THE
EXISTING SYSTEM CAN BE SCAVENGED FOR USE IN THE TEMPORARY SYSTEM. THE
OWNER DOES NOT GUARANTEE THE OPERATION OF THE EXISTING EQUIPMENT IN
USE AS A TEMPORARY SYSTEM.
AutoCAD SHX Text Date
AutoCAD SHX Text 16505
04/14/2020
CROW RESERVATION
CROW AGENCY, MONTANA
26/03/2020 VARIES
MICHAEL JENSEN, P.E. BC 13
VA
RI
ES
CR
O W
P U
M
PS
R
EP
LA
CE
M
EN
T
CR
O W
/N O
RT
HE
RN
C
HE
YE
N N
E
HO
SP
IT
AL
CR
O
W /N
O
RT
HE
RN
C
HE
YE
N
N E
HO
SP
IT
AL
CR
O
W R
ES
ER
VA
TI
O N
CR
O
W A
GE
N
CY
, M
O N
TA
N
A
ENGINEER:
NOTES
SH
DRAWN BY:
DATE: PROJECT NUMBER:
DEPARTMENT OF HEALTH & HUMAN SERVICES
U.S.PUBLIC HEALTH SERVICE
BILLINGS AREA INDIAN HEALTH SERVICE
P.O. BOX 36600
2900 4TH AVE. NORTH
BILLINGS, MT 59107
OF
REVISIONS
# DESCRIPTIONDATE BY
SH
EE
T
PR
O
JE
CT
GE
N
ER
AL
N
O
TE
S
6. IT IS COMMON FOR FIRE PUMPS TO BE DESIGNED TO LEAK AT THE SEAL. THE
START-UP WILL CREATE A GREATER THAN NORMAL LEAK UNTIL THE SEALS BECOME
SATURATED. SLIGHT ADJUSTMENTS AT THE SHAFT SEAL INTERFACE MAY BE
NECESSARY. THE START-UP IS TO BE WITNESSED BY A MANUFACTURER'S
REPRESENTATIVE TO ENSURE PROPER INSTALLATION AND TO PROVIDE TRAINING
TO THE FACILITY MANAGER AND HIS STAFF IN THE MAINTENANCE AND OPERATION
OF THE PUMP SYSTEM AND CONTROLS.
7. CONTROLS FOR PUMPING SYSTEMS WILL INCLUDE THE FOLLOWING (INCLUDED
WITH BOOSTER PUMP SCOPE, BUT REPEATED HERE FOR CLARITY):
7.1 NEW ALC CONTROLLER MOUNTED IN A NEW CONTROL PANEL, 10
UNIVERSAL INPUTS
7.2 NEW BACNET ROUTER
7.3 RELAYS AND CURRENT SENSORS AS NEEDED FOR EQUIPMENT
MONITORING
7.4 POWER SUPPLY FOR NEW ALC CONTROLLERS
7.5 COMPLETE INSTALLATION
7.6 PROGRAMMING AND EQUIPMENT GRAPHICS
8. BASIS OF PAYMENT -
8.1. FIRE PUMP (EQUIPMENT ONLY): THE CONTRACT LUMP SUM PRICE SHALL
CONSTITUTE FULL COMPENSATION FOR PURCHASING AND DELIVERING A NEW FIRE
PUMP AND MOTOR. THIS INCLUDES ANY TAXES, FEES, AND MARK-UPS TO DELIVER
FREIGHT TO THE CLIENT'S FACILITY WHERE THE ASSEMBLY WILL BE INSTALLED AND
WARRANTIED.
8.2. CONTROLLER, ATS, AND ALARM PANELS (EQUIPMENT ONLY): THE
CONTRACT LUMP SUM PRICE SHALL CONSTITUTE FULL COMPENSATION FOR
PURCHASING AND DELIVERING REPLACEMENT FIRE SUPPRESSION CONTROLS
INCLUDING THE ELECTRONIC FIRE PUMP CONTROLLER, AUTOMATIC TRANSFER
SWITCH, AND THREE REMOTE ALARM PANELS. THIS INCLUDES ANY TAXES, FEES,
AND MARK-UPS TO DELIVER FREIGHT TO THE CLIENT'S FACILITY WHERE THE
ASSEMBLY WILL BE INSTALLED AND WARRANTIED.
8.3. DEMOLITION, INSTALLATION AND COMMISSIONING: THE CONTRACT LUMP
SUM PRICE SHALL CONSTITUTE FULL COMPENSATION FOR REMOVING AND PROPERLY
DISPOSING OF SYSTEM COMPONENTS IDENTIFIED ON THE PLANS. THESE
COMPONENTS INCLUDE BUT NOT LIMITED TO THE EXISTING PUMP, MOTORS, PIPE,
FITTINGS, POWER SUPPLY,CONTROLS, AND ALL OTHER ITEMS TO ALLOW
INSTALLATION OF THE PROPOSED FIRE PUMP SYSTEM. THIS ITEM INCLUDES
PROVIDING A TEMPORARY SYSTEM TO PRESSURIZING THE FIRE SUPPRESSION SYSTEM
FOR THE PERIOD BETWEEN DEMO OF THE EXISTING SYSTEM AND INSTALLATION OF
THE NEW SYSTEM, IF NECESSARY.
IN ADDITION, INCLUDED IN THE BID ITEM IS FULL COMPENSATION FOR THE
INSTALLATION AND COMMISSIONING OF THE COMPLETE AND FULLY OPERATIONAL
FIRE PUMP AND ITS ASSOCIATED CONTROL COMPONENTS. THIS INCLUDES THE
INSTALLATION OF ALL MATERIALS PURCHASED IN ORDER TO MAKE THE SYSTEM
OPERATIONAL, INCLUDING ISOLATION VALVES. THIS ITEM INCLUDES MAKING
REPAIRS TO ITEMS THAT ARE DAMAGED/MODIFIED DURING CONSTRUCTION
ACTIVITIES. UPON COMPLETION OF INSTALLATION, BUT PRIOR TO TURNOVER OF
CARE, CUSTODY AND CONTROL TO FACILITY MANAGER, SYSTEM FLUSHING AND
TESTING WILL BE PERFORMED. THE SUCCESSFUL COMPLETION OF THESE ACTIVITIES
IS TO BE INCLUDED IN THE CONTRACT PRICE. THIS INCLUDES LABOR COST TO
PERFORM WORK ON NIGHTS OR WEEKEND HOURS IF NECESSARY.
SERVICES REQUIRED TO INTEGRATE PUMP MONITORING INTO THE AUTOMATED
LOGIC BUILDING AUTOMATION SYSTEM ARE INCLUDED IN BID ITEM 8.5.
8.4. ANCILLARY MATERIALS: THE CONTRACT LUMP SUM PRICE SHALL
CONSTITUTE FULL COMPENSATION FOR PURCHASING AND DELIVERING ALL
MATERIALS NOT PROVIDED WITH THE EQUIPMENT PURCHASES NOTED ABOVE, BUT
ARE REQUIRED IN ORDER TO PROVIDE CLIENT WITH A COMPLETE AND FULLY
OPERATIONAL SYSTEM. THIS SHALL INCLUDE, BUT MAY NOT BE LIMITED TO,
ISOLATION VALVES, PIPE SPOOLS, FITTINGS, ELECTRICAL CONDUCTORS, CONDUIT,
ELECTRICAL BOXES, GUTTERS, APPURTENANCES, CONSTRUCTION CONSUMABLES, ETC.,
TO TIE THE PROPOSED PUMP AND MOTOR INTO EXISTING SYSTEM. THE CONTRACT
PRICE SHALL INCLUDE ALL TAXES, FEES, AND MARK-UPS REQUIRED TO DELIVER TO
CLIENT'S FACILITY WHERE THE MATERIAL WILL BE INSTALLED AND WARRANTIED.
THIS EXCLUDES ANY MATERIALS REQUIRED TO INTEGRATE PUMP CONTROLS INTO
THE AUTOMATED LOGIC BUILDING CONTROL SYSTEM, WHICH CAN BE FOUND IN
SECTION 8.5.
8.5 CONTROLS INTEGRATION INTO AUTOMATED LOGIC: THE CONTRACT PRICE
SHALL INCLUDE INTEGRATION OF THE PUMP CONTROLS TO THE EXISTING BUILDING
AUTOMATION SYSTEM (AUTOMATED LOGIC). THE ITEM SHALL CONSTITUTE FULL
COMPENSATION FOR FURNISHING AND INSTALLING ALL MATERIALS AND
WORKMANSHIP INCLUDING CONTROL MODULES, ROUTERS, POWER SUPPLY, CONDUIT,
WIRING, PROGRAMMING, AND THE GRAPHICAL INTERFACE TO PROVIDE A COMPLETE
AND OPERATIONAL INTEGRATION TO THE EXISTING BUILDING AUTOMATION SYSTEM.
