Q&A

View the file

Other files for this federal contract opportunity

Other files attached to USCGC OSPREY WPB-87307 DOCKSIDE REPAIRS, newest first.
File Type Posted
SF30.doc DOC document
OSPREY_(WPB_87)_DS_FQ3_JEB_18R0_BLANK.xls XLS spreadsheet
OSPREY_(WPB_87)_DS_FQ3_JEB_18R0.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Work Item 1

1. What is the make and model of the engine be replaced?

Man Model D08241F01 diesel with Stanford 60KW Generator

2. Is the engine and generator set getting replaced the same as the one going in?

Yes it is the same make and model

3. Can the contractor be present during operation testing prior to engine and generator removal?

Yes KTR will be present for testing prior to engine and generator removal

4. Is there crane service available for the contractor to use during the removal and installation of the gen-set?

No. Crane service to be provided by contractor and Commercially contracted crane service must comply with all local USCG Facility crane operations requirements.

Work Item 2

1. Will the windows being replace be on site during the ship check for inspection?

New GFE windows will not be onsite during ship check but will be available for inspection upon start of availability

2. The spec does not mention about window seals and sealants? Is this being provided as GFP with the window?

Sealant is to be contracted provided and meet the requirements of applicable references

3. What is the weight of the windows being replaced?

Approximately 50-60 lbs. exact weight can be given upon award and transfer of GFE to contractor.

4. Spec says to accomplish a water test checking for leaks. Will the customer be willing to use LP 90 psi air and soap test in lieu of water for testing?

No. water testing required

Work Item 3

1. KTR has contacted the POC in the spec for the motor controllers. The vendors has stated the long-lead-time-material(LLTM) is 4-5 weeks fabricate and ship. can the POP be adjusted to accommodate the installation if needed?

Request to adjust POP can be submitted in the format of a CFR upon award of contract

2. When is the project award date?

OOA 26 Feb 2018

3. The spec does not say anything about motor controller removals. Is the contractor to assume this is a new install and not a replacement?

Yes this is a new install.

Work Item 4

1. drawing 593-004, PC #: 11. The part number does not match the GFP material list on the SOW, page 25. Can we confirm that this is still covered and correct part number for GFP?

Yes part being provided is correct all items are included in a kit. PN listed on SOW is a typo.