ROBERT G WARD BLANK SCHEDULE OF SERVICE.xls
XLS spreadsheet 49 KB Posted
- Attached to
- CGC ROBERT WARD DSFY2070Z Federal contract opportunity
- Solicitation number
- 70Z080-20-Q-P4504800
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPECIFICATION FOR THE CGC ROBERT WARD.pdf | ||
| SOLICITATION FOR THE CGC ROBERT G. WARD.11FEB2020.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC ROBERT G. WARD (WPC-1130) DOCKSIDE AVAILABILITY FY2020 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | U/W Body (waterborne), Clean and Inspect | JOB | 1 | $0.00 | |
| D-002 | SSDG Heat Exchangers, Clean and Inspect | JOB | 1 | $0.00 | |
| D-003 | Watertight Closures, Assess | JOB | 1 | $0.00 | |
| D-004 | Electrical Power Distribution System, Thermographic Inspection (450 VAC And Below) | JOB | 1 | $0.00 | |
| D-005 | Machinery Ventilation System, Clean | JOB | 1 | $0.00 | |
| D-006 | HVAC Duct System, Clean | JOB | 1 | $0.00 | |
| D-007 | Sewage and Grey Water System, Clean and Inspect | JOB | 1 | $0.00 | |
| O-008 | Grey Water Tank, Preserve (Opt) | JOB | 1 | $0.00 | |
| D-009 | Interior Wet Deck Coverings, Reseal | JOB | 1 | $0.00 | |
| O-010 | Topside Exterior Surfaces, Preserve (Partial, Opt) | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 100 | ||
| D-00B | GFP Report | EA | |||
| D-00C | Travel and Perdiem | JOB | 1 | ||
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
&C(10/02/2019)
Rev-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate