Schedule B.xls
XLS spreadsheet 50 KB Posted
- Attached to
- 70Z080-20-Q-P4507400_BEAR_Drydock Repairs Federal contract opportunity
- Solicitation number
- 70Z080-20-Q-P4507400
About this file
This document contains a pricing schedule and cost estimate template for ship repair work on the USCGC BEAR (WMEC-270A). The pricing schedule lists over 30 separate repair and maintenance items with unit pricing, including hull plating restoration, sea valve overhaul, deck repair, and propulsion system inspections. Labor rates are provided for various trades. The cost estimate template includes sections for direct labor hours and rates, material and subcontracting costs, overhead factors, and location-specific median labor rates.
The related federal contract opportunity is a solicitation issued by the U.S. Coast Guard for drydock repairs to the USCGC BEAR. The solicitation is open to full and open competition under FAR Part 12 for commercial items and FAR Part 13.5 for simplified acquisition procedures. The NAICS code is 336611 for ship repair with a small business size standard of 1,250 employees. Quotations are being requested rather than a separate written solicitation. The solicitation number is 70Z080-20-Q-P4507400.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 00001(12-16-19).pdf | ||
| 901-WMEC_256_13_1_-_- MN and AUX Cooling SysDiag.pdf | ||
| 70Z080-20-Q-P4507400 Solicitation BEAR Drydock FY20.pdf | ||
| Specification_BEAR Drydock.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC BEAR (WMEC-270A) DRYDOCK AVAILABILITY FY2020 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (U/W Body), Ultrasonic Testing | JOB | 1 | $0.00 | |
| D-002 | U/W Body, Preserve (100%) | JOB | 1 | $0.00 | |
| D-003 | Hull Plating Freeboard, Preserve “100%” | JOB | 1 | $0.00 | |
| D-004 | Appendages (U/W), Preserve (Internal) And Leak Test | JOB | 1 | $0.00 | |
| D-005 | Propulsion Shaft Fairwaters And Rope Guards, Inspect | JOB | 1 | $0.00 | |
| D-006 | Voids (Non-Accessible), Preserve (Internal) And Leak Test | JOB | 1 | $0.00 | |
| D-007 | Main Mast, Preserve, 100% | JOB | 1 | $0.00 | |
| D-008 | Propulsion Shafting, Strain Gage Alignment, Inspect | JOB | 1 | $0.00 | |
| D-009 | Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect And Repair Or Renew | JOB | 1 | $0.00 | |
| D-010 | Controllable Pitch Propellers, Clean and Inspect | JOB | 1 | $0.00 | |
| D-011 | Controllable Pitch Propeller (CPP) System, Inspect and Service | JOB | 1 | $0.00 | |
| D-012 | Controllable Pitch Propeller Hubs, Remove, Inspect and Reinstall | JOB | 1 | $0.00 | |
| D-013 | Fathometer Transducer, Renew | JOB | 1 | $0.00 | |
| D-014 | Sea Valves and Waster Pieces, Overhaul Or Renew | JOB | 1 | $0.00 | |
| D-015 | Sea Strainers - Duplex (All Sizes), Overhaul | JOB | 1 | $0.00 | |
| D-016 | Sea Strainers - Simplex (All Sizes), Clean and Inspect | JOB | 1 | $0.00 | |
| D-017 | Rudder Assemblies, Inspect and Repair | JOB | 1 | $0.00 | |
| D-018 | Superstructure, Preserve “100%” | JOB | 1 | $0.00 | |
| D-019 | Cathodic Protection / Zinc Anodes, Renew | JOB | 1 | $0.00 | |
| D-020 | Drydock | JOB | 1 | $0.00 | |
| D-021 | Temporary Services, Provide - Cutter | JOB | 1 | $0.00 | |
| D-022 | Sea Trial Performance, Support, Provide | JOB | 1 | $0.00 | |
| D-023 | Deep Water Sounder, Remove | JOB | 1 | $0.00 | |
| D-024 | Doppler Speed Log, Replace | JOB | 1 | $0.00 | |
| D-025 | OTHB Fueling Station Pump Relief Valve, Replace | JOB | 1 | $0.00 | |
| D-026 | Hull Plating (Ballast Tanks), Renew | JOB | 1 | $0.00 | |
| D-027 | Ventilation Plenum Space, Repair | JOB | 1 | $0.00 | |
| D-028 | Emergency Diesel Generator (EDG) Exhaust System, Repair | JOB | 1 | $0.00 | |
| D-029 | Deck Plating (Lower Stores Passageway), Repair | JOB | 1 | $0.00 | |
| D-030 | ASW Piping, Renew | JOB | 1 | $0.00 | |
| D-031 | Bilges (Dry Stores), Preserve | JOB | 1 | $0.00 | |
| D-032 | Watertight Doors and Hatches, Renew | JOB | 1 | $0.00 | |
| D-033 | Deck Panels and Deck Covering (CIC, Radio), Renew | JOB | 1 | $0.00 | |
| D-034 | Fantail and 01 Deck, Repair and Preserve | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 1 | 0 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(9/9/2019) Draft-1 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .