| PROJECT TITLE: Plan Program Integrity MEDIC |
| Detailed Price Summary |
| Contract Line Item Description | Base Period | | | | Option Year One | | | | Option Year Two | | | | Option Year Three | | | | Option Year Four | | | |
| Director Labor | FTEs | Hours | Rates | Total Price | FTEs | Hours | Rates | Total Price | FTEs | Hours | Rates | Total Price | FTEs | Hours | Rates | Total Price | FTEs | Hours | Rates | Total Price |
| Program Director (K) | | | | | | | | | | | | | | | | | | | | |
| Audit Manager (K) | | | | | | | | | | | | | | | | | | | | |
| Chief Statistician (K) | | | | | | | | | | | | | | | | | | | | |
| Pharmacy Specialist (K) | | | | | | | | | | | | | | | | | | | | |
| Medical Director (K) | | | | | | | | | | | | | | | | | | | | |
| Total | |
| Direct Labor Subtotal | |
| Fringe Benefits | |
| Subtotal Director Labor & Fringe | |
| Overhead | |
| Subtotal Direct Labor, Fringe and Overhead | |
| ODCs (see separate schedule) | |
| Travel | |
| Subcontracts | |
| Subtotal ODCs | |
| Subtotal - All Costs | |
| G&A | |
| Total Cost | |
| Fee/Profit | |
| Total Estimated Yearly Values | |
| TOTAL ESTIMATED VALUE OF CONTRACT | $ - |
| Assumptions: | Percent |
| Inflation Rate Per Year | 0.00% |
| Fringe Benefits Rate | 0.00% |
| Overhead Rate | 0.00% |
| G&A Rate | 0.00% |
| Fee/Profit Percentage | 6.00% |
Fee/Profit Percentage 0.00%
CLIN 001-Base Year
| PROJECT TITLE: PPI MEDIC |
| Base Year |
| Contract Line Item Description | Total FTEs | Task 1: Transition | | | Task 2: Access Systems | | | Task 3: Program Integrity Data Users Group | | | Task 4: IDR User Group | | | Task 5: Analytics: Data and Ad Hoc Analysis | | | Task 6.1: Self-Audits | | | Task 6.2: National Audits | | | Task 6.3: PI Audits | | | Task 7: Presenation Materials | | | Task 8: Identifying Volunerabilities | | | Task 9: Peer to Peer Communication Reporting | | | Task 10: Plan Sponsor Alerts | | | Task 11: CMS Mailbox Plan Correspondence | | | Task 12: RFIs | | | Task 13: Reporting | | | Task 14: Status Meetings | | | All Tasks | | |
| Direct Labor | | Hours | Rates | Total | Hours | Rates | Total Price | Hours | Rates | Total | Hours | Rates | Total | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Total hours | Rates | Total |
| Program Director (K) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Audit Manager (K) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Chief Statistician (K) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Pharmacy Specialist (K) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Medical Director (K) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Direct Labor Subtotal |
| Fringe Benefits |
| Subtotal Director Labor & Fringe |
| Overhead |
| Subtotal Direct Labor, Fringe and Overhead |
| ODCs (see separate schedule) |
| Travel (see separate schedule) |
| Subcontracts |
| Subtotal ODCs |
| Subtotal - All Costs |
| G&A |
| Total Cost |
| Fee/Profit |
| Total Estimated Yearly Values |
| Assumptions: | Percent |
| Inflation Rate Per Year | 0.00% |
| Fringe Benefits Rate | 0.00% |
| Overhead Rate | 0.00% |
| G&A Rate | 0.00% |
| Fee/Profit Percentage | 0.00% |
CLIN 002-Option Year 1
| PROJECT TITLE: PPI MEDIC |
| Option Year 1 |
| Contract Line Item Description | Total FTEs | Task 1: Transition | | | Task 2: Access Systems | | | Task 3: Program Integrity Data Users Group | | | Task 4: IDR User Group | | | Task 5: Analytics: Data and Ad Hoc Analysis | | | Task 6.1: Self-Audits | | | Task 6.2: National Audits | | | Task 6.3: PI Audits | | | Task 7: Presenation Materials | | | Task 8: Identifying Volunerabilities | | | Task 9: Peer to Peer Communication Reporting | | | Task 10: Plan Sponsor Alerts | | | Task 11: CMS Mailbox Plan Correspondence | | | Task 12: RFIs | | | Task 13: Reporting | | | Task 14: Status Meetings | | | All Tasks | | |
| Direct Labor | | Hours | Rates | Total | Hours | Rates | Total Price | Hours | Rates | Total | Hours | Rates | Total | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Total hours | Rates | Total |
| Program Director (K) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Audit Manager (K) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Chief Statistician (K) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Pharmacy Specialist (K) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Medical Director (K) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Direct Labor Subtotal |
| Fringe Benefits |
| Subtotal Director Labor & Fringe |
| Overhead |
| Subtotal Direct Labor, Fringe and Overhead |
| ODCs (see separate schedule) |
| Travel |
| Subcontracts |
| Subtotal ODCs |
| Subtotal - All Costs |
| G&A |
| Total Cost |
| Fee/Profit |
| Total Estimated Yearly Values |
| Assumptions: | Percent |
| Inflation Rate Per Year | 0.00% |
| Fringe Benefits Rate | 0.00% |
| Overhead Rate | 0.00% |
| G&A Rate | 0.00% |
| Fee/Profit Percentage | 0.00% |
CLIN 003-Option Year 2
| PROJECT TITLE: PPI MEDIC |
| Option Year 2 |
| Contract Line Item Description | Total FTEs | Task 1: Transition | | | Task 2: Access Systems | | | Task 3: Program Integrity Data Users Group | | | Task 4: IDR User Group | | | Task 5: Analytics: Data and Ad Hoc Analysis | | | Task 6.1: Self-Audits | | | Task 6.2: National Audits | | | Task 6.3: PI Audits | | | Task 7: Presenation Materials | | | Task 8: Identifying Volunerabilities | | | Task 9: Peer to Peer Communication Reporting | | | Task 10: Plan Sponsor Alerts | | | Task 11: CMS Mailbox Plan Correspondence | | | Task 12: RFIs | | | Task 13: Reporting | | | Task 14: Status Meetings | | | All Tasks | | |
| Direct Labor | | Hours | Rates | Total | Hours | Rates | Total Price | Hours | Rates | Total | Hours | Rates | Total | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Total hours | Rates | Total |
| Program Director (K) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Audit Manager (K) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Chief Statistician (K) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Pharmacy Specialist (K) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Medical Director (K) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Direct Labor Subtotal |
| Fringe Benefits |
| Subtotal Director Labor & Fringe |
| Overhead |
| Subtotal Direct Labor, Fringe and Overhead |
| ODCs (see separate schedule) |
| Travel |
| Subcontracts |
| Subtotal ODCs |
| Subtotal - All Costs |
| G&A |
| Total Cost |
| Fee/Profit |
| Total Estimated Yearly Values |
| Assumptions: | Percent |
| Inflation Rate Per Year | 0.00% |
| Fringe Benefits Rate | 0.00% |
| Overhead Rate | 0.00% |
| G&A Rate | 0.00% |
| Fee/Profit Percentage | 0.00% |
CLIN 004-Option Year 3
| PROJECT TITLE: PPI MEDIC |
| Option Year 3 |
| Contract Line Item Description | Total FTEs | Task 1: Transition | | | Task 2: Access Systems | | | Task 3: Program Integrity Data Users Group | | | Task 4: IDR User Group | | | Task 5: Analytics: Data and Ad Hoc Analysis | | | Task 6.1: Self-Audits | | | Task 6.2: National Audits | | | Task 6.3: PI Audits | | | Task 7: Presenation Materials | | | Task 8: Identifying Volunerabilities | | | Task 9: Peer to Peer Communication Reporting | | | Task 10: Plan Sponsor Alerts | | | Task 11: CMS Mailbox Plan Correspondence | | | Task 12: RFIs | | | Task 13: Reporting | | | Task 14: Status Meetings | | | All Tasks | | |
| Direct Labor | | Hours | Rates | Total | Hours | Rates | Total Price | Hours | Rates | Total | Hours | Rates | Total | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Total hours | Rates | Total |
| Program Director (K) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Audit Manager (K) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Chief Statistician (K) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Pharmacy Specialist (K) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Medical Director (K) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Direct Labor Subtotal |
| Fringe Benefits |
| Subtotal Director Labor & Fringe |
| Overhead |
| Subtotal Direct Labor, Fringe and Overhead |
| ODCs (see separate schedule) |
| Travel |
| Subcontracts |
| Subtotal ODCs |
| Subtotal - All Costs |
| G&A |
| Total Cost |
| Fee/Profit |
| Total Estimated Yearly Values |
| Assumptions: | Percent |
| Inflation Rate Per Year | 0.00% |
| Fringe Benefits Rate | 0.00% |
