This is a combined synopsis and solicitation for commercial ship repair services. The Coast Guard is seeking quotations for dry dock repairs of the USCGC Dependable at a contractor's facility from March 2 to May 11, 2020. Services include all work items in the specification attachment. The solicitation is set aside for small businesses and issued as a request for quotation under FAR Part 12 for commercial items. Quotes are due by January 3, 2020. The contract type will be firm fixed price. The document includes a scope of supplies/services, description of work, and instructions for questions. Relevant details on the repair work, response timeline, and small business set-aside are provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 70Z080-20-Q-P4505700 Solicitation DEPENDABLE Drydock FY20.pdf | ||
| Amendment A00002 Clarifications to Questions.pdf | ||
| Amendment A00001 Clarifications to Questions.pdf | ||
| 70Z080-20-Q-P4505700 Solicitation DEPENDABLE Drydock FY20.pdf | ||
| Amendment A00001 Clarifications to Questions.pdf | ||
| Attachment I DEPENDABLE FY20 DDL.xlsx | XLSX spreadsheet | |
| 70Z080-20-Q-P4505700 Solicitation DEPENDABLE Drydock FY20.pdf | ||
| Attachment III Past_Perf_Quest (PPQ).pdf | ||
| Attachment IV Notice For Filing Agency Protests.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC DEPENDABLE (WMEC 626)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2020
Developed By: Moriba H George
(REV-0, 21 October 2019)
USCGC DEPENDABLE (WMEC-210B) DRYDOCK AVAILABILITY FY2020
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record .......................................................................................................................................... iv Consolidated List of References .................................................................................................................... v Consolidated List of Government-furnished Property ............................................................................... xii Consolidated List of Critical Inspection Items ........................................................................................... xiv Principal Characteristics .............................................................................................................................. xv General Requirements WORK ITEM 1: Hull Plating (U/W Body), Ultrasonic Testing WORK ITEM 2: U/W Body, Preserve (100%) WORK ITEM 3: Hull Plating Freeboard, Preserve – Partial WORK ITEM 4: Appendages (U/W), Leak Test WORK ITEM 5: Propulsion Shaft Fairwaters and Rope Guards, Inspect WORK ITEM 6: Appendages (U/W) - Internal, Preserve WORK ITEM 7: Voids (Non-Accessible), Leak Test WORK ITEM 8: Voids (Non-Accessible), Internal Surfaces, Preserve WORK ITEM 9: Main Mast, Preserve, 100% (CSMP – 20160007) WORK ITEM 10: Propulsion Shafting, Strain Gage Alignment, Inspect WORK ITEM 11: Propulsion Shafting; Remove, Inspect, and Reinstall WORK ITEM 12: Propulsion Intermediate/Line Shafts, Remove, Inspect, and Reinstall WORK ITEM 13: Propulsion Shaft Coating, Renew (OPTIONAL) WORK ITEM 14: Propulsion Shafting, Straighten (OPTIONAL) WORK ITEM 15: Propeller Shaft Sleeve, Renew (OPTIONAL) WORK ITEM 16: Propulsion Shafting, Optical Or Laser Alignment Check (OPTIONAL) WORK ITEM 17: Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect And Repair Or
