This document is a federal government contract work item that describes the requirements for investigating the source of elevated iron and aluminum levels in the compressor oil for the #1 Start Air Compressor on the USCGC Healy. The key details are:
The contractor must inspect the internal components of the compressor, take an oil sample, and renew the oil per the technical publications. The work must be performed while the Healy is docked in Seattle, WA from April 8 to April 30, 2024. The contractor must witness initial and final operational tests of the compressor. The related federal contract opportunity is a solicitation for $81,652.29 in services and parts, including a $51,502.29 overhaul kit and $30,150 in field service labor. This is a small business set-aside with responses due by December 1, 2023.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CGC HEALY Start Air Comp 1 Lube Oil Sample Analysis.pdf | ||
| Scope of Work-CGC HEALY- start air compressor.docx | DOCX document | |
| Scope of Work-CGC HEALY- start air compressor.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and equipment.
3.3 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.4 Fire Prevention Specification. The Contractor must submit a Fire Prevention Plan in accordance with paragraph 3.1 of SFLC Standard Spec 5550
50000_ BJA_0324_420
WORK ITEM 1: Start Air Compressor, Open and Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to investigate the source of elevated iron and aluminum levels in compressor oil for the #1 Start Air Compressor in AMR #7.
1.2 Government-furnished property.
None
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 420-WAGB-801-001, Rev K, Booklet of General Drawings Coast Guard Publications
Coast Guard Technical Publication (TP) 5340, SWBS 551,Sauer WP 400 Air Compressor Operating Instructions.
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, General Requirements Other References
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2. Tech Rep.
None.
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000.
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.1.5. Period of Performance. The period of performance for this work starts on 8 April 2024 and ends on 30 April 2024.
3.1.6. Location. The Contractor must perform the work whole the USCGC Healy (WAGB 20) is alongside the pier at 1519 Alaskan Way South, Seattle, WA 98134-1102. Start Air Compressor #1 is located in Auxiliary Machine Room 8 (2-93-0-E), as shown in CG Drawing 420-WAGB-801-001.
3.2 Operational test - initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. The steering system will unavailable for an operational test, but any other disturbed equipment must be tested. Submit a CFR.
3.3 Fuel Sample. The Contractor must take a sample of the compressor oil in accordance with SFLC Std Spec 2.1.3.1. Portable testing apparatuses are acceptable for this test.
3.4 Inspect. The Contractor must inspect the internals of compressor to determine the source of aluminum and steel shavings in the oil samples.
3.3.1. The Contractor must reassemble any portion of the compressor that is disassembled to investigate the shavings. They must for renewing all disturbed seals.
3.3.2. Any disassembly and reassembly must be accomplished in accordance with TP 5340.
3.3.3. The oil sample report that included the shavings is attached to the solicitation.
3.3.4. At a minimum, the Contractor must remove the inspection plates on the side of the crank case (see Figure 1). The Contractor must also disconnect the compressor from the motor via the coupling and rotate the compressor, listening for unusual noise and noting freedom of movement.
3.3.5. The Contactor must renew the oil for the compressor in accordance with TP 5340 and SFLC Std Spec 5000 C2.1.1. Testing may be accomplished with a portable testing apparatus. Provide the old oil to the COR for disposal.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.4 Operational Test, Final. Upon completion of work, the Contractor must witness Coast Guard personnel perform an operational test of all items or shipboard devices that were disturbed, used, repaired or altered, to demonstrate their operational condition. Submit a CFR.
4. NOTES
Figure 1. Inspection plate (Circled in orange)