J03 Construction Documents - Crow Agency Pumps_100 submittal_18 August.pdf

PDF 15 MB Posted

Attached to
Pump Replacement at Crow Agency, MT Federal contract opportunity
Solicitation number
75H701-20-R-00050
Issued by
Department of Health and Human Services Indian Health Service

About this file

This document provides details for a federal contract solicitation to replace pumps at the Crow Service Unit in Crow Agency, Montana. The Indian Health Service is seeking proposals under solicitation number 75H701-20-R-00050 for pump replacement projects at three locations. The magnitude of construction is estimated between $250,000 and $500,000. NAICS code 238220 for plumbing, heating, and air conditioning contractors applies, with a small business size standard of $16.5 million. This solicitation is set aside 100% for small businesses. Proposals are due by August 18, 2020. The selected contractor will replace pumps to improve infrastructure and services at the Crow Agency health facility operated by the Department of Health and Human Services Indian Health Service.

View the file

Other files for this federal contract opportunity

Other files attached to Pump Replacement at Crow Agency, MT, newest first.
File Type Posted
Amendment 00003 RFP 75H701-20-R-00050.pdf PDF
Amendment 00002_75H701-20-R-00050.pdf PDF
Amendment 00001_75H701-20-R-00050.pdf PDF
J01 Crow Pumps Schedule of Items.pdf PDF
J04 Self-Performed Calculation Sheet.docx DOCX document
B01 Solicitation - 75H701-20-R-00050.pdf PDF
J06 General Decision Number MT20200056 06_26_2020.pdf PDF
J02 Construction Documents Section 011000 Summary.doc DOC document
J05 Past Performance Questionnaire (PPQ) Form PPQ-0.docx DOCX document
J03 Construction Documents Drawings and Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CROW PUMPS REPLACEMENT

CROW/NORTHERN CHEYENNE HOSPITAL

CROW RESERVATION

CROW AGENCY, MONTANA

26/03/2020 VARIES

MICHAEL JENSEN, P.E. BC 13

VA

RI

ES

CR

O W

P U

M

PS

R

EP

LA

CE

M

EN

T

CR

O W

/N O

RT

HE

RN

C

HE

YE

N N

E

HO

SP

IT

AL

CR

O

W /N

O

RT

HE

RN

C

HE

YE

N

N E

HO

SP

IT

AL

CR

O

W R

ES

ER

VA

TI

O N

CR

O

W A

GE

N

CY

, M

O N

TA

N

A

MONTANA

CROW RESERVATION

MONTANA

WYOMING

HARDIN

CROW AGENCY

ST. XAVIER

LODGE GRASS

PRYOR

WYOLA

RANCHESTER

LOVELL

EDGAR

BILLINGS

FT. SMITH

CROW/NORTHERN

CHEYENNE

HOSPITAL

STATE MAP RESERVATION MAP

VICINITY MAP

ENGINEER:

DEPARTMENT OF HEALTH

AND

HUMAN SERVICES

TITLE SHEET

SH

DRAWN BY:

DATE: PROJECT NUMBER:

DEPARTMENT OF HEALTH & HUMAN SERVICES

U.S.PUBLIC HEALTH SERVICE

BILLINGS AREA INDIAN HEALTH SERVICE

P.O. BOX 36600

2900 4TH AVE. NORTH

BILLINGS, MT 59107

OF

REVISIONS

# DESCRIPTIONDATE BYDESCRIPTION#

DRAWING INDEX

1 TITLE PAGE

2 NOTES

3 NOTES

4 FLOOR PLAN OVERVIEW

5 FLOW DIAGRAM ALL SYSTEMS

6 ISOLATION PLAN- HOT WATER CIRCULATION

7 NEW FACILITIES- HOT WATER CIRCULATION SYSTEM

8 ISOLATION PLAN DOMESTIC BOOSTER PUMPS

9 NEW FACILITIES- DOMESTIC BOOSTER PUMPS

10 ISOLATION AND REPLACEMENT PLAN- SOFT COLD WATER

11 ISOLATION PLAN- FIRE PUMP

12 NEW FACILITIES- FIRE PUMP

13 PRODUCT INFORMATION

SH

EE

T

PR

O

JE

CT

TI

TL

E

PA

GE

N

CROW AGENCY PUMPS REPLACEMENT PROJECT

CROW/NORTHERN CHEYENNE HOSPITAL

CROW RESERVATION

CROW AGENCY, MONTANA

PROJECTS BI18CR202H6, BI19CR200H6, BI20CR201H6

AutoCAD SHX Text Date

AutoCAD SHX Text 16505

AutoCAD SHX Text 04/14/2020

AutoCAD SHX Text

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text o

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text o

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text V

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text F

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text H

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text H

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text U

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text A

CROW RESERVATION

CROW AGENCY, MONTANA

26/03/2020 VARIES

MICHAEL JENSEN, P.E. BC 13

VA

RI

ES

CR

O W

P U

M

PS

R

EP

LA

CE

M

EN

T

CR

O W

/N O

RT

HE

RN

C

HE

YE

N N

E

HO

SP

IT

AL

CR

O

W /N

O

RT

HE

RN

C

HE

YE

N

N E

HO

SP

IT

AL

CR

O

W R

ES

ER

VA

TI

O N

CR

O

W A

GE

N

CY

, M

O N

TA

N

A

ENGINEER:

NOTES

SH

DRAWN BY:

DATE: PROJECT NUMBER:

DEPARTMENT OF HEALTH & HUMAN SERVICES

U.S.PUBLIC HEALTH SERVICE

BILLINGS AREA INDIAN HEALTH SERVICE

P.O. BOX 36600

2900 4TH AVE. NORTH

BILLINGS, MT 59107

OF

REVISIONS

# DESCRIPTIONDATE BY

SH

EE

T

PR

O

JE

CT

GE

N

ER

AL

N

O

TE

S

GENERAL NOTES

1.THIS WORK WILL TAKE PLACE IN AN OPERATING FACILITY THAT IS FULLY BUILT

OUT, WITH MINIMAL FREE FLOOR SPACE OR OVERHEAD SPACE. THUS, THE

DIMENSIONS OF THE EXISTING EQUIPMENT/INSTALLATIONS SHALL BE NOMINALLY

ADHERED TO REGARDING THE SELECTION OF NEW EQUIPMENT.

2.PUMP SUCTION AND DISCHARGE NOZZLES LOCATIONS/ORIENTATIONS SHALL BE

NOMINALLY THE SAME IN ORDER TO MINIMIZE UNNECESSARY PIPING REWORK.

3.THE CONTRACTOR SHALL PROVIDE REDLINES TO THE PLANS AS RECORD DRAWINGS.

4.ALL MATERIALS AND WORKMANSHIP SHALL BE WARRANTIED FOR A PERIOD OF ONE

YEAR. MANUFACTURER'S WARRANTY CERTIFICATES SHALL BE PROVIDED TO THE

OWNER, WHERE APPLICABLE.

5. ALL MATERIAL REQUIREMENTS, UNLESS OTHERWISE NOTED, WITH REFERENCE TO

SPECIFIC MANUFACTURERS OR BRANDS ARE INTENDED TO SPECIFIED AS "OR EQUAL

BASIS".

6.THE EXISTING BUILDING AUTOMATION SYSTEM IS AUTOMATED LOGIC. THE SYSTEM

IS CURRENTLY MAINTAINED AND SUPPORTED BY:

STANDARD PLUMBING AND HEATING

JASON MICHAEL

HELENA, MT (406) 422-3966

DOMESTIC WATER BOOSTER PUMPS

1.DOMESTIC WATER BOOSTER PUMPS SHALL BE REPLACED WITH A SKID ASSEMBLY

ACCORDING TO THE BELOW SPECIFICATIONS OR THEIR APPROVED EQUALS:

1.1.TWO ARMSTRONG SERIES 6800 MODEL N250322 WITH A 10HP 460V / 3PH /

60HZ HIGH EFFICIENCY MOTOR, SEE PRODUCT INFO PAGE FOR MORE DETAILS

2.ISOLATION AND BYPASS VALVES SHALL BE 4" MILWAUKEE HP1LSS BUTTERFLY VALVE

WITH LEVER HANDLE OR APPROVED EQUAL.

3.WATER SOFTENER SYSTEM VALVE SHALL BE 2" APOLLO 70LF-200 SERIES LEAD FREE

BALL VALVE OR APPROVED EQUAL.

4.PUMP CONTROL SYSTEMS SHALL BE TIED INTO FACILITY'S EXISTING AUTOMATED

LOGIC BUILDING AUTOMATION SYSTEM (BAS), WHICH SHALL BE ABLE TO MONITOR

AND ADJUST THE PUMPS' OPERATIONS REMOTELY. THE PANEL SHALL PROVIDE AN

HOA SWITCH. THE AUTOMATIC CONTROLS SHALL PROVIDE FOR A CONSTANT

PRESSURE SYSTEM INCLUDING PRESSURE SENSOR WITH A 4-20 MA OUTPUT ON

THE SKID AND ANOTHER REMOTELY LOCATED AT THE NURSES' STATION. THIS

PRESSURE SENSOR SHALL PROVIDE INPUT TO THE BUILDING AUTOMATION SYSTEM,

WHICH SHALL PROVIDE THE LOGIC TO THE VARIABLE FREQUENCY DRIVE.

THEREFORE, THE VFD MUST BE BACNET COMPATIBLE TO THE BAS.

5.DUE TO THE CRITICAL NATURE OF THE BOOSTER PUMPS SERVICE TO THE OVERALL

FACILITY, THE INSTALLATION CONTRACTOR MUST HAVE A PLAN THAT LIMITS

SERVICE DOWNTIME TO NOT EXCEED TWO (2) HOURS, WITHOUT AN APPROVED

MITIGATION PLAN. THE DOWNTIME MUST BE COORDINATED WITH THE FACILITY

MANAGER AND MAY BE REQUIRED TO HAPPEN DURING EVENINGS, NIGHTS, OR

WEEKENDS.IF SERVICE DOWNTIME IS EXPECTED TO EXCEED TWO (2) HOURS, THE

TEMPORARY SYSTEM MUST BE OPERATIONAL WITHIN TWO HOURS OF TAKING THE

EXISTING SYSTEM OFF-LINE. THE EXISTING SYSTEM CAN BE SCAVENGED FOR USE IN

THE TEMPORARY SYSTEM. THE OWNER DOES NOT GUARANTEE THE OPERATION OF

THE EXISTING EQUIPMENT IN USE AS A TEMPORARY SYSTEM.

6.CONTROLS FOR PUMPING SYSTEMS WILL INCLUDE THE FOLLOWING:

6.1.NEW CONTROLLERS COMPATIBLE WITH AUTOMATED LOGIC MOUNTED IN A

NEW CONTROL PANEL, 10 UNIVERSAL INPUTS, 6 DIGITAL OUTPUTS AND 4

ANALOG OUTPUTS.

6.2.NEW BACNET ROUTER

6.3.RELAYS AND CURRENT SENSORS AS NEEDED FOR EQUIPMENT CONTROL AND

MONITORING

6.4.POWER SUPPLY FOR NEW AUTOMATED LOGIC CORPORATION COMPATIBLE

CONTROLLERS

6.5.COMPLETE INSTALLATION

6.6.PROGRAMMING AND EQUIPMENT GRAPHICS

6.7.BACnet TO THE DRIVES IF BACnet COMPATIBLE.

7. BASIS OF PAYMENT -

7.1.BOOSTER PUMP SKID ASSEMBLY (EQUIPMENT ONLY): THE CONTRACT LUMP

SUM PRICE SHALL CONSTITUTE FULL COMPENSATION FOR PURCHASING AND

DELIVERING ALL MATERIALS ASSOCIATED WITH SKID ASSEMBLY INCLUDING, PUMPS,

MOTORS, ELECTRICAL EQUIPMENT AND ENCLOSURES, INSTRUMENTATION, PIPING,

AND FITTINGS. THIS INCLUDES ANY TAXES, FEES, AND MARK-UPS TO DELIVER

FREIGHT TO THE CLIENT'S FACILITY WHERE THE ASSEMBLY WILL BE INSTALLED AND

WARRANTIED.

7.2.DEMOLITION, INSTALLATION, AND COMMISSIONING SERVICES: THE CONTRACT

LUMP SUM PRICE SHALL CONSTITUTE FULL COMPENSATION FOR REMOVING AND

PROPERLY DISPOSING OF SYSTEM COMPONENTS IDENTIFIED ON THE PLANS. THESE

COMPONENTS INCLUDE BUT NOT LIMITED TO THE EXISTING PUMP SKID AND ITS

INTEGRAL COMPONENTS SUCH AS PUMPS, MOTORS, PIPE, FITTINGS, POWER SUPPLY

AND CONTROL AND ALL OTHER ITEMS DEMO'ED TO ALLOW INSTALLATION OF THE

PROPOSED BOOSTER PUMP SYSTEM. THIS ITEM MAY ALSO INCLUDE PROVIDING A

TEMPORARY SYSTEM TO PRESSURIZE THE DOMESTIC WATER SYSTEM FOR THE

PERIOD BETWEEN DEMO OF THE EXISTING SYSTEM AND COMMISSIONING OF THE

NEW SYSTEM.

IN ADDITION, INCLUDED IN THE CONTRACT PRICE, IS FULL COMPENSATION FOR THE

INSTALLATION AND COMMISSIONING OF THE COMPLETE AND FULLY OPERATIONAL

DOMESTIC BOOSTER PUMP SYSTEM. THIS INCLUDES THE INSTALLATION OF ALL

MATERIALS PURCHASED IN ORDER TO MAKE THE SYSTEM OPERATIONAL, INCLUDING

ISOLATION AND BYPASS VALVES, AS WELL AS A SINGLE VALVE LOCATED ON THE

WATER SOFTENING SYSTEM. THIS ITEM ALSO INCLUDES MAKING REPAIRS TO ITEMS

THAT ARE DAMAGED/MODIFIED DURING CONSTRUCTION ACTIVITIES, SUCH AS

INSULATION REMOVAL. THIS INCLUDES LABOR COST TO PERFORM WORK ON NIGHTS

OR WEEKEND HOURS IF NECESSARY.

THIS EXCLUDES ANY SERVICES REQUIRED TO INTEGRATE PUMP CONTROLS INTO THE

AUTOMATED LOGIC BUILDING CONTROL SYSTEM, WHICH CAN BE FOUND IN SECTION

7.4.

7.3. ANCILLARY MATERIALS: THE CONTRACT LUMP SUM PRICE SHALL CONSTITUTE

FULL COMPENSATION FOR PURCHASING AND DELIVERING ALL MATERIALS NOT

PROVIDED WITH THE SKID ASSEMBLY BUT REQUIRED IN ORDER TO PROVIDE CLIENT

WITH A COMPLETE AND FULLY OPERATIONAL SYSTEM. THIS SHALL INCLUDE, BUT

MAY NOT BE LIMITED TO, ISOLATION AND BYPASS VALVES, WATER SOFTENER

VALVE, PIPE SPOOLS AND FITTINGS TO TIE THE SKID INTO THE EXISTING SYSTEM,

CONSTRUCTION CONSUMABLES, INSULATION, ETC. THE CONTRACT PRICE SHALL

INCLUDE ALL TAXES, FEES, AND MARK-UPS REQUIRED TO DELIVER TO THE CLIENT'S

FACILITY WHERE THE MATERIAL WILL BE INSTALLED AND WARRANTIED.

THIS EXCLUDES ANY MATERIALS REQUIRED TO INTEGRATE PUMP CONTROLS INTO

THE AUTOMATED LOGIC BUILDING CONTROL SYSTEM, WHICH CAN BE FOUND IN

SECTION 7.4.

7.4. CONTROLS INTEGRATION INTO AUTOMATED LOGIC: THE CONTRACT LUMP SUM

PRICE SHALL INCLUDE INTEGRATION OF THE PUMP CONTROLS TO THE EXISTING

BUILDING AUTOMATION SYSTEM (AUTOMATED LOGIC). THE ITEM SHALL CONSTITUTE

FULL COMPENSATION FOR FURNISHING AND INSTALLING ALL MATERIALS AND

WORKMANSHIP INCLUDING CONTROL MODULES, CONDUIT, WIRING, PROGRAMMING,

AND THE GRAPHICAL INTERFACE TO PROVIDE A COMPLETE AND OPERATIONAL

INTEGRATION TO THE EXISTING BUILDING AUTOMATION SYSTEM.

PROVIDING AND INSTALLING INPUT DEVICES, SUCH AS PRESSURE SENSORS, OR

OUTPUT DEVICES, SUCH AS MOTORIZED VALVES, SHALL BE INCLUDED IN OTHER BID

ITEMS.

FIRE WATER SYSTEM

1.FIRE PUMP SHALL BE REPLACED ACCORDING TO THE BELOW SPECIFICATIONS OR

THEIR APPROVED EQUALS:

1.1.PENTAIR AURORA MODEL 3-483-10, WITH A 30HP 460V/3PH/60HZ MOTOR. SEE

PRODUCT INFO PAGE FOR MORE DETAILS.

2. FIRE PUMP CONTROL PANELS SHALL BE REPLACED ACCORDING TO THE BELOW

SPECIFICATIONS OR THEIR APPROVED EQUALS:

2.1 FIRETROL FTA-1000-BM30B-TSA, ACROSS-THE-LINE STARTER WITH AUTOMATIC

TRANSFER SWITCH.

2.2 FIRETROL FTA-200-A-Q REMOTE ALARM PANEL. THE CONTRACTOR SHALL

REPLACE THREE EXISTING FIRE PUMP ALARM PANELS LOCATED IN THE BOILER

ROOM, THE EMERGENCY DEPARTMENT, AND THE MEDICAL-SURGICAL INPATIENT

DEPARTMENT. THE EXISTING PANEL IN THE SURGICAL DEPARTMENT SHALL BE

REMOVED AND NOT REPLACED. THE CONTRACTOR SHALL VERIFY THE

CONNECTION TO THE FIRE ALARM PANEL AND MAINTAIN THE EXISTING

ARRANGEMENT FOR THE PROPOSED REPLACEMENT REMOTE ALARM PANELS.

3. ISOLATION VALVES SHALL BE VICTAULIC 4" SERIES 765 WITH WEATHERPROOF

ACTUATOR OR APPROVED EQUAL.

4. PUMP CONTROL SYSTEMS SHALL BE TIED INTO THE FACILITY'S EXISTING

AUTOMATED LOGIC BUILDING CONTROL SYSTEM, WHICH SHALL BE ABLE TO

MONITOR PUMP OPERATIONS REMOTELY. THE BUILDING AUTOMATION SYSTEM

SHALL RECORD THE START AND STOP TIMES AND DATES TO DOCUMENT THE

LENGTH OF THE FIRE PUMP RUN TIMES.

5. UPON COMPLETION OF INSTALLATION OF THE FIRE PUMP, CONTRACTOR SHALL

PERFORM TESTING OF THE PUMP AND SPRINKLER SYSTEM IN ACCORDANCE WITH

NFPA's ANNUAL TESTING REQUIREMENT BEFORE TURNING CUSTODY OF THE

SYSTEM BACK OVER TO THE FACILITY MANAGER. THIS TESTING MAY BE

SUBCONTRACTED OUT TO AN APPROVED CONTRACTOR OR PERFORMED BY

INSTALLATION CONTRACTOR IF APPROVED AND CERTIFIED TO CONDUCT THE

TESTING.

6. DUE TO THE CRITICAL NATURE OF THE FIRE PUMPS SERVICE TO THE OVERALL

FACILITY, THE INSTALLATION CONTRACTOR MUST HAVE PLANS THAT LIMIT SERVICE

DOWNTIME TO NOT EXCEED FOUR (4) HOURS. THE DOWNTIME MUST BE

COORDINATED WITH THE FACILITY MANAGER AND MAY BE REQUIRED TO HAPPEN

DURING EVENINGS, NIGHTS, OR WEEKENDS. IF SERVICE DOWN TIME IS EXPECTED

TO EXCEED FOUR (4) HOURS, THE CONTRACTOR MUST SUBMIT A PLAN FOR

MITIGATION OF EXTENDED DOWN TIME TO THE FACILITY MANAGER FOR

APPROVAL BEFORE COMMENCING THE WORK. THE TEMPORARY SYSTEM MUST BE

OPERATIONAL WITHIN FOUR HOURS OF TAKING THE EXISTING SYSTEM OFF-LINE.

THE MEANS AND METHODS FOR THIS WILL BE LEFT TO THE CONTRACTOR. THE

EXISTING SYSTEM CAN BE SCAVENGED FOR USE IN THE TEMPORARY SYSTEM. THE

OWNER DOES NOT GUARANTEE THE OPERATION OF THE EXISTING EQUIPMENT IN

USE AS A TEMPORARY SYSTEM.

AutoCAD SHX Text Date

AutoCAD SHX Text 16505

04/14/2020

CROW RESERVATION

CROW AGENCY, MONTANA

26/03/2020 VARIES

MICHAEL JENSEN, P.E. BC 13

VA

RI

ES

CR

O W

P U

M

PS

R

EP

LA

CE

M

EN

T

CR

O W

/N O

RT

HE

RN

C

HE

YE

N N

E

HO

SP

IT

AL

CR

O

W /N

O

RT

HE

RN

C

HE

YE

N

N E

HO

SP

IT

AL

CR

O

W R

ES

ER

VA

TI

O N

CR

O

W A

GE

N

CY

, M

O N

TA

N

A

ENGINEER:

NOTES

SH

DRAWN BY:

DATE: PROJECT NUMBER:

DEPARTMENT OF HEALTH & HUMAN SERVICES

U.S.PUBLIC HEALTH SERVICE

BILLINGS AREA INDIAN HEALTH SERVICE

P.O. BOX 36600

2900 4TH AVE. NORTH

BILLINGS, MT 59107

OF

REVISIONS

# DESCRIPTIONDATE BY

SH

EE

T

PR

O

JE

CT

GE

N

ER

AL

N

O

TE

S

6. IT IS COMMON FOR FIRE PUMPS TO BE DESIGNED TO LEAK AT THE SEAL. THE

START-UP WILL CREATE A GREATER THAN NORMAL LEAK UNTIL THE SEALS BECOME

SATURATED. SLIGHT ADJUSTMENTS AT THE SHAFT SEAL INTERFACE MAY BE

NECESSARY. THE START-UP IS TO BE WITNESSED BY A MANUFACTURER'S

REPRESENTATIVE TO ENSURE PROPER INSTALLATION AND TO PROVIDE TRAINING

TO THE FACILITY MANAGER AND HIS STAFF IN THE MAINTENANCE AND OPERATION

OF THE PUMP SYSTEM AND CONTROLS.

7. CONTROLS FOR PUMPING SYSTEMS WILL INCLUDE THE FOLLOWING (INCLUDED

WITH BOOSTER PUMP SCOPE, BUT REPEATED HERE FOR CLARITY):

7.1 NEW ALC CONTROLLER MOUNTED IN A NEW CONTROL PANEL, 10

UNIVERSAL INPUTS

7.2 NEW BACNET ROUTER

7.3 RELAYS AND CURRENT SENSORS AS NEEDED FOR EQUIPMENT

MONITORING

7.4 POWER SUPPLY FOR NEW ALC CONTROLLERS

7.5 COMPLETE INSTALLATION

7.6 PROGRAMMING AND EQUIPMENT GRAPHICS

8. BASIS OF PAYMENT -

8.1. FIRE PUMP (EQUIPMENT ONLY): THE CONTRACT LUMP SUM PRICE SHALL

CONSTITUTE FULL COMPENSATION FOR PURCHASING AND DELIVERING A NEW FIRE

PUMP AND MOTOR. THIS INCLUDES ANY TAXES, FEES, AND MARK-UPS TO DELIVER

FREIGHT TO THE CLIENT'S FACILITY WHERE THE ASSEMBLY WILL BE INSTALLED AND

WARRANTIED.

8.2. CONTROLLER, ATS, AND ALARM PANELS (EQUIPMENT ONLY): THE

CONTRACT LUMP SUM PRICE SHALL CONSTITUTE FULL COMPENSATION FOR

PURCHASING AND DELIVERING REPLACEMENT FIRE SUPPRESSION CONTROLS

INCLUDING THE ELECTRONIC FIRE PUMP CONTROLLER, AUTOMATIC TRANSFER

SWITCH, AND THREE REMOTE ALARM PANELS. THIS INCLUDES ANY TAXES, FEES,

AND MARK-UPS TO DELIVER FREIGHT TO THE CLIENT'S FACILITY WHERE THE

ASSEMBLY WILL BE INSTALLED AND WARRANTIED.

8.3. DEMOLITION, INSTALLATION AND COMMISSIONING: THE CONTRACT LUMP

SUM PRICE SHALL CONSTITUTE FULL COMPENSATION FOR REMOVING AND PROPERLY

DISPOSING OF SYSTEM COMPONENTS IDENTIFIED ON THE PLANS. THESE

COMPONENTS INCLUDE BUT NOT LIMITED TO THE EXISTING PUMP, MOTORS, PIPE,

FITTINGS, POWER SUPPLY,CONTROLS, AND ALL OTHER ITEMS TO ALLOW

INSTALLATION OF THE PROPOSED FIRE PUMP SYSTEM. THIS ITEM INCLUDES

PROVIDING A TEMPORARY SYSTEM TO PRESSURIZING THE FIRE SUPPRESSION SYSTEM

FOR THE PERIOD BETWEEN DEMO OF THE EXISTING SYSTEM AND INSTALLATION OF

THE NEW SYSTEM, IF NECESSARY.

IN ADDITION, INCLUDED IN THE BID ITEM IS FULL COMPENSATION FOR THE

INSTALLATION AND COMMISSIONING OF THE COMPLETE AND FULLY OPERATIONAL

FIRE PUMP AND ITS ASSOCIATED CONTROL COMPONENTS. THIS INCLUDES THE

INSTALLATION OF ALL MATERIALS PURCHASED IN ORDER TO MAKE THE SYSTEM

OPERATIONAL, INCLUDING ISOLATION VALVES. THIS ITEM INCLUDES MAKING

REPAIRS TO ITEMS THAT ARE DAMAGED/MODIFIED DURING CONSTRUCTION

ACTIVITIES. UPON COMPLETION OF INSTALLATION, BUT PRIOR TO TURNOVER OF

CARE, CUSTODY AND CONTROL TO FACILITY MANAGER, SYSTEM FLUSHING AND

TESTING WILL BE PERFORMED. THE SUCCESSFUL COMPLETION OF THESE ACTIVITIES

IS TO BE INCLUDED IN THE CONTRACT PRICE. THIS INCLUDES LABOR COST TO

PERFORM WORK ON NIGHTS OR WEEKEND HOURS IF NECESSARY.

SERVICES REQUIRED TO INTEGRATE PUMP MONITORING INTO THE AUTOMATED

LOGIC BUILDING AUTOMATION SYSTEM ARE INCLUDED IN BID ITEM 8.5.

8.4. ANCILLARY MATERIALS: THE CONTRACT LUMP SUM PRICE SHALL

CONSTITUTE FULL COMPENSATION FOR PURCHASING AND DELIVERING ALL

MATERIALS NOT PROVIDED WITH THE EQUIPMENT PURCHASES NOTED ABOVE, BUT

ARE REQUIRED IN ORDER TO PROVIDE CLIENT WITH A COMPLETE AND FULLY

OPERATIONAL SYSTEM. THIS SHALL INCLUDE, BUT MAY NOT BE LIMITED TO,

ISOLATION VALVES, PIPE SPOOLS, FITTINGS, ELECTRICAL CONDUCTORS, CONDUIT,

ELECTRICAL BOXES, GUTTERS, APPURTENANCES, CONSTRUCTION CONSUMABLES, ETC.,

TO TIE THE PROPOSED PUMP AND MOTOR INTO EXISTING SYSTEM. THE CONTRACT

PRICE SHALL INCLUDE ALL TAXES, FEES, AND MARK-UPS REQUIRED TO DELIVER TO

CLIENT'S FACILITY WHERE THE MATERIAL WILL BE INSTALLED AND WARRANTIED.

THIS EXCLUDES ANY MATERIALS REQUIRED TO INTEGRATE PUMP CONTROLS INTO

THE AUTOMATED LOGIC BUILDING CONTROL SYSTEM, WHICH CAN BE FOUND IN

SECTION 8.5.

8.5 CONTROLS INTEGRATION INTO AUTOMATED LOGIC: THE CONTRACT PRICE

SHALL INCLUDE INTEGRATION OF THE PUMP CONTROLS TO THE EXISTING BUILDING

AUTOMATION SYSTEM (AUTOMATED LOGIC). THE ITEM SHALL CONSTITUTE FULL

COMPENSATION FOR FURNISHING AND INSTALLING ALL MATERIALS AND

WORKMANSHIP INCLUDING CONTROL MODULES, ROUTERS, POWER SUPPLY, CONDUIT,

WIRING, PROGRAMMING, AND THE GRAPHICAL INTERFACE TO PROVIDE A COMPLETE

AND OPERATIONAL INTEGRATION TO THE EXISTING BUILDING AUTOMATION SYSTEM.

PROVIDING AND INSTALLING INPUT DEVICES, SUCH AS CURRENT SENSORS SHALL BE

INCLUDED IN THIS BID ITEM. ALL NECESSARY MATERIALS AND INSTALLATION TO

MONITOR THE FIRE PUMP IN ACCORDANCE WITH THE DRAWINGS AND NOTES, AND

PROVIDING COMMUNICATION BETWEEN THE DEVICES AND BUILDING AUTOMATION

SYSTEM IS INCLUDED IN THIS BID ITEM.

HEATING WATER SYSTEM

1.THE HEATING WATER PUMPS SHALL BE REPLACED ACCORDING TO THE BELOW

SPECIFICATIONS OR THEIR APPROVED EQUALS:

1.1.ARMSTRONG SERIES 4030 MODEL 4X3X10 PUMPS WITH 15 HP, 460V, 3 PHASE,

60HZ MOTOR. SEE PRODUCT INFO PAGE FOR MORE DETAILS.

2.VARIABLE FREQUENCY DRIVERS SHALL BE INSTALLED FOR THE HEATING WATER

CIRCULATION PUMPS ACCORDING TO THE BELOW SPECIFICATION OR THEIR

APPROVED EQUALS:

2.1.ABB DRIVER ACH550-PDR-023A-4 SERIES.

3.CONTROL VALVES SHALL BE BELIMO F6100VIC+PRXUP-MFT-T OR THEIR APPROVED

EQUALS. THE CONTROL VALVES SHALL BE INSTALLED ON THE DISCHARGE SIDE OF

THE BOILER, PER DESIGN DRAWINGS. THE CONTRACTOR SHALL PROVIDE A

SUBMITTAL TO DETAIL WHERE THE CONTROL VALVES FIT IN THE EXISTING PIPING

SYSTEM AS WELL AS THE CONNECTIONS OF THE CONTROL WIRES TO THE BOILER

CONTROLS.

4.ISOLATION AND BYPASS VALVES SHALL BE 6" MILWAUKEE HP1LSS BUTTERFLY VALVE

WITH LEVER HANDLE OR APPROVED EQUAL.

5.CONTRACTOR WILL NEED TO PLAN FOR DRAINAGE, STORAGE, AND REINJECTION OF

HEATING WATER SYSTEM FLUID. REINSTALLATION OF HEATING WATER FLUID SHALL

INCLUDE EVALUATION OF THE MIXTURE AND ADDITION OF GLYCOL TO ACHIEVE A

30% GLYCOL WATER MIXTURE. THE CONTRACTOR CAN ASSUME, FOR PURPOSES OF

BIDDING THAT THE EXISTING SYSTEM IS APPROXIMATELY 2,500 GALLONS WITH A

15% GLYCOL MIX.

6.BOILER CONTROL SOFTWARE IS TO BE UPDATED TO THE MOST CURRENT VERSION

OF PATTERSON KELLEY NURO CONTROL SOFTWARE. SOFTWARE WILL CONTROL THE

SPEED OF THE HEATING WATER PUMPS AND THE CONTROL VALVES TO PROVIDE A

HEATING SYSTEM THAT OPTIMIZES ENERGY CONSERVATION. THIS WORK SHALL BE

PERFORMED IN A MANNER THAT DOES NOT AFFECT ONGOING WARRANTIES OF

THE EXISTING BOILERS, IF ANY.

7.DURING THE INSTALLATION OF THESE NEW FACILITIES, COMMUNICATION AND

COORDINATION MUST BE MAINTAINED WITH FACILITIES MANAGEMENT AND

OPERATIONS TEAMS. THE SURGERY AND OPERATING BRANCHES CANNOT SUSTAIN

ANY PERIOD WITHOUT HVAC FACILITIES. THERE IS A BACKUP HEATING LOOP THAT

CAN BE INITIATED FOR THIS BRANCH OF THE HOSPITAL; HOWEVER, MAINTENANCE

AND OPERATIONS MUST BE GIVEN PROPER NOTIFICATION BEFORE IT CAN BE

IMPLEMENTED.

8.BASIS OF PAYMENT -

8.1 HEATING WATER CIRCULATION PUMPS (EQUIPMENT ONLY): THE CONTRACT

LUMP SUM PRICE SHALL CONSTITUTE FULL COMPENSATION FOR PURCHASING AND

DELIVERING ALL MATERIALS ASSOCIATED WITH HEATING WATER CIRCULATION PUMPS

INCLUDING, PUMPS, MOTORS, PUMP ACCESSORIES (E.G. SUCTION GUIDES), AND

VARIABLE FREQUENCY DRIVERS. THIS INCLUDES ANY TAXES, FEES, AND MARK-UPS TO

DELIVER FREIGHT TO THE CLIENT'S FACILITY WHERE THE ASSEMBLY WILL BE INSTALLED

AND WARRANTIED.

8.2. CONTROL VALVES (EQUIPMENT ONLY): THE CONTRACT LUMP SUM PRICE

SHALL CONSTITUTE FULL COMPENSATION FOR PURCHASING AND DELIVERING ALL NEW

CONTROL VALVES BEING INSTALLED TO ALLOW FOR MODULATION OF CONDENSING

BOILERS. THIS INCLUDES ANY TAXES, FEES, AND MARK-UPS TO DELIVER FREIGHT TO

THE CLIENT'S FACILITY WHERE THE ASSEMBLY WILL BE INSTALLED AND WARRANTIED.

8.3.NURO BOILER SOFTWARE UPGRADES: THE CONTRACT LUMP SUM PRICE

SHALL CONSTITUTE FULL COMPENSATION FOR PURCHASING AND INSTALLING

SOFTWARE AND COMPONENT UPGRADES TO THE THREE (3) EXISTING PATTERSON

KELLY CONDENSING BOILERS. THIS COST INCLUDES ANY TAXES, FEES, AND MARK-UPS

TO DELIVER FREIGHT TO THE CLIENT'S FACILITY WHERE THE ASSEMBLY WILL BE

INSTALLED AND WARRANTIED.

8.4.DEMOLITION, INSTALLATION, AND COMMISSIONING SERVICES: THE

CONTRACT LUMP SUM PRICE SHALL CONSTITUTE FULL COMPENSATION FOR

REMOVING AND PROPERLY DISPOSING OF SYSTEM COMPONENTS IDENTIFIED ON THE

PLANS. THESE COMPONENTS INCLUDE, BUT ARE NOT LIMITED TO, THE EXISTING

PUMPS, MOTORS, AND ANY NECESSARY PIPING/INSULATION TO ALLOW INSTALLATION

OF THE PROPOSED NEW HEATING WATER PUMPS.

IN ADDITION, INCLUDED IN THE BID ITEM IS FULL COMPENSATION FOR THE

INSTALLATION AND COMMISSIONING OF THE COMPLETE AND FULLY OPERATIONAL

HEATING WATER SYSTEM. THIS INCLUDES THE INSTALLATION OF ALL MATERIALS

PURCHASED IN ORDER TO MAKE THE SYSTEM OPERATIONAL, INCLUDING CONTROL

VALVES, AND VARIABLE FREQUENCY DRIVERS. THIS ITEM INCLUDES MAKING REPAIRS

TO ITEMS THAT WERE DAMAGED/MODIFIED DURING CONSTRUCTION ACTIVITIES, SUCH

AS INSULATION REMOVAL. THIS INCLUDES LABOR COST TO PERFORM WORK ON

NIGHTS OR WEEKEND HOURS IF NECESSARY.

THIS DOES NOT INCLUDE THE PROGRAMMING EFFORTS TO ALLOW FOR HEATING

WATER SYSTEM CONTROL COMMUNICATIONS WITH CONTROL VALVES, FREQUENCY

DRIVERS AND BOILER CONTROL SOFTWARE.

8.5. ANCILLARY MATERIALS: THE CONTRACT LUMP SUM PRICE SHALL

CONSTITUTE FULL COMPENSATION FOR PURCHASING AND DELIVERING ALL MATERIALS

NOT PROVIDED WITH THE EQUIPMENT PURCHASES NOTED ABOVE, BUT THAT ARE

REQUIRED IN ORDER TO PROVIDE CLIENT WITH A COMPLETE AND FULLY

OPERATIONAL SYSTEM. THIS SHALL INCLUDE, BUT MAY NOT BE LIMITED TO,

ISOLATION VALVES, PIPE SPOOLS, AND FITTINGS TO TIE PUMPS INTO EXISTING

SYSTEM, CONSTRUCTION CONSUMABLES, INSULATION, ETC. THE CONTRACT PRICE

SHALL INCLUDE ALL TAXES, FEES, AND MARK-UPS REQUIRED TO DELIVER TO CLIENT'S

FACILITY WHERE THE MATERIAL WILL BE INSTALLED AND WARRANTIED.

8.6.PROGRAMMING FOR BOILER/CONTROL VALVE/PUMP DRIVER

COMMUNICATION - THE LUMP SUM CONTRACT PRICE SHALL CONSTITUTE FULL

COMPENSATION FOR THE PROGRAMMING OF BOILER-CONTROL VALVE-VFD

COMMUNICATIONS. THIS SHALL PROVIDE A COMPLETELY CONTROLLED AND

OPERATIONAL HEATING SYSTEM THAT CAN BE COMMISSIONED BY A FACTORY

AUTHORIZED REPRESENTATIVE AND BASIC TRAINING TO INSTRUCT THE FACILITIES

MAINTENANCE PERSONNEL HOW TO OPERATE THE BOILER AND CONTROLS IN AN

EMERGENCY SITUATIONS. BOILERS SHALL BE TURNED OVER TO FACILITY

MANAGEMENT IN A WORKING STATE. THIS INCLUDES LABOR COST TO PERFORM

WORK ON NON-PEAK OR WEEKEND HOURS IF NECESSARY.

AutoCAD SHX Text Date

AutoCAD SHX Text 16505

CROW RESERVATION

CROW AGENCY, MONTANA

26/03/2020 VARIES

MICHAEL JENSEN, P.E. BC 13

VA

RI

ES

CR

O W

P U

M

PS

R

EP

LA

CE

M

EN

T

CR

O W

/N O

RT

HE

RN

C

HE

YE

N N

E

HO

SP

IT

AL

CR

O

W /N

O

RT

HE

RN

C

HE

YE

N

N E

HO

SP

IT

AL

CR

O

W R

ES

ER

VA

TI

O N

CR

O

W A

GE

N

CY

, M

O N

TA

N

A

ENGINEER:

BOILER ROOM FLOOR PLAN

SH

DRAWN BY:

DATE: PROJECT NUMBER:

DEPARTMENT OF HEALTH & HUMAN SERVICES

U.S.PUBLIC HEALTH SERVICE

BILLINGS AREA INDIAN HEALTH SERVICE

P.O. BOX 36600

2900 4TH AVE. NORTH

BILLINGS, MT 59107

OF

REVISIONS

# DESCRIPTIONDATE BY

SH

EE

T

PR

O

JE

CT

PL

AN

V

IE

W

- B O

IL

ER

R O

O M

DOMESTIC BOOSTER PUMPS

SEE SHEETS 7-8

FIRE SUPPRESSION SYSTEM

SEE SHEETS 10-11

HOT WATER CIRCULATION SYSTEM

SEE SHEETS 5-6

SOFTENED COLD WATER SYSTEM

SEE SHEET 9

Equipment Panel Location Description Circuit # Breaker Amps Fed From Fire Pump 1E2H B-162 Electrical Closet 20 N/A 1E1DP

Jockey Pump * 1E3L * C-109 * Main Floor Pharmacy

Area * 35 * 20 * 1E2L * Domestic Booster Pump 1 1E1DP B-162 Electrical Closet 20 15 MDP Domestic Booster Pump 2 1E1DP B-163 Electrical Closet 20 15 MDP Hot Water Circ Pump 1 1E2H B-162 Electrical Closet 13 25 1E1DP Hot Water Circ Pump 2 1E2H B-163 Electrical Closet 19 25 1E1DP

ASSOCIATED ELECTRICAL EQUIPMENT LOCATIONS AND INFORMATION

NOTE: JOCKEY PUMP LOCATION AND PANEL INFORMATION NOT FIELD VERIFIED AND IS BASED ON

PLAN INFORMATION ONLY.

AutoCAD SHX Text Date

AutoCAD SHX Text 16505

AutoCAD SHX Text 04/14/2020

AutoCAD SHX Text

AutoCAD SHX Text

TRUE

AutoCAD SHX Text

NORTH

AutoCAD SHX Text 4'

AutoCAD SHX Text 2'

AutoCAD SHX Text 8'

AutoCAD SHX Text 12'

AutoCAD SHX Text

ENLARGED BOILER ROOM PLAN

AutoCAD SHX Text

HWS

AutoCAD SHX Text

HWR

AutoCAD SHX Text

CWS

AutoCAD SHX Text

CWR

AutoCAD SHX Text

TUBE REMOVAL

AutoCAD SHX Text

AREA

AutoCAD SHX Text

FOS

AutoCAD SHX Text

FOV

AutoCAD SHX Text

NG

AutoCAD SHX Text

FOS

AutoCAD SHX Text

FOV

AutoCAD SHX Text

HWP-2

AutoCAD SHX Text

HWP-1

AutoCAD SHX Text

AS-1

AutoCAD SHX Text

FUEL OIL

AutoCAD SHX Text

VENT

AutoCAD SHX Text

PANEL

AutoCAD SHX Text

F.P. PANEL

AutoCAD SHX Text

DCBFP-1

AutoCAD SHX Text

FS-3

AutoCAD SHX Text

FD-3

AutoCAD SHX Text

HW

AutoCAD SHX Text

HWC

AutoCAD SHX Text

(140)HW

AutoCAD SHX Text

(140)HWC

AutoCAD SHX Text

CW

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text

NG

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text 5'-0"

AutoCAD SHX Text

CW

AutoCAD SHX Text

POC SITE

AutoCAD SHX Text

UTILITIES

AutoCAD SHX Text

6" F (UG)

AutoCAD SHX Text

4" CW (OH)

AutoCAD SHX Text

COIL PULL

AutoCAD SHX Text

AREA

AutoCAD SHX Text

COIL PULL

AutoCAD SHX Text

AREA

AutoCAD SHX Text

CHILLER NO. 1

AutoCAD SHX Text

FOS

AutoCAD SHX Text

FOV

AutoCAD SHX Text

NG

AutoCAD SHX Text

NG

AutoCAD SHX Text

CWP-2

AutoCAD SHX Text

CWP-1

AutoCAD SHX Text

AutoCAD SHX Text

SALT

AutoCAD SHX Text

STOR.

AutoCAD SHX Text

SALT

AutoCAD SHX Text

STOR.

AutoCAD SHX Text

CW

AutoCAD SHX Text

CW

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FD-3

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BRINE

AutoCAD SHX Text

SCW

AutoCAD SHX Text

WF-1

AutoCAD SHX Text

WS-1

AutoCAD SHX Text

HWH-1

AutoCAD SHX Text

COORDINATE PIPE CONNECTION

AutoCAD SHX Text

POINTS W/MFGR. SHOP DWGS.

AutoCAD SHX Text

(2) RPBFP-1

AutoCAD SHX Text

WH-1

AutoCAD SHX Text

BP-1

AutoCAD SHX Text

FUEL OIL

AutoCAD SHX Text

GAUGE

AutoCAD SHX Text

FIRE DEPARTMENT

AutoCAD SHX Text

CONNECTION

AutoCAD SHX Text

AutoCAD SHX Text C6.1

AutoCAD SHX Text

WH-1

AutoCAD SHX Text

CW

AutoCAD SHX Text

2" RISER W/SOV

AutoCAD SHX Text

& DRAIN

AutoCAD SHX Text

PVB-1 @ 24"

AutoCAD SHX Text

ABOVE GRADE

AutoCAD SHX Text

CW

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

TANK

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PIPING CONT.

AutoCAD SHX Text

ON SHEET P4.2

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text

FIRE PUMP

AutoCAD SHX Text

FLOW TEST

AutoCAD SHX Text

CONNECTION

AutoCAD SHX Text S-11

AutoCAD SHX Text S-11

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AUX CHILLER

AutoCAD SHX Text

CONTROL PANEL

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AS-2

AutoCAD SHX Text

AutoCAD SHX Text 1 1/4 "

AutoCAD SHX Text 1 1/4 "

AutoCAD SHX Text 3/4 "

AutoCAD SHX Text 1/2 "

AutoCAD SHX Text 1/2 "

AutoCAD SHX Text 1 1/4 "

AutoCAD SHX Text

AutoCAD SHX Text

FOP-1

AutoCAD SHX Text

FOP-2

AutoCAD SHX Text

AutoCAD SHX Text

FOS

AutoCAD SHX Text

FOV

AutoCAD SHX Text

MONITORING WELL W/

AutoCAD SHX Text

24" SQ. CONCRETE

AutoCAD SHX Text

PAD AT GRADE

AutoCAD SHX Text

INTERSTITIAL SENSOR

AutoCAD SHX Text

W/ 24" SQ. CONCRETE

AutoCAD SHX Text

PAD AT GRADE

AutoCAD SHX Text 10'-0"

AutoCAD SHX Text

8 FOOT

AutoCAD SHX Text

SERVICE ACCESS

AutoCAD SHX Text

TPV

AutoCAD SHX Text

AutoCAD SHX Text 3"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 4"

AutoCAD SHX Text 3"

AutoCAD SHX Text

AutoCAD SHX Text

TO FIRE SPRINKLER

AutoCAD SHX Text

SYSTEM (TYP.)

AutoCAD SHX Text

FOS, FOV & FOG

AutoCAD SHX Text

LINES IN 10" DIA.

AutoCAD SHX Text

PVC CONDUIT

AutoCAD SHX Text

FD-3

AutoCAD SHX Text

FD-3

AutoCAD SHX Text

AutoCAD SHX Text

CONT. ON

AutoCAD SHX Text

SHT P8.2

AutoCAD SHX Text

AutoCAD SHX Text

FIRE PUMP

AutoCAD SHX Text

SEE 7/P5.1

AutoCAD SHX Text

FD-3

AutoCAD SHX Text

4" CW

AutoCAD SHX Text

POC, 2" CW

AutoCAD SHX Text

STUBOUT FOR

AutoCAD SHX Text

LANDSCAPING

AutoCAD SHX Text

RPBFP-2

AutoCAD SHX Text

AutoCAD SHX Text P6.1

AutoCAD SHX Text

BRICK WALL

AutoCAD SHX Text

4" OF 3/4" DIA. MINUS GRAVEL

AutoCAD SHX Text

OVER COMPACTED SUB-GRADE

AutoCAD SHX Text

WATER MAIN

AutoCAD SHX Text

SUPPLY

AutoCAD SHX Text D

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text

RISE UP

AutoCAD SHX Text

OVERHEAD

AutoCAD SHX Text D

AutoCAD SHX Text

SCW

AutoCAD SHX Text

3/4" CW (UG) TO

AutoCAD SHX Text

INCINERATOR BUILDING.

AutoCAD SHX Text

CONT. ON P2.0

AutoCAD SHX Text

JOCKEY

AutoCAD SHX Text

PUMP

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text

UNDERGROUND

AutoCAD SHX Text

NATURAL GAS

AutoCAD SHX Text

SERVICE BY

AutoCAD SHX Text

UTILITY COMPANY

AutoCAD SHX Text 2 1/2 "

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

(695 MBH)

AutoCAD SHX Text

(14,400 MBH)

AutoCAD SHX Text 2 1/2"

AutoCAD SHX Text M

AutoCAD SHX Text

AutoCAD SHX Text

BOILER B-3

AutoCAD SHX Text

FOS

AutoCAD SHX Text

FOV

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FD-3

AutoCAD SHX Text

NG

AutoCAD SHX Text

NG

AutoCAD SHX Text

NG

AutoCAD SHX Text

FD-3

AutoCAD SHX Text

AutoCAD SHX Text

BOILER B-1

AutoCAD SHX Text

XT-2

AutoCAD SHX Text 1 1/2"

AutoCAD SHX Text B143

AutoCAD SHX Text

BOILER B-2

2.5"

CROW RESERVATION

CROW AGENCY, MONTANA

26/03/2020 VARIES

MICHAEL JENSEN, P.E. BC 13

VA

RI

ES

CR

O W

P U

M

PS

R

EP

LA

CE

M

EN

T

CR

O W

/N O

RT

HE

RN

C

HE

YE

N N

E

HO

SP

IT

AL

CR

O

W /N

O

RT

HE

RN

C

HE

YE

N

N E

HO

SP

IT

AL

CR

O

W R

ES

ER

VA

TI

O N

CR

O

W A

GE

N

CY

, M

O N

TA

N

A

TO DOMESTIC

WATER PUMP

ENGINEER:

FLOW DIAGRAM

SH

DRAWN BY:

DATE: PROJECT NUMBER:

DEPARTMENT OF HEALTH & HUMAN SERVICES

U.S.PUBLIC HEALTH SERVICE

BILLINGS AREA INDIAN HEALTH SERVICE

P.O. BOX 36600

2900 4TH AVE. NORTH

BILLINGS, MT 59107

OF

REVISIONS

# DESCRIPTIONDATE BY

SH

EE

T

PR

O

JE

CT

FL

O W

D

IA

GR

AM

DOMESTIC BOOSTER PUMPS

SEE SHEETS 7-8

FIRE SUPPRESSION SYSTEM

SEE DETAIL AND SHEETS 10-11

HOT WATER CIRCULATION SYSTEM

SEE SHEETS 5-6

SOFTENED COLD WATER SYSTEM

SEE SHEET 9

MUNICIPAL SERVICE

SEE DETAIL

MUNICIPAL SERVICE DETAIL

FIRE SPRINKLER RISER DIAGRAM DETAIL

AutoCAD SHX Text Date

AutoCAD SHX Text 16505

AutoCAD SHX Text 04/14/2020

AutoCAD SHX Text

METER

AutoCAD SHX Text

CB-3

AutoCAD SHX Text

CB-2

AutoCAD SHX Text

CB-1

AutoCAD SHX Text

SW-1

AutoCAD SHX Text

SW-2

AutoCAD SHX Text

STOR

AutoCAD SHX Text

VFD

AutoCAD SHX Text

VFD

AutoCAD SHX Text

NTS

AutoCAD SHX Text

AutoCAD SHX Text

NOTES:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FIRE DEPT. CONNECTION

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TO SPRINKLER SYSTEM (TYP.)

AutoCAD SHX Text

2" DRAIN (TYP.)

AutoCAD SHX Text

PRESSURE GAUGE & VALVE (TYP.)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SUPERVISED INDICATING SHUT-OFF VALVE (TYP.)

AutoCAD SHX Text

SHUT-OFF VALVE

AutoCAD SHX Text

CONCENTRIC REDUCER

AutoCAD SHX Text

FIRE PUMP TEST CONNECTION

AutoCAD SHX Text

FIRE PUMP AND ACCESSORIES- TO BE REPLACED

AutoCAD SHX Text

ECCENTRIC REDUCER

AutoCAD SHX Text

DOUBLE CHECK BACKFLOW PREVENTER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PIPING UNDERGROUND

AutoCAD SHX Text

TO INCINERATOR BLDG.

AutoCAD SHX Text

LONG SWEEP

AutoCAD SHX Text

ELBOW

AutoCAD SHX Text

SEAL FLOOR

AutoCAD SHX Text

PENETRATION

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

SEAL WALL

AutoCAD SHX Text

PENETRATION

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

TO WATER MAIN

AutoCAD SHX Text

NOT USED

AutoCAD SHX Text

ALARM CHECK VALVE W/ACCESSORIES (TYP.)

AutoCAD SHX Text

CHECK VALVE W/AUTO DRIP TO DRAIN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ISOLATION VALVE- TO BE REPLACED

AutoCAD SHX Text

AutoCAD SHX Text

CHECK VALVE- TO BE REPLACED

AutoCAD SHX Text

RPBFP-1

AutoCAD SHX Text

AGF

AutoCAD SHX Text

RPBFP-1

AutoCAD SHX Text

AGF

AutoCAD SHX Text

CW

AutoCAD SHX Text

DCBFP-1

AutoCAD SHX Text

CW

AutoCAD SHX Text 24"

AutoCAD SHX Text 62"

AutoCAD SHX Text 14'

AutoCAD SHX Text

EXTERIOR

AutoCAD SHX Text

WALL

AutoCAD SHX Text

FLOOR

AutoCAD SHX Text

FD-3

AutoCAD SHX Text

2" AIR GAP

AutoCAD SHX Text

PIPE BRACE

AutoCAD SHX Text

TO FIRE BOOSTER

AutoCAD SHX Text

PUMP

AutoCAD SHX Text

8" WATER

AutoCAD SHX Text

MAIN

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text 38"

AutoCAD SHX Text 36"

AutoCAD SHX Text 2"

AutoCAD SHX Text 18"

AutoCAD SHX Text C

AutoCAD SHX Text

SLEEVE W/SEALS

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text 3"

AutoCAD SHX Text 4"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text 3"

AutoCAD SHX Text 3/4"

AutoCAD SHX Text

PVB-1

AutoCAD SHX Text

DRAIN &

AutoCAD SHX Text

CAP

AutoCAD SHX Text

THRUST

AutoCAD SHX Text

BLOCK

AutoCAD SHX Text M

AutoCAD SHX Text

WATER

AutoCAD SHX Text

METER

AutoCAD SHX Text

THRUST

AutoCAD SHX Text

BLOCK

AutoCAD SHX Text 4"

AutoCAD SHX Text 8"

6"

PROJECT DESCRIPTION

CROW RESERVATION

CROW AGENCY, MONTANA

26/03/2020 BI20CR201H6

MICHAEL JENSEN, P.E. BC 13

BI

CR

1H

CR

O

W P

U M

PS

R

EP

LA

CE

M

EN

T

CR

O

W /N

O

RT

HE

RN

C

HE

YE

N

N E

HO

SP

IT

AL

CR

O

W /N

O

RT

HE

RN

C

HE

YE

N

N E

HO

SP

IT

AL

CR

O

W R

ES

ER

VA

TI

O N

CR

O

W A

GE

N

CY

, M

O N

TA

N

A

ENGINEER:

HWC ISOLATION PLAN

SH

DRAWN BY:

DATE: PROJECT NUMBER:

DEPARTMENT OF HEALTH & HUMAN SERVICES

U.S.PUBLIC HEALTH SERVICE

BILLINGS AREA INDIAN HEALTH SERVICE

P.O. BOX 36600

2900 4TH AVE. NORTH

BILLINGS, MT 59107

OF

REVISIONS

# DESCRIPTIONDATE BY

SH

EE

T

PR

O

JE

CT

EX

IS

TI

N G

HO

T

W

AT

ER

C

IR

CU

LA

TI

O N

S

YS

TE

M

CLOSE SHUT OFF VALVES ON

DISCHARGE SIDE OF BOILERS

DRAIN SYSTEM THROUGH TRIPLE DUTY

VALVES LOCATED ON DISCHARGE SIDE

OF PUMPS

NOTES:

1. CONTRACTOR TO DISPOSE OF CURRENT SYSTEM FLUIDS AND REPLACE WITH

APPROXIMATELY 2,000 GALLONS OF 30% GLYCOL MIXTURE.

2. THERE IS AN OWNER-INSTALLED BYPASS AROUND AIR HANDLER #5. CONTRACTOR IS

RESPONSIBLE FOR OPERATING AND MAINTAINING THIS BYPASS HEATING LOOP FOR THE

DURATION OF SYSTEM DOWN TIME. SEE FIGURE 1, THIS SHEET.

3. CONTRACTOR TO AVOID ANY SYSTEM OUTAGES DURING SURGICAL TIMES.

CONTRACTOR TO COORDINATE WITH THE FACILITY MANAGER TO SCHEDULE ALL WORK.

4. HEATING SYSTEM WATER MUST BE REPLACED WITH WATER THAT MEETS OR EXCEEDS

WATER QUALITY STANDARDS SPECIFIED ON TABLE 6.1.

TRIPLE DUTY VALVE

BUTTERFLY VALVE-

DISCHARGE SIDE OF BOILER

PLAN VIEW: BOILER ROOM

FIGURE 2: CONDENSING BOILER SUPPLY AND DISCHARGE

FIGURE 3: HWC PUMP AND TRIPLE DUTY VALVE

PLAN VIEW: ROOM B224 AND AHU #5

FIGURE 1: BACK UP HEATING UNIT

DIAGRAM: EXISTING HWC

TABLE 6.1: WATER QUALITY STANDARDS

AutoCAD SHX Text Date

AutoCAD SHX Text 16505

AutoCAD SHX Text 04/14/2020

AutoCAD SHX Text

CB-3

AutoCAD SHX Text

CB-2

AutoCAD SHX Text

CB-1

AutoCAD SHX Text

HWR

AutoCAD SHX Text

HWP-2

AutoCAD SHX Text

HWP-1

AutoCAD SHX Text

COIL PULL

AutoCAD SHX Text

AREA

AutoCAD SHX Text

CWP-2

AutoCAD SHX Text

CWP-1

AutoCAD SHX Text

AutoCAD SHX Text

SALT

AutoCAD SHX Text

STOR.

AutoCAD SHX Text

AutoCAD SHX Text

FD-3

AutoCAD SHX Text

AutoCAD SHX Text

BRINE

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AUX CHILLER

AutoCAD SHX Text

CONTROL PANEL

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AS-2

AutoCAD SHX Text

FD-3

AutoCAD SHX Text

FOS

AutoCAD SHX Text

FOV

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FD-3

AutoCAD SHX Text

NG

AutoCAD SHX Text

BOILER B-1

AutoCAD SHX Text

BOILER B-2

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text 4-4

AutoCAD SHX Text

AHU-2

AutoCAD SHX Text

AHU-5

AutoCAD SHX Text 30X24

AutoCAD SHX Text

RAF-2

AutoCAD SHX Text I

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 30X24

AutoCAD SHX Text

LCEF-1

AutoCAD SHX Text 26X24

AutoCAD SHX Text

RISE

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text 40X18

AutoCAD SHX Text

HEF-13

AutoCAD SHX Text 12X10

AutoCAD SHX Text 14X12

AutoCAD SHX Text 14X12

AutoCAD SHX Text

HEF-12

AutoCAD SHX Text

HEF-11

AutoCAD SHX Text

HEF-10

AutoCAD SHX Text 8X8

AutoCAD SHX Text 6X12

AutoCAD SHX Text 12X10

AutoCAD SHX Text 14X12

AutoCAD SHX Text 12X12

AutoCAD SHX Text

HEF-9

AutoCAD SHX Text

HEF-8

AutoCAD SHX Text 12X12

AutoCAD SHX Text

HEF-7

AutoCAD SHX Text 18X12

AutoCAD SHX Text 18X12

AutoCAD SHX Text

HEF-5

AutoCAD SHX Text

HEF-6

AutoCAD SHX Text 8X8

AutoCAD SHX Text 8X8

AutoCAD SHX Text 6X12

AutoCAD SHX Text 18X10

AutoCAD SHX Text 24X24

AutoCAD SHX Text 6X12

AutoCAD SHX Text 8X12

AutoCAD SHX Text

HEF-3

AutoCAD SHX Text 30X20

AutoCAD SHX Text

ALUM.

AutoCAD SHX Text

ALUM.

AutoCAD SHX Text

ALUM.

AutoCAD SHX Text H-6

AutoCAD SHX Text H-5

AutoCAD SHX Text 16X16

AutoCAD SHX Text 14X12

AutoCAD SHX Text H-3

AutoCAD SHX Text H-4

AutoCAD SHX Text

ALUM.

AutoCAD SHX Text

ALUM.

AutoCAD SHX Text H-2

AutoCAD SHX Text

30X24 RELIEF

AutoCAD SHX Text

DAMPER

AutoCAD SHX Text

30X30 UP

AutoCAD SHX Text

TO RH-4

AutoCAD SHX Text

HEF-4

AutoCAD SHX Text

CONT. ON PART.

AutoCAD SHX Text

PLAN BELOW

AutoCAD SHX Text

30X24 DOWN

AutoCAD SHX Text

72X30 RTN

AutoCAD SHX Text

CONN. TO

AutoCAD SHX Text

PLENUM

AutoCAD SHX Text 18X18

AutoCAD SHX Text A.D.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 12X14

AutoCAD SHX Text B

AutoCAD SHX Text M3.4

AutoCAD SHX Text M3.4

AutoCAD SHX Text M3.4

AutoCAD SHX Text (2)4X8

AutoCAD SHX Text

LOUVER,

AutoCAD SHX Text L-1

AutoCAD SHX Text (2)4X8

AutoCAD SHX Text

LOUVER,

AutoCAD SHX Text L-1

AutoCAD SHX Text

TRANS TO.

AutoCAD SHX Text 24X30

AutoCAD SHX Text 12X8

AutoCAD SHX Text

36X22 RTN

AutoCAD SHX Text

FRM BELOW

AutoCAD SHX Text

HEF-1

AutoCAD SHX Text

AFMS-3

AutoCAD SHX Text 72X48

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 48X30

AutoCAD SHX Text M3.3

AutoCAD SHX Text

LCEF-1

AutoCAD SHX Text

AHU-5

AutoCAD SHX Text

AHU-2

AutoCAD SHX Text

RAF-2

AutoCAD SHX Text

FAN

AutoCAD SHX Text

FILTER

AutoCAD SHX Text

AutoCAD SHX Text

COILS

AutoCAD SHX Text

FAN

AutoCAD SHX Text

FILTER

AutoCAD SHX Text

ZONE-4 (1300 CFM)

AutoCAD SHX Text

ZONE-3 (350 CFM)

AutoCAD SHX Text

ZONE-2 (350 CFM)

AutoCAD SHX Text 12X6

AutoCAD SHX Text 12X6

AutoCAD SHX Text

ZONE-6 (1820 CFM)

AutoCAD SHX Text

ZONE-5 (1185 CFM)

AutoCAD SHX Text

ZONE-11 (600 CFM)

AutoCAD SHX Text

ZONE-10 (1000 CFM)

AutoCAD SHX Text

ZONE-9 (360 CFM)

AutoCAD SHX Text

ZONE-8 (1000 CFM)

AutoCAD SHX Text

ZONE-7 (820 CFM)

AutoCAD SHX Text

UP

AutoCAD SHX Text

SEE PARTIAL UPPER

AutoCAD SHX Text

PLAN OF THIS

AutoCAD SHX Text

AREA BELOW

AutoCAD SHX Text M

AutoCAD SHX Text 30X24

AutoCAD SHX Text

AutoCAD SHX Text

CONT. ON

AutoCAD SHX Text M2.3

AutoCAD SHX Text

AutoCAD SHX Text M3.4

AutoCAD SHX Text

FILTER

AutoCAD SHX Text

FAN

AutoCAD SHX Text

HT REC COIL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text M4.3

AutoCAD SHX Text

(TYP)

AutoCAD SHX Text

CONT. ON

AutoCAD SHX Text

SHEET M2.5

AutoCAD SHX Text 14X8

AutoCAD SHX Text

COIL PULL

AutoCAD SHX Text

KEEP CLEAR

AutoCAD SHX Text

RETURN

AutoCAD SHX Text

DAMPER

AutoCAD SHX Text H-1

AutoCAD SHX Text

12X8 ALUM.

AutoCAD SHX Text

RAF-2 VFD

AutoCAD SHX Text

AHU-2 VFD

AutoCAD SHX Text

EMCS

AutoCAD SHX Text

AHU-5

AutoCAD SHX Text

STARTER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 30X22

AutoCAD SHX Text

RETURN DAMPER

AutoCAD SHX Text

ELECTRIC STEAM

AutoCAD SHX Text

GENERATOR ESG-1

AutoCAD SHX Text

30X20 AHU-6 SUPPLY

AutoCAD SHX Text

DUCT DOWN THRU FLOOR.

AutoCAD SHX Text

FD AT FLOOR

AutoCAD SHX Text

AD

AutoCAD SHX Text

AD

AutoCAD SHX Text

12X12 AD ON BTM

AutoCAD SHX Text

SIDE OF DUCT AT

AutoCAD SHX Text

EACH HUMIDIFIER

AutoCAD SHX Text

AD

AutoCAD SHX Text

AD

AutoCAD SHX Text

AD

AutoCAD SHX Text

AD

AutoCAD SHX Text

KEEP DUCTS & PIPING AWAY

AutoCAD SHX Text

FROM ELECTRICAL EQUIPMENT

AutoCAD SHX Text

AHU-6

AutoCAD SHX Text

STARTER

AutoCAD SHX Text

LCEF-1

AutoCAD SHX Text

STARTER

AutoCAD SHX Text

STEAM GENERATOR

AutoCAD SHX Text

FOR STEAM GUN, SEE DIV. 11700

AutoCAD SHX Text

AutoCAD SHX Text

(TYP)

AutoCAD SHX Text

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

AutoCAD SHX Text 36"X24"

AutoCAD SHX Text F.O.

AutoCAD SHX Text

UNIT HEATER

AutoCAD SHX Text

AT CEILING

AutoCAD SHX Text

SEE P8.5

AutoCAD SHX Text 12x18 A.D.

AutoCAD SHX Text

IN BTM.

AutoCAD SHX Text

RISE

AutoCAD SHX Text B224

B234

CROW RESERVATION

CROW AGENCY, MONTANA

26/03/2020 BI20CR201H6

MICHAEL JENSEN, P.E. BC 13

VA

RI

ES

CR

O W

P U

M

PS

R

EP

LA

CE

M

EN

T

CR

O W

/N O

RT

HE

RN

C

HE

YE

N N

E

HO

SP

IT

AL

CR

O

W /N

O

RT

HE

RN

C

HE

YE

N

N E

HO

SP

IT

AL

CR

O

W R

ES

ER

VA

TI

O N

CR

O

W A

GE

N

CY

, M

O N

TA

N

A

ENGINEER:

NEW EQUIPMENT- HWC

SH

DRAWN BY:

DATE: PROJECT NUMBER:

DEPARTMENT OF HEALTH & HUMAN SERVICES

U.S.PUBLIC HEALTH SERVICE

BILLINGS AREA INDIAN HEALTH SERVICE

P.O. BOX 36600

2900 4TH AVE. NORTH

BILLINGS, MT 59107

OF

REVISIONS

# DESCRIPTIONDATE BY

SH

EE

T

PR

O

JE

CT

HO

T W

AT

ER

C

IR

CU

LA

TI

O

N N

EW

E

Q U

IP

M

EN

T

REPLACE TRIPLE DUTY AND EXISTING

BUTTERFLY VALVE AT BOTH PUMPS WITH 6"

MILWAUKEE HP1LSS WITH LEVER HANDLE

OR APPROVED EQUAL. SEE FIGURE 1.

REPLACE CURRENT PUMPS WITH THE

CIRCULATING PUMPS SHOWN IN FIGURE B.

UPGRADE CURRENT ENVI

CONTROL SOFTWARE PACKAGE

ON CONDENSING BOILERS TO

NURO CONTROL SOFTWARE

INSTALL BELIMO MOTORIZED CONTROL VALVE

SHOWN IN FIGURE 2, OR APPROVED EQUAL IN

FRONT OF ALL BOILER ISOLATION VALVES.

FIGURE 1: 6" MILWAUKEE, OR APPROVED

EQUAL, BUTTERFLY VALVE

NOTES:

1. CONTRACTOR RESPONSIBLE FOR REPLACING ANY

DAMAGED PIPE INSULATION. INSULATION SHALL BE 2"

THICK OWENS CORNING FIBERGLASS INSULATION OR

APPROVED EQUAL.

2. SEE NOTES SECTION, SHEET 3 FOR FURTHER

DETAILS.

PLAN VIEW: BOILER ROOM

FIGURE 2: BELLIMO, OR APPROVED EQUAL,

CONTROL VALVE

DIAGRAM: NEW HWC SYSTEM

AutoCAD SHX Text Date

AutoCAD SHX Text 16505

AutoCAD SHX Text 04/14/2020

AutoCAD SHX Text

CB-3

AutoCAD SHX Text

CB-2

AutoCAD SHX Text

CB-1

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text

VFD

AutoCAD SHX Text

VFD

AutoCAD SHX Text

HWR

AutoCAD SHX Text

HWP-2

AutoCAD SHX Text

HWP-1

AutoCAD SHX Text

COIL PULL

AutoCAD SHX Text

AREA

AutoCAD SHX Text

CHILLER NO. 1

AutoCAD SHX Text

CWP-2

AutoCAD SHX Text

CWP-1

AutoCAD SHX Text

AutoCAD SHX Text

SALT

AutoCAD SHX Text

STOR.

AutoCAD SHX Text

SALT

AutoCAD SHX Text

AutoCAD SHX Text

FD-3

AutoCAD SHX Text

AutoCAD SHX Text

BRINE

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AUX CHILLER

AutoCAD SHX Text

CONTROL PANEL

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AS-2

AutoCAD SHX Text

FD-3

AutoCAD SHX Text

FOS

AutoCAD SHX Text

FOV

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FD-3

AutoCAD SHX Text

NG

AutoCAD SHX Text

BOILER B-1

AutoCAD SHX Text

XT-2

BOILER B-2

CROW RESERVATION

CROW AGENCY, MONTANA

26/03/2020 BI19CR202H6

MICHAEL JENSEN, P.E. BC 13

VA

RI

ES

CR

O W

P U

M

PS

R

EP

LA

CE

M

EN

T

CR

O W

/N O

RT

HE

RN

C

HE

YE

N N

E

HO

SP

IT

AL

CR

O

W /N

O

RT

HE

RN

C

HE

YE

N

N E

HO

SP

IT

AL

CR

O

W R

ES

ER

VA

TI

O N

CR

O

W A

GE

N

CY

, M

O N

TA

N

A

ENGINEER:

DOMESTIC BOOSTER ISOLATION

SH

DRAWN BY:

DATE: PROJECT NUMBER:

DEPARTMENT OF HEALTH & HUMAN SERVICES

U.S.PUBLIC HEALTH SERVICE

BILLINGS AREA INDIAN HEALTH SERVICE

P.O. BOX 36600

2900 4TH AVE. NORTH

BILLINGS, MT 59107

OF

REVISIONS

# DESCRIPTIONDATE BY

SH

EE

T

PR

O

JE

CT

DO

M

ES

TI

C

BO

O

ST

ER

P U

M P

IS

O

LA

TI

O N

CLOSE SHUT OFF VALVES

OPEN BYPASS VALVE

NOTES:

1. IF SYSTEM IS DOWN FOR MORE THAN 2 HOURS,

CONTRACTOR MUST PROVIDE PLAN AND OBTAIN

APPROVAL FROM THE FACILITY MANAGER THAT

MITIGATES EXTENDED DOWNTIME.

2. SYSTEM OUTAGES SHOULD BE KEPT TO NON-PEAK

HOURS. CONTRACTOR TO COORDINATE WITH FACILITY

MANAGER FOR SCHEDULING.

PLAN VIEW: BOILER ROOM

FIGURE 3: EXISTING BOOSTER PUMP SKID AND CONTROLS

DIAGRAM: EXISTING DOMESTIC BOOSTER FLOW

FIGURE 1: SHUT OFF VALVES

FIGURE 2: BYPASS VALVE

AutoCAD SHX Text Date

AutoCAD SHX Text 16505

AutoCAD SHX Text 04/14/2020

AutoCAD SHX Text

METER

AutoCAD SHX Text

VFD

AutoCAD SHX Text

VFD

AutoCAD SHX Text

PANEL

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text

6" F (UG)

AutoCAD SHX Text

4" CW (OH)

AutoCAD SHX Text

CW

AutoCAD SHX Text

BP-1

AutoCAD SHX Text

FIRE PUMP

AutoCAD SHX Text

FLOW TEST

AutoCAD SHX Text

CONNECTION

AutoCAD SHX Text

AutoCAD SHX Text 1 1/4 "

AutoCAD SHX Text 3/4 "

AutoCAD SHX Text 1/2 "

AutoCAD SHX Text

FIRE PUMP

AutoCAD SHX Text

SEE 7/P5.1

AutoCAD SHX Text

FD-3

AutoCAD SHX Text

4" CW

AutoCAD SHX Text 4"

4"

CROW RESERVATION

CROW AGENCY, MONTANA

26/03/2020 BI19CR202H6

MICHAEL JENSEN, P.E. BC 13

VA

RI

ES

CR

O W

P U

M

PS

R

EP

LA

CE

M

EN

T

CR

O W

/N O

RT

HE

RN

C

HE

YE

N N

E

HO

SP

IT

AL

CR

O

W /N

O

RT

HE

RN

C

HE

YE

N

N E

HO

SP

IT

AL

CR

O

W R

ES

ER

VA

TI

O N

CR

O

W A

GE

N

CY

, M

O N

TA

N

A

HERE

CONNECT TO DATA

LINES

ENGINEER:

NEW EQUIPMENT- DOMESTIC

SH

DRAWN BY:

DATE: PROJECT NUMBER:

DEPARTMENT OF HEALTH & HUMAN SERVICES

U.S.PUBLIC HEALTH SERVICE

BILLINGS AREA INDIAN HEALTH SERVICE

P.O. BOX 36600

2900 4TH AVE. NORTH

BILLINGS, MT 59107

OF

REVISIONS

# DESCRIPTIONDATE BY

SH

EE

T

PR

O

JE

CT

DO

M

ES

TI

C

BO

O

ST

ER

P U

M

PS

N

EW

E Q

U

IP

M

EN

T

INSTALL NEW PUMPS

AND CONTROLS

REPLACE ALL BYPASS AND

SHUT OFF VALVES

NOTES:

1. BYPASS AND CONTROL VALVES SHALL BE 4"

MILWAUKEE HPILSS BUTTERFLY VALVES WITH LEVER

HANDLE OR APPROVED EQUAL. SEE DETAIL ON SHEET

6.

2. CONTRACTOR RESPONSIBLE FOR REPLACING ANY

DAMAGED INSULATION WITH 2" THICK CORNING

FIBERGLASS PIPE INSULATION OR APPROVED EQUAL.

3. REPLACEMENT FLANGES WILL BE RATED FOR

ASME/ANSI B 16.5 PRESSURE CLASS 150 OR GREATER.

REPLACE REMOTE PRESSURE SENSOR

AT 2ND FLOOR NURSE'S STATION, LOCATED

ABOVE THE CEILING, TO BE COMPATIBLE

WITH NEW PUMP CONTROL

LOGIC

FIGURE 1: REMOTE PRESSURE SENSOR

PLAN VIEW: 2ND FLOOR NURSE'S STATION

PLAN VIEW: BOILER ROOM

DIAGRAM: NEW DOMESTIC BOOSTER FLOW

AutoCAD SHX Text Date

AutoCAD SHX Text 16505

AutoCAD SHX Text 04/14/2020

AutoCAD SHX Text

METER

AutoCAD SHX Text

VFD

AutoCAD SHX Text

VFD

AutoCAD SHX Text

PANEL

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text

6" F (UG)

AutoCAD SHX Text

4" CW (OH)

AutoCAD SHX Text

BP-1

AutoCAD SHX Text

FIRE PUMP

AutoCAD SHX Text

FLOW TEST

AutoCAD SHX Text

CONNECTION

AutoCAD SHX Text

AutoCAD SHX Text 1 1/4 "

AutoCAD SHX Text 3/4 "

AutoCAD SHX Text 1/2 "

AutoCAD SHX Text

FIRE PUMP

AutoCAD SHX Text

SEE 7/P5.1

AutoCAD SHX Text

FD-3

AutoCAD SHX Text

4" CW

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text

CW

AutoCAD SHX Text

HW

AutoCAD SHX Text

HW

AutoCAD SHX Text

HW

AutoCAD SHX Text

CW

AutoCAD SHX Text

HW

AutoCAD SHX Text

CW

AutoCAD SHX Text

CW

AutoCAD SHX Text

HW

AutoCAD SHX Text

HW

AutoCAD SHX Text

CW

AutoCAD SHX Text

CW

AutoCAD SHX Text

HW

AutoCAD SHX Text

CS-1

AutoCAD SHX Text S-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

WC-1

AutoCAD SHX Text

WC-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text L-4

AutoCAD SHX Text

WC-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text L-4

AutoCAD SHX Text

WC-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text L-4

AutoCAD SHX Text

WC-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text L-4

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

WC-2

AutoCAD SHX Text L-2

AutoCAD SHX Text L-1

AutoCAD SHX Text S-1

AutoCAD SHX Text

CS-1

AutoCAD SHX Text

SS-1

AutoCAD SHX Text

BT-3

AutoCAD SHX Text S-5

AutoCAD SHX Text S-1

AutoCAD SHX Text S-1

AutoCAD SHX Text

WC-2

AutoCAD SHX Text L-2

AutoCAD SHX Text

SS-1

AutoCAD SHX Text

WC-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text L-4

AutoCAD SHX Text

WC-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text L-4

AutoCAD SHX Text

WC-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text L-4

AutoCAD SHX Text

WC-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text L-4

AutoCAD SHX Text

WC-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text L-4

AutoCAD SHX Text

WC-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text L-4

AutoCAD SHX Text

WC-1

AutoCAD SHX Text

SH-1

AutoCAD SHX Text L-1

AutoCAD SHX Text

WC-2

AutoCAD SHX Text

SH-1

AutoCAD SHX Text L-2

AutoCAD SHX Text L-1

AutoCAD SHX Text

EWC-1

AutoCAD SHX Text

WC-2

AutoCAD SHX Text

SH-1

AutoCAD SHX Text L-2

AutoCAD SHX Text

AutoCAD SHX Text N.O.

AutoCAD SHX Text N.O.

AutoCAD SHX Text N.O.

AutoCAD SHX Text

SA-1

AutoCAD SHX Text

SA-1

AutoCAD SHX Text

SA-1

AutoCAD SHX Text

SA-1

AutoCAD SHX Text

SA-1

AutoCAD SHX Text

SA-1

AutoCAD SHX Text

SA-2

AutoCAD SHX Text

SA-1

AutoCAD SHX Text S-5

AutoCAD SHX Text S-4

AutoCAD SHX Text S-5

AutoCAD SHX Text

SA-1

AutoCAD SHX Text

SA-1

AutoCAD SHX Text

SA-1

AutoCAD SHX Text

SA-1

AutoCAD SHX Text

SA-1

AutoCAD SHX Text

SA-2

AutoCAD SHX Text

SA-1

AutoCAD SHX Text

SA-1

AutoCAD SHX Text

SA-1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

3" CW

AutoCAD SHX Text

2-1/2" HW

AutoCAD SHX Text

PIPING CONT.

AutoCAD SHX Text

ON SHEET P3.5

AutoCAD SHX Text

AutoCAD SHX Text

2" CW

AutoCAD SHX Text

3/4" HW

AutoCAD SHX Text

1-1/2" CW

AutoCAD SHX Text

1/2" HW

AutoCAD SHX Text

AutoCAD SHX Text 3/4"

AutoCAD SHX Text

1" HW

AutoCAD SHX Text

AutoCAD SHX Text

(2) RPBFP-2

AutoCAD SHX Text

DRAIN TO

AutoCAD SHX Text

S-4 TAILPIECE

AutoCAD SHX Text 1"

AutoCAD SHX Text

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

2-1/2" CW

AutoCAD SHX Text

2" HW

AutoCAD SHX Text

2" CW

AutoCAD SHX Text

3/4" HW

AutoCAD SHX Text

2" CW

AutoCAD SHX Text

3/4" HW

AutoCAD SHX Text

3" CW

AutoCAD SHX Text

2" HW

AutoCAD SHX Text

2-1/2" CW

AutoCAD SHX Text

2" HW

AutoCAD SHX Text 2-1/2"

AutoCAD SHX Text S-18

AutoCAD SHX Text

1-1/2" CW

AutoCAD SHX Text

SH-1

AutoCAD SHX Text

WC-1

AutoCAD SHX Text L-1

AutoCAD SHX Text

HW

AutoCAD SHX Text

CW

AutoCAD SHX Text

2" CW

AutoCAD SHX Text

1" HW

AutoCAD SHX Text 1/2"

AutoCAD SHX Text S-18

AutoCAD SHX Text A240

AutoCAD SHX Text A237

AutoCAD SHX Text A235

AutoCAD SHX Text A233

AutoCAD SHX Text A241

AutoCAD SHX Text A239

AutoCAD SHX Text A236

AutoCAD SHX Text A234

AutoCAD SHX Text A231

AutoCAD SHX Text A232

AutoCAD SHX Text A229

AutoCAD SHX Text A225

AutoCAD SHX Text A230

AutoCAD SHX Text A219

AutoCAD SHX Text A218

AutoCAD SHX Text A217

AutoCAD SHX Text A216

AutoCAD SHX Text A215

AutoCAD SHX Text A214

AutoCAD SHX Text A213

AutoCAD SHX Text A212

AutoCAD SHX Text A211

AutoCAD SHX Text A210

AutoCAD SHX Text A209

AutoCAD SHX Text A208

AutoCAD SHX Text A207

AutoCAD SHX Text A206

AutoCAD SHX Text A205

AutoCAD SHX Text A204

AutoCAD SHX Text A203

AutoCAD SHX Text A202

AutoCAD SHX Text A201

AutoCAD SHX Text A258

AutoCAD SHX Text A260

AutoCAD SHX Text A261

AutoCAD SHX Text A280

AutoCAD SHX Text A282

AutoCAD SHX Text A278

AutoCAD SHX Text A264

AutoCAD SHX Text A268

AutoCAD SHX Text A277

AutoCAD SHX Text A276

AutoCAD SHX Text A275

AutoCAD SHX Text A270

AutoCAD SHX Text A273

AutoCAD SHX Text A271

AutoCAD SHX Text A272

AutoCAD SHX Text A279

AutoCAD SHX Text A281

AutoCAD SHX Text A224

AutoCAD SHX Text A221

AutoCAD SHX Text A259

AutoCAD SHX Text A220

AutoCAD SHX Text A222

AutoCAD SHX Text A266

AutoCAD SHX Text A269

AutoCAD SHX Text A223

AutoCAD SHX Text A226

AutoCAD SHX Text A227

AutoCAD SHX Text A265

AutoCAD SHX Text A267

AutoCAD SHX Text A274

AutoCAD SHX Text A283

AutoCAD SHX Text A284

AutoCAD SHX Text

MATCHLINE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A201

AutoCAD SHX Text A203

AutoCAD SHX Text A205

AutoCAD SHX Text A206

AutoCAD SHX Text A207

AutoCAD SHX Text A208

AutoCAD SHX Text A210

AutoCAD SHX Text A211

AutoCAD SHX Text A220

AutoCAD SHX Text A221

AutoCAD SHX Text A222

AutoCAD SHX Text A223

AutoCAD SHX Text A224

AutoCAD SHX Text A225

AutoCAD SHX Text A226

AutoCAD SHX Text A228

AutoCAD SHX Text A229

AutoCAD SHX Text A231

AutoCAD SHX Text A232

AutoCAD SHX Text A233

AutoCAD SHX Text A234

AutoCAD SHX Text A235

AutoCAD SHX Text A236

AutoCAD SHX Text A237

AutoCAD SHX Text A238

AutoCAD SHX Text A239

NURSE OFFICE

CROW RESERVATION

CROW AGENCY, MONTANA

26/03/2020 BI18CR202H6

MICHAEL JENSEN, P.E. BC 13

VA

RI

ES

CR

O W

P U

M

PS

R

EP

LA

CE

M

EN

T

CR

O W

/N O

RT

HE

RN

C

HE

YE

N N

E

HO

SP

IT

AL

CR

O

W /N

O

RT

HE

RN

C

HE

YE

N

N E

HO

SP

IT

AL

CR

O

W R

ES

ER

VA

TI

O N

CR

O

W A

GE

N

CY

, M

O N

TA

N

A

ENGINEER:

SCW BYPASS VALVE

SH

DRAWN BY:

DATE: PROJECT NUMBER:

DEPARTMENT OF HEALTH & HUMAN SERVICES

U.S.PUBLIC HEALTH SERVICE

BILLINGS AREA INDIAN HEALTH SERVICE

P.O. BOX 36600

2900 4TH AVE. NORTH

BILLINGS, MT 59107

OF

REVISIONS

# DESCRIPTIONDATE BY

SH

EE

T

PR

O

JE

CT

SO

FT

EN

ED

C

O

LD

W

AT

ER

V

AL

VE

R

EP

LA

CE

M

EN

T

PL

AN

DOWNSTREAM ISOLATION

VALVES LOCATED IN B 124

CLOSE THESE VALVES TO ISOLATE

CORRODED VALVE.

DRAIN THROUGH VALVE

TO BE REPLACED

FIGURE 1: APOLLO 70LF-209-01,OR APPROVED EQUAL,

LEAD FREE BALL VALVE

VALVE TO BE REPLACED

PLAN VIEW: ROOMS B121-B124

PLAN VIEW: BOILER ROOM

NOTES:

1. DOWNSTREAM ISOLATION VALVES ARE LOCATED IN

B-124.

2. DRAIN SOFTENED COLD WATER INTO NEAREST

AVAILABLE FLOOR DRAIN.

3. CONTRACTOR TO REPLACE CORRODED PIPE AS

NECESSARY.

DIAGRAM: SOFT COLD WATER FLOW

FIGURE 2: CORRODED BALL VALVE

AutoCAD SHX Text Date

AutoCAD SHX Text 16505

AutoCAD SHX Text 04/14/2020

AutoCAD SHX Text

SW-1

AutoCAD SHX Text

SW-2

AutoCAD SHX Text

STOR

AutoCAD SHX Text

FS-3

AutoCAD SHX Text

SALT

AutoCAD SHX Text

STOR.

AutoCAD SHX Text

SALT

AutoCAD SHX Text

STOR.

AutoCAD SHX Text

BRINE

AutoCAD SHX Text

WS-1

AutoCAD SHX Text

AutoCAD SHX Text

SCW

AutoCAD SHX Text 4"

Auto…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .