A00001,_QP4500200,_Questions_&_Responses.pdf
PDF 7 KB Posted
- Attached to
- Dockside maintenance repairs Federal contract opportunity
- Solicitation number
- 70Z080-18-Q-P4500200
About this file
A00001, Questions and Response, dated 8/21/2018
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A00001,_P4500200,_Specification,_CGC_DIAMOND_BACK_(WPB_87),_Rev1.pdf | ||
| A00001,_70Z08018QP4500200.pdf | ||
| 70Z08018QP45002000_Combined_Synopsis_Solicitation_CGC_DIAMONDBACK_DS.pdf | ||
| P4500200,_Schedule_of_Supplies_&_Services,_CGC_DIAMONDBACK.xls | XLS spreadsheet | |
| P4500200,_Specification,_CGC_DIAMOND_BACK_(WPB_87).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMBINED SYNOPSIS SOLICITATION 70Z08018Q-P4500200/ A00001
DOCKSIDE USCGC DIAMONDBACK
QUESTIONS AND RESPONSES
8/21/2018
Q1. Item 4 Interior Deck Covering Renew, needs clarification. Table 1 indicates that for the Passageway (2-5-0-L) and Mess Deck & Galley (2-9-2-Q, 2-9-1-Q) that Contractor is to replace the underlayment. Paragraph 3.3 below states that the Contractor is to Reseal versus Completely renew the deck area. Please confirm the intent is to reseal the area only?
R1. Intentions are to RENEW the Flooring. Section 3.3 references what kind of standard the flooring should be brought up to; 3.3 Epoxy flake system. The Contractor shall reseal, versus completely renew, the deck areas specified. Sand down the existing deck covering to the color layer to remove all discolorations and damage. Reapply color coat to obtain uniform color. Reapply sealers. Renew pc 7 of Coast Guard Drawing 87 WPB
634-001 (slip-resistant treads) where disturbed.
"CAUTION
Epoxy flake system is resealed over delicate joiner deck. Do not damage joiner deck during removal of top layer of existing deck material.
To minimize impact on cutter weight & moment, do not add excessive deck covering material, beyond what was removed. Make new deck covering thickness as close as practicable original, pre-resealed thickness."
Q2. Please forward the NAVSEA Drawing 813-1385866, Rev E, Penetration, Bulkhead
& Deck and Powergen Controls, SSDG System Replacement Project, Preliminary Mock-up Replacement Plan.
R2. The SSDG System Replacement Project, Preliminary Mock-up Replacement Plan is no longer referenced in the latest revision for that work item. It has been replaced by the
Description of System Operations (DOSO).
The NAVSEA Drawing 813-1385866, Rev-E, should be requested through
Magdalena.N.Pitre@uscg.mil no later than Friday, August 24, 2018 at 3pm ET.