697DCK-24-R-00298 Phuenix AZ Flagpole Installation Project.pdf
PDF 430 KB Posted
- Attached to
- Sky Harbour ATCT, Phoenix, AZ Flagpole Installation Project Federal contract opportunity
- Solicitation number
- 697DCK-24-R-00298
About this file
This document is a Solicitation for the Phoenix Sky Harbour ATCT Flagpole Installation Project. The Federal Aviation Administration (FAA) is seeking proposals from eligible small businesses to provide all labor, tools, equipment, materials, transportation, cleanup, and supervision required to complete the project, as outlined in the Statement of Work. The anticipated contract value is less than $50,000.
The solicitation is set aside for small businesses, with a NAICS code of 238990 - All Other Specialty Trade Contractors and a small business size standard of $19 million. A site visit is scheduled for April 9, 2024, and proposals are due by April 24, 2024. The FAA intends to award a single firm-fixed-price contract based on the lowest price technically acceptable offer. Questions and requests for information must be submitted by April 12, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 697DCK-24-R-00298 Amendment 5.pdf | ||
| 697DCK-24-R-00298 Amendment 4...pdf | ||
| 697DCK-24-R-00298 Amendment 3.pdf | ||
| 697DCK-24-R-00298 Amendment 2.pdf | ||
| PHX-19004858-C001-Rev1.pdf | ||
| 697DCK-24-R-00298 Amendment 1.pdf | ||
| PHX ATCT Flagpole Installation Statement of Work.docx | DOCX document | |
| General Decision Number AZ20240039 01.19.2024.pdf | ||
| PHX FLAGPOLE COST Breakdown.xlsx | XLSX spreadsheet | |
| PHX-19004858-C001.pdf | ||
| Supplemental Information.pdf | ||
| PHX-19004858-G001.pdf | ||
| PHX-19004858-G002.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
A. NAME B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder"
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED BID (RFP)
CS-24-00700
FEDERAL AVIATION ADMINISTRATION
AAQ-500 - REGIONAL ACQUISITIONS
1701 COLUMBIA AVENUE
COLLEGE PARK GA 30337
AAQ510ATL-AFN
regina.singleton@faa.gov
Regina Singleton 404-305-5790 x
03/22/2024 80
PURCHASE REQUEST NO.
697DCK-24-R-00298
10. THE CONTRACT AUTHORITY REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Phoenix Sky Harbour Airport ATCT
PHX ATCT Flagpole Installation Project
A single contract award will be made resulting from this Screening Information
Request (SIR) based on Lowest Price Technically Acceptable (LTPA) by way of the
Tiered Evaluation method.
NAICS Code: 238990
Small Business Size Standard $19 million
Estimated Project Cost Magnitude is less than $50,000.00.
Performance and Payment Bonds ARE NOT required for this requirement.
All submittals must be provided to the Government within 14 days of Contract Award and approved before issuance of the Notice to Proceed NTP.
Milestones:
Site visit attendee list due Monday, April 8, 2024, by 4:00pm MDT
Site visit date Tuesday, April 9, 2024, by 10:00am MDT
Continued ...
11. The Contractor shall begin performance within
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award notice to proceed. The performance period is mandatory, negotiable. (See ________________________________________________ .)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and is not required.is, B. An offer guarantee
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers must be publicly opened at that time . Sealed envelopes containing offers shall be marked to show the offeror's name and address. The solicitation number, and the date and time offers are due.
D. Offers providing less than
12B. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in item 12B.)
5 30 calendar days and complete it within ________________ ________________ calendar days after receiving
1 1700
AMS Clause 3.2.2.3-71
04/24/2024 x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Contract Authority acceptance after the date offers are due will not be considered and will _________________ be rejected.
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Contract Authority in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13D. Failure to insert any number means the offeror accepts the minimum in item 13D.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (MUST BE FULLY COMPLETED BY OFFEROR)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Contract Authority)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Contract Authority solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE 30C. DATE 31B. CONTRACT AUTHORITY 31C. AWARD DATE
BY
2PAGE OF
FEDERAL AVIATION ADMINISTRATION
AAQ-500 - REGIONAL ACQUISITIONS
1701 COLUMBIA AVENUE
COLLEGE PARK GA 30337
AAQ510ATL-AFN
Regina A. Singleton
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.)
Continued...
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 80
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
697DCK-24-R-00298
(A) (B) (C) (D) (E) (F)
Requests for Information and Questions are due
Friday, April 12, 2024, by 5:00pm EDT to regina.singleton@faa.gov
All Offers are due NLT Wednesday, April 24, 2024 at 5:00pm EDT to regina.singleton@faa.gov
Delivery: 5 Days After Notice to Proceed
Delivery Location Code: 4698288F
4698288F
698288 DOT FAA
PHOENIX TRACON ATCT
3500 E SKY HARBOR BLVD
PHOENIX AZ 850344400 US
00001 PHX ATCT Flagpole Installation
Phoenix, AZ 85034
Furnish and install 3 flagpoles with flags and accessories at the front of the main entrance of the building in accordance with the Statement of
Work and specifications.
Electronic & IT: 03
Contractor must provide all labor, material, transportation, and supervision for the project.
Contractor is required to purchase all necessary components perform all tasks and supply equipment to complete project.
The Notice to Proceed (NTP) will be issued to give notice when onsite work can be started and when the project is to be completed based upon the performance time stated in Clause 3.2.2.3-71
COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK. Prior to its issuance, the Contracting
Officer will ensure all required submittals are delivered to and approved by the FAA, that all required insurance and bonding documents have been submitted and are acceptable, and the materials and/or equipment are delivered to the site. Instead of a general notice, a Limited
Notice to Proceed (LNTP)may be issued after award to specify which portions of the work that the contractor should begin. For instance, to place
Continued ...
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
4 80
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
697DCK-24-R-00298
(A) (B) (C) (D) (E) (F) orders against the award or make onsite surveying and/or markings, or other necessary coordination efforts.
Section B - Supplies or Services/Prices Section B - Schedule
Furnish all labor, materials, equipment, transportation, insurance, notifications, licenses, permits, fees and supervision necessary for the Flagpole Installation Project located at Sky Harbour Airport ATCT, 3500 Sky Harbour Blvd, Phoenix, AZ 85034 in accordance with the Statement of Work, contract clauses, specifications, and wage rates. The offered price shall encompass all costs related to (a) direct and indirect labor, fringe benefits, overhead, G&A expenses, profit, material, equipment, other direct costs, insurance, freight, handling, transportation, inspection, testing, operation and maintenance manuals, bonds, etc., (b) federal, state, and local taxes, (c) all applicable fees permits, licenses, and (d) any miscellaneous charges.
An Offeror is required to provide a price for each contract line item (CLIN). Failure to comply may result in the rejection of the subject offer. A single award shall be made. There shall be no split award. In the event that the CLIN price for any line item is materially unbalanced, the entire offer may be rejected without discussion with the Offeror. In the event of any disparity between the CLIN price and the total offered price, the CLIN price shall be deemed correct, and the total offered amount shall be revised accordingly, unless available information indicates otherwise.
Effective April 1, 1996, the Federal Aviation Administration (FAA) began operating under the new FAA Acquisition Management System. The l996 DOT Appropriation Act, Public Law 104-50, mandated that the FAA rewrite its acquisition regulations and granted legislative relief from certain laws. The Federal Acquisition Regulations (FAR), Federal Acquisition Streamlining Act of 1994, Small Business Act, and Competition in Contracting Act, are three of these laws.
(End of Clause)
Clause List
The remainder of this page has been intentionally left blank.
Section C - Description/Specifications Scope of Work
Furnish all necessary supervision, labor, material, equipment, transportation, and services to perform Flagpole Installation Project located at Sky Harbour Airport ATCT, 3500 Sky Harbour Blvd, Phoenix, AZ 85034 in accordance with the Statement of Work(SOW), contract clauses, specifications, and Department of Labor Wage Rates shown in Section J.
Section D - Packaging and Marking
Section E - Inspection and Acceptance Clause List
3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)
This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:
https://fast.faa.gov/contractclauses.cfm.
(End of clause)
3.10.4-4 INSPECTION OF SERVICES - BOTH FIXED-PRICE & COST REIMBURSEMENT (APR
1996)
3.10.4-11 INSPECTION - DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS
(APR 1996)
3.10.4-10 INSPECTION OF CONSTRUCTION (SEP 2009)
(a) 'Work' includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not--
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) below.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.
(e) The Contractor shall promptly furnish, without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer.
The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless the Government determines that it is in the public interest to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may:
(1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or
(2) terminate for default the Contractor's right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.
(j) In the absence of any formal disputes, a project will be deemed physically and financially complete within one year after final acceptance and excess funds will be deobligated at that time.
(End of clause)
Section F - Deliveries or Performance Clause List
3.10.1-24 NOTICE OF DELAY (MAR 2009)
If the Contractor becomes unable to complete the contract work at the time(s) specified because of technical difficulties, notwithstanding the exercise of good faith and diligent efforts in the performance of the work called for hereunder, the contractor shall give the Contracting officer written notice of the anticipated delay and the reasons therefor. Such notice and reasons shall be delivered promptly after the condition creating the anticipated delay becomes known to the contractor, but in no event less than forty-five (45) days before the completion date specified in this contract, unless otherwise directed by the Contracting Officer. When notice is so required, the Contracting officer may extend the time specified in the Schedule for such period as deemed advisable.
(End of clause)
SA13 HOLIDAYS
The following Federal holidays are observed by the Federal Aviation Administration.
New Year's Day January 1st
Martin Luther King's Birthday Third Monday in January
Presidents Day Third Monday in February
Memorial Day Last Monday in May
Independence Day July 4th
Labor Day First Monday in September
Columbus Day Second Monday in October
Veterans Day November 11th
Thanksgiving Day Fourth Thursday in November
Christmas Day December 25th
Section G - Contract Administration Data Clause List
3.10.1-22 CONTRACTING OFFICER'S REPRESENTATIVE (APR 2012)
(a) The Contracting Officer may designate other Government personnel (known as the Contracting Officer's Representative) to act as his or her authorized representative for contract administration functions which do not involve changes to the scope, price, schedule, or terms and conditions of the contract. The designation will be in writing, signed by the Contracting Officer, and will set forth the authorities and limitations of the representative(s) under the contract. Such designation will not contain authority to sign contractual documents, order contract changes, modify contract terms, or create any commitment or liability on the part of the Government different from that set forth in the contract.
(b) The Contractor shall immediately contact the Contracting Officer if there is any question regarding the authority of an individual to act on behalf of the Contracting Officer under this contract.
(End of Clause)
Section H - Special Contract Requirements Clause List
3.1.9-1 ELECTRONIC COMMERCE AND SIGNATURE (JUL 2020)
(a) The Electronic Signatures in Global and National Commerce Act (E-SIGN) establishes a legal equivalence between:
(1) Contracts written on paper and contracts in electronic form;
(2) Pen-and-ink signatures and electronic signatures; and
(3) Other legally-required written records and the same information in electronic form.
(b) With the submission of an offer, the offeror acknowledges and accepts the utilization of electronic commerce as part of the requirements of this solicitation and the resultant contract.
(c) Certain documents may need to be provided or maintained in original form, such as large-scale drawings impractical to convert to electronic format or a document with a raised seal signifying authenticity. This clause does not change or affect any other requirements that a document must be in paper format to satisfy legal requirements such as for certain real estate transactions.
(d) The use of electronic signature technology is authorized under this solicitation and the resulting contract.
(e) Contractors must not digitally sign any documents with software that uses the Secure Hash Algorithm 1 (SHA- 1). All digitally signed documents and contracts sent to the FAA must use a SHA-256 or higher hash algorithm. This is based on the National Institute of Standards and Technology (NIST) Policy Statement on Hash Functions dated August 5, 2015. Further guidance on the use of SHA-256 is in NIST Special Publication (SP) 800-57 Part 1, section
5.6.2 as amended and SP 800-131A, Revision 1 dated November 6, 2015. Additional guidance on the use of SHA-3 is in NIST SP 800-185 as amended.
(f) Contractors do not have to update documents previously digitally signed using SHA-1 hash algorithms unless the document requires updating. The FAA and contractors may continue to use SHA-1 for the following applications:
Verifying old digital signatures and time stamps, generating and verifying hash-based message authentication codes (HMACs), key derivation functions (KDFs), and random bit/number generation.
(End of Clause)
Section I - Contract Clauses Clause List
3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)
This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:
https://fast.faa.gov/contractclauses.cfm.
(End of clause)
3.1.7-2 ORGANIZATIONAL CONFLICTS OF INTEREST (JAN 2023)
3.2.2.3-8 AUDIT AND RECORDS (JUL 2010)
3.2.2.3-42 DIFFERING SITE CONDITIONS (JUL 2004)
3.2.2.3-43 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (JUL 2004)
3.2.2.3-46 SUPERVISING THE CONTRACT WORK (JUL 2004)
3.2.2.3-48 OTHER CONTRACTS (MAR 2009)
3.2.2.3-49 PROTECTING EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES,
AND IMPROVEMENTS (JUL 2004)
3.2.2.3-50 PROPERTY PROTECTION (OCT 2014)
3.2.2.3-51 OPERATIONS AND STORAGE AREAS (APR 2012)
3.2.2.3-53 CLEANING UP AND ROADWAY MAINTENANCE (JUL 2004)
3.2.2.3-54 PREVENTING ACCIDENTS (JUL 2004)
3.2.2.3-55 AVAILABILITY AND USE OF UTILITY SERVICES (JUL 2004)
3.2.2.3-60 SPECIFICATIONS, DRAWINGS, AND MATERIAL OFFERS (MAR 2009)
3.2.2.3-67 SPECIAL PRECAUTIONS FOR WORK AT OPERATING AIRPORTS (APR 2022)
3.2.2.3-83 PROHIBITION AGAINST CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS (OCT 2015)
3.2.2.7-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (APR 2023)
3.2.2.7-8 DISCLOSURE OF TEAM ARRANGEMENTS (APR 2008)
3.2.4-34 OPTION TO EXTEND SERVICES (OCT 2019)
3.2.5-1 OFFICIALS NOT TO BENEFIT (APR 2021)
3.2.5-3 GRATUITIES OR GIFTS (OCT 2019)
3.2.5-4 CONTINGENT FEES (OCT 1996)
3.2.5-5 ANTI-KICKBACK PROCEDURES (OCT 2019)
3.2.5-8 WHISTLEBLOWER PROTECTION FOR CONTRACTOR EMPLOYEES (APR 1996)
3.3.1-2 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (JUL 2018)
3.3.1-9 INTEREST (APR 2023)
3.3.1-19 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2021)
3.3.1-20 PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS SUBCONTRACTORS
(OCT 2012)
3.3.1-34 PAYMENT BY ELECTRONIC FUNDS TRANSFER- SYSTEM FOR AWARD
MANAGEMENT (JUL 2018)
3.4.1-10 INSURANCE - WORK ON A GOVERNMENT INSTALLATION (OCT 2020)
3.4.2-6 TAXES - CONTRACTS PERFORMED IN U.S. POSSESSIONS OR PUERTO RICO (OCT
1996)
3.4.2-8 FEDERAL, STATE, AND LOCAL TAXES - FIXED PRICE CONTRACT (JUL 2019)
3.5-1 AUTHORIZATION AND CONSENT (APR 2023)
3.6.1-1 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2019)
3.6.1-3 UTILIZATION OF SMALL, SMALL DISADVANTAGED, WOMEN-OWNED, SERVICE-
DISABLED VETERAN OWNED, AND HUBZONE SMALL BUSINESS CONCERNS (JAN 2021)
3.6.1-4 SMALL BUSINESS SUBCONTRACTING PLAN (JAN 2024)
3.6.1-11 MENTOR-PROTEGE REQUIREMENTS AND EVALUATION (JAN 2024)
3.6.1-15 POST-AWARD SMALL BUSINESS PROGRAM RE-REPRESENTATION (JUL 2023)
3.6.1-18 NOTICE OF HUBZONE SET-ASIDE OR NONCOMPETITIVE AWARD (JAN 2024)
3.6.1-19 NOTICE OF SET-ASIDE, OR NONCOMPETITIVE AWARD TO WOMEN-OWNED SMALL
BUSINESS CONCERNS ELIGIBLE UNDER THE WOMEN-OWNED SMALL BUSINESS
PROGRAM (JAN 2024)
3.6.1-20 NOTICE OF SET-ASIDE FOR, OR NONCOMPETITIVE AWARD TO, ECONOMICALLY
DISADVANTAGED WOMEN-OWNED SMALL BUSINESS CONCERNS ELIGIBLE UNDER THE
WOMEN-OWNED SMALL BUSINESS PROGRAM (JAN 2024)
3.6.1-21 NOTICE OF SMALL DISADVANTAGED BUSINESS SET-ASIDE (APR 2023)
3.6.2-2 CONVICT LABOR (APR 1996)
3.6.2-9 EQUAL OPPORTUNITY (JUL 2023)
3.6.2-12 EQUAL OPPORTUNITY FOR VETERANS (APR 2022)
3.6.2-13 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (APR 2022)
3.6.2-16 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (OCT 2018)
3.6.2-18 DAVIS BACON ACT (JUL 2023)
3.6.2-19 WITHHOLDING-LABOR VIOLATIONS (JUL 2023)
3.6.2-21 APPRENTICES, TRAINEES, AND HELPERS (JUL 2023)
3.6.2-22 SUBCONTRACTS (LABOR STANDARDS) (JUL 2023)
3.6.2-35 PREVENTION OF SEXUAL HARASSMENT (JUL 2023)
3.6.2-39 TRAFFICKING IN PERSONS (JUL 2023)
3.6.3-13 AFFIRMATIVE PROCUREMENT OF RECYCLED CONTENT AND PRODUCTS UNDER
SERVICE AND CONSTRUCTION CONTRACTS (JAN 2020)
3.6.3-14 USE OF ENVIRONMENTALLY PREFERABLE PRODUCTS (JAN 2020)
3.6.3-17 EFFICIENCY IN ENERGY-CONSUMING PRODUCTS (JAN 2020)
3.6.3-23 DELIVERY OF ELECTRONIC AND PAPER DOCUMENTS (JAN 2020)
3.6.3-25 AEROSOLS (OCT 2016)
3.6.3-26 FOAMS (OCT 2016)
3.6.4-10 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JAN 2010)
3.6.4-11 INCONSISTENCY BETWEEN ENGLISH VERSION AND TRANSLATION OF CONTRACT
(APR 1996)
3.6.6-1 DRUG FREE WORKPLACE (APR 2023)
3.6.6-2 SEAT BELT USE BY CONTRACTOR EMPLOYEES (APR 2023)
3.6.6-3 CONTRACTOR POLICY TO BAN TEXT MESSAGING WHILE DRIVING (JUL 2023)
3.9.1-1 CONTRACT DISPUTES (JAN 2020)
3.9.1-2 PROTEST AFTER AWARD (AUG 1997)
3.10.1-7 BANKRUPTCY (APR 1996)
3.10.1-8 SUSPENSION OF WORK (SEP 1998)
3.10.1-25 NOVATION AND CHANGE-OF-NAME AGREEMENTS (OCT 2007)
3.10.1-28 CHANGES REQUIRED BY AMS (JAN 2024)
3.10.6-6 DEFAULT (FIXED PRICE CONSTRUCTION) (OCT 1996)
3.2.2.3-33 ORDER OF PRECEDENCE (MAR 2009)
The order of precedence is:
(a) The Schedule (excluding the specifications);
(b) Representations;
(c) Contract clauses;
(d) Other documents, exhibits, and attachments;
(e) The specifications; and
(f) The drawings.
(End of clause or provision)
3.2.2.3-41 PERFORMING WORK (JUL 2004)
The Contractor (you) must perform, using your own organization, work equivalent to at least 25 percent of the total amount of work under the contract on the site. The CO may modify this contract to reduce this percentage if you request a reduction and the CO determines that it would be to the Government's advantage to do so.
(End of clause)
3.2.2.3-56 SCHEDULES FOR CONSTRUCTION CONTRACTS (JUL 2004)
(a) The Contractor (you) must, within five days after the work on the contract starts or after another period determined by the Contracting Officer (CO), prepare and submit to the CO for approval three copies of a practicable schedule showing the order in which you propose to perform the work, and the dates you plan to start and finish the important stages of the work (including acquiring materials, plant, and equipment). The schedule must be in a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion during the contract period. If you do not submit a schedule within the time prescribed, FAA (us) may withhold payments until you submit the schedule. If you fall behind your schedule, you must send a revised schedule with your next request for payment. Provide us additional schedules as soon as practicable if the CO requests them.
(b) With each payment request, submit a copy of the last schedule you submitted, annotated to show progress to date. If at any time, in the CO's opinion, you have fallen behind the schedule to an extent which would jeopardize timely completion, you must take steps to improve progress, including those the CO may require, to enable timely completion without additional cost to us. The CO may require you to increase the number of shifts, the amount of overtime, days of work each week, or the amount of constructor plant being used. You must submit any supplementary schedules the CO deems necessary to demonstrate how you will regain the rate of progress necessary for timely completion.
(c) If you fail to comply with the CO's requirements under this clause, the CO may determine that you are not performing the work with enough diligence to ensure completing it within the time the contract requires. If the CO makes this determination, the CO may terminate this contract for default.
(End of clause)
3.2.2.3-66 CONTRACTOR'S DAILY LOG (OCT 2014)
The Contractor (you) must submit a "Daily Log." You must complete the forms daily and deliver them to the designated FAA Contracting Officer's (CO) Representative. The forms must include, but is not limited to, workers by classification, construction equipment moved on and off the site, materials and equipment delivered to the site, inspections and tests performed, and total cumulative hours worked.
(End of clause)
3.2.2.3-71 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (OCT 2021)
The Contractor must (a) begin work under this contract within 5 calendar days after the date you receive the notice to proceed, (b) perform the work diligently, and (c) complete the entire work ready for use not later than 30 days.
The time allowed for completion must include final cleanup of the premises.
(End of clause)
3.3.1-17 PROMPT PAYMENT (JAN 2021)
As indicated below, different language in this clause applies depending on whether standard prompt payment invoicing procedures apply per AMS Guidance T3.3.1A.14, or eInvoicing prompt payment procedures apply based on clause 3.3.31-40 "Electronic Submission of Payment Requests" and AMS Guidance T3.3.1A.15.
Notwithstanding any other payment clause in this contract, the Government will make invoice payments and contract financing payments under the terms and conditions specified in this clause. Payment will be considered as being made on the day a check is dated or an electronic funds transfer is made. All days referred to in this clause are calendar days, unless otherwise specified.
STANDARD PROMPT PAYMENT INVOICING PROCEDURES
(a) Invoice Payments.
(1) For purposes of this clause, invoice payment means a Government disbursement of monies to a Contractor under a contract or other authorization for supplies or services accepted by the Government. This includes payments for partial deliveries that have been accepted by the Government, final payments under T&M and labor-hour contracts, and final cost or fee payments where amounts owed have been settled between the Government and the Contractor.
(2) Except as indicated in subparagraph (a)(3) and paragraph (c) of this clause, the due date for making invoice payments by the designated payment office will be the later of the following two events:
(i) The 30th day after the designated billing office has received a proper invoice from the Contractor.
(ii) The 30th day after Government acceptance of supplies delivered or services performed by the Contractor. On a final invoice where the payment amount is subject to contract settlement actions, acceptance will be deemed to have occurred on the effective date of the contract settlement. However, if the designated billing office fails to annotate the invoice with the actual date of receipt, the invoice payment due date will be deemed to be the 30th day after the date the Contractor's invoice is dated, provided a proper invoice is received and there is no disagreement over quantity, quality, or Contractor compliance with contract requirements.
(iii) For all invoices under contracts with small businesses, "30th day" as indicated in subdivisions (a)(2)(i) and (a)(2)(ii) of this clause is changed to "15th day" to the extent practicable. This does not change whether interest is owed in accordance with subparagraphs (a)(4) through (a)(6) below. Interest will not be owed unless payment is not made within 30 days of becoming due.
(3) An invoice is the Contractor's bill or written request for payment under the contract for supplies delivered or services performed. An invoice must be prepared and submitted to the designated billing officer specified in the contract. A proper invoice must include the items listed in subdivisions (a)(3)(i) through (a)(3)(ix) of this clause. If the invoice does not comply with these requirements, then the Contractor will be notified of the defect within 7 days after receipt of the invoice at the designated billing office. Untimely notification will be taken into account in the computation of any interest penalty owed the Contractor in the manner described in subparagraph (a)(6) of this clause.
(i) Name and address of the Contractor.
(ii) Invoice date.
(iii) Contract number or other authorization for supplies delivered or services performed (including order number and contract line item number).
(iv) Description, quantity, unit of measure, unit price, and extended price of supplies delivered or services performed and applicable contract line item.
(v) Shipping and payment terms (e.g., shipment number and date of shipment, prompt payment discount terms). Bill of lading number and weight of shipment will be shown for shipments on Government bills of lading.
(vi) Name and address of Contractor official to whom payment is to be sent (must be the same as that in the contract or in a proper notice of assignment).
(vii) Name (where practicable), title, phone number and mailing address of person to be notified in event of a defective invoice.
(viii) Vendor invoice number, account number and/or any other identifying number agreed under the contract.
(ix) Any other information or documentation required by other requirements of the contract (such as evidence of shipment).
(4) An interest penalty will be paid automatically by the Government, without request from the contractor, if payment is not made by the due date and the conditions listed in subdivisions (a)(4)(i) through (a)(4)(iii) of this clause are met, if applicable.
(i) A proper invoice was received by the designated billing office.
(ii) A receiving report or other Government documentation authorizing payment was processed and there was no disagreement over quantity, quality, or contractor compliance with any contract term or condition.
(iii) In the case of a final invoice for any balance of funds due the Contractor for supplies delivered or services performed, the amount was not subject to further contract settlement actions between the Government and the Contractor.
(5) The interest penalty will bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate will be the interest rate established by the Secretary of the Treasury, referred to as the 'Renegotiation Board Interest Rate,' (It is published in the Federal Register semiannually on or about January 1 and July 1), which is applicable to the period in which the amount becomes due. The interest penalty amount, interest rate and the period for which the interest penalty was computed, will be separately stated by the designated payment office on the check, in accompanying remittance advice, or, in the case of wire transfers, by an appropriate electronic data message accompanying the wire transfer. If the designated billing office failed to notify the Contractor of a defective invoice within the periods prescribed in subparagraph (a)(3) of this clause, then the due date on the corrected invoice will be adjusted by subtracting the number of days taken beyond the prescribed notification of defects period. Any interest penalty owed the Contractor will be based on this adjusted due date.
Adjustments will be made by the designated payment office for errors in calculating interest penalties, if requested by the Contractor.
(i) For the sole purpose of computing an interest penalty that might be due the contractor, Government acceptance will be deemed to have occurred constructively on the 7th day (unless otherwise specified in this contract) after the contractor delivered the supplies or performed the services in accordance with the terms and conditions of the contract, unless there is a disagreement over quantity, quality, or contractor compliance with a contract provision. In the event that actual acceptance occurs within the constructive acceptance period, the determination of an interest penalty will be based on the actual date of acceptance. The constructive acceptance requirement does not, however, compel Government officials to accept supplies or services, perform contract administration functions, or make payment prior to fulfilling their responsibilities.
(ii) The following periods of time will not be included in the determination of an interest penalty:
(A) The period taken to notify the Contractor of defects in invoices submitted to the Government, but this may not exceed 7 days.
(B) The period between the defects notice and resubmission of the corrected invoice by the Contractor.
(C) Any period of delay caused by incorrect electronic funds transfer (EFT) information, in accordance with the EFT clause of this contract.
(iii) Interest penalties will not continue to accrue after the filing of a claim for such penalties under Federal Aviation Administration (FAA) contract disputes resolution procedures. Interest penalties of less than $1.00 need not be paid.
(iv) Interest penalties will not accrue for more than one year.
(v) Interest penalties are not required on payment delays due to disagreement between the Government and Contractor over the payment amount or other issues involving contract compliance or on amounts temporarily withheld or retained in accordance with the terms of the contract. Contract disputes, and any interest that may be payable, will be resolved in accordance with FAA contract disputes resolution procedures.
(6) An interest penalty will also be paid automatically by the designated payment office, without request from the contractor, if a discount for prompt payment is taken improperly. The interest penalty will be calculated as described in subparagraph (a)(5) of this clause on the amount of discount taken for the period beginning with the first day after the end of the discount period through the date when the contractor is paid.
(b) Contract Financing Payments.
(1) For purposes of this clause, contract financing payments mean Government disbursements of monies to a Contractor under a contract clause or other authorization without regard to acceptance of supplies or services by the Government. Contract financing payments include but are not limited to payments made according to commercial terms and installment payments. They also include interim vouchers under T&M, labor-hour, and cost reimbursement contracts (regardless of whether goods or services were delivered and received by the Government).
(2) For contracts that provide for contract financing payments, requests for payment must be submitted to the designated billing office as specified in this contract or as directed by the Contracting Officer. Payments will be made on the 30th day after receipt of a proper payment request by the designated billing office. In the event that an audit or other review of a specific payment request is required to ensure compliance with the terms and conditions of the contract, the designated payment office is not compelled to make payment by the due date specified.
(3) Contract financing payments, except for interim vouchers for services under T&M, labor hour, or cost reimbursement contracts, will not be assessed an interest penalty for payment delays.
(4) For purposes of computing late payment interest penalties for interim vouchers for services under T&M, labor hour, or cost reimbursement contracts, the due date for payment is the 30th day after FAA receives a proper invoice.
If the invoice is found to be improper, it will be returned within 7 days after the date FAA receives the invoice.
(c) If this contract contains the Fast Payment Procedures, payments will be made within 15 days after the date of receipt of the invoice.
ELECTRONIC INVOICING (eInvoicing) PROMPT PAYMENT PROCEDURES
(d) Invoice Payments.
(1) For purposes of this clause, invoice payment means a Government disbursement of monies to a Contractor under a contract or other authorization for supplies or services accepted by the Government. This includes payments for partial deliveries that have been accepted by the Government, final payments under T&M and labor-hour contracts, and final cost or fee payments where amounts owed have been settled between the Government and the Contractor.
(2) Except as indicated in subparagraph (d)(3) and paragraph (f) of this clause, the due date for making invoice payments by the designated payment office will be the later of the following two events:
(i) The 30th day after the Delphi eInvoicing web portal has received a proper invoice from the Contractor.
(ii) The 30th day after Government acceptance of supplies delivered or services performed by the Contractor. On a final invoice where the payment amount is subject to contract settlement actions, acceptance will be deemed to have occurred on the effective date of the contract settlement..
(iii) For all invoices under contracts with small businesses, "30th day" as indicated in subdivisions (d)(2)(i) and (d)(2)(ii) of this clause is changed to "15th day" to the extent practicable. This does not change whether interest is owed in accordance with subparagraphs (d) (4) through (a) (6) below. Interest will not be owed unless payment is not made within 30 days of becoming due.
(3) An invoice is the Contractor's bill or written request for payment under the contract for supplies delivered or services performed. An invoice must be prepared and submitted to the Delphi eInvoicing web portal for processing.
A proper invoice must include the items listed in part (d) of clause AMS 3.3.1-40 "Electronic Submission of Payment Requests". If the invoice does not comply with these requirements, then the Contractor will be notified by the Contracting Officer in Delphi of the defect within 7 days after receipt of the invoice at the Delphi eInvoicing web portal. Untimely notification will be taken into account in the computation of any interest penalty owed the Contractor in the manner described in subparagraph (d) (6) of this clause.
(4) An interest penalty will be paid automatically by the Government, without request from the contractor, if payment is not made by the due date and the conditions listed in subdivisions (d) (4) (i) through (d) (4) (iii) of this clause are met, if applicable.
(i) A proper invoice was received by the Delphi eInvoicing web portal.
(ii) A receiving report or other Government documentation authorizing payment was processed and there was no disagreement over quantity, quality, or contractor compliance with any contract term or condition.
(iii) In the case of a final invoice for any balance of funds due the Contractor for supplies delivered or services performed, the amount was not subject to further contract settlement actions between the Government and the Contractor.
(5) The interest penalty will bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate will be the interest rate established by the Secretary of the Treasury, referred to as the 'Renegotiation Board Interest Rate,' (It is published in the Federal Register semiannually on or about January 1 and July 1), which is applicable to the period in which the amount becomes due. The interest penalty amount, interest rate and the period for which the interest penalty was computed, will be separately stated by the designated payment office on the check, in accompanying remittance advice, or, in the case of wire transfers, by an appropriate electronic data message accompanying the wire transfer. If the Contracting Officer failed to notify the Contractor in Delphi of a defective invoice within the periods prescribed in subparagraph (d)(3) of this clause, then the due date on the corrected invoice will be adjusted by subtracting the number of days taken beyond the prescribed notification of defects period. Any interest penalty owed the Contractor will be based on this adjusted due date. Adjustments will be made by the designated payment office for errors in calculating interest penalties, if requested by the Contractor.
(i) For the sole purpose of computing an interest penalty that might be due the contractor, Government acceptance will be deemed to have occurred constructively on the 7th day (unless otherwise specified in this contract) after the contractor delivered the supplies or performed the services in accordance with the terms and conditions of the contract, unless there is a disagreement over quantity, quality, or contractor compliance with a contract provision. In the event that actual acceptance occurs within the constructive acceptance period, the determination of an interest penalty will be based on the actual date of acceptance. The constructive acceptance requirement does not, however, compel Government officials to accept supplies or services, perform contract administration functions, or make payment prior to fulfilling their responsibilities.
(ii) The following periods of time will not be included in the determination of an interest penalty:
(A) The period taken to notify the Contractor of defects in invoices submitted to the Government, but this may not exceed 7 days.
(B) The period between the defects notice and resubmission of the corrected invoice by the Contractor.
(C) Any period of delay caused by incorrect electronic funds transfer (EFT) information, in accordance with the EFT clause of this contract.
(iii) Interest penalties will not continue to accrue after the filing of a claim for such penalties under Federal Aviation Administration (FAA) contract disputes resolution procedures. Interest penalties of less than $1.00 need not be paid.
(iv) Interest penalties will not accrue for more than one year.
(v) Interest penalties are not required on payment delays due to disagreement between the Government and Contractor over the payment amount or other issues involving contract compliance or on amounts temporarily withheld or retained in accordance with the terms of the contract. Contract disputes, and any interest that may be payable, will be resolved in accordance with FAA contract disputes resolution procedures.
(6) An interest penalty will also be paid automatically by the designated payment office, without request from the contractor, if a discount for prompt payment is taken improperly. The interest penalty will be calculated as described in subparagraph (d)(5) of this clause on the amount of discount taken for the period beginning with the first day after the end of the discount period through the date when the contractor is paid.
(e) Contract Financing Payments.
(1) For purposes of this clause, contract financing payments mean Government disbursements of monies to a Contractor under a contract clause or other authorization without regard to acceptance of supplies or services by the Government. Contract financing payments include but are not limited to payments made according to commercial terms and installment payments. They also include interim vouchers under T&M, labor-hour, and cost reimbursement contracts (regardless of whether goods or services were delivered and received by the Government).
(2) For contracts that provide for contract financing payments, requests for payment must be submitted via the Delphi eInvocing web portal as specified in this contract or as directed by the Contracting Officer. Payments will be made on the 30th day after receipt of a proper payment request via the Delphi eInvoicing web portal. In the event that an audit or other review of a specific payment request is required to ensure compliance with the terms and conditions of the contract, the designated payment office is not compelled to make payment by the due date specified.
(3) Contract financing payments, except for interim vouchers for services under T&M, labor hour, or cost reimbursement contracts, will not be assessed an interest penalty for payment delays.
(4) For purposes of computing late payment interest penalties for interim vouchers for services under T&M, labor hour, or cost reimbursement contracts, the due date for payment is the 30th day after FAA receives a proper invoice.
If the invoice is found to be improper, it will be returned within 7 days after the date FAA receives the invoice.
(f) If this contract contains the Fast Payment Procedures, payments will be made within 15 days after the date of receipt of the invoice.
(End of Clause)
3.3.1-33 SYSTEM FOR AWARD MANAGEMENT (JAN 2024)
(a) Definitions. As used in this clause
"Registered in the SAM database" means that the Contractor has entered all mandatory information, including the Unique Identity Identifier (UEI) or the Electronic Funds Transfer indicator, into the SAM database.
"System for Award Management (SAM) database" means the primary Government repository for Contractor information required for the conduct of business with the Government.
"Unique Entity Identifier (UEI)" (also known as the Unique Entity ID) means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.
"Electronic Funds Transfer indicator" means a 4-character suffix to the Unique Entity Identifier. This 4-character suffix may be assigned at the discretion of the business concern to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts for the same parent concern.
(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee must be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The offeror must enter, in Representations, Certifications and Other Statements of Offerors Section of the solicitation, the UEI or EFT indicator that identifies the offeror's name and address exactly as stated in the offer. The UEI will be used by the Contracting Officer to verify that the offeror is registered in the SAM database.
(c) If the offeror does not have a UEI, it should contact www.sam.gov directly to obtain one.
The offeror should be prepared to provide the following information:
(1) Company legal business name.
(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(3) Company Physical Street Address, City, State, and ZIP Code.
(4) Company Mailing Address, City, State and ZIP Code (if different from physical street address).
(5) Company Telephone Number.
(6) Date the company was started.
(7) Number of employees at your location.
(8) Chief executive officer/key manager.
(9) Line of business (industry).
(10) Company Headquarters name and address (reporting relationship within your entity).
(d) If the offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer may proceed to award to the next otherwise successful registered offeror.
(e) Processing time should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.
(f) The Contractor is responsible for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and complete.