| Overhead Rate | 0.00% |
| G&A Rate | 0.00% |
| Fee/Profit Percentage | 0.00% |
CLIN 005- Option Year 4
| PROJECT TITLE: PPI MEDIC |
| Option Year 4 |
| Contract Line Item Description | Total FTEs | Task 1: Transition | | | Task 2: Access Systems | | | Task 3: Program Integrity Data Users Group | | | Task 4: IDR User Group | | | Task 5: Analytics: Data and Ad Hoc Analysis | | | Task 6.1: Self-Audits | | | Task 6.2: National Audits | | | Task 6.3: PI Audits | | | Task 7: Presenation Materials | | | Task 8: Identifying Volunerabilities | | | Task 9: Peer to Peer Communication Reporting | | | Task 10: Plan Sponsor Alerts | | | Task 11: CMS Mailbox Plan Correspondence | | | Task 12: RFIs | | | Task 13: Reporting | | | Task 14: Status Meetings | | | All Tasks | | |
| Direct Labor | | Hours | Rates | Total | Hours | Rates | Total Price | Hours | Rates | Total | Hours | Rates | Total | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Hours | Rates | Total Price | Total hours | Rates | Total |
| Program Director (K) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Audit Manager (K) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Chief Statistician (K) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Pharmacy Specialist (K) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Medical Director (K) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Direct Labor Subtotal |
| Fringe Benefits |
| Subtotal Director Labor & Fringe |
| Overhead |
| Subtotal Direct Labor, Fringe and Overhead |
| ODCs (see separate schedule) |
| Travel |
| Subcontracts |
| Subtotal ODCs |
| Subtotal - All Costs |
| G&A |
| Total Cost |
| Fee/Profit |
| Total Estimated Yearly Values |
| Assumptions: | Percent |
| Inflation Rate Per Year | 0.00% |
| Fringe Benefits Rate | 0.00% |
| Overhead Rate | 0.00% |
| G&A Rate | 0.00% |
| Fee/Profit Percentage | 0.00% |
Travel
| Travel Estimates - Base Period | | | | | | | | | | | | |
| Reason for Trip | From | To | Number of People | Times per PoP | Airfare/Train | Hotel | Number of Nights | Meals & Incidentals Per Diem Per FTR | Car Rental | Home Airport/train Parking | Milage/Tolls/Parking/Misc* | Total |
| Travel Estimates - Option Period 1 | | | | | | | | | | | | |
| Reason for Trip | From | To | Number of People | Times per PoP | Airfare/Train | Hotel | Number of Nights | Meals & Incidentals Per Diem Per FTR | Car Rental | Home Airport/train Parking | Milage/Tolls/Parking/Misc* | Total |
| Travel Estimates - Option Period 2 | | | | | | | | | | | | |
| Reason for Trip | From | To | Number of People | Times per PoP | Airfare/Train | Hotel | Number of Nights | Meals & Incidentals Per Diem Per FTR | Car Rental | Home Airport/train Parking | Milage/Tolls/Parking/Misc* | Total |
| Travel Estimates - Option Period 3 | | | | | | | | | | | | |
| Reason for Trip | From | To | Number of People | Times per PoP | Airfare/Train | Hotel | Number of Nights | Meals & Incidentals Per Diem Per FTR | Car Rental | Home Airport/train Parking | Milage/Tolls/Parking/Misc* | Total |
| Travel Estimates - Option Period 4 | | | | | | | | | | | | |
| Reason for Trip | From | To | Number of People | Times per PoP | Airfare/Train | Hotel | Number of Nights | Meals & Incidentals Per Diem Per FTR | Car Rental | Home Airport/train Parking | Milage/Tolls/Parking/Misc* | Total |
Total $0
ODCs
| Other Direct Costs - Base Year | | | | | | | | | | | | | | | | | |
| TASKS: | Task 1: Transition | Task 2: Access Systems | Task 3: Program Integrity Data Usesr | Task 4: IDR User Group | Task 5: Analytics-Data and Ad Hoc Analysis | Task 6.1: Self-Audits | Task 6.2: National Audits | Task 6.3: PI Audits | Task 7: Presentation Materials | Task 8: Identifiying Volunerabilities | Task 9: Peer to Peer Communication | Task 10: Plan Sponsor | Task 11: CMS Mailbox Plan Correspondence | Task 12: RFIs | Task 13: Reporting | Task 14: Status Meetings | GRAND TOTAL |
TOTAL: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Other Direct Costs - Option Year 1 | | | | | | | | | | | | | | | | | |