Renew WORK ITEM 18: Propulsion Shaft Bearings (External), Renew WORK ITEM 19: Propulsion Stern Tube Bearings, Renew WORK ITEM 20: Stern Tube Interior Surfaces, Preserve 100% (OPTIONAL) WORK ITEM 21: Controllable Pitch Propeller (CPP) System, Inspect and Service WORK ITEM 22: Controllable Pitch Propeller (CPP) Hubs, Remove, Inspect and Reinstall WORK ITEM 23: Fathometer Transducer, General Maintenance WORK ITEM 24: Doppler Speed Log, Replace WORK ITEM 25: Sea Valves and Waster Pieces, Overhaul or Renew WORK ITEM 26: Sea Strainers - Duplex (All Sizes), Overhaul WORK ITEM 27: Rudder Assembly; Remove, Inspect and Reinstall WORK ITEM 28: Deep Water Sounder, Remove WORK ITEM 29: Superstructure, Preserve “Partial” WORK ITEM 30: Cathodic Protection / Zinc Anodes, Renew WORK ITEM 31: Drydock WORK ITEM 32: Temporary Services, Provide - Cutter WORK ITEM 33: Structural Stiffeners (Engine Room), Repair (CSMP – 20160012) WORK ITEM 34: Chain Locker, Repair (CSMP – 20170012) WORK ITEM 35: Stringers (Auxiliary Machinery Room / JP-5 Handling Room), Renew (CSMP –
20170023) WORK ITEM 36: Magazine Sprinkler Piping, Renew (CSMP – 20170041) WORK ITEM 37: Bilges (Machinery Spaces), Preserve (CSMP – 20180012) WORK ITEM 38: Mess Deck, Renew (CSMP -20180023) WORK ITEM 39: Tank (MP Fuel Stowage), Repair (CSMP – 20180054) WORK ITEM 40: Striker Plates (OWHT and MP Fuel), Renew (CSMP – 20180055) iii (Rev-0)
WORK ITEM 41: Sea Trial Performance, Support, Provide WORK ITEM 42: Controllable Pitch Propellers, Clean and Inspect iv (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
v (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Bill of Materials 618 WMEC 67, Rev B, Foundations in Auxiliary Machinery Room
Coast Guard Drawing 618 WMEC 163-003, Rev D, Transducer Sea Chests Struct Arrgts & Details
Coast Guard Drawing 618-WMEC-410-001, Seawatch Block Diagram and Installation Details
Coast Guard Drawing 618-WMEC-424-005, Doppler Speed Log System Replacement Ripout, Installation, Arrangement, Wiring, and Details
Coast Guard Drawing 618-WMEC-426-003, MK27F Gyrocompass Installation (See Special Note)
Coast Guard Drawing 618-WMEC 426-005, SAFRAN Bluenaute Gyrocompass Block an Elementary
Wiring Diagram (See Special Note)
Coast Guard Drawing 618-WMEC-451-009, 1SG38-SINS2(V)43 Installation BWD and Details
Coast Guard Drawing 618 WMEC 801-008, Rev -, Curves of Form
Coast Guard Bill of Materials 627 WMEC 7, Rev D, Structural Modifications
Coast Guard Drawing Bill of Materials 627 WMEC 8, Rev G; Arr Firemain, Sprinkling and Washdown
Mn Deck and Above
Coast Guard Drawing Bill of Materials 627 WMEC 9, Rev E; Arr of Firemain, Sprinkling and Washdown
System 2nd Dk & Below
Coast Guard Drawing 627 WMEC 085-231, Rev A, Booklet Of General Plan
Coast Guard Drawing 627 WMEC 085-262, Rev F, Docking Plan, (DEPENDABLE)
Coast Guard Drawing 627-WMEC 085-301, Rev C, Booklet Of General Plans
Coast Guard Drawing 627 WMEC 085-302, Rev F, Docking Plan
Coast Guard Drawing 627 WMEC 101-001, Rev-, Structural Details
Coast Guard Drawing 627 WMEC 111-001, Rev A, Shell Expansion Framing & C.V.K.
Coast Guard Drawing 627 WMEC 116-001, Rev-, Forepeak Framing, Chain Locker, & Transv Bhds #12
& 15-1/2
Coast Guard Drawing 627 WMEC 117-001, Rev B, Transverse Web Frames FWD & AFT of Midship
Coast Guard Drawing 627 WMEC 120-001, Rev D, Misc Bhds 2nd & 3rd Decks
Coast Guard Drawing 627 WMEC 120-002, Rev E, Misc. Bhds Main Deck
Coast Guard Drawing 627 WMEC 122-001, Rev D, Transverse Bulkheads FWD & AFT of Midship
Coast Guard Drawing 627 WMEC 123-002, Rev C, New Double Bottoms Fuel Tank Structure Details
Coast Guard Drawing 627 WMEC 123-003, Rev B, Lube Oil, Dirty Oil, & Diesel Oil Overflow Tanks
Structural Details vi (Rev-0)
Coast Guard Drawing 627 WMEC 131-001, Rev D, Second & Main Deck Plating & Supports
Coast Guard Drawing 627 WMEC 133-001, Rev B, Third Deck Plating & Supports
Coast Guard Drawing 627 WMEC 152-1, Rev G, Superstructure – Aircastle, 01 and 02 Deckhouse and
Stack
Coast Guard Drawing 627 WMEC 161-001, Rev B, Arrg’t & Details Stern Tube & Strut (NOTE: For purpose of bid, Contractor shall assume rope guards are welded in.)
Coast Guard Drawing 627 WMEC 163-003, Rev C, Transducer Sea Chests Struct Arrgts & Details
Coast Guard Drawing 627-WMEC 171-001, Rev R, MMA Main Mast Radar Platform
Coast Guard Drawing 627 WMEC 182-001, Rev C, Main Engine Foundations
Coast Guard Drawing 627 WMEC 182-002, Rev G, MMA Foundation in Engine Room
Coast Guard Drawing 627 WMEC 182-003, Rev B, Foundations in Auxiliary Machinery Room
Coast Guard Drawing 627 WMEC 184-004, Rev E, Doppler Sea Valve Foundations
Coast Guard Drawing 627-WMEC-184-007, DS60 Doppler Sea Valve Foundation
Coast Guard Drawing 627 WMEC 191-001, Rev U, Major Maintenance Availability Solid Ballast
Arrangement
Coast Guard Drawing 627 WMEC 191-002, Rev-, Fixed Ballast Arrangement
Coast Guard Drawing 627 WMEC 201-003, Rev B, Arrangement of Auxiliary Machinery Space
Coast Guard Drawing 627 WMEC 243-1, Rev D, Arrangement and Detail Stern Tube Seal
Coast Guard Drawing 627 WMEC 243-002, Rev C, Arrangement and Details of Piping and Hydraulics
Coast Guard Drawing 627 WMEC 243-005, Rev-, Coupling (Muff) Thrust Ring & Key
Coast Guard Drawing 627 WMEC 243-006, Rev A, Line Shaft
Coast Guard Drawing 627 WMEC 243-006, Rev C, Line Shaft
Coast Guard Drawing 627 WMEC 243-006, Rev-, Line Shaft
Coast Guard Drawing 627 WMEC 243-007, Rev A, Tail Shaft
Coast Guard Drawing 627 WMEC 243-007, Rev C, Tail Shaft
Coast Guard Drawing 627 WMEC 243-007, Rev-, Tail Shaft
Coast Guard Drawing 627 WMEC 243-008, Rev H, Shaft Installation
Coast Guard Drawing 627 WMEC 243-008, Rev K, Shaft Installation
Coast Guard Drawing 627 WMEC 243-008, Rev-, Shaft Installation
Coast Guard Drawing 627 WMEC 243-010, Rev-, CPP Hydraulic Storage Tank & Piping Arrangement
Coast Guard Drawing 627 WMEC 243-2, Rev C, Arrg’t Dets of Piping and Hydraulics
Coast Guard Drawing 627 WMEC 243-5, Rev-, Coupling (Muff) Thrust Ring & Key
Coast Guard Drawing 627 WMEC 243-8, Rev J, Shaft Installation
Coast Guard Drawing 627 WMEC 243-9, Rev A, Arrangement and Details Installation of New John
Crane Seal (Type MX9)
Coast Guard Drawing 627 WMEC 244-001, Rev B, Propulsion Shaft Alignment
Coast Guard Drawing 627 WMEC 245-001, Rev-, Hub Assy (LH)
Coast Guard Drawing 627 WMEC 245-002, Rev-, Hub Assy (RH)
Coast Guard Drawing 627 WMEC 245-003, Rev-, Control Plate Assy (LH)
Coast Guard Drawing 627 WMEC 245-004, Rev-, Control Plate Assy (RH)
Coast Guard Drawing 627 WMEC 245-008, Rev-, CPP Hydraulic System Schematic vii (Rev-0)
Coast Guard Drawing 627 WMEC 245-009, Rev A, Pitch Limit Bracket
Coast Guard Drawing 627 WMEC 245-010, Rev-, Pitch Stop Installation
Coast Guard Drawing 627 WMEC 245-017, Rev E, 210 Foot B Class WMEC Major Maint Availability
Propeller Blade for 66X/4 Hub
Coast Guard Drawing 627 WMEC 245-021, Rev A, CPP Hub Modification Details
Coast Guard Drawing 627 WMEC 245-022, Rev-, Pitch Limit Bracket
Coast Guard Drawing 627 WMEC 261-001, Rev C, Diagram Fuel Oil System
Coast Guard Drawing 627 WMEC 261-002, Rev F, Arrangement of Fuel Oil System
Coast Guard Drawing 627-WMEC-320-001, Power One-Line Diagram
Coast Guard Drawing 627 WMEC 320-002, Rev AW, Power Supplies to Electronic Equipment
Coast Guard Drawing 627-WMEC-401-001, IC & Gyro Room, General Arrangement
Coast Guard Drawing 627-WMEC-401-002, Arrangement of ELEX Equipment, Radio Room and CIC
Coast Guard Drawing 627-WMEC-401-004. Pilothouse Arrangement
Coast Guard Drawing 627-WMEC-424-001, MMA Underwater Navigation System BWD
Coast Guard Drawing 627 WMEC 424-002, Rev U, Underwater Navigation Sys Wrg Data
Coast Guard Drawing 627-WMEC-426-001, MMA Gyrocompass Block Wiring Diagram
Coast Guard Drawing 627 WMEC 506-001, Rev C, Diagram Sounding Tubes & Air Escapes
Coast Guard Drawing 627 WMEC 506-002, Rev E, Arrangement of Sounding Tubes & Air Escapes
Coast Guard Drawing 627 WMEC 512-009, Rev F, Arrangement Ventilation & Air Conditioning Third
Deck
Coast Guard Drawing 627 WMEC 521-001, Rev B; Diagram Firemain, Sprinkling & Washdown
Coast Guard Drawing 627 WMEC 521-002, Rev G, Arr of Firemain, Sprinkling & Washdown System
Main Deck & Above
Coast Guard Drawing 627 WMEC 521-003, Rev F, Arr. of Firemain, Sprinkling and Washdown System
2nd Dk. & Below
Coast Guard Drawing 627 WMEC 521-003, Rev G, Arrangement of Firemain, Sprinkling and Washdown
System 2nd Dk. & Below
Coast Guard Drawing 627 WMEC 528-001, Rev H, Arr of Plumbing Sys and Drains
Coast Guard Drawing 627 WMEC 528-004, Rev-, Arrangement Plumbing System Drains and Deck
Coast Guard Drawing 627 WMEC 529-001, Rev C, Diagram of Bilge System
Coast Guard Drawing 627 WMEC 529-004, Rev B, Diagram of Oily Water Separator System
Coast Guard Drawing 627 WMEC 529-005, Rev B, Arrgt of Oily Water Separator System
Coast Guard Drawing 627 WMEC 531-001, Rev A, Foundation Installation Disconnect Switches RC5000
Osmosis Unit
Coast Guard Drawing 627 WMEC 533-007, Rev D, Reverse Osmosis Desalinator Arrangement & Details
Coast Guard Drawing 627 WMEC 535-002, Rev F, Arrangement of Stm., Feed & Condensate System
Piping
Coast Guard Drawing 627 WMEC 535-002, Rev G, Arrangement of Steam, Feed & Condensate System
Piping
Coast Guard Drawing 627 WMEC 562-001, Rev G, Arrgt & Details Rudder Stocks, Bearings, & Stuff
Box
Coast Guard Drawing 627 WMEC 562-003, Rev A, “A” & “B” Class Rudder Construction
Coast Guard Drawing 627 WMEC 581-001, Rev B, Anchor Handling viii (Rev-0)
Coast Guard Drawing 627 WMEC 601-001, Rev F, Outboard Profile
Coast Guard Drawing 627 WMEC 601-1, Rev C; Outboard Profile
Coast Guard Drawing 627 WMEC 601-003, Rev E, General Arrangement – Second and Third Decks
Coast Guard Drawing 627-WMEC 613-001, Rev B, Mainmast Rigging Arrg’t & Dets.
Coast Guard Drawing 627 WMEC 622-001, Rev D; Arrgt Dets of Ladders, Grating, Floor Plates in
Machy Space - plans
Coast Guard Drawing 627 WMEC 633-001, Rev B, Hull Zinc Protectors
Coast Guard Drawing 627 WMEC 651-001, Rev H, Arrgt Crew’s Galley Mess & Scullery
Coast Guard Drawing 627-WMEC-672-002, Storeroom, Third Deck
Coast Guard Drawing 627 WMEC 763-004, Rev B, Armory Arrangement & Details
Coast Guard Drawing FL 6713-203, Rev -, CRP-V850 Transducer (SS505) Adapter Assembly
Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem
Coast Guard Fleet Drawing FL 2804-22, Rev-, Consolidated Visual ID for Cutters
Coast Guard Drawing FL 6713-203, Rev -, CRP-V850 Transducer (SS505) Adapter Assembly
Coast Guard Drawing FL-6701-221, SIRVSS & CVRS Block Wiring Diagrams and Installation Details
NAVSEA Drawing 803-2145807, Rev C, Propulsion Shafting And Components
NAVSEA Drawing 803-921865, Rev R, Cathodic Protection Hull Zinc Anodes
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual
Coast Guard Commandant Instruction (COMDTINST) M9000.6F, Naval Engineering Manual
Coast Guard Commandant Instruction (COMDTINST) M9077.1C, Change 1, Aug 2001, Equipment Tag-
Out Procedures
Coast Guard Commandant Instruction (COMDTINST) 9077.1 (series), Equipment Tag-Out Procedures
Coast Guard Technical Publication TP-3446, Doppler Speed Log, Model SRD-500 Dual Axis
Coast Guard Technical Publication (TP) 0701, Feb 2009, Ship Instruction Manual - Propellers and
Shafting - Operation and Service KAMEWA Controllable Pitch Marine Propeller
Coast Guard Technical Publication (TP) 0701, Sept 2017, Manufacturers Instruction Book – SWBS 245
Coast Guard Technical Publication (TP) 3231A, Feb 2012, Manufacturer’s Instruction Book-SWBS
Group(s) 242-245, Chapter 243, Section A, Stern Tube Seal, MX9, US-71996
Coast Guard Technical Publication (TP) 3446, Jun 2009, Doppler Speed Log, Model SRD-500 Dual Axis
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 3041, (SFLC Std Spec 3041) 2014 Edition, Shipboard Electrical Cable Test
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary
Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures ix (Rev-0)
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2014, Drydocking
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary
Services
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary
Hull Accesses
OTHER REFERENCES
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and
Welding End
ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D4174, R2015, Standard Practice for Cleaning, Flushing, and Purification of Petroleum Fluid Hydraulic Systems
ASTM International (ASTM) D4174, Re-approved 2005, Standard Practice for Cleaning, Flushing, and
Purification of Petroleum Fluid Hydraulic Systems
ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component
Adhesives (An)
ASTM International (ASTM) D5363, 2016, Standard Specification for Anaerobic Single-Component
Adhesives (AN)
ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates
Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Anti-seize, Zinc Dust-
Petrolatum
Commercial Item Descriptions (CID) A-A-59316, Nov 2003 Abrasive Materials for Blasting
Environmental Protection Agency (EPA) Technician Certification, Type IV (Universal Certification)
Federal Specification (Fed Spec) HH-P-151, Mar 1991, Packing; Rubber-Sheet, Cloth-Insert
Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement
IEEE STD 45-2002, Recommended Practice for Electrical Installations on Shipboard
International Standard Organization (ISO) 4406, 1999, Hydraulic Fluid Power – Fluids – Method for
Coding Level of Contamination by Solid Particles
International Standard Organization (ISO) 4406, 2017, Hydraulic Fluid Power – Fluids – Method for
Coding the Level of Contamination by Solid Particles – Third Edition
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze Gate, Globe, Angle and Check Valves
MIL PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut Back, Cold Application
MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418)
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-DTL-15024, General Specification for Plates, Tags, and Bands for Identification of Equipment
MIL-DTL-24643, General Specification for Low Smoke Electric Cables and Cords for Shipboard Use
MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application x (Rev-0)
MIL-PRF-16173, Sep 2006, Corrosion Preventive Compound, Solvent Cutback, Cold-Application
MIL-PRF-24647, Apr 2013, Paint System, Anticorrosive and Antifouling, Ship Hull
MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
MIL-STD-1310 (series), Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic
Compatibility, Electromagnetic Pulse (EPM) Mitigation and Safety
MIL-STD-2003, Electric Plant Installation Standard Methods (Section 1: Cable)
MIL-STD-2003, Electric Plant Installation Standard Methods (Section 2: Equipment)
MIL-STD-2003, Electric Plant Installation Standard Methods (Section 3: Penetrations)
MIL-STD-2003, Electric Plant Installation Standard Methods (Section 4: Cableways)
MIL-STD-2191, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main
Propulsion Shafting
MIL-STD-2199A (SH), July 2010, Covering for Waterborne Main Propulsion Shafting on U.S. Naval
Surface Ships and Submarines
Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA-
PRO-160, Jan 2006, Chapter 16, Cofferdams
Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA-
PRO-160, Jan 2011, Chapter 16, Cofferdams
NAVSEA Drawing 803-1385866, Rev E, Penetration, Bulkhead and Deck
NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation for Compartments Installation
Details
NAVSEA Drawing NAVSEA S9AAO-AB-GOS-101, General Specification for the Overhaul of Surface
Ships
IME/72640-G1, FURUNO DS60 Doppler Speed Log Installation Manual
DS60 Doppler Speed Log Operator’s Manual
Actisense Data Multiplexer NDC-4 Full User Manual
ODOM Echotrac DF3200 MKII, Rev 2, Technical Manual
Raytheon V850 Color Echosounder, 2nd Edition, Mar 1993, Operation Manual
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2014 Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2014, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2015, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, 2007, Near-White Metal Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 12/NACE No.5, 2002, Surface Preparation and Cleaning of Metals by
Waterjetting Prior to Recoating xi (Rev-0)
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP WJ-2/NACE WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough
Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE), 2007, Joint Surface
Preparation Standard SSPC-SP 10/NACE No.2, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation
Standard SSPC-SP 12/NACE No. SSPC-SP 12/NACE No.5, Surface Preparation and Cleaning of
Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting Prior to Recoating xii (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM
DESCRIPTION
NSN/PN QTY ESTIMATED
COST
($/UNIT)
11 Y **Propeller shaft NSN: 2010-01-092-5810 2 ea. 42,000.00
12 Y **Line Shaft NSN: 2010-01-141-3512 2 ea. 10,000.00
15 N **Inboard stern tube seal sleeve
NSN: 2010-01-187-1763 2 ea. $1485
15 N **Outboard stern tube bearing sleeve
NSN: 2010-01-094-8938 2 ea. $1792
15 N **Forward Strut
Sleeve
NSN: 2010-01-222-9353 2 ea. $1917
15 N **Aft Strut Sleeve NSN: 2010-01-222-9322 2 ea. $2067
17 N Overhaul kit NSN: 2040-01-537-0557 2 ea. 3,000.00
17 Y **Seal Assy NSN: 2040-01-433-6781 2 ea. 24,000.00
18 N Intermediate strut bearing
NSN: 3120-01-027-0025 2 ea. 5516.00
18 N Aft strut bearing NSN: 3120-01-024-6328 2 ea. 3101.00
19 N Stern Tube Bearing NSN: 3120-01-027-0025 2 ea. 5516
21 N Servo Box seal kit
(NOTE: Parts may require machining for proper fit.)
NSN: 5330-01-517-4281 2 ea. 850.00
22 Y **Hub Assembly
(R/H)
NSN: 2010-01-091-5056 1 ea 90,219.50
22 Y **Hub Assembly
(L/H)
NSN: 2010-01-092-0440 1 ea 8,439.00
22 N Hub Installation Kit NSN: 2010-01-466-4844 2 ea. 9,500.00
22 Y **Port Propeller
Blades (R/H)
NSN: 2010-01-134-7238 1 Set 33,090.26
22 Y **Starboard
Propeller Blades
(L/H)
NSN: 2010-01-134-0378 1 set 33,090.26
22 N **Propeller Blade
Bolts
NSN: 5306-01-225-2920 48 ea. 1,900.02
23 N *** Fathometer
Transducer, Shallow
Water, 50-200 kHz
(Airmar Technology
SS505) (without adapter plate)
NSN: 5845-01-470-2500 1 ea. 346.83
24 Y ***Doppler speed log w/ Furuno DS-60
NSN:6605-01-F18-5390 1 ea. 12,936.00 xiii (Rev-0)
Kit
24 N ***Hull Ring 1 ea.
27 N Upper Roller Bearing
Assembly
NSN: 3110-01-080-0814 2 ea. 2,300.00
27 N Lower Micarta Split
Bearing Assembly
(9-3/8"ID x 10-
1/8"OD x 14" Lg)
NSN: 3120-01-148-3763 2 ea. 2,429.00
27 N **Rudder stock sleeve
NSN: 2040-01-653-9587 2 ea. 4,429.00
31 Y *Transducer Cover
Plate
N/A 3 ea. 50.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center xiv (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5
(Inspection report particulars)):
Work
Item Title
1 Hull Plating (U/W Body), Ultrasonic Testing
2 U/W Body, Preserve (100%)
4 Appendages (U/W), Leak Test
7 Voids (Non-Accessible), Leak Test
11 Propulsion Shafting; Remove, Inspect, and Reinstall
12 Propulsion Intermediate/Line Shafts, Inspect
16 Propulsion Shafting, Optical Or Laser Alignment Check
Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect And Repair Or
Renew
18 Propulsion Shaft Bearings (External), Renew
26 Sea Strainers - Duplex (All Sizes), Overhaul
Rudder Assembly; Remove, Inspect and Reinstall
Stringers (Auxiliary Machinery Room / JP-5 Handling Room), Renew
Bilges (Machinery Spaces), Preserve
42 Controllable Pitch Propellers, Clean and Inspect xv (Rev-0)
PRINCIPAL CHARACTERISTICS
210' WMEC (B-CLASS)
PHYSICAL
Length overall 210' 6"
Length between perpendiculars 200' 0"
Beam molded 34' 0"
Depth molded, main deck amidships 19' 6"
Full load displacement 1,170 long tons
Draft, full load to baseline amidships
*Baseline is 9” below keel amidships
12' 0"
Design drag between perpendiculars 1' 6"
Highest projection above baseline
*VHF-FM ADF antenna
90' 0"
Shore tie voltage requirements 400A / 440V
Frame spacing 1' 0"
MACHINERY
Main propulsion 2 ALCO Model 16-251-B Diesel Engines, 5,000 BHP total
Ship's service generators 2 Caterpillar Model 3406B Diesel-driven SR4, 250 KW each @ 0.8 power factor, 440VAC, 3 phase, 60 cycle
Emergency generator Caterpillar Model 3306B Diesel-driven SR4, 180 KW @ 0.8 power factor, 440VAC, 3 phase 60 cycle
Number of propellers 2
Propeller diameter 7' 6"
Number of blades, each 4
Pitch Controllable
Shaft RPM 300
Shaft diameter 8.25" at exit of hull
Anchor & chain Two 2,800 lb. Navy Stockless Anchors, 7 shots of chain each
TANK CAPACITIES
Diesel fuel total (95%) 48,427 gal.
Fresh water total (100%) 11,693 gal.
JP-5 fuel total (95%) 4,683 gal.
Lube oil total (95%) 2,390 gal.
1 (Rev-0)
00000_0618_FLT
REC_00000_FLT_Commercial Project @ Contractor’ Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and
'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is
Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Rev-0)
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec
0000, in accomplishing the following task:
Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to
FOUR Coast Guard fire watch personnel.
Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes
(provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC STD Spec 0000 Appendix A, Requirements for Environmental Protection at
Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The
Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
3 (Rev-0)
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste
Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the
Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;
ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the
Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC STD Spec 0000 Appendix A, Requirements For
Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
3.7.1 Change to SFLC Std Spec 0000, paragraph 1.3. ‘Acronyms and term definitions’, page 5, “PCL (Paint
Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”
3.7.1.1 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for over coating or for system service resumption (see paragraph 3.1.19 of
SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for over coating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”
3.7.2 Change to Std Spec 5000, paragraph D2.2.1.1 bullet, "For running rigging, furnish class 6x37, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope," to "For running rigging, furnish class 6x36, uncoated, independent wire rope core (IWRC), right regular lay
(RRL) wire rope or Dyform-18, rotation resistant wire rope."
3.7.2.1 Change to Std Spec 5000, page D-2, Table D-1 title from "DYFORM-18, 6X19 AND 6X37 IWRC RRL," to " DYFORM-18, 6X19 AND 6X36 IWRC RRL"
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC STD Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
4 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
5 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK ITEM
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
6 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /
7 (Rev-0)
TIME
8 (Rev-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA
RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading
(mils)
Mean Reading (mils) IAW ASTM DD4417).
9 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
10 (Rev-0)
11 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL #
WORK ITEM
COATING MFG PRODUCT NAME
BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR) Required, If Magnetic
Pull-Off (Type I/Banana) Gauge Is
Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
1 AVG. BMR DEVIATION
1 AVG. BMR DEVIATION
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
12 (Rev-0)
11010_UT_0617_FLT
REC_11010_UT_FLT_210’ WMEC ‘B’ Class (ALERT) (1215)
WORK ITEM 1: Hull Plating (U/W Body), Ultrasonic Testing
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to conduct ultrasonic testing
(UT) of U/W hull plating (1000 shots).
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 627 WMEC 085-302, Rev F, Docking Plan
Coast Guard Drawing 627 WMEC 111-001, Rev A; Shell Expansion Framing & C.V.K.
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC STD Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC STD Spec 0740), 2014, Welding and Allied Processes
OTHER REFERENCES
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph:
3.2 (UT measurements).
3.1.2 Tech Rep.
Not applicable.
13 (Rev-0)
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC STD Spec
0000, paragraph 3.3.5 (Interferences).
3.2 UT measurements. The Contractor shall perform a total of __1,000___ UT measurements of U/W hull surfaces, in locations designated by the Coast Guard Inspector, using Coast Guard Drawings 627 WMEC
085-302 and 627 WMEC 111-001 for guidance, in accordance with SFLC Std Spec 0740, Appendix C.
Mark up a copy of Coast Guard Drawing 627 WMEC 111-001 to show all locations selected for measurement and record all measurements in Table I (UT Measurements Summary Sheet - Port/Stbd
Shell) provided at the end of this item. Submit a CIR, to also include the marked up drawing and completed Table I.
4. NOTES
4.1 UT Table. Table 1 provided below is for the recording of all UT measurements.
14 (Rev-0)
TABLE 1 - UT MEASUREMENTS SUMMARY SHEET PORT/STBD SHELL
SHOT # STRAKE # FWD/MID/AFT ORIG PL MEASURED PL PERCENT
PLATE # TOP/MID/BOT THICKNESS THICKNESS WASTAGE
15 (Rev-0)
63130_0617_FLT
REC_63130_100Percent_FLT_210' WMEC (“B” Class) (0718)
WORK ITEM 2: U/W Body, Preserve (100%)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to preserve U/W body surfaces.
NOTES
1. The purpose of the preservation tasks covered by this item is to completely remove all existing coatings and recoat the U/W body surfaces with a new coating system.
2. U/W body surfaces are as defined in 4.1 (Definitions) and exclude areas covered by docking blocks, unless the vessel is fleeted for the express purpose of preserving blocked areas.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 627 WMEC 601-001, Rev F, Outboard Profile
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC STD Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2015, Solvent Cleaning
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
16 (Rev-0)
3.2.3 Post-surface preparation cleaning and inspection
3.1.2 Tech Rep. The Contractor shall refer to SFLC Std Spec 0000, paragraphs 3.2.4.2.1 (Painting contractor certification program requirement) and 3.2.4.2.2 (Coating Tech Rep), for applicable requirements.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness. Specific areas/equipment/components to be protected include, but are not limited to:
All scuppers and overboard discharges.
Waterline area where U/W body coating system interfaces with freeboard coating system
(unless freeboard surfaces are also being preserved).
Fathometer transducer surfaces.
Sea valve openings.
Propeller shaft bearings and seals.
Rudder bearings.
Propellers.
Zinc anodes (unless anodes are being renewed).
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
Sea chest grating.
NOTE
The hull fairings are not to be removed simply as an interference for 100% near white blasting unless found to be failing.
3.1.5 Initial inspection. Prior to removing the existing coating system, the Contractor shall inspect and verify whether all draft marks have permanent markings (weld beads or impressions), showing their location on the hull. Submit a CFR.
3.1.5.1 Fairing inspection. Prior to preservation preparation, inspect hull fairing condition. Submit a CFR.
3.1.6 Water used in preparation and washing procedures. The Contractor shall ensure that water used in all surface preparation tasks, including pre-surface preparation wash and water jetting, is of sufficient purity and quality that it does not prevent the surface being cleaned from achieving the required degree of surface cleanliness or non-visible contamination criteria.
3.1.6.1 Ensure that surface preparation water does not contain sediments or other impurities that are destructive to the proper functioning of the cleaning equipment.
3.1.6.2 Ensure that all water used in any surface…