PROVIDING AND INSTALLING INPUT DEVICES, SUCH AS CURRENT SENSORS SHALL BE
INCLUDED IN THIS BID ITEM. ALL NECESSARY MATERIALS AND INSTALLATION TO
MONITOR THE FIRE PUMP IN ACCORDANCE WITH THE DRAWINGS AND NOTES, AND
PROVIDING COMMUNICATION BETWEEN THE DEVICES AND BUILDING AUTOMATION
SYSTEM IS INCLUDED IN THIS BID ITEM.
HEATING WATER SYSTEM
1.THE HEATING WATER PUMPS SHALL BE REPLACED ACCORDING TO THE BELOW
SPECIFICATIONS OR THEIR APPROVED EQUALS:
1.1.ARMSTRONG SERIES 4030 MODEL 4X3X10 PUMPS WITH 15 HP, 460V, 3 PHASE,
60HZ MOTOR. SEE PRODUCT INFO PAGE FOR MORE DETAILS.
2.VARIABLE FREQUENCY DRIVERS SHALL BE INSTALLED FOR THE HEATING WATER
CIRCULATION PUMPS ACCORDING TO THE BELOW SPECIFICATION OR THEIR
APPROVED EQUALS:
2.1.ABB DRIVER ACH550-PDR-023A-4 SERIES.
3.CONTROL VALVES SHALL BE BELIMO F6100VIC+PRXUP-MFT-T OR THEIR APPROVED
EQUALS. THE CONTROL VALVES SHALL BE INSTALLED ON THE DISCHARGE SIDE OF
THE BOILER, PER DESIGN DRAWINGS. THE CONTRACTOR SHALL PROVIDE A
SUBMITTAL TO DETAIL WHERE THE CONTROL VALVES FIT IN THE EXISTING PIPING
SYSTEM AS WELL AS THE CONNECTIONS OF THE CONTROL WIRES TO THE BOILER
CONTROLS.
4.ISOLATION AND BYPASS VALVES SHALL BE 6" MILWAUKEE HP1LSS BUTTERFLY VALVE
WITH LEVER HANDLE OR APPROVED EQUAL.
5.CONTRACTOR WILL NEED TO PLAN FOR DRAINAGE, STORAGE, AND REINJECTION OF
HEATING WATER SYSTEM FLUID. REINSTALLATION OF HEATING WATER FLUID SHALL
INCLUDE EVALUATION OF THE MIXTURE AND ADDITION OF GLYCOL TO ACHIEVE A
30% GLYCOL WATER MIXTURE. THE CONTRACTOR CAN ASSUME, FOR PURPOSES OF
BIDDING THAT THE EXISTING SYSTEM IS APPROXIMATELY 2,500 GALLONS WITH A
15% GLYCOL MIX.
6.BOILER CONTROL SOFTWARE IS TO BE UPDATED TO THE MOST CURRENT VERSION
OF PATTERSON KELLEY NURO CONTROL SOFTWARE. SOFTWARE WILL CONTROL THE
SPEED OF THE HEATING WATER PUMPS AND THE CONTROL VALVES TO PROVIDE A
HEATING SYSTEM THAT OPTIMIZES ENERGY CONSERVATION. THIS WORK SHALL BE
PERFORMED IN A MANNER THAT DOES NOT AFFECT ONGOING WARRANTIES OF
THE EXISTING BOILERS, IF ANY.
7.DURING THE INSTALLATION OF THESE NEW FACILITIES, COMMUNICATION AND
COORDINATION MUST BE MAINTAINED WITH FACILITIES MANAGEMENT AND
OPERATIONS TEAMS. THE SURGERY AND OPERATING BRANCHES CANNOT SUSTAIN
ANY PERIOD WITHOUT HVAC FACILITIES. THERE IS A BACKUP HEATING LOOP THAT
CAN BE INITIATED FOR THIS BRANCH OF THE HOSPITAL; HOWEVER, MAINTENANCE
AND OPERATIONS MUST BE GIVEN PROPER NOTIFICATION BEFORE IT CAN BE
IMPLEMENTED.
8.BASIS OF PAYMENT -
8.1 HEATING WATER CIRCULATION PUMPS (EQUIPMENT ONLY): THE CONTRACT
LUMP SUM PRICE SHALL CONSTITUTE FULL COMPENSATION FOR PURCHASING AND
DELIVERING ALL MATERIALS ASSOCIATED WITH HEATING WATER CIRCULATION PUMPS
INCLUDING, PUMPS, MOTORS, PUMP ACCESSORIES (E.G. SUCTION GUIDES), AND
VARIABLE FREQUENCY DRIVERS. THIS INCLUDES ANY TAXES, FEES, AND MARK-UPS TO
DELIVER FREIGHT TO THE CLIENT'S FACILITY WHERE THE ASSEMBLY WILL BE INSTALLED
AND WARRANTIED.
8.2. CONTROL VALVES (EQUIPMENT ONLY): THE CONTRACT LUMP SUM PRICE
SHALL CONSTITUTE FULL COMPENSATION FOR PURCHASING AND DELIVERING ALL NEW
CONTROL VALVES BEING INSTALLED TO ALLOW FOR MODULATION OF CONDENSING
BOILERS. THIS INCLUDES ANY TAXES, FEES, AND MARK-UPS TO DELIVER FREIGHT TO
THE CLIENT'S FACILITY WHERE THE ASSEMBLY WILL BE INSTALLED AND WARRANTIED.
8.3.NURO BOILER SOFTWARE UPGRADES: THE CONTRACT LUMP SUM PRICE
SHALL CONSTITUTE FULL COMPENSATION FOR PURCHASING AND INSTALLING
SOFTWARE AND COMPONENT UPGRADES TO THE THREE (3) EXISTING PATTERSON
KELLY CONDENSING BOILERS. THIS COST INCLUDES ANY TAXES, FEES, AND MARK-UPS
TO DELIVER FREIGHT TO THE CLIENT'S FACILITY WHERE THE ASSEMBLY WILL BE
INSTALLED AND WARRANTIED.
8.4.DEMOLITION, INSTALLATION, AND COMMISSIONING SERVICES: THE
CONTRACT LUMP SUM PRICE SHALL CONSTITUTE FULL COMPENSATION FOR
REMOVING AND PROPERLY DISPOSING OF SYSTEM COMPONENTS IDENTIFIED ON THE
PLANS. THESE COMPONENTS INCLUDE, BUT ARE NOT LIMITED TO, THE EXISTING
PUMPS, MOTORS, AND ANY NECESSARY PIPING/INSULATION TO ALLOW INSTALLATION
OF THE PROPOSED NEW HEATING WATER PUMPS.
IN ADDITION, INCLUDED IN THE BID ITEM IS FULL COMPENSATION FOR THE
INSTALLATION AND COMMISSIONING OF THE COMPLETE AND FULLY OPERATIONAL
HEATING WATER SYSTEM. THIS INCLUDES THE INSTALLATION OF ALL MATERIALS
PURCHASED IN ORDER TO MAKE THE SYSTEM OPERATIONAL, INCLUDING CONTROL
VALVES, AND VARIABLE FREQUENCY DRIVERS. THIS ITEM INCLUDES MAKING REPAIRS
TO ITEMS THAT WERE DAMAGED/MODIFIED DURING CONSTRUCTION ACTIVITIES, SUCH
AS INSULATION REMOVAL. THIS INCLUDES LABOR COST TO PERFORM WORK ON
NIGHTS OR WEEKEND HOURS IF NECESSARY.
THIS DOES NOT INCLUDE THE PROGRAMMING EFFORTS TO ALLOW FOR HEATING
WATER SYSTEM CONTROL COMMUNICATIONS WITH CONTROL VALVES, FREQUENCY
DRIVERS AND BOILER CONTROL SOFTWARE.