| TASKS: | Task 1: Transition | Task 2: Access Systems | Task 3: Program Integrity Data Usesr | Task 4: IDR User Group | Task 5: Analytics-Data and Ad Hoc Analysis | Task 6.1: Self-Audits | Task 6.2: National Audits | Task 6.3: PI Audits | Task 7: Presentation Materials | Task 8: Identifiying Volunerabilities | Task 9: Peer to Peer Communication | Task 10: Plan Sponsor | Task 11: CMS Mailbox Plan Correspondence | Task 12: RFIs | Task 13: Reporting | Task 14: Status Meetings | GRAND TOTAL |
TOTAL: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Other Direct Costs - Option Year 2 | | | | | | | | | | | | | | | | | |
| TASKS: | Task 1: Transition | Task 2: Access Systems | Task 3: Program Integrity Data Usesr | Task 4: IDR User Group | Task 5: Analytics-Data and Ad Hoc Analysis | Task 6.1: Self-Audits | Task 6.2: National Audits | Task 6.3: PI Audits | Task 7: Presentation Materials | Task 8: Identifiying Volunerabilities | Task 9: Peer to Peer Communication | Task 10: Plan Sponsor | Task 11: CMS Mailbox Plan Correspondence | Task 12: RFIs | Task 13: Reporting | Task 14: Status Meetings | GRAND TOTAL |
TOTAL: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Other Direct Costs - Option Year 3 | | | | | | | | | | | | | | | | | |
| TASKS: | Task 1: Transition | Task 2: Access Systems | Task 3: Program Integrity Data Usesr | Task 4: IDR User Group | Task 5: Analytics-Data and Ad Hoc Analysis | Task 6.1: Self-Audits | Task 6.2: National Audits | Task 6.3: PI Audits | Task 7: Presentation Materials | Task 8: Identifiying Volunerabilities | Task 9: Peer to Peer Communication | Task 10: Plan Sponsor | Task 11: CMS Mailbox Plan Correspondence | Task 12: RFIs | Task 13: Reporting | Task 14: Status Meetings | GRAND TOTAL |
TOTAL: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Other Direct Costs - Option Year 4 | | | | | | | | | | | | | | | | | |
| TASKS: | Task 1: Transition | Task 2: Access Systems | Task 3: Program Integrity Data Usesr | Task 4: IDR User Group | Task 5: Analytics-Data and Ad Hoc Analysis | Task 6.1: Self-Audits | Task 6.2: National Audits | Task 6.3: PI Audits | Task 7: Presentation Materials | Task 8: Identifiying Volunerabilities | Task 9: Peer to Peer Communication | Task 10: Plan Sponsor | Task 11: CMS Mailbox Plan Correspondence | Task 12: RFIs | Task 13: Reporting | Task 14: Status Meetings | GRAND TOTAL |
TOTAL: $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
BLS Matrix
| Offeror's Proposed Labor Category | Offeror's Proposed Labor Rate | BLS Labor Category/Number | State/Municipality (If "National" is used please justify) | BLS Labor Rate | BLS Percentile | BLS Labor Category Description | Offeror's Proposed Labor Category Description/Duties | Offeror's Justification of Choosen BLS Labor Category/Percentile/Rate and Proposed Labor Rate/Duties |
| Aerospace Engineer - Design and Development | $78.00 | Lead Aerospace Engineer 17-2011 | Los Angeles - Long Beach - Glendale, California Metropolitan Division | $74.96 | 75th | Perform engineering duties in designing, constructing, and testing aircraft, missiles, and spacecraft. May conduct basic and applied research to evaluate adaptability of materials and equipment to aircraft design and manufacture. May recommend improvements in testing equipment and techniques. | The individual proposed will serve as Design and Development Division's Aerospace Engineering Team Lead. This individual will lead a team of four Engineers in the development, design, and testing of spacecrafts. This individual is required to have a Master's Degree in Aerospace Engineering and 10+ years of experience. | *Based on the Offeror’s review of the labor category 17-2011, it is the labor category which best captures the duties and skills set required for the proposed labor category of “Lead Aerospace Engineer”. This individual is proposed in the Los Angeles, CA and as a result the offeror utilized BLS labor rate data specific to the Los Angeles - Long Beach - Glendale, California Metropolitan Division. The individual proposed for this effort is intended to fulfill a team lead position and as a result the offeror believes these extra duties justify a labor rate closer to 75th percentile rather than the mean or median rate for Los Angeles for an Aerospace Engineer. |