AMEND-01_RFC-01.pdf

PDF 327 KB Posted

Attached to
USCGC BENJAMIN DAILEY DOCKSIDE Federal contract opportunity
Solicitation number
70Z080-19-Q-P4500400
Issued by
Department of Homeland Security US Coast Guard

About this file

Request for Clarification -RFC01

View the file

Other files for this federal contract opportunity

Other files attached to USCGC BENJAMIN DAILEY DOCKSIDE, newest first.
File Type Posted
SF30_AMEND_A00002_RFQ_70Z080-19-Q-P4500400_DAILEY_DS.pdf PDF
SF30_AMEND_A00001_RFQ_70Z080-19-Q-P4500400_DAILEY_DS.pdf PDF
SOLC_Benjamin_Dailey_P45004_FY19_DS_070918.pdf PDF
Attachment-1_SCHEDULE_FOR_BEN_DAILEY_DS.xlsx XLSX spreadsheet
Attachment-2_SPECIFICATION_-_BEN_DAILEY_DS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

70Z080-18-Q-P4500400

USCGC BENJAMIN DAILEY DS

RFC: 01

Work Item 5: Sewage & Grey Water System; Clean & Inspect

Paragraph 3.1.5 Temporary Services

QUESTION NO. One: For the purpose of accurately estimating the level of temporary sanitation facilities that will be required during the dockside repair availability how many Ship’s Force personnel will be on board the ship on a daily basis?

CG APM REPLY: The level of temporary facilities required for each Cutter type are designated by Standard Spec 0000, in paragraph 3.2.11.; Table II (page 16) and Table III (page 17) for specific numbers. The crew size will make no impact to the required number of sanitary facilities or portable toilets. There is, however, a stipulation in the standard spec that could make a difference to the number of sanitary facilities based on the crew gender (Reference standard spec 0000, paragraph 3.2.11.5). With regards to crew gender, CGC BENJAMIN DAILEY has a mixed gender crew.

*This will apply to Work Item # 6 (grey water tank, preserve) if *CLIN is activated.