8.5. ANCILLARY MATERIALS: THE CONTRACT LUMP SUM PRICE SHALL
CONSTITUTE FULL COMPENSATION FOR PURCHASING AND DELIVERING ALL MATERIALS
NOT PROVIDED WITH THE EQUIPMENT PURCHASES NOTED ABOVE, BUT THAT ARE
REQUIRED IN ORDER TO PROVIDE CLIENT WITH A COMPLETE AND FULLY
OPERATIONAL SYSTEM. THIS SHALL INCLUDE, BUT MAY NOT BE LIMITED TO,
ISOLATION VALVES, PIPE SPOOLS, AND FITTINGS TO TIE PUMPS INTO EXISTING
SYSTEM, CONSTRUCTION CONSUMABLES, INSULATION, ETC. THE CONTRACT PRICE
SHALL INCLUDE ALL TAXES, FEES, AND MARK-UPS REQUIRED TO DELIVER TO CLIENT'S
FACILITY WHERE THE MATERIAL WILL BE INSTALLED AND WARRANTIED.
8.6.PROGRAMMING FOR BOILER/CONTROL VALVE/PUMP DRIVER
COMMUNICATION - THE LUMP SUM CONTRACT PRICE SHALL CONSTITUTE FULL
COMPENSATION FOR THE PROGRAMMING OF BOILER-CONTROL VALVE-VFD
COMMUNICATIONS. THIS SHALL PROVIDE A COMPLETELY CONTROLLED AND
OPERATIONAL HEATING SYSTEM THAT CAN BE COMMISSIONED BY A FACTORY
AUTHORIZED REPRESENTATIVE AND BASIC TRAINING TO INSTRUCT THE FACILITIES
MAINTENANCE PERSONNEL HOW TO OPERATE THE BOILER AND CONTROLS IN AN
EMERGENCY SITUATIONS. BOILERS SHALL BE TURNED OVER TO FACILITY
MANAGEMENT IN A WORKING STATE. THIS INCLUDES LABOR COST TO PERFORM
WORK ON NON-PEAK OR WEEKEND HOURS IF NECESSARY.
AutoCAD SHX Text Date
AutoCAD SHX Text 16505
CROW RESERVATION
CROW AGENCY, MONTANA
26/03/2020 VARIES
MICHAEL JENSEN, P.E. BC 13
VA
RI
ES
CR
O W
P U
M
PS
R
EP
LA
CE
M
EN
T
CR
O W
/N O
RT
HE
RN
C
HE
YE
N N
E
HO
SP
IT
AL
CR
O
W /N
O
RT
HE
RN
C
HE
YE
N
N E
HO
SP
IT
AL
CR
O
W R
ES
ER
VA
TI
O N
CR
O
W A
GE
N
CY
, M
O N
TA
N
A
ENGINEER:
BOILER ROOM FLOOR PLAN
SH
DRAWN BY:
DATE: PROJECT NUMBER:
DEPARTMENT OF HEALTH & HUMAN SERVICES
U.S.PUBLIC HEALTH SERVICE
BILLINGS AREA INDIAN HEALTH SERVICE
P.O. BOX 36600
2900 4TH AVE. NORTH
BILLINGS, MT 59107
OF
REVISIONS
# DESCRIPTIONDATE BY
SH
EE
T
PR
O
JE
CT
PL
AN
V
IE
W
- B O
IL
ER
R O
O M
DOMESTIC BOOSTER PUMPS
SEE SHEETS 7-8
FIRE SUPPRESSION SYSTEM
SEE SHEETS 10-11
HOT WATER CIRCULATION SYSTEM
SEE SHEETS 5-6
SOFTENED COLD WATER SYSTEM
SEE SHEET 9
Equipment Panel Location Description Circuit # Breaker Amps Fed From Fire Pump 1E2H B-162 Electrical Closet 20 N/A 1E1DP
Jockey Pump * 1E3L * C-109 * Main Floor Pharmacy
Area * 35 * 20 * 1E2L * Domestic Booster Pump 1 1E1DP B-162 Electrical Closet 20 15 MDP Domestic Booster Pump 2 1E1DP B-163 Electrical Closet 20 15 MDP Hot Water Circ Pump 1 1E2H B-162 Electrical Closet 13 25 1E1DP Hot Water Circ Pump 2 1E2H B-163 Electrical Closet 19 25 1E1DP
ASSOCIATED ELECTRICAL EQUIPMENT LOCATIONS AND INFORMATION
NOTE: JOCKEY PUMP LOCATION AND PANEL INFORMATION NOT FIELD VERIFIED AND IS BASED ON
PLAN INFORMATION ONLY.
AutoCAD SHX Text Date
AutoCAD SHX Text 16505
AutoCAD SHX Text 04/14/2020
AutoCAD SHX Text
AutoCAD SHX Text
TRUE
AutoCAD SHX Text
NORTH
AutoCAD SHX Text 4'
AutoCAD SHX Text 2'
AutoCAD SHX Text 8'
AutoCAD SHX Text 12'
AutoCAD SHX Text
ENLARGED BOILER ROOM PLAN
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
CWS
AutoCAD SHX Text
CWR
AutoCAD SHX Text
TUBE REMOVAL
AutoCAD SHX Text
AREA
AutoCAD SHX Text
FOS
AutoCAD SHX Text
FOV
AutoCAD SHX Text
NG
AutoCAD SHX Text
FOS
AutoCAD SHX Text
FOV
AutoCAD SHX Text
HWP-2
AutoCAD SHX Text
HWP-1
AutoCAD SHX Text
AS-1
AutoCAD SHX Text
FUEL OIL
AutoCAD SHX Text
VENT
AutoCAD SHX Text
PANEL
AutoCAD SHX Text
F.P. PANEL
AutoCAD SHX Text
DCBFP-1
AutoCAD SHX Text
FS-3
AutoCAD SHX Text
FD-3
AutoCAD SHX Text
HW
AutoCAD SHX Text
HWC
AutoCAD SHX Text
(140)HW
AutoCAD SHX Text
(140)HWC
AutoCAD SHX Text
CW
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text
NG
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text 5'-0"
AutoCAD SHX Text
CW
AutoCAD SHX Text
POC SITE
AutoCAD SHX Text
UTILITIES
AutoCAD SHX Text
6" F (UG)
AutoCAD SHX Text
4" CW (OH)
AutoCAD SHX Text
COIL PULL
AutoCAD SHX Text
AREA
AutoCAD SHX Text
COIL PULL
AutoCAD SHX Text
AREA
AutoCAD SHX Text
CHILLER NO. 1
AutoCAD SHX Text
FOS
AutoCAD SHX Text
FOV
AutoCAD SHX Text
NG
AutoCAD SHX Text
NG
AutoCAD SHX Text
CWP-2
AutoCAD SHX Text
CWP-1
AutoCAD SHX Text
AutoCAD SHX Text
SALT
AutoCAD SHX Text
STOR.
AutoCAD SHX Text
SALT
AutoCAD SHX Text
STOR.
AutoCAD SHX Text
CW
AutoCAD SHX Text
CW
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FD-3
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BRINE
AutoCAD SHX Text
SCW
AutoCAD SHX Text
WF-1
AutoCAD SHX Text
WS-1
AutoCAD SHX Text
HWH-1
AutoCAD SHX Text
COORDINATE PIPE CONNECTION
AutoCAD SHX Text
POINTS W/MFGR. SHOP DWGS.
AutoCAD SHX Text
(2) RPBFP-1
AutoCAD SHX Text
WH-1
AutoCAD SHX Text
BP-1
AutoCAD SHX Text
FUEL OIL
AutoCAD SHX Text
GAUGE
AutoCAD SHX Text
FIRE DEPARTMENT
AutoCAD SHX Text
CONNECTION
AutoCAD SHX Text
AutoCAD SHX Text C6.1
AutoCAD SHX Text
WH-1
AutoCAD SHX Text
CW
AutoCAD SHX Text
2" RISER W/SOV
AutoCAD SHX Text
& DRAIN
AutoCAD SHX Text
PVB-1 @ 24"
AutoCAD SHX Text
ABOVE GRADE
AutoCAD SHX Text
CW
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
TANK
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PIPING CONT.
AutoCAD SHX Text
ON SHEET P4.2
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text
FIRE PUMP
AutoCAD SHX Text
FLOW TEST
AutoCAD SHX Text
CONNECTION
AutoCAD SHX Text S-11
AutoCAD SHX Text S-11
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AUX CHILLER
AutoCAD SHX Text
CONTROL PANEL
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AS-2
AutoCAD SHX Text
AutoCAD SHX Text 1 1/4 "
AutoCAD SHX Text 1 1/4 "
AutoCAD SHX Text 3/4 "
AutoCAD SHX Text 1/2 "
AutoCAD SHX Text 1/2 "
AutoCAD SHX Text 1 1/4 "
AutoCAD SHX Text
AutoCAD SHX Text
FOP-1
AutoCAD SHX Text
FOP-2
AutoCAD SHX Text
AutoCAD SHX Text
FOS
AutoCAD SHX Text
FOV
AutoCAD SHX Text
MONITORING WELL W/
AutoCAD SHX Text
24" SQ. CONCRETE
AutoCAD SHX Text
PAD AT GRADE
AutoCAD SHX Text
INTERSTITIAL SENSOR
AutoCAD SHX Text
W/ 24" SQ. CONCRETE
AutoCAD SHX Text
PAD AT GRADE
AutoCAD SHX Text 10'-0"
AutoCAD SHX Text
8 FOOT
AutoCAD SHX Text
SERVICE ACCESS
AutoCAD SHX Text
TPV
AutoCAD SHX Text
AutoCAD SHX Text 3"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 4"
AutoCAD SHX Text 3"
AutoCAD SHX Text
AutoCAD SHX Text
TO FIRE SPRINKLER
AutoCAD SHX Text
SYSTEM (TYP.)
AutoCAD SHX Text
FOS, FOV & FOG
AutoCAD SHX Text
LINES IN 10" DIA.
AutoCAD SHX Text
PVC CONDUIT
AutoCAD SHX Text
FD-3
AutoCAD SHX Text
FD-3
AutoCAD SHX Text
AutoCAD SHX Text
CONT. ON
AutoCAD SHX Text
SHT P8.2
AutoCAD SHX Text
AutoCAD SHX Text
FIRE PUMP
AutoCAD SHX Text
SEE 7/P5.1
AutoCAD SHX Text
FD-3
AutoCAD SHX Text
4" CW
AutoCAD SHX Text
POC, 2" CW
AutoCAD SHX Text
STUBOUT FOR
AutoCAD SHX Text
LANDSCAPING
AutoCAD SHX Text
RPBFP-2
AutoCAD SHX Text
AutoCAD SHX Text P6.1
AutoCAD SHX Text
BRICK WALL
AutoCAD SHX Text
4" OF 3/4" DIA. MINUS GRAVEL
AutoCAD SHX Text
OVER COMPACTED SUB-GRADE
AutoCAD SHX Text
WATER MAIN
AutoCAD SHX Text
SUPPLY
AutoCAD SHX Text D
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text
RISE UP
AutoCAD SHX Text
OVERHEAD
AutoCAD SHX Text D
AutoCAD SHX Text
SCW
AutoCAD SHX Text
3/4" CW (UG) TO
AutoCAD SHX Text
INCINERATOR BUILDING.
AutoCAD SHX Text
CONT. ON P2.0
AutoCAD SHX Text
JOCKEY
AutoCAD SHX Text
PUMP
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text
UNDERGROUND
AutoCAD SHX Text
NATURAL GAS
AutoCAD SHX Text
SERVICE BY
AutoCAD SHX Text
UTILITY COMPANY
AutoCAD SHX Text 2 1/2 "
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(695 MBH)
AutoCAD SHX Text
(14,400 MBH)
AutoCAD SHX Text 2 1/2"
AutoCAD SHX Text M
AutoCAD SHX Text
AutoCAD SHX Text
BOILER B-3
AutoCAD SHX Text
FOS
AutoCAD SHX Text
FOV
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FD-3
AutoCAD SHX Text
NG
AutoCAD SHX Text
NG
AutoCAD SHX Text
NG
AutoCAD SHX Text
FD-3
AutoCAD SHX Text
AutoCAD SHX Text
BOILER B-1
AutoCAD SHX Text
XT-2
AutoCAD SHX Text 1 1/2"
AutoCAD SHX Text B143
AutoCAD SHX Text
BOILER B-2
2.5"
CROW RESERVATION
CROW AGENCY, MONTANA
26/03/2020 VARIES
MICHAEL JENSEN, P.E. BC 13
VA
RI
ES
CR
O W
P U
M
PS
R
EP
LA
CE
M
EN
T
CR
O W
/N O
RT
HE
RN
C
HE
YE
N N
E
HO
SP
IT
AL
CR
O
W /N
O
RT
HE
RN
C
HE
YE
N
N E
HO
SP
IT
AL
CR
O
W R
ES
ER
VA
TI
O N
CR
O
W A
GE
N
CY
, M
O N
TA
N
A
TO DOMESTIC
WATER PUMP
ENGINEER:
FLOW DIAGRAM
SH
DRAWN BY:
DATE: PROJECT NUMBER:
DEPARTMENT OF HEALTH & HUMAN SERVICES
U.S.PUBLIC HEALTH SERVICE
BILLINGS AREA INDIAN HEALTH SERVICE
P.O. BOX 36600
2900 4TH AVE. NORTH
BILLINGS, MT 59107
OF
REVISIONS
# DESCRIPTIONDATE BY
SH
EE
T
PR
O
JE
CT
FL
O W
D
IA
GR
AM
DOMESTIC BOOSTER PUMPS
SEE SHEETS 7-8
FIRE SUPPRESSION SYSTEM
SEE DETAIL AND SHEETS 10-11
HOT WATER CIRCULATION SYSTEM
SEE SHEETS 5-6
SOFTENED COLD WATER SYSTEM
SEE SHEET 9
MUNICIPAL SERVICE
SEE DETAIL
MUNICIPAL SERVICE DETAIL
FIRE SPRINKLER RISER DIAGRAM DETAIL
AutoCAD SHX Text Date
AutoCAD SHX Text 16505
AutoCAD SHX Text 04/14/2020
AutoCAD SHX Text
METER
AutoCAD SHX Text
CB-3
AutoCAD SHX Text
CB-2
AutoCAD SHX Text
CB-1
AutoCAD SHX Text
SW-1
AutoCAD SHX Text
SW-2
AutoCAD SHX Text
STOR
AutoCAD SHX Text
VFD
AutoCAD SHX Text
VFD
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FIRE DEPT. CONNECTION
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TO SPRINKLER SYSTEM (TYP.)
AutoCAD SHX Text
2" DRAIN (TYP.)
AutoCAD SHX Text
PRESSURE GAUGE & VALVE (TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SUPERVISED INDICATING SHUT-OFF VALVE (TYP.)
AutoCAD SHX Text
SHUT-OFF VALVE
AutoCAD SHX Text
CONCENTRIC REDUCER
AutoCAD SHX Text
FIRE PUMP TEST CONNECTION
AutoCAD SHX Text
FIRE PUMP AND ACCESSORIES- TO BE REPLACED
AutoCAD SHX Text
ECCENTRIC REDUCER
AutoCAD SHX Text
DOUBLE CHECK BACKFLOW PREVENTER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PIPING UNDERGROUND
AutoCAD SHX Text
TO INCINERATOR BLDG.
AutoCAD SHX Text
LONG SWEEP
AutoCAD SHX Text
ELBOW
AutoCAD SHX Text
SEAL FLOOR
AutoCAD SHX Text
PENETRATION
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
SEAL WALL
AutoCAD SHX Text
PENETRATION
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
TO WATER MAIN
AutoCAD SHX Text
NOT USED
AutoCAD SHX Text
ALARM CHECK VALVE W/ACCESSORIES (TYP.)
AutoCAD SHX Text
CHECK VALVE W/AUTO DRIP TO DRAIN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ISOLATION VALVE- TO BE REPLACED
AutoCAD SHX Text
AutoCAD SHX Text
CHECK VALVE- TO BE REPLACED
AutoCAD SHX Text
RPBFP-1
AutoCAD SHX Text
AGF
AutoCAD SHX Text
RPBFP-1
AutoCAD SHX Text
AGF
AutoCAD SHX Text
CW
AutoCAD SHX Text
DCBFP-1
AutoCAD SHX Text
CW
AutoCAD SHX Text 24"
AutoCAD SHX Text 62"
AutoCAD SHX Text 14'
AutoCAD SHX Text
EXTERIOR
AutoCAD SHX Text
WALL
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text
FD-3
AutoCAD SHX Text
2" AIR GAP
AutoCAD SHX Text
PIPE BRACE
AutoCAD SHX Text
TO FIRE BOOSTER
AutoCAD SHX Text
PUMP
AutoCAD SHX Text
8" WATER
AutoCAD SHX Text
MAIN
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text 38"
AutoCAD SHX Text 36"
AutoCAD SHX Text 2"
AutoCAD SHX Text 18"
AutoCAD SHX Text C
AutoCAD SHX Text
SLEEVE W/SEALS
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text 3"
AutoCAD SHX Text 4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text
PVB-1
AutoCAD SHX Text
DRAIN &
AutoCAD SHX Text
CAP
AutoCAD SHX Text
THRUST
AutoCAD SHX Text
BLOCK
AutoCAD SHX Text M
AutoCAD SHX Text
WATER
AutoCAD SHX Text
METER
AutoCAD SHX Text
THRUST
AutoCAD SHX Text
BLOCK
AutoCAD SHX Text 4"
AutoCAD SHX Text 8"
6"
PROJECT DESCRIPTION
CROW RESERVATION
CROW AGENCY, MONTANA
26/03/2020 BI20CR201H6
MICHAEL JENSEN, P.E. BC 13
BI
CR
1H
CR
O
W P
U M
PS
R
EP
LA
CE
M
EN
T
CR
O
W /N
O
RT
HE
RN
C
HE
YE
N
N E
HO
SP
IT
AL
CR
O
W /N
O
RT
HE
RN
C
HE
YE
N
N E
HO
SP
IT
AL
CR
O
W R
ES
ER
VA
TI
O N
CR
O
W A
GE
N
CY
, M
O N
TA
N
A
ENGINEER:
HWC ISOLATION PLAN
SH
DRAWN BY:
DATE: PROJECT NUMBER:
DEPARTMENT OF HEALTH & HUMAN SERVICES
U.S.PUBLIC HEALTH SERVICE
BILLINGS AREA INDIAN HEALTH SERVICE
P.O. BOX 36600
2900 4TH AVE. NORTH
BILLINGS, MT 59107
OF
REVISIONS
# DESCRIPTIONDATE BY
SH
EE
T
PR
O
JE
CT
EX
IS
TI
N G
HO
T
W
AT
ER
C
IR
CU
LA
TI
O N
S
YS
TE
M
CLOSE SHUT OFF VALVES ON
DISCHARGE SIDE OF BOILERS
DRAIN SYSTEM THROUGH TRIPLE DUTY
VALVES LOCATED ON DISCHARGE SIDE
OF PUMPS
NOTES:
1. CONTRACTOR TO DISPOSE OF CURRENT SYSTEM FLUIDS AND REPLACE WITH
APPROXIMATELY 2,000 GALLONS OF 30% GLYCOL MIXTURE.
2. THERE IS AN OWNER-INSTALLED BYPASS AROUND AIR HANDLER #5. CONTRACTOR IS
RESPONSIBLE FOR OPERATING AND MAINTAINING THIS BYPASS HEATING LOOP FOR THE
DURATION OF SYSTEM DOWN TIME. SEE FIGURE 1, THIS SHEET.
3. CONTRACTOR TO AVOID ANY SYSTEM OUTAGES DURING SURGICAL TIMES.
CONTRACTOR TO COORDINATE WITH THE FACILITY MANAGER TO SCHEDULE ALL WORK.
4. HEATING SYSTEM WATER MUST BE REPLACED WITH WATER THAT MEETS OR EXCEEDS
WATER QUALITY STANDARDS SPECIFIED ON TABLE 6.1.
TRIPLE DUTY VALVE
BUTTERFLY VALVE-
DISCHARGE SIDE OF BOILER
PLAN VIEW: BOILER ROOM
FIGURE 2: CONDENSING BOILER SUPPLY AND DISCHARGE
FIGURE 3: HWC PUMP AND TRIPLE DUTY VALVE
PLAN VIEW: ROOM B224 AND AHU #5
FIGURE 1: BACK UP HEATING UNIT
DIAGRAM: EXISTING HWC
TABLE 6.1: WATER QUALITY STANDARDS
AutoCAD SHX Text Date
AutoCAD SHX Text 16505
AutoCAD SHX Text 04/14/2020
AutoCAD SHX Text
CB-3
AutoCAD SHX Text
CB-2
AutoCAD SHX Text
CB-1
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWP-2
AutoCAD SHX Text
HWP-1
AutoCAD SHX Text
COIL PULL
AutoCAD SHX Text
AREA
AutoCAD SHX Text
CWP-2
AutoCAD SHX Text
CWP-1
AutoCAD SHX Text
AutoCAD SHX Text
SALT
AutoCAD SHX Text
STOR.
AutoCAD SHX Text
AutoCAD SHX Text
FD-3
AutoCAD SHX Text
AutoCAD SHX Text
BRINE
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AUX CHILLER
AutoCAD SHX Text
CONTROL PANEL
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AS-2
AutoCAD SHX Text
FD-3
AutoCAD SHX Text
FOS
AutoCAD SHX Text
FOV
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FD-3
AutoCAD SHX Text
NG
AutoCAD SHX Text
BOILER B-1
AutoCAD SHX Text
BOILER B-2
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text 4-4
AutoCAD SHX Text
AHU-2
AutoCAD SHX Text
AHU-5
AutoCAD SHX Text 30X24
AutoCAD SHX Text
RAF-2
AutoCAD SHX Text I
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 30X24
AutoCAD SHX Text
LCEF-1
AutoCAD SHX Text 26X24
AutoCAD SHX Text
RISE
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text 40X18
AutoCAD SHX Text
HEF-13
AutoCAD SHX Text 12X10
AutoCAD SHX Text 14X12
AutoCAD SHX Text 14X12
AutoCAD SHX Text
HEF-12
AutoCAD SHX Text
HEF-11
AutoCAD SHX Text
HEF-10
AutoCAD SHX Text 8X8
AutoCAD SHX Text 6X12
AutoCAD SHX Text 12X10
AutoCAD SHX Text 14X12
AutoCAD SHX Text 12X12
AutoCAD SHX Text
HEF-9
AutoCAD SHX Text
HEF-8
AutoCAD SHX Text 12X12
AutoCAD SHX Text
HEF-7
AutoCAD SHX Text 18X12
AutoCAD SHX Text 18X12
AutoCAD SHX Text
HEF-5
AutoCAD SHX Text
HEF-6
AutoCAD SHX Text 8X8
AutoCAD SHX Text 8X8
AutoCAD SHX Text 6X12
AutoCAD SHX Text 18X10
AutoCAD SHX Text 24X24
AutoCAD SHX Text 6X12
AutoCAD SHX Text 8X12
AutoCAD SHX Text
HEF-3
AutoCAD SHX Text 30X20
AutoCAD SHX Text
ALUM.
AutoCAD SHX Text
ALUM.
AutoCAD SHX Text
ALUM.
AutoCAD SHX Text H-6
AutoCAD SHX Text H-5
AutoCAD SHX Text 16X16
AutoCAD SHX Text 14X12
AutoCAD SHX Text H-3
AutoCAD SHX Text H-4
AutoCAD SHX Text
ALUM.
AutoCAD SHX Text
ALUM.
AutoCAD SHX Text H-2
AutoCAD SHX Text
30X24 RELIEF
AutoCAD SHX Text
DAMPER
AutoCAD SHX Text
30X30 UP
AutoCAD SHX Text
TO RH-4
AutoCAD SHX Text
HEF-4
AutoCAD SHX Text
CONT. ON PART.
AutoCAD SHX Text
PLAN BELOW
AutoCAD SHX Text
30X24 DOWN
AutoCAD SHX Text
72X30 RTN
AutoCAD SHX Text
CONN. TO
AutoCAD SHX Text
PLENUM
AutoCAD SHX Text 18X18
AutoCAD SHX Text A.D.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 12X14
AutoCAD SHX Text B
AutoCAD SHX Text M3.4
AutoCAD SHX Text M3.4
AutoCAD SHX Text M3.4
AutoCAD SHX Text (2)4X8
AutoCAD SHX Text
LOUVER,
AutoCAD SHX Text L-1
AutoCAD SHX Text (2)4X8
AutoCAD SHX Text
LOUVER,
AutoCAD SHX Text L-1
AutoCAD SHX Text
TRANS TO.
AutoCAD SHX Text 24X30
AutoCAD SHX Text 12X8
AutoCAD SHX Text
36X22 RTN
AutoCAD SHX Text
FRM BELOW
AutoCAD SHX Text
HEF-1
AutoCAD SHX Text
AFMS-3
AutoCAD SHX Text 72X48
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 48X30
AutoCAD SHX Text M3.3
AutoCAD SHX Text
LCEF-1
AutoCAD SHX Text
AHU-5
AutoCAD SHX Text
AHU-2
AutoCAD SHX Text
RAF-2
AutoCAD SHX Text
FAN
AutoCAD SHX Text
FILTER
AutoCAD SHX Text
AutoCAD SHX Text
COILS
AutoCAD SHX Text
FAN
AutoCAD SHX Text
FILTER
AutoCAD SHX Text
ZONE-4 (1300 CFM)
AutoCAD SHX Text
ZONE-3 (350 CFM)
AutoCAD SHX Text
ZONE-2 (350 CFM)
AutoCAD SHX Text 12X6
AutoCAD SHX Text 12X6
AutoCAD SHX Text
ZONE-6 (1820 CFM)
AutoCAD SHX Text
ZONE-5 (1185 CFM)
AutoCAD SHX Text
ZONE-11 (600 CFM)
AutoCAD SHX Text
ZONE-10 (1000 CFM)
AutoCAD SHX Text
ZONE-9 (360 CFM)
AutoCAD SHX Text
ZONE-8 (1000 CFM)
AutoCAD SHX Text
ZONE-7 (820 CFM)
AutoCAD SHX Text
UP
AutoCAD SHX Text
SEE PARTIAL UPPER
AutoCAD SHX Text
PLAN OF THIS
AutoCAD SHX Text
AREA BELOW
AutoCAD SHX Text M
AutoCAD SHX Text 30X24
AutoCAD SHX Text
AutoCAD SHX Text
CONT. ON
AutoCAD SHX Text M2.3
AutoCAD SHX Text
AutoCAD SHX Text M3.4
AutoCAD SHX Text
FILTER
AutoCAD SHX Text
FAN
AutoCAD SHX Text
HT REC COIL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text M4.3
AutoCAD SHX Text
(TYP)
AutoCAD SHX Text
CONT. ON
AutoCAD SHX Text
SHEET M2.5
AutoCAD SHX Text 14X8
AutoCAD SHX Text
COIL PULL
AutoCAD SHX Text
KEEP CLEAR
AutoCAD SHX Text
RETURN
AutoCAD SHX Text
DAMPER
AutoCAD SHX Text H-1
AutoCAD SHX Text
12X8 ALUM.
AutoCAD SHX Text
RAF-2 VFD
AutoCAD SHX Text
AHU-2 VFD
AutoCAD SHX Text
EMCS
AutoCAD SHX Text
AHU-5
AutoCAD SHX Text
STARTER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 30X22
AutoCAD SHX Text
RETURN DAMPER
AutoCAD SHX Text
ELECTRIC STEAM
AutoCAD SHX Text
GENERATOR ESG-1
AutoCAD SHX Text
30X20 AHU-6 SUPPLY
AutoCAD SHX Text
DUCT DOWN THRU FLOOR.
AutoCAD SHX Text
FD AT FLOOR
AutoCAD SHX Text
AD
AutoCAD SHX Text
AD
AutoCAD SHX Text
12X12 AD ON BTM
AutoCAD SHX Text
SIDE OF DUCT AT
AutoCAD SHX Text
EACH HUMIDIFIER
AutoCAD SHX Text
AD
AutoCAD SHX Text
AD
AutoCAD SHX Text
AD
AutoCAD SHX Text
AD
AutoCAD SHX Text
KEEP DUCTS & PIPING AWAY
AutoCAD SHX Text
FROM ELECTRICAL EQUIPMENT
AutoCAD SHX Text
AHU-6
AutoCAD SHX Text
STARTER
AutoCAD SHX Text
LCEF-1
AutoCAD SHX Text
STARTER
AutoCAD SHX Text
STEAM GENERATOR
AutoCAD SHX Text
FOR STEAM GUN, SEE DIV. 11700
AutoCAD SHX Text
AutoCAD SHX Text
(TYP)
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text 36"X24"
AutoCAD SHX Text F.O.
AutoCAD SHX Text
UNIT HEATER
AutoCAD SHX Text
AT CEILING
AutoCAD SHX Text
SEE P8.5
AutoCAD SHX Text 12x18 A.D.
AutoCAD SHX Text
IN BTM.
AutoCAD SHX Text
RISE
AutoCAD SHX Text B224
B234
CROW RESERVATION
CROW AGENCY, MONTANA
26/03/2020 BI20CR201H6
MICHAEL JENSEN, P.E. BC 13
VA
RI
ES
CR
O W
P U
M
PS
R
EP
LA
CE
M
EN
T
CR
O W
/N O
RT
HE
RN
C
HE
YE
N N
E
HO
SP
IT
AL
CR
O
W /N
O
RT
HE
RN
C
HE
YE
N
N E
HO
SP
IT
AL
CR
O
W R
ES
ER
VA
TI
O N
CR
O
W A
GE
N
CY
, M
O N
TA
N
A
ENGINEER:
NEW EQUIPMENT- HWC
SH
DRAWN BY:
DATE: PROJECT NUMBER:
DEPARTMENT OF HEALTH & HUMAN SERVICES
U.S.PUBLIC HEALTH SERVICE
BILLINGS AREA INDIAN HEALTH SERVICE
P.O. BOX 36600
2900 4TH AVE. NORTH
BILLINGS, MT 59107
OF
REVISIONS
# DESCRIPTIONDATE BY
SH
EE
T
PR
O
JE
CT
HO
T W
AT
ER
C
IR
CU
LA
TI
O
N N
EW
E
Q U
IP
M
EN
T
REPLACE TRIPLE DUTY AND EXISTING
BUTTERFLY VALVE AT BOTH PUMPS WITH 6"
MILWAUKEE HP1LSS WITH LEVER HANDLE
OR APPROVED EQUAL. SEE FIGURE 1.
REPLACE CURRENT PUMPS WITH THE
CIRCULATING PUMPS SHOWN IN FIGURE B.
UPGRADE CURRENT ENVI
CONTROL SOFTWARE PACKAGE
ON CONDENSING BOILERS TO
NURO CONTROL SOFTWARE
INSTALL BELIMO MOTORIZED CONTROL VALVE
SHOWN IN FIGURE 2, OR APPROVED EQUAL IN
FRONT OF ALL BOILER ISOLATION VALVES.
FIGURE 1: 6" MILWAUKEE, OR APPROVED
EQUAL, BUTTERFLY VALVE
NOTES:
1. CONTRACTOR RESPONSIBLE FOR REPLACING ANY
DAMAGED PIPE INSULATION. INSULATION SHALL BE 2"
THICK OWENS CORNING FIBERGLASS INSULATION OR
APPROVED EQUAL.
2. SEE NOTES SECTION, SHEET 3 FOR FURTHER
DETAILS.
PLAN VIEW: BOILER ROOM
FIGURE 2: BELLIMO, OR APPROVED EQUAL,
CONTROL VALVE
DIAGRAM: NEW HWC SYSTEM
AutoCAD SHX Text Date
AutoCAD SHX Text 16505
AutoCAD SHX Text 04/14/2020
AutoCAD SHX Text
CB-3
AutoCAD SHX Text
CB-2
AutoCAD SHX Text
CB-1
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text
VFD
AutoCAD SHX Text
VFD
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWP-2
AutoCAD SHX Text
HWP-1
AutoCAD SHX Text
COIL PULL
AutoCAD SHX Text
AREA
AutoCAD SHX Text
CHILLER NO. 1
AutoCAD SHX Text
CWP-2
AutoCAD SHX Text
CWP-1
AutoCAD SHX Text
AutoCAD SHX Text
SALT
AutoCAD SHX Text
STOR.
AutoCAD SHX Text
SALT
AutoCAD SHX Text
AutoCAD SHX Text
FD-3
AutoCAD SHX Text
AutoCAD SHX Text
BRINE
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AUX CHILLER
AutoCAD SHX Text
CONTROL PANEL
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AS-2
AutoCAD SHX Text
FD-3
AutoCAD SHX Text
FOS
AutoCAD SHX Text
FOV
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FD-3
AutoCAD SHX Text
NG
AutoCAD SHX Text
BOILER B-1
AutoCAD SHX Text
XT-2
BOILER B-2
CROW RESERVATION
CROW AGENCY, MONTANA
26/03/2020 BI19CR202H6
MICHAEL JENSEN, P.E. BC 13
VA
RI
ES
CR
O W
P U
M
PS
R
EP
LA
CE
M
EN
T
CR
O W
/N O
RT
HE
RN
C
HE
YE
N N
E
HO
SP
IT
AL
CR
O
W /N
O
RT
HE
RN
C
HE
YE
N
N E
HO
SP
IT
AL
CR
O
W R
ES
ER
VA
TI
O N
CR
O
W A
GE
N
CY
, M
O N
TA
N
A
ENGINEER:
DOMESTIC BOOSTER ISOLATION
SH
DRAWN BY:
DATE: PROJECT NUMBER:
DEPARTMENT OF HEALTH & HUMAN SERVICES
U.S.PUBLIC HEALTH SERVICE
BILLINGS AREA INDIAN HEALTH SERVICE
P.O. BOX 36600
2900 4TH AVE. NORTH
BILLINGS, MT 59107
OF
REVISIONS
# DESCRIPTIONDATE BY
SH
EE
T
PR
O
JE
CT
DO
M
ES
TI
C
BO
O
ST
ER
P U
M P
IS
O
LA
TI
O N
CLOSE SHUT OFF VALVES
OPEN BYPASS VALVE
NOTES:
1. IF SYSTEM IS DOWN FOR MORE THAN 2 HOURS,
CONTRACTOR MUST PROVIDE PLAN AND OBTAIN
APPROVAL FROM THE FACILITY MANAGER THAT
MITIGATES EXTENDED DOWNTIME.
2. SYSTEM OUTAGES SHOULD BE KEPT TO NON-PEAK
HOURS. CONTRACTOR TO COORDINATE WITH FACILITY
MANAGER FOR SCHEDULING.
PLAN VIEW: BOILER ROOM
FIGURE 3: EXISTING BOOSTER PUMP SKID AND CONTROLS
DIAGRAM: EXISTING DOMESTIC BOOSTER FLOW
FIGURE 1: SHUT OFF VALVES
FIGURE 2: BYPASS VALVE
AutoCAD SHX Text Date
AutoCAD SHX Text 16505
AutoCAD SHX Text 04/14/2020
AutoCAD SHX Text
METER
AutoCAD SHX Text
VFD
AutoCAD SHX Text
VFD
AutoCAD SHX Text
PANEL
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text
6" F (UG)
AutoCAD SHX Text
4" CW (OH)
AutoCAD SHX Text
CW
AutoCAD SHX Text
BP-1
AutoCAD SHX Text
FIRE PUMP
AutoCAD SHX Text
FLOW TEST
AutoCAD SHX Text
CONNECTION
AutoCAD SHX Text
AutoCAD SHX Text 1 1/4 "
AutoCAD SHX Text 3/4 "
AutoCAD SHX Text 1/2 "
AutoCAD SHX Text
FIRE PUMP
AutoCAD SHX Text
SEE 7/P5.1
AutoCAD SHX Text
FD-3
AutoCAD SHX Text
4" CW
AutoCAD SHX Text 4"
4"
CROW RESERVATION
CROW AGENCY, MONTANA
26/03/2020 BI19CR202H6
MICHAEL JENSEN, P.E. BC 13
VA
RI
ES
CR
O W
P U
M
PS
R
EP
LA
CE
M
EN
T
CR
O W
/N O
RT
HE
RN
C
HE
YE
N N
E
HO
SP
IT
AL
CR
O
W /N
O
RT
HE
RN
C
HE
YE
N
N E
HO
SP
IT
AL
CR
O
W R
ES
ER
VA
TI
O N
CR
O
W A
GE
N
CY
, M
O N
TA
N
A
HERE
CONNECT TO DATA
LINES
ENGINEER:
NEW EQUIPMENT- DOMESTIC
SH
DRAWN BY:
DATE: PROJECT NUMBER:
DEPARTMENT OF HEALTH & HUMAN SERVICES
U.S.PUBLIC HEALTH SERVICE
BILLINGS AREA INDIAN HEALTH SERVICE
P.O. BOX 36600
2900 4TH AVE. NORTH
BILLINGS, MT 59107
OF
REVISIONS
# DESCRIPTIONDATE BY
SH
EE
T
PR
O
JE
CT
DO
M
ES
TI
C
BO
O
ST
ER
P U
M
PS
N
EW
E Q
U
IP
M
EN
T
INSTALL NEW PUMPS
AND CONTROLS
REPLACE ALL BYPASS AND
SHUT OFF VALVES
NOTES:
1. BYPASS AND CONTROL VALVES SHALL BE 4"
MILWAUKEE HPILSS BUTTERFLY VALVES WITH LEVER
HANDLE OR APPROVED EQUAL. SEE DETAIL ON SHEET
6.
2. CONTRACTOR RESPONSIBLE FOR REPLACING ANY
DAMAGED INSULATION WITH 2" THICK CORNING
FIBERGLASS PIPE INSULATION OR APPROVED EQUAL.
3. REPLACEMENT FLANGES WILL BE RATED FOR
ASME/ANSI B 16.5 PRESSURE CLASS 150 OR GREATER.
REPLACE REMOTE PRESSURE SENSOR
AT 2ND FLOOR NURSE'S STATION, LOCATED
ABOVE THE CEILING, TO BE COMPATIBLE
WITH NEW PUMP CONTROL
LOGIC
FIGURE 1: REMOTE PRESSURE SENSOR
PLAN VIEW: 2ND FLOOR NURSE'S STATION
PLAN VIEW: BOILER ROOM
DIAGRAM: NEW DOMESTIC BOOSTER FLOW
AutoCAD SHX Text Date
AutoCAD SHX Text 16505
AutoCAD SHX Text 04/14/2020
AutoCAD SHX Text
METER
AutoCAD SHX Text
VFD
AutoCAD SHX Text
VFD
AutoCAD SHX Text
PANEL
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text
6" F (UG)
AutoCAD SHX Text
4" CW (OH)
AutoCAD SHX Text
BP-1
AutoCAD SHX Text
FIRE PUMP
AutoCAD SHX Text
FLOW TEST
AutoCAD SHX Text
CONNECTION
AutoCAD SHX Text
AutoCAD SHX Text 1 1/4 "
AutoCAD SHX Text 3/4 "
AutoCAD SHX Text 1/2 "
AutoCAD SHX Text
FIRE PUMP
AutoCAD SHX Text
SEE 7/P5.1
AutoCAD SHX Text
FD-3
AutoCAD SHX Text
4" CW
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text
CW
AutoCAD SHX Text
HW
AutoCAD SHX Text
HW
AutoCAD SHX Text
HW
AutoCAD SHX Text
CW
AutoCAD SHX Text
HW
AutoCAD SHX Text
CW
AutoCAD SHX Text
CW
AutoCAD SHX Text
HW
AutoCAD SHX Text
HW
AutoCAD SHX Text
CW
AutoCAD SHX Text
CW
AutoCAD SHX Text
HW
AutoCAD SHX Text
CS-1
AutoCAD SHX Text S-1
AutoCAD SHX Text
SH-1
AutoCAD SHX Text
WC-1
AutoCAD SHX Text
WC-1
AutoCAD SHX Text
SH-1
AutoCAD SHX Text L-4
AutoCAD SHX Text
WC-1
AutoCAD SHX Text
SH-1
AutoCAD SHX Text L-4
AutoCAD SHX Text
WC-1
AutoCAD SHX Text
SH-1
AutoCAD SHX Text L-4
AutoCAD SHX Text
WC-1
AutoCAD SHX Text
SH-1
AutoCAD SHX Text L-4
AutoCAD SHX Text
SH-1
AutoCAD SHX Text
WC-2
AutoCAD SHX Text L-2
AutoCAD SHX Text L-1
AutoCAD SHX Text S-1
AutoCAD SHX Text
CS-1
AutoCAD SHX Text
SS-1
AutoCAD SHX Text
BT-3
AutoCAD SHX Text S-5
AutoCAD SHX Text S-1
AutoCAD SHX Text S-1
AutoCAD SHX Text
WC-2
AutoCAD SHX Text L-2
AutoCAD SHX Text
SS-1
AutoCAD SHX Text
WC-1
AutoCAD SHX Text
SH-1
AutoCAD SHX Text L-4
AutoCAD SHX Text
WC-1
AutoCAD SHX Text
SH-1
AutoCAD SHX Text L-4
AutoCAD SHX Text
WC-1
AutoCAD SHX Text
SH-1
AutoCAD SHX Text L-4
AutoCAD SHX Text
WC-1
AutoCAD SHX Text
SH-1
AutoCAD SHX Text L-4
AutoCAD SHX Text
WC-1
AutoCAD SHX Text
SH-1
AutoCAD SHX Text L-4
AutoCAD SHX Text
WC-1
AutoCAD SHX Text
SH-1
AutoCAD SHX Text L-4
AutoCAD SHX Text
WC-1
AutoCAD SHX Text
SH-1
AutoCAD SHX Text L-1
AutoCAD SHX Text
WC-2
AutoCAD SHX Text
SH-1
AutoCAD SHX Text L-2
AutoCAD SHX Text L-1
AutoCAD SHX Text
EWC-1
AutoCAD SHX Text
WC-2
AutoCAD SHX Text
SH-1
AutoCAD SHX Text L-2
AutoCAD SHX Text
AutoCAD SHX Text N.O.
AutoCAD SHX Text N.O.
AutoCAD SHX Text N.O.
AutoCAD SHX Text
SA-1
AutoCAD SHX Text
SA-1
AutoCAD SHX Text
SA-1
AutoCAD SHX Text
SA-1
AutoCAD SHX Text
SA-1
AutoCAD SHX Text
SA-1
AutoCAD SHX Text
SA-2
AutoCAD SHX Text
SA-1
AutoCAD SHX Text S-5
AutoCAD SHX Text S-4
AutoCAD SHX Text S-5
AutoCAD SHX Text
SA-1
AutoCAD SHX Text
SA-1
AutoCAD SHX Text
SA-1
AutoCAD SHX Text
SA-1
AutoCAD SHX Text
SA-1
AutoCAD SHX Text
SA-2
AutoCAD SHX Text
SA-1
AutoCAD SHX Text
SA-1
AutoCAD SHX Text
SA-1
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
3" CW
AutoCAD SHX Text
2-1/2" HW
AutoCAD SHX Text
PIPING CONT.
AutoCAD SHX Text
ON SHEET P3.5
AutoCAD SHX Text
AutoCAD SHX Text
2" CW
AutoCAD SHX Text
3/4" HW
AutoCAD SHX Text
1-1/2" CW
AutoCAD SHX Text
1/2" HW
AutoCAD SHX Text
AutoCAD SHX Text 3/4"
AutoCAD SHX Text
1" HW
AutoCAD SHX Text
AutoCAD SHX Text
(2) RPBFP-2
AutoCAD SHX Text
DRAIN TO
AutoCAD SHX Text
S-4 TAILPIECE
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
2-1/2" CW
AutoCAD SHX Text
2" HW
AutoCAD SHX Text
2" CW
AutoCAD SHX Text
3/4" HW
AutoCAD SHX Text
2" CW
AutoCAD SHX Text
3/4" HW
AutoCAD SHX Text
3" CW
AutoCAD SHX Text
2" HW
AutoCAD SHX Text
2-1/2" CW
AutoCAD SHX Text
2" HW
AutoCAD SHX Text 2-1/2"
AutoCAD SHX Text S-18
AutoCAD SHX Text
1-1/2" CW
AutoCAD SHX Text
SH-1
AutoCAD SHX Text
WC-1
AutoCAD SHX Text L-1
AutoCAD SHX Text
HW
AutoCAD SHX Text
CW
AutoCAD SHX Text
2" CW
AutoCAD SHX Text
1" HW
AutoCAD SHX Text 1/2"
AutoCAD SHX Text S-18
AutoCAD SHX Text A240
AutoCAD SHX Text A237
AutoCAD SHX Text A235
AutoCAD SHX Text A233
AutoCAD SHX Text A241
AutoCAD SHX Text A239
AutoCAD SHX Text A236
AutoCAD SHX Text A234
AutoCAD SHX Text A231
AutoCAD SHX Text A232
AutoCAD SHX Text A229
AutoCAD SHX Text A225
AutoCAD SHX Text A230
AutoCAD SHX Text A219
AutoCAD SHX Text A218
AutoCAD SHX Text A217
AutoCAD SHX Text A216
AutoCAD SHX Text A215
AutoCAD SHX Text A214
AutoCAD SHX Text A213
AutoCAD SHX Text A212
AutoCAD SHX Text A211
AutoCAD SHX Text A210
AutoCAD SHX Text A209
AutoCAD SHX Text A208
AutoCAD SHX Text A207
AutoCAD SHX Text A206
AutoCAD SHX Text A205
AutoCAD SHX Text A204
AutoCAD SHX Text A203
AutoCAD SHX Text A202
AutoCAD SHX Text A201
AutoCAD SHX Text A258
AutoCAD SHX Text A260
AutoCAD SHX Text A261
AutoCAD SHX Text A280
AutoCAD SHX Text A282
AutoCAD SHX Text A278
AutoCAD SHX Text A264
AutoCAD SHX Text A268
AutoCAD SHX Text A277
AutoCAD SHX Text A276
AutoCAD SHX Text A275
AutoCAD SHX Text A270
AutoCAD SHX Text A273
AutoCAD SHX Text A271
AutoCAD SHX Text A272
AutoCAD SHX Text A279
AutoCAD SHX Text A281
AutoCAD SHX Text A224
AutoCAD SHX Text A221
AutoCAD SHX Text A259
AutoCAD SHX Text A220
AutoCAD SHX Text A222
AutoCAD SHX Text A266
AutoCAD SHX Text A269
AutoCAD SHX Text A223
AutoCAD SHX Text A226
AutoCAD SHX Text A227
AutoCAD SHX Text A265
AutoCAD SHX Text A267
AutoCAD SHX Text A274
AutoCAD SHX Text A283
AutoCAD SHX Text A284
AutoCAD SHX Text
MATCHLINE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A201
AutoCAD SHX Text A203
AutoCAD SHX Text A205
AutoCAD SHX Text A206
AutoCAD SHX Text A207
AutoCAD SHX Text A208
AutoCAD SHX Text A210
AutoCAD SHX Text A211
AutoCAD SHX Text A220
AutoCAD SHX Text A221
AutoCAD SHX Text A222
AutoCAD SHX Text A223
AutoCAD SHX Text A224
AutoCAD SHX Text A225
AutoCAD SHX Text A226
AutoCAD SHX Text A228
AutoCAD SHX Text A229
AutoCAD SHX Text A231
AutoCAD SHX Text A232
AutoCAD SHX Text A233
AutoCAD SHX Text A234
AutoCAD SHX Text A235
AutoCAD SHX Text A236
AutoCAD SHX Text A237
AutoCAD SHX Text A238
AutoCAD SHX Text A239
NURSE OFFICE
CROW RESERVATION
CROW AGENCY, MONTANA
26/03/2020 BI18CR202H6
MICHAEL JENSEN, P.E. BC 13
VA
RI
ES
CR
O W
P U
M
PS
R
EP
LA
CE
M
EN
T
CR
O W
/N O
RT
HE
RN
C
HE
YE
N N
E
HO
SP
IT
AL
CR
O
W /N
O
RT
HE
RN
C
HE
YE
N
N E
HO
SP
IT
AL
CR
O
W R
ES
ER
VA
TI
O N
CR
O
W A
GE
N
CY
, M
O N
TA
N
A
ENGINEER:
SCW BYPASS VALVE
SH
DRAWN BY:
DATE: PROJECT NUMBER:
DEPARTMENT OF HEALTH & HUMAN SERVICES
U.S.PUBLIC HEALTH SERVICE
BILLINGS AREA INDIAN HEALTH SERVICE
P.O. BOX 36600
2900 4TH AVE. NORTH
BILLINGS, MT 59107
OF
REVISIONS
# DESCRIPTIONDATE BY
SH
EE
T
PR
O
JE
CT
SO
FT
EN
ED
C
O
LD
W
AT
ER
V
AL
VE
R
EP
LA
CE
M
EN
T
PL
AN
DOWNSTREAM ISOLATION
VALVES LOCATED IN B 124
CLOSE THESE VALVES TO ISOLATE
CORRODED VALVE.
DRAIN THROUGH VALVE
TO BE REPLACED
FIGURE 1: APOLLO 70LF-209-01,OR APPROVED EQUAL,
LEAD FREE BALL VALVE
VALVE TO BE REPLACED
PLAN VIEW: ROOMS B121-B124
PLAN VIEW: BOILER ROOM
NOTES:
1. DOWNSTREAM ISOLATION VALVES ARE LOCATED IN
B-124.
2. DRAIN SOFTENED COLD WATER INTO NEAREST
AVAILABLE FLOOR DRAIN.
3. CONTRACTOR TO REPLACE CORRODED PIPE AS
NECESSARY.
DIAGRAM: SOFT COLD WATER FLOW
FIGURE 2: CORRODED BALL VALVE
AutoCAD SHX Text Date
AutoCAD SHX Text 16505
AutoCAD SHX Text 04/14/2020
AutoCAD SHX Text
SW-1
AutoCAD SHX Text
SW-2
AutoCAD SHX Text
STOR
AutoCAD SHX Text
FS-3
AutoCAD SHX Text
SALT
AutoCAD SHX Text
STOR.
AutoCAD SHX Text
SALT
AutoCAD SHX Text
STOR.
AutoCAD SHX Text
BRINE
AutoCAD SHX Text
WS-1
AutoCAD SHX Text
AutoCAD SHX Text
SCW
AutoCAD SHX Text 4"
Auto…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .